You are on page 1of 3

Job No Sheet No Rev

N° Cliente: 3 1
25800-220-V1A-MLGT-00115
DDR: 110 Part Ø43 m Elevated Steel Sc Bottom Tank
Software licensed to
Job Title Ø43 m Bulk Rotated Conc Elevated Steel Sc Bottom Tank Ref 43000 dia. x 2400 SWH 1.84 Sgu 6920 mud elev STAAD Tank Inpu
By JDN Date8/11/2016 Chd
8:16:12 AM
Client JOB NO Quebrada Blanca II Drum Discharge, Lrg Dia, High Seismic File Date/Time
43000 dia. x 2400 TSWH 1.84 SGu08-Nov-2017
6925 Mud Elev.
14:14
Tank Input with

Y
X
Z
Load 1

There are four pinned nodes


that differ from all the others,
why?
Whole Structure
Central reaction shall have
axial, shear and moment
recations. Check it.

FLS to check nodes boundary


conditions and reported reaction
at central discharge point. To
confirm if the seismic forces of
the bridge have considered the
vertical distribution of NCh 2369

Print Time/Date: 13/12/2017 11:37 STAAD.Pro V8i (SELECTseries 6) 20.07.11.50 Print Run 3 of 5
Job No Sheet No Rev
4 1

Part Ø43 m Elevated Steel Sc Bottom Tank


Software licensed to
Job Title Ø43 m Bulk Rotated Conc Elevated Steel Sc Bottom Tank Ref 43000 dia. x 2400 SWH 1.84 Sgu 6920 mud elev STAAD Tank Inpu
By JDN Date8/11/2016 Chd
8:16:12 AM
Client JOB NO Quebrada Blanca II Drum Discharge, Lrg Dia, High Seismic File Date/Time
43000 dia. x 2400 TSWH 1.84 SGu08-Nov-2017
6925 Mud Elev.
14:14
Tank Input with

Y Has the mass of the bridge being


X
Z incorporated inLoad
this
1
model, and
corresponding seismic shear
force being vertically distributed
as per NCh 2369?
Structural Elements

Print Time/Date: 13/12/2017 11:37 STAAD.Pro V8i (SELECTseries 6) 20.07.11.50 Print Run 4 of 5
Job No Sheet No Rev
5 1

Part Ø43 m Elevated Steel Sc Bottom Tank


Software licensed to
Job Title Ø43 m Bulk Rotated Conc Elevated Steel Sc Bottom Tank Ref 43000 dia. x 2400 SWH 1.84 Sgu 6920 mud elev STAAD Tank Inpu
By JDN Date8/11/2016 Chd
8:16:12 AM
Client JOB NO Quebrada Blanca II Drum Discharge, Lrg Dia, High Seismic File Date/Time
43000 dia. x 2400 TSWH 1.84 SGu08-Nov-2017
6925 Mud Elev.
14:14
Tank Input with

Structural Elements Discharge Close Up

Print Time/Date: 13/12/2017 11:37 STAAD.Pro V8i (SELECTseries 6) 20.07.11.50 Print Run 5 of 5