Professional Documents
Culture Documents
Areva PDF
Areva PDF
F1 F2
Argues
There are fewer faults on busbars than on other parts of the
power system.
No risk of dislocation of system due to accidental operation of
busbar protection.
2 05/02/03
08/02 2
Without Busbar Protection
F1 F2
Drawbacks
Slow fault clearance.
Busbar faults at F1 and F2 are cleared by remote time
delayed protection on circuits feeding the faults:
Time Delayed Overcurrent or
Time Delayed Distance Protection
3 05/02/03
08/02 3
With Busbar Protection
BUSBAR
ZONE
F1
4 05/02/03
08/02 4
With Busbar Protection
BUSBAR
ZONE
F1 F2
5 05/02/03
08/02 5
With Busbar Protection
1/2
SS SS SS
1 87BB 2 3
87BB
21 21
6 05/02/03
08/02 6
With Busbar Protection
2/2
87BB
87BB
21 21
7 05/02/03
08/02 7
With No Busbar Protection
1/2
21 21 21
21 21
8 05/02/03
08/02 8
With No Busbar Protection
2/2
21 21 21
21 21
9 05/02/03
08/02 9
With Burbar protection
87BB
87BB
21 21
21 21 21
21 21
1005/02/03
08/02 10
Busbar Faults Are Usually Permanent
Insulation failures
Circuit breaker failures
Current transformer failures
Isolators switchs operated on load or outside their ratings
Safety earths left connected
Therefore :
Circuit breakers should be tripped and locked out by busbar
protection
1105/02/03
08/02 11
Busbar Protection must be :
RELIABLE
– Failure to trip could cause widespread damage to the substation
STABLE
– False tripping can cause widespread interruption of supplies to
customers / possible power system instability
DISCRIMINATING
– Should trip the minimum number of breakers to clear the fault
FAST
– To limit damage and possible power system instability
1205/02/03
08/02 12
Methods of Providing Busbar Protection
Frame to Earth (Leakage) Protection
>I
Insulation
1305/02/03
08/02 13
Frame Leakage Protection
>I
Insulation
1505/02/03
08/02 15
Frame Leakage Busbar Protection
>I
1605/02/03
08/02 16
Frame Leakage Busbar Protection
>I
1705/02/03
08/02 17
Frame Leakage Busbar Protection
>I >I
1805/02/03
08/02 18
Frame Leakage Busbar Protection
1905/02/03
08/02 19
Frame Leakage Busbar Protection
Neutral Check
False Operation
because induced
loop
>I
>I
No operation
prevents from
2005/02/03
08/02 false trip 20
Frame Leakage Busbar Protection
Neutral Check
>I
>I
2105/02/03
08/02 21
Frame Leakage Busbar Protection
Neutral Check
>I
>I
2205/02/03
08/02 22
Blocking Scheme Protection
2405/02/03
08/02 24
Blocking Scheme Busbar Protection
2505/02/03
08/02 25
Blocking Scheme Busbar Protection
2605/02/03
08/02 26
High Impedance Protection
2805/02/03
08/02 28
Single Bus Substation
P1 S1 P1 S1 P1 S1
P2 S2 P2 S2 P2 S2
2905/02/03
08/02 29
Single Bus Substation
3005/02/03
08/02 30
Single Bus Substation
3105/02/03
08/02 31
Single Bus Substation
3205/02/03
08/02 32
Double Bus Substation
3305/02/03
08/02 33
Isolator Auxiliary Switches
Current switching
Bus A
Bus B
P1 S1
P2 S2
P1 S1 P1 S1 P1 S1 P2 S2
P2 S2 P2 S2 P2 S2 P1 S1
a Current
b
3405/02/03
08/02 34
Isolator Auxiliary Switches
Current switching
Bus A
Bus B
Current
a
b
3505/02/03
08/02 35
Isolator Auxiliary Switches
Current switching
Bus A
Bus B
a Current
b
3605/02/03
08/02 36
Isolator Auxiliary Switches
Current switching
Bus A
Bus B
Current
a
b
3705/02/03
08/02 37
Isolator Auxiliary Switches
Current switching
Bus A
Bus B
a Current
b
3805/02/03
08/02 38
Isolator Auxiliary Switches
Current switching
Bus A
Bus B
a Current
b
3905/02/03
08/02 39
Isolator Auxiliary Switches
Tripping switching
Bus A
Bus B
Tripping a
b
a
Current b
4005/02/03
08/02 40
Interposing CT are not acceptable
4105/02/03
08/02 41
Isolator Auxiliary Switches
Current switching
Bus A
Bus B
a
Current b
4205/02/03
08/02 42
Isolator Auxiliary Switches
Current switching
Bus A Bus A
Bus B Bus B
a a
Current b Current b
4305/02/03
08/02 43
Isolator Auxiliary Switches
On Load Transfer
Bus A
Bus B
a
Current b
4405/02/03
08/02 44
Isolator Auxiliary Switches
On Load Transfer
Bus A
Bus B
a
Current b
4505/02/03
08/02 45
Isolator Auxiliary Switches
On Load Transfer
Bus A
Bus B
a
Current b
4605/02/03
08/02 46
Isolator Auxiliary Switches
On Load Transfer
Bus A
Bus B
a
Current b
4705/02/03
08/02 47
Isolator Auxiliary Switches
On Load Transfer
Bus A
Bus B
Current a
b
4805/02/03
08/02 48
Isolator Auxiliary Switches
On Load Transfer
Bus A
Bus B
a
Current b
4905/02/03
08/02 49
Isolator Auxiliary Switches
On Load Transfer
Bus A
Bus B
a
Current b
5005/02/03
08/02 50
Isolator Auxiliary Switches
Check Zone
Bus A
Bus B
Trip Bus A
Trip Bus B
Zone A
Zone B
5105/02/03
08/02 51
Isolator Auxiliary Switches
Check Zone
Bus A
Bus B
Trip Bus A
Trip Bus B
Current
switching
failure
Zone A
Zone B
False
Tripping
5205/02/03
08/02 52
Isolator Auxiliary Switches
Check Zone
Bus A
Bus B
Trip Bus A
Trip Bus B
Zone A
Zone B
Check
Zone
5305/02/03
08/02 53
Isolator Auxiliary Switches
Check Zone
Bus A
Bus B
Trip Bus A
Trip Bus B
Zone A
Zone B
5405/02/03
08/02 54
Isolator Auxiliary Switches
Check Zone
Bus A
Bus B
Trip Bus A
Trip Bus B
Check
Zone
5505/02/03
08/02 55
One Breaker and a Half
Substation
5605/02/03
08/02 56
S1 P1
S2 P2
Bus A Bus
B
P1 P2 P2 P1
S1 S2 S2 S1
5705/02/03
08/02 57
Bus A Bus
B
5805/02/03
08/02 58
Bus A Bus
B
5905/02/03
08/02 59
Bus A Bus
B
6005/02/03
08/02 60
Bus A Bus
B
6105/02/03
08/02 61
Bus A Bus
B
6205/02/03
08/02 62
Bus A Bus
B
P1 P2 P2 P1
S1 S2 S2 S1
P1 P2 P2 P1
S1 S2 S2 S1
6305/02/03
08/02 63