You are on page 1of 4

ANNEXURE-I

List of RFI raised- Works


Submission CH/Elev- CH/Elev- Specification Approved / Not
Sl.No. RFI No Description Location BOQ Ref. Drawing Ref. Inspection Date Remarks
Date From To Clause No. Approved
RKSH-KNPG/TUNNELS/PK- Slope excavation for T3P2 portal (Main 7.3 of works RIKR-PK2-YPJ-BT2-CE-
1 05-09-2020 T3P2 portal, Byasi 493/32140 497/32200 1002a 07-09-2020 Work in Progress
2/LNT/201/RFI/200289/A0 Tunnel Portion) requirement DWG-205F to 208F
RKSH-KNPG/TUNNELS/PK- RIKR-PK2-YPJ-BT0-CE- Work and Survey completed. Joint
2 05-09-2020 Excavation in Support Section Type B2 Construction Adit-2 567 569 A1.2 8.12.1, 8.22 07-09-2020
2/LNT/202/RFI/200290/A0 DWG-250-F, 251-F measurement under process.
Lead measurement taken. Joint
RKSH-KNPG/TUNNELS/PK- Lead measurement and haulage of RIKR-PK2-YPJ-BT0-CE-
3 05-09-2020 Construction Adit-2 567 569 A4 8.22.1.ii.T 07-09-2020 measurement for haulage qty under
2/LNT/202/RFI/200291/A0 excavated materials DWG-250-F, 251-F
process.
RKSH-KNPG/TUNNELS/PK- 8.5.2, 11.11, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
4 05-09-2020 1st layer Shotcreting Construction Adit-2 566.5 568.5 B2.1.1.1 07-09-2020
2/LNT/202/RFI/200292/A0 11.13 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- 10.12.2, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
5 05-09-2020 1st layer wiremesh fixing Construction Adit-2 B1.5.1 07-09-2020
2/LNT/202/RFI/200293/A0 10.15.4 DWG-250-F, 251-F under process.
Lead inspection and haulage qty for T3P2
RKSH-KNPG/Tunnels/PK- 7.3 of works RIKR-PK2-YPJ-BT2-CE-
6 06-08-2020 portal excavation during the month of T3P2 portal, Byasi 498/32135 501/32200 1003 07-08-2020 Approved
2/LNT/201/RFI/200294/A0 requirement DWG-205F to 208F
Aug'20
RKSH-KNPG/TUNNELS/PK- Fabrication and Erection of Lattice Girder RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
7 05-09-2020 Construction Adit-2 B1.4.2 9.4.5, 9.6.2 07-09-2020
2/LNT/202/RFI/200294/A0 (Escape Tunnel Portion) DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- 8.5.2, 11.11, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
8 05-09-2020 2nd layer shotcreting Construction Adit-2 B2.1.1.1 07-09-2020
2/LNT/202/RFI/200295/A0 11.13 DWG-250-F, 251-F under process.
Excavation and Manual slope dressing for
RKSH-KNPG/TUNNELS/PK- 7.3 of works RIKR-PK2-YPJ-BT1-CE-
9 07-09-2020 maintaining the slopes incl. extended T2P1 portal, Shivpuri -22/415 36/417 1002a 08-09-2020 Work in Progress
2/LNT/201/RFI/200297/A0 requirement DWG-201F to 204F
portion
1st layer Shotcreting incl. extended
RKSH-KNPG/TUNNELS/PK- 8.5.2, 11.11, RIKR-PK2-YPJ-BT1-CE-
10 07-09-2020 portion for T2P1 (Excavation Supporting T2P1 portal, Shivpuri -22/415 36/417 B2.1.1.4 08-09-2020 Work in Progress
2/LNT/201/RFI/200298/A0 11.13 DWG-201F to 204F
works)
RKSH-KNPG/TUNNELS/PK- Inspection and measurement of rock not 7.3 of works RIKR-PK2-YPJ-ALG-00-
11 07-09-2020 Byasi Station Excavation 32450/495 32640/498 1002b 08-09-2020 Approved
2/LNT/201/RFI/200299/A0 requiring blasting requirement 026 to 029, 065 to 075
RKSH-KNPG/TUNNELS/PK- Inspection and measurement of rock 7.3 of works RIKR-PK2-YPJ-ALG-00- Measurement taken. Blasting is to be
12 07-09-2020 Byasi Station Excavation 32450/495 32640/498 1002c 08-09-2020
2/LNT/201/RFI/200300/A0 requiring blasting requirement 026 to 029, 065 to 075 done.
RKSH-KNPG/TUNNELS/PK- 10.12.2, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
13 07-09-2020 2nd layer wiremesh fixing Construction Adit-2 B1.5.1 08-09-2020
2/LNT/202/RFI/200301/A0 10.15.4 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- 8.5.2, 11.11, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
14 07-09-2020 3rd layer shotcreting Construction Adit-2 B2.1.1.1 08-09-2020
2/LNT/202/RFI/200302/A0 11.13 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- 14.10, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurements
15 07-09-2020 Drilling of Probe Holes at tunnel face Construction Adit-2 569 - D1.1 08-09-2020
2/LNT/202/RFI/200303/A0 14.13.2.ii DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- RIKR-PK2-YPJ-BT0-CE- Work and Survey completed. Joint
16 07-09-2020 Excavation in Support Section Type B2 Construction Adit-2 569 571.6 A1.2 8.12.1, 8.22 09-09-2020
2/LNT/202/RFI/200304/A0 DWG-250-F, 251-F measurement under process.
RKSH-KNPG/TUNNELS/PK- Lead measurment and haulage qty of RIKR-PK2-YPJ-BT0-CE- Work and Survey completed. Joint
17 07-09-2020 Construction Adit-2 569 571.6 A4 8.22.1.ii.T 09-09-2020
2/LNT/202/RFI/200305/A0 excavated materials DWG-250-F, 251-F measurement under process.
RKSH-KNPG/TUNNELS/PK- 10.12.2, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
18 05-09-2020 1st layer wiremesh fixing Construction Adit-2 564.5 566.5 B1.5.1 07-09-2020
2/LNT/202/RFI/200306/A0 10.15.4 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- Fabrication and Erection of Lattice Girder RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
19 07-09-2020 Construction Adit-2 564.7 - B1.4.2 9.4.5, 9.6.2 08-09-2020
2/LNT/202/RFI/200307/A0 (Escape Tunnel Portion) DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- 8.5.2, 11.11, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
20 08-09-2020 2nd layer shotcreting Construction Adit-2 564.5 566.5 B2.1.1.1 08-09-2020
2/LNT/202/RFI/200308/A0 11.13 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- 10.12.2, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
21 08-09-2020 2nd layer wiremesh fixing Construction Adit-2 564.5 566.5 B1.5.1 08-09-2020
2/LNT/202/RFI/200309/A0 10.15.4 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- 8.5.2, 11.11, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
22 08-09-2020 3rd layer shotcreting Construction Adit-2 564.5 566.5 B2.1.1.1 08-09-2020
2/LNT/202/RFI/200310/A0 11.13 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- Drilling, Installation and Grouting of Resin 10.8, 10.15.2, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
23 08-09-2020 Construction Adit-2 563.7 - B1.1.1.2 09-09-2020
2/LNT/202/RFI/200311/A0 Grouted type SN Bolts 10.15.5 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- 10.12.2, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
24 08-09-2020 1st layer wiremesh fixing Construction Adit-2 566.5 568.5 B1.5.1 08-09-2020
2/LNT/202/RFI/200312/A0 10.15.4 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- Fabrication and Erection of Lattice Girder RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
25 08-09-2020 Construction Adit-2 566.7 - B1.4.2 9.4.5, 9.6.2 08-09-2020
2/LNT/202/RFI/200313/A0 (Escape Tunnel Portion) DWG-250-F, 251-F under process.
Submission CH/Elev- CH/Elev- Specification Approved / Not
Sl.No. RFI No Description Location BOQ Ref. Drawing Ref. Inspection Date Remarks
Date From To Clause No. Approved
RKSH-KNPG/TUNNELS/PK- 8.5.2, 11.11, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
26 08-09-2020 2nd layer shotcreting Construction Adit-2 566.5 568.5 B2.1.1.1 08-09-2020
2/LNT/202/RFI/200314/A0 11.13 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- 10.12.2, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
27 08-09-2020 2nd layer wiremesh fixing Construction Adit-2 566.5 568.5 B1.5.1 08-09-2020
2/LNT/202/RFI/200315/A0 10.15.4 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- 8.5.2, 11.11, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
28 08-09-2020 3rd layer shotcreting Construction Adit-2 566.5 568.5 B2.1.1.1 08-09-2020
2/LNT/202/RFI/200316/A0 11.13 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- Drilling, Installation and Grouting of Resin 10.8, 10.15.2, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
29 08-09-2020 Construction Adit-2 565.7 - B1.1.1.2 09-09-2020
2/LNT/202/RFI/200317/A0 Grouted type SN Bolts 10.15.5 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- Road Maintenance from NH-58 to T2P1
30 08-09-2020 Shivpuri Approach Road 0 970 H13 2.18.6 - 09-09-2020 Work in Progress
2/LNT/250/RFI/200318/A0 Portal for Sep'20
RKSH-KNPG/TUNNELS/PK- 8.5.2, 11.11, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
31 08-09-2020 1st layer shotcreting Construction Adit-2 568.5 571 B2.1.1.1 09-09-2020
2/LNT/202/RFI/200319/A0 11.13 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- RIKR-PK2-YPJ-BT0-CE- Work and Survey completed. Joint
32 08-09-2020 Excavation in Support Section Type B2 Construction Adit-2 571.6 574.3 A1.2 8.12.1, 8.22 10-09-2020
2/LNT/202/RFI/200320/A0 DWG-250-F, 251-F measurement under process.
RKSH-KNPG/TUNNELS/PK- Lead measurment and haulage qty of RIKR-PK2-YPJ-BT0-CE- Work and Survey completed. Joint
33 08-09-2020 Construction Adit-2 571.6 574.3 A4 8.22.1.ii.T 10-09-2020
2/LNT/202/RFI/200321/A0 excavated materials DWG-250-F, 251-F measurement under process.
RKSH-KNPG/TUNNELS/PK- 8.5.2, 11.11, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
34 08-09-2020 1st layer shotcreting Construction Adit-2 571 574 B2.1.1.1 10-09-2020
2/LNT/202/RFI/200322/A0 11.13 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- 10.12.2, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
35 10-09-2020 1st layer wiremesh fixing Construction Adit-2 568.5 572.5 B1.5.1 11-09-2020
2/LNT/202/RFI/200323/A0 10.15.4 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- Drilling of holes consolidation grout Main 14.10, RIKR-PK2-YPJ-BT0-CE-
36 02-09-2020 T3P2 portal, Byasi 32140/502 32145/503 D1.1 03-09-2020 Approved
2/LNT/201/RFI/200324/A0 tunnel portion 14.13.2.ii DWG-228-F
10.12.2,
RKSH-KNPG/TUNNELS/PK- Wiremesh fixing for slope protection at RIKR-PK2-YPJ-BT2-CE-
37 09-09-2020 T3P2 portal, Byasi 495/32140 499/32200 B1.5.1 10.15.4 of 10-09-2020 Work in Progress
2/LNT/201/RFI/200325/A0 T3P2 Portal (Main Tunnel Portion) DWG-205F to 208F
Section-5
RKSH-KNPG/TUNNELS/PK- 8.5.2, 11.11, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
38 09-09-2020 2nd layer shotcreting Construction Adit-2 568.5 572.5 B2.1.1.1 10-09-2020
2/LNT/202/RFI/200326/A0 11.13 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- 10.12.2, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
39 09-09-2020 2nd layer wiremesh fixing Construction Adit-2 568.5 572.5 B1.5.1 10-09-2020
2/LNT/202/RFI/200327/A0 10.15.4 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- 8.5.2, 11.11, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
40 09-09-2020 3rd layer shotcreting Construction Adit-2 568.5 572.5 B2.1.1.1 10-09-2020
2/LNT/202/RFI/200328/A0 11.13 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- Drilling, Installation and Grouting of Resin 10.8, 10.15.2, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
41 09-09-2020 Construction Adit-2 568, 570 572 B1.1.1.2 10-09-2020
2/LNT/202/RFI/200329/A0 Grouted type SN Bolts 10.15.5 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- Inspection and measurement of rock not 7.3 of works RIKR-PK2-YPJ-BT2-CE-
42 09-09-2020 T3P2 portal, Byasi 32140/493 32200/498 1002b 10-09-2020 Work in Progress
2/LNT/201/RFI/200330/A0 requiring blasting (Main Tunnel Portion) requirement DWG-205F to 208F

RKSH-KNPG/TUNNELS/PK- Percussion Drilling of Holes for Injection 14.10, RIKR-PK2-YPJ-BT0-CE-


43 08-09-2020 T3P2 portal, Byasi 488/32142 493.5/32150 D1.1 09-09-2020 Approved
2/LNT/201/RFI/200331/A0 Grout Holes (Escape Tunnel Portion) 14.13.2.ii DWG-228-F
RKSH-KNPG/TUNNELS/PK- Shotcreting for Slope Protection (Main 8.5.2, 11.11, RIKR-PK2-YPJ-BT2-CE-
44 09-09-2020 T3P2 portal, Byasi 495/32140 499/32200 B2.1.1.4 10-09-2020 Work in Progress
2/LNT/201/RFI/200332/A0 Tunnel Portion) 11.13 DWG-205F to 208F
RKSH-KNPG/TUNNELS/PK- Inspection and measurement of rock not 7.3 of works RIKR-PK2-YPJ-ALG-00-
45 09-09-2020 Byasi Station Excavation 32450/495 32640/499 1002b 10-09-2020 Approved
2/LNT/201/RFI/200333/A0 requiring blasting requirement 026 to 029, 065 to 075
RKSH-KNPG/TUNNELS/PK- Grouting of injection holes (Escape 3.7, 14.7.3, RIKR-PK2-YPJ-BT0-CE-
46 08-09-2020 T3P2 portal, Byasi 488/32142 493.5/32150 D2.1 09-09-2020 Approved
2/LNT/201/RFI/200334/A0 Tunnel Portion) 14.13.3.iii.A DWG-228-F
1st layer of Wiremesh fixing incl. 10.12.2,
RKSH-KNPG/TUNNELS/PK- RIKR-PK2-YPJ-BT1-CE-
47 09-09-2020 extended portion at T2P1 (Excavation T2P1 portal, Shivpuri -22/415 36/417 B1.5.1 10.15.4 of 10-09-2020 Work in Progress
2/LNT/201/RFI/200335/A0 DWG-201F to 204F
Supporting works) Section-5
2nd layer Shotcreting incl. extended
RKSH-KNPG/TUNNELS/PK- 8.5.2, 11.11, RIKR-PK2-YPJ-BT1-CE-
48 09-09-2020 portion for T2P1 (Excavation Supporting T2P1 portal, Shivpuri -22/415 36/417 B2.1.1.4 10-09-2020 Work in Progress
2/LNT/201/RFI/200336/A0 11.13 DWG-201F to 204F
works)
Supply, drilling hole, installation and
RKSH-KNPG/TUNNELS/PK- RIKR-PK2-YPJ-BT2-CE-
49 10-09-2020 grouting of Light Forepoling elements T3P2 portal, Byasi 32140/490.5 32150/493.5 B1.3.1 10.13.3, 10.15 11-09-2020 Work in Progress
2/LNT/201/RFI/200337/A0 DWG-205F to 208F
(Escape Tunnel Portion)
1st layer Shotcreting for extended
RKSH-KNPG/TUNNELS/PK- 8.5.2, 11.11, RIKR-PK2-YPJ-BT1-CE-
50 10-09-2020 portion for T2P1 (Excavation Supporting T2P1 portal, Shivpuri 36/418 46/434 B2.1.1.4 11-09-2020 Work in Progress
2/LNT/201/RFI/200338/A0 11.13 DWG-201F to 204F
works)
Submission CH/Elev- CH/Elev- Specification Approved / Not
Sl.No. RFI No Description Location BOQ Ref. Drawing Ref. Inspection Date Remarks
Date From To Clause No. Approved
10.10, 10.13,
RKSH-KNPG/TUNNELS/PK- Drilling, Installation and Grouting of SDA RIKR-PK2-YPJ-BT1-CE-
51 10-09-2020 T2P1 portal, Shivpuri -22/416.25 5/417.5 B1.1.2 10.15.2, 11-09-2020 Work in Progress
2/LNT/201/RFI/200339/A0 Bolts DWG-201F to 204F
10.15.5
RKSH-KNPG/TUNNELS/PK- Drillling holes for Weepholes and fixing RIKR-PK2-YPJ-BT1-CE- Work is completed. Joint measurement
52 10-09-2020 T2P1 portal, Shivpuri -22/419.375 36/419.375 NS Item - 11-09-2020
2/LNT/201/RFI/200340/A0 perforated PVC pipe DWG-201F to 204F under process.
RKSH-KNPG/TUNNELS/PK- Soil excavation for Byasi station 7.3 of works RIKR-PK2-YPJ-ALG-00-
53 10-09-2020 Byasi open excavation 32450/495 32640/517 1002a 11-09-2020 Work in Progress
2/LNT/201/RFI/200341/A0 embankment requirement 071 to 075
RKSH-KNPG/TUNNELS/PK- RIKR-PK2-YPJ-BT0-CE- Work and Survey completed. Joint
54 10-09-2020 Excavation in Support Section Type B2 Construction Adit-2 574.3 577.2 A1.2 8.12.1, 8.22 10-09-2020
2/LNT/202/RFI/200342/A0 DWG-250-F, 251-F measurement under process.
RKSH-KNPG/TUNNELS/PK- Lead measurment and haulage qty of RIKR-PK2-YPJ-BT0-CE- Work and Survey completed. Joint
55 10-09-2020 Construction Adit-2 574.3 577.2 A4 8.22.1.ii.T 11-09-2020
2/LNT/202/RFI/200343/A0 excavated materials DWG-250-F, 251-F measurement under process.
RKSH-KNPG/TUNNELS/PK- 8.5.2, 11.11, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
56 10-09-2020 1st layer shotcreting Construction Adit-2 574 577 B2.1.1.1 11-09-2020
2/LNT/202/RFI/200344/A0 11.13 DWG-250-F, 251-F under process.
RKSH-KNPG/Tunnels/PK- 10.12.2, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
57 10-09-2020 1st layer wiremesh fixing Construction Adit-2 572.5 576 B1.5.1 11-09-2020
2/LNT/202/RFI/200345/A0 10.15.4 DWG-250-F, 251-F under process.
RKSH-KNPG/Tunnels/PK- 8.5.2, 11.11, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
58 10-09-2020 2nd layer shotcreting Construction Adit-2 568.5 576 B2.1.1.1 11-09-2020
2/LNT/202/RFI/200346/A0 11.13 DWG-250-F, 251-F under process.
RKSH-KNPG/Tunnels/PK- 10.12.2, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
59 10-09-2020 2nd layer wiremesh fixing Construction Adit-2 568.5 576 B1.5.1 11-09-2020
2/LNT/202/RFI/200347/A0 10.15.4 DWG-250-F, 251-F under process.
RKSH-KNPG/Tunnels/PK- 8.5.2, 11.11, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
60 10-09-2020 3rd layer shotcreting Construction Adit-2 568.5 576 B2.1.1.1 11-09-2020
2/LNT/202/RFI/200348/A0 11.13 DWG-250-F, 251-F under process.
RKSH-KNPG/Tunnels/PK- Drilling, Installation and Grouting of Resin 567.7, 569.7, 10.8, 10.15.2, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
61 10-09-2020 Construction Adit-2 574.35 B1.1.1.2 12-09-2020
2/LNT/202/RFI/200349/A0 Grouted type SN Bolts 571.7 10.15.5 DWG-250-F, 251-F under process.
Inspection and measurement of rock
RKSH-KNPG/TUNNELS/PK- 7.3 of works RIKR-PK2-YPJ-BT2-CE- Work is completed. Survey and Joint
62 11-09-2020 requiring blasting but not permitted T3P2 portal, Byasi 32140/493 32200/498 1002d 12-09-2020
2/LNT/201/RFI/200350/A0 requirement DWG-205F to 208F measurement under process.
(Main Tunnel Portion)
RKSH-KNPG/TUNNELS/PK- RIKR-PK2-YPJ-BT0-CE- Work and Survey completed. Joint
63 11-09-2020 Excavation in Support Section Type B2 Construction Adit-2 577.2 579.2 A1.2 8.12.1, 8.22 11-09-2020
2/LNT/202/RFI/200351/A0 DWG-250-F, 251-F measurement under process.
RKSH-KNPG/TUNNELS/PK- Lead measurment and haulage qty of RIKR-PK2-YPJ-BT0-CE- Work and Survey completed. Joint
64 11-09-2020 Construction Adit-2 577 579.5 A4 8.22.1.ii.T 11-09-2020
2/LNT/202/RFI/200352/A0 excavated materials DWG-250-F, 251-F measurement under process.
RKSH-KNPG/TUNNELS/PK- 8.5.2, 11.11, RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
65 11-09-2020 1st layer shotcreting Construction Adit-2 577 579.5 B2.1.1.1 11-09-2020
2/LNT/202/RFI/200353/A0 11.13 DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- Fabrication and Erection of Lattice Girder RIKR-PK2-YPJ-BT0-CE- Work is completed. Joint measurement
66 12-09-2020 Construction Adit-2 573.6 575.1 B1.4.2 9.4.5, 9.6.2 12-09-2020
2/LNT/202/RFI/200354/A0 (Escape Tunnel Portion) DWG-250-F, 251-F under process.
RKSH-KNPG/TUNNELS/PK- Rock excavation not requiring blasting for Minor Bridge at RIKR-PK2-YPJ-MBR-CE-
67 12-09-2020 25+345.6 426.77 1002b 7.3.3, 7.10 12-09-2020 Work in Progress
2/LNT/201/RFI/200355/A0 Minor Bridge (3x3m) KM=25+345.60 Guller DWG-701-F to 703-F
List of RFIs- QA/QC
Date Date of
Sl.No. RFI No RFI Description UoM Status
raised inspection
1 QAQC/2020/159 04.09.2020 05.09.2020 ITP-Aggregate testing Approved

2 QAQC/2020/160 04.09.2020 05.09.2020 Field soil test at Byasi Embankment area Under testing

3 QAQC/2020/161 05.09.2020 07.09.2020 In-situ core cutting & compressive strength of Shotcrete-T3P2 Approved
7days & 28 results
4 QAQC/2020/162 07.09.2020 08.09.2020 Testing of Cement-Ultratech
awaited
5 QAQC/2020/163 10.09.2020 11.09.2020 Joint sampling & testing of SDA and Reinforcement Under testing

6 QAQC/2020/164 10.09.2020 11.09.2020 Petrographic examination & Soundness of B2 class rock Under testing

7 QAQC/2020/165 11.09.2020 12.09.2020 Joint visit of CIPET Lab (Thrid party testing of Plastic releated testings) Reports to be submit