You are on page 1of 5

Safe Plan of Action RAMSU ENTERPRISE

SPA NO: SPA- 008 | Rev. # 0

Project No. : 44AC6615 Location: old chiller room to W.H


Activity/Task : Cable pulling / laying work on cable tray Date: 16/09/2019

Steps of Hazard / Reaction


Safe Plan Resources
Activity/Task to Change

 Only safety inducted and medically fit workforce shall be deployed


for work and the medical certificates shall be produced to Jacobs.
 Task specific trained workforce shall be appointed and training shall
be conducting periodically. (At least once in a week)  Training session
Arrangement of tools and  Untrained workforce  Work permits
 All of tools and equipment shall be inspected and same should be
equipment and deploying  Defective tools and  Tools and equipment
workforce free from defects. Ensure the provision of monthly Jacobs Color  PPEs
equipment
coded stickers.
 All are must be equipped with mandatory PPEs i.e. helmet, goggles,
jacket, hand gloves and safety shoes.

 Only competent person allowed to operate the FARANA and trained


signaler for safe crane operations.
 Overloading  Ensure TPI for Crane, lifting tools and tackles.
 Lifting failure  Always maintain the Safe Working Load.
 Unstable support  Cable Jack shall be placed on leveled and proper compacted
 Slip, trip & fall. ground.
 Cut injury.  Ensure proper Jack stand stable on the even ground.
Shifting, Loading and  Material may hit to  Cable Jack and Loading Shaft shall be with sufficient capacity &  PPEs
unloading of cable drum at person during same duly inspected.  Training session
work location by FARANA loading or  Proper manual handling techniques shall be followed.  Flag man
unloading.  Provide stoppers on both side of electrical drums to avoid
 Vehicle strike with unbalancing of cable drum while unrolling.
other vehicle or  Use cut resisted hand gloves during handling of material.
adjacent structure or  Only trained workforce shall be deployed for work.
personal.  Cables or other work related materials should stack at adequate
location so that it doesn’t hinder any emergency equipment.
 Area of work shall be barricade with Caution
Cable pulling, laying on  A- Ladder / platform shall be used as access or working platform  Work permit &
cable tray using A- ladder where scaffolding erection is not possible due to congested area. approved SPA
and platform ladder  collapse of ladder/  One person shall be available all the time to hold ladder to prevent  PPEs
Page 1
Safe Plan of Action RAMSU ENTERPRISE
collapse of ladder/ platform ladder.
 Person working on ladder face will be toward the ladder.
 Height work trained workforce shall be engaged and all are must be
 Trained workforce
equipped with appropriate PPEs i.e. Helmet with chain strip,
 Site engineer /
goggles, hand gloves, jacket, safety shoes and full body safety
platform ladder supervisor
harness with twin lanyard.
 fall from ladder  A-ladder & platform
 Full body harness shall be 100% tie off with cable tray support or
 fall from height ladder
saga rod of the fabricated structure or angle structure or any other
 Training session
rigid structure
 Tag inspected ladder
 Only tag inspected ladder shall be used
 Full body harness should be 100% tie off while working on ladder /
platform ladder with solid anchorage point

 Fall of loose material


at the person  Loose material should not be placed on working platform / platform
working below ladder
 Training
 Hit to the adjacent  Manual handling of material to be carried out in safe manner
 Handling of material
person working  Any type of material tools hand tools/ power tools should not be
 Training session
nearby throw from the height in any way
 PPEs (hand gloves,
 Cut injury due to  Material should not be throw from ground to height to ground
safety goggle, hardhat,
grinding work  While handling material proper PPEs to be used
safety shoe, face shield
Conducting & cable dressing  Eye damage  Ensure proper co – ordination while pulling the cables.
with helmet, safety
using cable tray as working  Fall of tools from the  Proper PPE & tools shall be provided (tag inspected) wheels guard /
platform harness)
gap between cable fencing to all openly rotating parts of machine/ equipment’s shall be
 Grating of proper width
tray support provided (cutter machine)
 Entrapment between  Face shield with helmet must be used while grinding operation.
the cable tray due to  Ensure fire extinguisher readily available during the work.
gap  Cable tray shall not be considered as a working platform, extra
grating shall be provided as working platform with the help of cable
tray support.

Page 2
Safe Plan of Action RAMSU ENTERPRISE

 Proper housekeeping to be maintained around the working area


,and all access way should be cleared
 Ensure no one stand near the cable drum which is on jack or
barricaded area.
 Extra care to be taken while pulling cable on cable tray or ladder
 While cable pulling ensure locks provided on both side of cable
drums
 Slip, trip, fall at the  Ensure proper co – ordination while pulling the cables.
same level  Ensure no one stand near the cable drum which is on jack or
 Sharp Edge from barricaded area.
cable tray and  Inspected tag ladder to be used , always climb up and down facing
 Contractor supervisor
ladder the ladder
 TBT ,Hand gloves
 Fall from height or  Cable drum jack should be of sufficient capacity to hold the cable
 Full body harness
ladder drum load or weight
 Proper PPE`s
 Fall of material  Material should not be in hands while climbing up and down on the
 Access way or walkway
Cable pulling group  Not using PPE`s ladder
 Safe handling practices
 Block access or  Full body harness must be wear and 100 % tie off with rigid
 Communication method
gangway/walkway structure or anchorage point
 Back injury  Material should not be kept in walkways or access way
 Poor communication  All personnel involved in cable pulling activities must wear PPE`s all
among the workers the times ( hard hat, safety goggle, safety shoe ) and other PPE`S
 Changing as per job requirement
environment  Supervisor must ensured that access is cleared from any blockage
or obstruction to carry out activity in safe manner
 Correct handling practices should be used to avoid back injury or
muscles strain
 Supervisor to ensure all the workers understand the objectives of
the activity

 No work shall be allowed during rain to avoid slip, trip & fall

Page 3
Safe Plan of Action RAMSU ENTERPRISE
Cable GLANDING and
termination

Opening of insulation and


cut the cable for
termination, Ref SPA for cable termination—rev-01, 20-08-2019
Crimp the lugs
Remove the bolt from circuit
breaker and tight the cable
lugs with bolt to the circuit
breaker

 Ensure proper lighting arrangement provided for safe work at night.


Night work  Poor illumination  Fluorescent jacket must be used by all workers.  Sufficient lights

 All cable drums shall be stored provided with stoppers and secured
in a safe manner at designated location.  PPEs
 Storing of Materials
Housekeeping  Ensure the drums are not blocked any movement  Site supervisor
 Tripping Hazards  Trainings & TBT
 Unrolled cables shall be secure and keep away from the personnel /
access way / walkway to prevent trip hazard.

Page 4
Safe Plan of Action RAMSU ENTERPRISE

Signatures of Persons Involved in Development of SPA

Name

Sign

Date

Prepared by
(Supervisor) Checked by (Lead) Lead Engineer
Reviewed by Safety RCM Safety Engineer
Execution Team Execution

Contractor: - RAMSU ENTERPRISES Consultant (Jacobs)

The signature of the supervisor confirms the completion of the hazard assessment and Safe Plan of Action by the crew.
Supervisor’s Signature: Date

Instructions: 1. Write name of job or task in space provided. 2. Conduct walk-through survey of work area. 3. Write the steps of the task in a safe sequence.
4. List all possible hazards involved in each step and reaction to change. 5. In the Safe Plan column, state actions that will be taken to prevent the hazards or
injury from reaction to change. 6. In Resources column, list equipment, tools, etc. needed to do the job. 8. Ask each team member, who helped develop and will
use this SPA, to sign in spaces provided. 9. Review the SPA at the end of the task for improvements.
Work shall stop when conditions change, the job changes, or a deficiency in the plan is discovered, and the current SPA will be modified or a new SPA created.

Page 5

You might also like