Professional Documents
Culture Documents
Department of Education
Region VIII
Division of Samar
District of Marabut
LOGERO ELEM. SCHOOL
Marabut
1 (Poor)
Feb. NAT Performance and GSA is 50% and
2014 to
Increased NAT result by 2% in: Feb. below
2015
English 2 (Unsatisfactory)
Math NAT Performance and GSA is 51% - 99%
Science
1 (Poor)
Filipino
NAT Performance and GSA is 50% and
HKS June below
Gen. Ave. 2014
To
Maintain Drop-out rate of Zero (0) March
2015
5 (Outstanding)
Zero drop-out rate
4 (Very Satisfactory)
2% drop –out rate
June 3 (Satisfactory)
2014 to 5% drop-out rate
June
2015 2 (Unsatisfactory)
Increased the enrolment rate by 2% in all
7% drop-out rate
Grade levels from 198 to 202.
1 (Poor)
10% drop-out rate
5 (Outstanding)
June Increase of enrolment is 20% and above
2014 to
March 4 (Very Satisfactory)
2015 19% increase of enrolment
Increased the Completion Rate by at least 2
% from ______ to ______ 3 (Satisfactory)
9% increase of enrolment
2 (Unsatisfactory)
4% increase of enrolment
1 (Poor)
No increase of enrolment
June
2014 to
March 5 (Outstanding)
2015 Completion rate is 100% and above
Decreased the Retention Rate by at least 2 %
4 (Very Satisfactory)
from ______ to ______
80-90% of completion rate
3 (Satisfactory)
60-79% completion rate
2 (Unsatisfactory)
40-59% completion rate
June
2014 to 1 (Poor)
March 30-39% completion rate
4 (Very Satisfactory)
2-3% decrease of retention rate
3 (Satisfactory)
June 4-5% decrease of retention rate
2014 to 10% 2 (Unsatisfactory)
March 6-7% decrease of retention rate
2015
1 (Poor)
2. Performed instructional supervision to 8-10% decrease of retention rate
achieve learning outcomes.
5 (Outstanding)
(Target: Increase 10 supervision per week, 8-10% decrease of non-readers
from 15 to 20 supervision)
June 4 (Very Satisfactory)
2014 to 6-7% decrease of non-readers
March 3 (Satisfactory)
2015 4-5% decrease of non-readers
2 (Unsatisfactory)
Checked daily lesson log sheets and lesson 2-3% decrease of non-readers
plans thrice a week instead of having it
weekly. 1 (Poor)
1% decrease of non-readers
5 (Outstanding)
Supervise 6 teachers per week
4 (Very Satisfactory)
Supervise 5 teachers per week
3 (Satisfactory)
Supervise 4 teachers per week
2 (Unsatisfactory)
Supervise 2-3 teachers per week
June
2014 to 10% 1 (Poor)
March Supervise 1 teacher per week
2015
5 (Outstanding)
3. Monitored closely the conduct of RRE per Log sheets and lesson plans checking
Grade Level. was 130% and above systematically
carried out
(Target: Increase in the observation of 6 4 (Very Satisfactory)
classes per week from 3 to 6 classes)
Log sheets and lesson plans checking
was 115-129% systematically carried
out
3 (Satisfactory)
Log sheets and lesson plans checking
was 100-114% systematically carried
out
2 (Unsatisfactory)
Log sheets and lesson plans checking
was 51-99% systematically carried out
1 (Poor)
Log sheets and lesson plans checking
was 50% and below systematically
carried out
5 (Outstanding)
Observe 6 classes having RRE per week
4 (Very Satisfactory)
Observe 4-5 classes having RRE per
week
3 (Satisfactory)
Observe 2-3 classes having RRE per
week
2 (Unsatisfactory)
Observe 1 classes having RRE per week
1 (Poor)
Did not observe classes having RRE
Learning 1. Provided safe and child friendly learning and 20% 5 (Outstanding)
Environment school environment for learners/pupils Set agreement met
(20%)
Target: Conduct regular quarterly meetings Quarterl 4 (Very Satisfactory)
with PTA to accomplish projects. y Providing only sets of agreements and
partial accomplish of these
3 (Satisfactory)
Producing sets of agreements
2 (Unsatisfactory)
With minimal results
1 (Poor)
Increased 20% participation rate in the
Brigada Eskwela from 151 stakeholders to Conducted with no result
181 stakeholders May
2015 5 (Outstanding)
to 25-30% increase of participation rate in
June Brigada Eskwela
2015
4 (Very Satisfactory)
20-24% increase of participation rate in
Brigada Eskwela
3 (Satisfactory)
15-19% increase of participation rate in
Brigada Eskwela
2 (Unsatisfactory)
10-14% increase of participation rate in
Brigada Eskwela
Intensified health and nutrition program.
1 (Poor)
(Target: Decrease the severely wasted and
Year 9% below increase of participation rate
wasted pupils by 10%)
Wasted: round in Brigada Eskwela
Severely Wasted:
5 (Outstanding)
20-15% decrease of severely wasted
pupils
4 (Very Satisfactory)
14-11% decrease of severely wasted
pupils
3 (Satisfactory)
10-6% decrease of severely wasted
pupils
2 (Unsatisfactory)
Constructed perimeter fence in the entire 5-1% decrease of severely wasted
school site. pupils
(Target: 80% constructed the perimeter Nov.
fence of the entire school site) 2014 1 (Poor)
No decrease of severely wasted and
wasted pupils
5 (Outstanding)
130% and above constructed the
perimeter fence of the entire school
4 (Very Satisfactory)
115-129% and above constructed the
perimeter fence of the entire school
3 (Satisfactory)
Constructed 7 classrooms thru Emirates Red 100-114% and above constructed the
Crescent (UAE) perimeter fence of the entire school
Aug.
2014 to 2 (Unsatisfactory)
Nov. 51-99% and above constructed the
2014 perimeter fence of the entire school
1 (Poor)
No perimeter fence was constructed
5 (Outstanding)
Constructed 6 classrooms and above
thru Emirates Red Crescent-UAE
4 (Very Satisfactory)
Constructed 4-5 classrooms thru
Repaired 3-seaters toilet with wash stand Emirates Red Crescent-UAE
thru PLAN
3 (Satisfactory)
Sept.
2014 Constructed 2-3 classrooms thru
Emirates Red Crescent-UAE
2 (Unsatisfactory)
Constructed 1 classroom thru Emirates
Red Crescent-UAE
1 (Poor)
No classroom was constructed
5 (Outstanding)
Repaired 3-seaters comfort room with
wash stand thru PLAN
Rehabilitated 2 classrooms for repair thru 4 (Very Satisfactory)
Joint Together Society (JTS) Korea Repaired 3-seaters comfort room with
Aug. no wash stand thru PLAN
2014
3 (Satisfactory)
Repaired 2-seaters comfort room with
wash stand thru PLAN
2 (Unsatisfactory)
Provided ICT facilities workshop room as Repaired 2-seaters comfort room with
learning support system no wash stand thru PLAN
(Target: Accomplished 75% requirements for Feb.
e-classroom) 2015 1 (Poor)
No comfort room was repaired
5 (Outstanding)
Rehabilitated 2 classrooms for repair
3 ( Satisfactory)
Rehabilitated 1 classrooms for repair
1 (Poor)
No classroom was rehabilitated for
repair
5 (Outstanding)
100% accomplished the requirements
for e-classroom with complete facilities
4 (Very Satisfactory)
85-99% accomplished the requirements
for e-classroom with complete facilities
3 (Satisfactory)
70-84% accomplished the requirements
for e-classroom with complete facilities
2 (Unsatisfactory)
50-69% accomplished the requirements
for e-classroom with complete facilities
1 (Poor)
49% below accomplished the
requirements for e-classroom with
complete facilities
Human 1. Provide technical assistance to teachers on 20% 5 (Outstanding)
Resource matters pertaining to enhancement of 100% of teachers made the IPPD and
Management classroom and management skills and use the TSNA for analysis of trainings to
(20%) instructional competence for support be conducted
services within the RPMS cycle
4 (Very Satisfactory)
Assess the TSNA results of every teacher 90% of teachers made the IPPD and use
(Target: 5 teachers submitted TSNA results the TSNA for analysis of trainings to be
which means 83% made their IPPD) conducted
3 (Satisfactory)
80% of teachers made the IPPD and use
the TSNA for analysis of trainings to be
conducted
2 (Unsatisfactory)
50% of teachers made the IPPD and use
the TSNA for analysis of trainings to be
conducted
1 (Poor)
Below 50% of teachers made the IPPD
and use the TSNA for analysis of
trainings to be conducted
Conducted School-Based INSET for teachers
based on TSNA
5 (Outstanding)
130% and above of teachers
performance increase at the end of
every semester
4 (Very Satisfactory)
115-129% of teachers performance
increase at the end of every semester
3 (Satisfactory)
100-114% of teachers performance
increase at the end of every semester
2 (Unsatisfactory)
51-99% of teachers performance
increase at the end of every semester
1 (Poor)
50% and below of teachers
Encourage at least 2 teachers to enrol in performance increase at the end of
Master’s Degree this second semester every semester
5 (Outstanding)
4 teachers enrolled of Master’s Degree
4 (Very Satisfactory)
3 teachers enrolled of Master’s Degree
1 (Poor)
No teacher enrolled of Master’s Degree
5 (Outstanding)
100% of teachers attended school-
based training for LIS and access of
LRMDS Portal
4 (Very Satisfactory)
80% of teachers attended school-based
training for LIS and access of LRMDS
Portal
3 (Satisfactory)
75% of teachers attended school-based
training for LIS and access of LRMDS
Portal
2 (Unsatisfactory)
50% of teachers attended school-based
training for LIS and access of LRMDS
Portal
1 (Poor)
50% below 0f teachers attended school-
based training for LIS and access of
LRMDS Portal
Parents 1. Established school, family and community July 2014 10% 5 (Outstanding)
Involvement partnership for performance 130% and above project
and accomplishment with full
Community Plan International donated 6 teaching kits documentation report on completion
Partnership and 190 school supplies for the school
(15%) children which is 100% of the school 4 (Very Satisfactory)
enrolees 115-129% project accomplishment with
full documentation report on
completion
3 (Satisfactory)
100-114% project initiative only with no
completion report
2 (Unsatisfactory)
51-99% project initiative only with no
completion report
1 (Poor)
UNICEFF donated 10 teaching kits, 192 July 2014 No project/event initiated
school supplies, 2 boxes sports equipments
for the school children which is 100% of the
school enrolees 5 (Outstanding)
130% and above project
accomplishment with full
documentation report on completion
4 (Very Satisfactory)
115-129% project accomplishment with
full documentation report on
completion
3 (Satisfactory)
100-114% project initiative only with no
completion report
2 (Unsatisfactory)
51-99% project initiative only with no
Rehabilitated the water system thru Aug. completion report
donation from NGO/stakeholder 2014
1 (Poor)
No project/event initiated
5 (Outstanding)
130% and above project
accomplishment with full
documentation report on completion
4 (Very Satisfactory)
115-129% project accomplishment with
full documentation report on
completion
3 (Satisfactory)
100-114% project initiative only with no
completion report
Conducted quarterly meeting with SGC for Quarterl
strategic planning y 2 (Unsatisfactory)
Meeting 51-99% project initiative only with no
completion report
1 (Poor)
No project/event initiated
5 (Outstanding)
Set agreements met.
4 (Very Satisfactory)
Producing only set agreement and
partial accomplishment of strategic
planning
3 (Satisfactory)
Performed data based Strategic Plan/SIP Producing set of agreements
and AIP through the strategy
2 (Unsatisfactory)
With minimal results
1 (Poor)
Conducted with no result
5 (Outstanding)
130% and above accomplishment and
strategic plan of set successful
interventions
4 (Very Satisfactory)
115-129% and above accomplishment
and strategic plan of set successful
interventions
3 (Satisfactory)
100-114% and above accomplishment
Produced a school strategic plan/SIP and and strategic plan of set successful
AIP through the strategic planning process October interventions
2014
2 (Unsatisfactory)
51-99% accomplishment of planned
interventions
1 (Poor)
50% below accomplishment with no
intervention
5 (Outstanding)
130% and above accomplishment and
strategic plan of set successful
interventions
4 (Very Satisfactory)
115-129% and above accomplishment
and strategic plan of set successful
interventions
Strategic Plan was based on DepEd Mission
and Vission 3 (Satisfactory)
100-114% and above accomplishment
and strategic plan of set successful
interventions
2 (Unsatisfactory)
51-99% accomplishment of planned
interventions
1 (Poor)
50% below accomplishment with no
intervention
5 (Outstanding)
130% and above accomplishment and
strategic plan of set successful
interventions
2 (Unsatisfactory)
51-99% accomplishment of planned
interventions
1 (Poor)
50% below accomplishment with no
intervention
5 (Outstanding)
130% above updated and complete
Maintained School EMIS and submit it to submission of liquidation reports on any
the Di vision Office cash advances
4 (Very Satisfactory)
115-129% partial submission of
liquidation reports in any cash advances
3 (Satisfactory)
100-114% updated submission of
liquidation report but incomplete
documents in the liquidation
2 (Unsatisfactory)
51-99% incomplete documents in the
liquidation and late in submission
1 (Poor)
Very late and incomplete in submission
of liquidation reports
5 (Outstanding)
Updated and complete information in
school EMIS
4 (Very Satisfactory)
Updated but incomplete information in
school EMIS
3 (Satisfactory)
late but complete information in school
EMIS
2 (Unsatisfactory)
late and incomplete information in
school EMIS
1 (Poor)
No information at all of School EMIS