Ras Markaz Crude Oil Park Project (Phase1) : Document Transmittal
Ras Markaz Crude Oil Park Project (Phase1) : Document Transmittal
DOCUMENT TRANSMITTAL
To: Zhang Zhi | China Petroleum Pipeline Engineering Co., Ltd.| RMCOP Project – Phase 1
Email: rasmarkaz@cppmde.com
Cc: Xing Hang | Project Manager | China Petroleum Pipeline Engineering Co., Ltd.
Documents For:
☒ A – Action ☐ IFR – Review ☐ IFA – for Approval
DOCUMENTS
1.
9686-OT-NCR-0091 PO0003 - Inspection Release of SPM-1 NA
without resolving Category A punch SIGNED
items
REMARKS
CONTRACTOR shall take necessary action on this NCR within 48 hours, including his proposed
corrective action in compliance to Company mark-up comments (if any).
9686-TR-OT-8774 Page 1 of 1