Professional Documents
Culture Documents
PETROAMAZONAS EP
GROUNDING MATERIALS
R. Jiménez 03-ago-2020
ELABORADO
REVISADO POR / APROBADO POR /
Rev No. FECHA / Date POR / EMITIDO PARA / Issued for
Revised by Approved by
Issued By
A 03-jul-2020 J. Vera J. Vera S. Chávez REVISIÓN INTERNA
B 04-jul-2020 J. Vera J. Vera S. Chávez REVISIÓN INTERDISCIPLINARIA
C 05-jul-2020 J. Vera R. Jiménez M. Cevallos REVISIÓN PETROAMAZONAS
0 30-jul-2020 J. Vera R. Jiménez L. Claudio PARA COMPRA
Page 1 43B250-TMBB-70-MR-050-0.xls
SISTEMA DE CALIDAD GDP MR Nº
PORTADA / Cover Sheet
43B250-TMBB-70-MR-050
05-RGT-021-01
SUMINISTRO DE / Request for: DATE/Fecha:
GROUNDING MATERIALS 30-jul-20
PROYECTO / Project:
Rev.: 0
ACONDICIONAMIENTO ELECTROMECÁNICO TMBB-E 19 POZOS
REVISIÓN / Revision
ITEM / Item DESCRIPCIÓN / Description
A B C D E 0 1 2 3
1 MATERIAL REQUEST X
2 REQUIRED DOCUMENTS FROM VENDOR X
3 INSPECTION ACTIVITY PLAN X
Page 2 43B250-TMBB-70-MR-050-0.xls
SISTEMA DE CALIDAD GDP MR Nº
PORTADA / Cover Sheet
43B250-TMBB-70-MR-050
05-RGT-021-01
SUMINISTRO DE / Request for: DATE/Fecha:
GROUNDING MATERIALS 30-jul-20
PROYECTO / Project:
Rev.: 0
ACONDICIONAMIENTO ELECTROMECÁNICO TMBB-E 19 POZOS
Page 3 43B250-TMBB-70-MR-050-0.xls
SISTEMA DE CALIDAD GDP MR Nº
PORTADA / Cover Sheet
43B250-TMBB-70-MR-050
05-RGT-021-01
SUMINISTRO DE / Request for: DATE/Fecha:
GROUNDING MATERIALS 30-jul-20
PROYECTO / Project:
Rev.: 0
ACONDICIONAMIENTO ELECTROMECÁNICO TMBB-E 19 POZOS
1 (EF) AND 1
1 CATALOGUE COPIES 1 (EF) WITH SHIPPING
(PD)
1 (EF) AND 1
2 QUALITY CERTIFICATES 1 (EF) WITH SHIPPING
(PD)
1 (EF) AND 1
3 CERTIFICATE OF GUARANTEE WITH SHIPPING
(PD)
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
NOTAS / Notes
EF: ARCHIVO ELECTRÓNICO / Electronic File
PD: DOCUMENTO IMPRESO / Printed Document
POD: FECHA DE ORDEN DE COMPRA / Purchase Order Date
BS: ANTES DEL ENVIO / Before Shipment
Page 4 43B250-TMBB-70-MR-050-0.xls
SISTEMA DE CALIDAD GDP MR Nº
PORTADA / Cover Sheet
43B250-TMBB-70-MR-050
05-RGT-021-01
SUMINISTRO DE / Request for: DATE/Fecha:
GROUNDING MATERIALS 30-jul-20
PROYECTO / Project:
Rev.: 0
ACONDICIONAMIENTO ELECTROMECÁNICO TMBB-E 19 POZOS
NOTES:
1. El PLAN DE ACTIVIDADES DE INSPECCIÓN ES UNA GUÍA PARA DEFINIR EL MINIMO ALCANCE DE LAS INSPECCIONES A REALIZAR POR PAM EP U
OTRAS ENTIDADES DE INSPECCIÓN / The Inspection Activity Plan is a guideline defining the minimum extent of PAM EP
2. TYPE AND EXTENT OF TEST WILL COMPLY WITH CODES AND ORDER SPECIFICATIONS
TYPE OF ACTIVITY:
R: REVISION POR EL INSPECTOR - REVIEWED BY THE INSPECTOR
RI: INSPECCION ALEATORIA DURANTE LA FABRICACIÓN SIN PREVIA NOTIFICACIÓN/ RANDOM INSPECTIONS DURING
FABRICATION - WITHOUT PRIOR NOTICE
W: TESTIFICADO POR EL INSPECTOR CON NOTIFICACIÓN DE PARTE DEL PROVEEDORVO FRABICANTE/ WITNESSED BY
INSPECTOR - UPON SUPPLIER/MANUFACTURER NOTICE
SW: INSPECCIÓN SPOT SIN NOTIVICACIÓN PREVIAS / SPOT-WITNESSED BY INSPECTOR - WITHOUT PRIOR NOTICE
O: PUNTO DE ESPERA PARA OBSERVACIÓN / HOLD POINT FOR OBSERVATION - DEFINITION AS PER APPLICABLE
N/A: NO APLICA / NOT APLICABLE
Page 5 43B250-TMBB-70-MR-050-0.xls