Day 1 Kirulapone Bridge (1 Gang) FM Piling Work For Bridge Crossing Sub 2 3 - - - - - 1
Day 8 Adamaly Place (1 SMA Group) 35C Pipe Laying 35C - D35 - 35C - D35B Sub 1 3 1 - - 1 1 1
Day 9 Buchanan Street (1 SMA Group) 35C Pipe Laying 35C - D28 - 35C - D28B Sub 2 13 1 - - 1 1 1
Day 10 Beltona Lane (1 SMA Group) 35C Pipe Laying 35C - D25 - 35C - D25A - - - - - - - - Continued from night site
Day 11 Dharmarama 3rd Lane 37A Pressure Testing Direct - 3 - - - - - -
Sub Contractor 7 29
Direct Team 1 12