PROJEC CONSULTANT MAIN CONTRACTOR CLIENT

RH0324 Remedial
Measures Against
Flooding in Al Jouf
Province

Site Daily Report


To Consultant: Date: 20/5/2021
Manpower on site M/C S/C Manpower on site M/C S/C Equipment on site M/C
Project Director Laborer skilled 4 Backhoe
Project Manager 1 Laborer unskilled 3 Bobcat
Safety/ QA Manager 1 Lift & escalator Boom truck
Safety Inspector Mason 1 Excavator 1
QA Engineer 1 Mechanic Mobile crane 1
Nurse Painter Roller compactor 1
Commercial Manager Plant Operator Telehandler
Senior QS 1 Plumber 1 Tower crane
Quantity Surveyor Rigger Truck
Construction Manager Scaffolder Water tunker (1B.D)
Section Manager Security Breaker
Works Superintendent Steel fixer 1 Compressor

Project Engineer Structural steelworks Generator (3working)(1B.D)

Site Engineer 3 Water proofer Pick Up


Chief Architect Welder Welding Plant
Architect Other 1 Concrete Mixer
Draftsman Concrete pump mobile
Planning Manager Concrete pump static
Planning Engineer Cube moulds
MEP Manager Cube test machine
MEP Engineer Slump cones
Clerk Vibrator poker
Document Controller Vibrator unit
Driver Bar bending machine
Office Attendant Bar cutting machine
Secretary Block cutter
Storekeeper Grader (1B.D)
Timekeeper Jack hammer
Surveyor 2 Plate compactor
Chainman Power float
General Foreman 1 Rotary drill
Foreman 1 Water pump
Charge hand Hoist materials
Aluminum Fitter Hoist passenger
Carpenter finishing Level instrument
Carpenter shuttering Theodolite /total station
Cladding Other
Electrician
Hoist Operator
HVAC
Lab Technician
Total: 22 Total: 6

Contractor’s Rep: MUSTAFA AMER Signature: Date: 20/5/2021


PROJEC CONSULTANT MAIN CONTRACTOR CLIENT

RH0324 Remedial
Measures Against
Flooding in Al Jouf
Province

Site Daily Report


Weather: sunny Temp Max: 39 Min: 30 Date: 20/5/2021
(oC): Time: 9:00 Am
Location: Level: Description of work Unit Quantity Remarks
SITE OFFICE SHED FOR GENERATOR N 1

1243 km - COMPACTING SERVICE ROAD Length 500 m


1230km
1202+600 – SURVEYING WORKING ZONE 1 ZONE 3
1213+200
1243+850 DEMOLISHING N 1 Finishing and cleaning

Labor camp Constructing utilities caravan 1

issues Minor maintenance of


equipment

H&SE report:

Quality report: Visual inspection

Other issues (visitors):


Contractors Rep: MUSTAFA AMER Signature: Date: 20/5/2021
Consultant Comment:

Consultant Rep: Signature: Date: