Progress Report of Augmentation & Strengthening of Adityapur Water Supply Scheme under Adityapur Municipal Corporation

Urban Water Supply


Agency :- JWIL Infra Ltd. ; Project Cost :- 395.14 Cr (Capex- 326.55 cr. Opex -68.59 Cr)
Agreement no :- JUIDCO/NIT/Adityapur WSS/2018/185; Funding Source :- AMRUT ; Name of PMC:-iDeCK Ltd.; Contractor:- JWIL- SPML (JV)

Daily Progress Report for 17.08.2021


Sl. Location Description of job Man Power % of work & job Equipment Job Progress Cumulative Progress till 16.08.2021
No. Engased in done as on Engased as on
Nos 16.08.2021 16.08.2021

1 ESR.-2 (Bhatiya Basti); (1.6-ML)- No work


Staging 0 10-25 %
Ht.- 25 M.
2 ESR.-3 (Hariom Nagar Rd.No.1,Durga No work 25-30 %
Puja Maidan (2.4-ML) -Staging Ht.- 0
25.0 M.
3 ESR.-4 (Near Railway Yard)ML- Formwork and Plumb work of 2nd lift
1.9 ;Staging Ht.- 25 M. column above Plinth beam.
14 25%

4 ESR.-5 (Near Railway Yard)ML- (1.5 No work


ML);Staging Ht.- 20 M. 0 40-45 %

5 ESR.-6 (Near Block Office Curing of 3rd Tie Beam & Stair case 35-40 %
,Gamharia;(1.5-ML) ;Staging Ht.- 20 M. 3rd flight and Staging work for 1st lift
20
column above 3rd Tie Beam.

6 ESR.-7 (Near old stn.rd.Govt.School); No work


(2- ML)- 0 25-30 %
;Staging Ht.-25 M.
7 ESR-No.8 (Mirudih);(1.0-ML); No work 50-57 %
Staging Ht.- 22 M. 0

8 ESR-No.9 (Banta Nagar);(2.1 ML); No work


0 25-30 %
Staging Ht.-15 M.
9 ESR.-10 (Banta Nagar);(1.6-ML) No work 25-30 %
Staging Ht.- 15 M. 1

10 ESR.-11 (Kuluptanga); (2.5-ML ; Backfilling of foundation and JCB-1


Staging Ht.-15.0 M. Reinforcement work of Plinth beam. 9 10-25 % No,Tractor-1
No.
11 DN Zone 1,DMA-1:-Ward-2. Fixing of Paver block.
2

12 DN Zone 1,DMA-1:-Ward-2, Shree RCC M25 of sluice valve chamber Slab - Mixer
dongri area. 100 mm dia-1 No. 4 machine-1
No.

13 DN Zone 3,DMA-1 (O&M):--Ward-7, House Service Connection. 26 Nos House Service Connection
Near Lal building. 12 - 7525 Nos

14 DN Zone 3,DMA-1 & 4:-Phase-6 & Earth work excavation and D.I.pipe Approx. Length- - JCB-2 Nos.
Ward-8, Near Bico more. laying 100 mm dia. 9 20.0 Mtr 254.80 M 304404.10 M

15 DN Zone 3,DMA-5:-Phase-6, Near Road Restoration by PCC M15. Approx. Length- Flori-1 No,
DVC. 7 PCC M15-76.0 Mtr Tractor- 1 No.

16 DN Zone 4,DMA-4-; Ward-10, Near Road restoration by PCC M15 & M40 at Flori-1 No,
Blue star company. AIADA Road. Tractor- 1 No.
13

17 DN Zone 4,DMA-4-; Ward-10, Near Formwork & RCC M25 of sluice valve Mixer
Hyva company. chamber raft -100 mm dia-1 No. machine-1
7
No.

18 DN Zone 5,DMA-1(O&M) :-Ward-11, House Service Connection. Approx.


Bhatia basti. 4 Connection-5 Nos

19 DN Zone 6,DMA-1:- Ward-17, Near Earth work excavation and D.I. pipe Approx. Length- - JCB-2 Nos,
Nagina Puri. laying 150,300 & 450 mm dia; Filling of 5.5 Mtr Tractor- 1 No.
Stone dust; shifting of soil and 9
Preparation of Hydrotest.

20 DN Zone 6,DMA-1(O&M) :-Ward-17, House Service Connection. Approx.


Near Kali mandir. 7 Connection-6 Nos

21 DN Zone 7,DMA-2 :-Ward-20, Near Preparation of Hydrotest-(L=0.29 KM, Tanker-1 No.


OHT-5. Dia-500 mm.) 1

22 DN Zone 7,DMA-2 :-Ward-19, Road No- Formwork & RCC M25 of Sluice valve Flori-1 No,
17. chamber slab-100 mm dia-1 No and Tractor- 1 No.
Road Restoration by PCC M15. 17
23 DN Zone 7,DMA-2, 3 & 4 :-Ward-18 & House Service Connection.
19, Near adityapur railway station & 12
Pandukan chowk.
24 DN Zone 8,DMA-2:-Phase-2, Industry Preparation of Hydrotest-(L=0.4 KM, Tanker-1 No.
area, Beside madhuban Hotel. Dia-100 & 200 mm).
4

25 DN Zone 8,DMA-3:-Phase-2, Industry Earth work excavation and D.I.pipe Approx. Length- JCB-2 Nos,
area, Beside madhuban Hotel. laying 100,150 & 200 mm dia and PCC M15-14.0 Mtr, Dumper- 1
Preparation of road rsetoration- D.I. Pipe Laid-30.0 No, Tanker-1
(Excavation, Dressing & dust filling) 19 Mtr. No.
and Preparation of Hydrotest-(L=0.71
KM, Dia-100 & 150 mm dia).

26 DN Zone 8,DMA-4:-Phase-2, Beside Road Dressing; Dust filling; Approx. Length- JCB-1 No,
nagar nigam office. compaction and Road Restoration by 9 PCC M40-36.40 Miller-1 No.
PCC M40 at AIADA Road. Mtr
27 DN Zone 9,DMA-1(O&M) :-Ward-30, House Service Connection. Approx.
Near banta nagar ESR. 8 Connection-5 Nos

28 DN Zone-9,DMA- 2(O&M):- Ward-31, House Service Connection. Approx.


Near Baba Ashram. 5 Connection-6 Nos

29 DN Zone-9,DMA- 2:- Ward-34, Near Dressing & Levelling of Road and


Baba Ashram. shifting of debris from site. 4

30 DN Zone 9,DMA-4 & Zone 11,DMA-1:- Dismantling of concrete road; Earth Approx. Length- Hand breaker-
Ward-27 & 35, work excavation and D.I.pipe laying 60.50 Mtr 1 No.
Near kulupatanga & Ichhapur basti. 100 mm dia 20

31 DN Zone-9,DMA-4;-Ward No-27, Near Preparation of Hydrotest-L=0.95 KM, Tanker-1 No.


Ichhapur basti. Dia-100,150 & 200 mm. 1

32 DN Zone-10,DMA-1;- Reinforcement, formwork & RCC M25 Mixer


Ward No-30, LIG Colony. of sluice valve chamber wall -200mm machine-1
dia and slab-150 mm dia- 1 No each. 10 No.

33 DN Zone-10,DMA- 2;- Earth work excavation and D.I. pipe Approx. Length- JCB-1 No,
Ward No-30, MIG Colony. laying 200 mm dia. 6 13.3 Mtr Tractor-1 No

34 DN Zone-10,DMA-3 (O&M) :- House Service Connection.


Ward No-27, Near RIT thana. 4

35 DN Zone-11,DMA- 1 :- Earth work excavation and D.I. pipe Approx. Length- JCB-2 No.
Ward No-35, Near Kulupatanga laying 200 mm dia and Preparation of 11 63.5 Mtr
school. Hydrotest.
36 DN Zone-11,DMA-2 :- Road Restoration by PCC M15. Miller-1 No.
Ward No-30, Road No.-8 & 9 15

37 DN Zone-11,DMA- 4 :- Dismantling of concrete road and Breaker-1 No.


Ward No-25, Road No.-30, Near Road shifting of debris. 2
No-10
TOTAL 266 Nos

Note:1.6o MLD Forest Clearance: - Regarding NOC Forest Clearance Forest Secretary Nepal's house has raised the quarry for getting the FRA certificate from DC Saraikela. For
getting the certificate one report to be submitted from SDM Saraikela. One District level committee to be formed for FRA /NOC. For further process, Nazri naksha submitted to SDM,
Saraikela on 02.07.2021.

2.Land schedule of Entire network of Water pipeline: Land schedule received on 07.07.2020 from C.O. Gamaharia Office. For tattered khata khatiyan pending with Rajkiya
Mundralay Patna and Abhilekhagar Officer, Chaibasa although two letters we have received for nonavailability of khata khatiyan from Land Reform Department Saraikela
Kharsawan & Settlement department East Singhbhum, Jamshedpur. We received some records of Khata Khatian from Chaibasa and the same has been submitted to
C.O.Gamharia.CO gamhariya send the fiel to the DC seraikela on 27.03.2021 after that DC seraikela return file (khata khatiyan ) to the CO Gamharia.Again CO Gamharia submits the
file to DC Saraikela for getting the certification on 481 nos plots from Rajya Chhtriya Bandobast Karyalay, Ranchi.

You might also like