BOILER (STEAM) TURBINE SYSTEM GENERATOR SYSTEM MAIN TRAVO SYSTEM STOP
No System Name
1 DCS SYSTEM
2 CIRCULATING WATER SYSTEM
3 WTP SYSTEM
CONDENSATE SYSTEM A
4 COAL HANDLING SYSTEM
5 BOILER (AIR & FLUE GAS)
6 CONDENSATE SYSTEM
7 FEEDWATER SYSTEM
8 BOILER (STEAM)
9 TURBINE SYSTEM
10 GENERATOR SYSTEM
STOP
11 MAIN TRAFO
MTBF (1 years) Reliability Availability
365.00 100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
100.00% 100.00%
BOILER (PEMBAKARAN)
PLTU AMURANG
POMPA CEP-A
POMPA CEP-B
LPH #3 LPH #2 LPH #1 DEAERATOR STOP
No KKS No Equipment Name Incident Description
1 CONDENSOR
2 CEP-A
3 CEP-B
4 GSC SYSTEM
5 LPH #3
6 LPH #2
7 LPH #1
8 DEAERATOR
Maintenance Time Total Day MTBF (1
t Description Start Stop Failure years) Reliability
365.00 100%
365.00 100%
365.00 100%
365.00 100%
365.00 100%
365.00 100%
365.00 100%
365.00 100%
Availability RELIABILITY
CONDESNSATE
100.00% SYSTEM
100.00% 100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00% AVAILABILITY
CONDESNSATE
SYSTEM
100.00%
FEEDWATER SYSTEM
PLTU AMURANG
POMPA BFP-1
POMPA BFP-3
No KKS No
1
2
3
4
HPH #1 ECONOMIZER STEAM DRUM STOP
5
6
7
Maintenance Time
KKS No Equipment Name Incident Description Start
DEAERATOR
BFP-1
BFP-2
HPH #2
HPH #1
ECONOMIZER
STEAM DRUM
Maintenance Time Total Day MTBF (1
Stop Failure years) Reliability Availability RELIABILITY FEED
WATER SYSTEM
365.00 100% 100.00%
365.00 100% 100.00% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
AVAILABILITY FEEDE
WATER SYSTEM
100.00%
BOILER (STEAM)
PLTU AMURANG
Primary
START STEAM DRUM DOWNCOMER WATER WALL
Superheater
Primary Platen Finishing STOP
MAIN STEAM
Superheater Superheater Superheater
No KKS No Equipment Name Incident Description
1 STEAM DRUM
2 DOWNCOMER
3 WATER WALL
4 PRIMARY SUPERHEATER
5 PLATEN SUPERHEATER
6 FINISHING SUPERHEATER
7 MAIN STEAM
Maintenance Time Total Day MTBF (1
on Start Stop Failure years) Reliability Availability
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
RELIABILITY BOILER
SYSTEM (STEAM)
100.00%
AVAILABILITY BOILER
SYSTEM (STEAM)
100.00%
TURBINE
PLTU AMURANG
START LUBE OIL SYSTEM TURNING GEAR DEH SYSTEM GLAND SEAL STEAM
GLAND SEAL STEAM MAIN STEAM TURBIN CONDENSOR GENERATOR
No KKS No Equipment Name Incident Description
1 LUBE OIL SYSTEM
2 TURNING GEAR
3 DEH SYSTEM
4 GALND SEAL
STOP
5 MAIN STEAM
6 TURBIN
7 CONDENSOR
8 GENERATOR
Maintenance Time Total Day MTBF (1
nt Description Start Stop Failure years) Reliability
365.00 100%
365.00 100%
365.00 100%
365.00 100%
365.00 100%
365.00 100%
365.00 100%
365.00 100%
Availability RELIABILITY
TURBINE SYSTEM
100.00%
100.00% 100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
100.00%
AVAILABILITY
TURBINE SYSTEM
100.00%
COAL HANDLING SYSTEM
PLTU AMURANG
VIBRATING SYSTEM
FRESH WATER
TANK 2/2
SWRO HIGH
PRESURE PUMP-B
No KKS No Equipment Name Incident Description
1 SEA WATER INTAKE
2 SEA WATER PUMP - A
3 SEA WATER PUMP - B
4 CLARIFIER - A
5 CLARIFIER - B
6 CLEAR WATER POND
7 FILTER FEED PUMP-A
8 FILTER FEED PUMP-B
9 SWRO
10 FRESH WATER TANK
11 FRESH WATER PUMP-A
12 FRESH WATER PUMP-B
13 CATRIDGE FILTER-A
14 CATRIDGE FILTER-B
15 SWRO HIGH PRESURE PUMP-A
16 SWRO HIGH PRESURE PUMP-B
17 BWRO
18 DEMIN TANK
Maintenance Time Total Day MTBF (1
ription Start Stop Failure years) Reliability Availability
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
365.00 100% 100.00%
RELIABILITY WTP
SYSTEM
100.00%
AVAILABILITY WTP
SYSTEM
100.00%
CIRCULATING WATER SYSTEM
PLTU AMURANG
CWP-1
CWP-2
INLET VALVE CONDENSOR-A OUTLET VALVE CONDENSO
1/2 CONDENSOR