Contract
REQUEST FOR INFORMATloN

SMDC-GEM RESIDENCES Location


Ref. No. : P20030-CP01 -ST-RFI-071 -21

Specificat.Ions
C5 BRGY UGONG PASI-a------CITY

CSM
Package Reference
Drawing
Contractor
A
BETONBAU PHIL INC
Reference -/
g.?frosO-clc;+-2ceROLANLAPAN/SIGNATURE/DATE

Requested by Received by tote)h


GMCPMl/ Designer
ystractor/GMCPM|

I CM/PM: GRIDLINES MGgconstTuction a Project Management lnc.


Designer/Consultant: ASYA/RBS

I Clarification/Request: Wall Height along Fabrication Area @ 2nd Floor Rampl


I Description:WallHeight Clarification along Fabrication Area @ 2nd Floor Ramp 1 with Cantilever Slab.

Yes No Remarks
Wth cost Implication? I I
Wth Time Implication? I I
Response/Attachment:

Date Responded By Designer:


Nana and Signature:

Datebywhlchinformationisrequired

Date Received by PMG Date Received by contractor


lf you consider that a change in the Contract Amount or Contract Time is required, notify the Project Management
Group within 48 hours from your receipt of the above response and prior to your proceeding with affected work.
Submit a Change Order Proposal to the Project Management Group within seven (7) days from your notification.

Distribution:

I PM I CM I OVVNER I CONTRACTOR I OTHERS: