JANGKA WAKTU PELAKSANAAN

PEKERJAAN : Slope Protection

DURASI
No. JENIS PEKERJAAN VOLUME
(HARI)

Mobilization

STA 0+00 Earth Works (Pekerjaan Tanah)


Excavation (Galian) 126.61 10
Embankment (Urugan tanah kembali dan pemadatan) 264.05 13
Sod facing (Gebalan Rumput)

Concrete Works (Pekerjaan Beton)


Concrete K-225 (Beton K-225) 25.12 21
Formworks non-Exposed (Bekisting tidak exposed) 22.32 19
Reinforcement Bar (Tulangan) 1,530.0 19
U-Ditch, dia.30cm, L=120cm

Stone Works (Pekerjaan Pasangan Batu)


Gabion (Bronjong)
Non-Woven Geotextile (200gr/m2)
Stone masonry (Pasangan batu kali) 148,220 23
Wheepholes, d:2", L:50cm 172,000 20
Round Stone fill by mortar
Anchor Bar D25 L=2m, include Boring and Mortar Fill

STA 1+60 Earth Works (Pekerjaan Tanah)


Excavation (Galian) 526.78 15
Embankment (Urugan tanah kembali dan pemadatan) 917.01 20
Sod facing (Gebalan Rumput) 460,770 10

Concrete Works (Pekerjaan Beton)


Concrete K-225 (Beton K-225) 51.60 26
Formworks non-Exposed (Bekisting tidak exposed) 21.60 22
Reinforcement Bar (Tulangan) 3,090.0 25
U-Ditch, dia.30cm, L=120cm

Stone Works (Pekerjaan Pasangan Batu)


Gabion (Bronjong)
Non-Woven Geotextile (200gr/m2)
Stone masonry (Pasangan batu kali) 308,710 23
Wheepholes, d:2", L:50cm 156,000 20
Round Stone fill by mortar
Anchor Bar D25 L=2m, include Boring and Mortar Fill

STA 10+00 Earth Works (Pekerjaan Tanah)


Excavation (Galian)
Embankment (Urugan tanah kembali dan pemadatan)
Sod facing (Gebalan Rumput)

Concrete Works (Pekerjaan Beton)


Concrete K-225 (Beton K-225)
Formworks non-Exposed (Bekisting tidak exposed)
Reinforcement Bar (Tulangan)
U-Ditch, dia.30cm, L=120cm

Stone Works (Pekerjaan Pasangan Batu)


Gabion (Bronjong)
Non-Woven Geotextile (200gr/m2)
Stone masonry (Pasangan batu kali)
Wheepholes, d:2", L:50cm
Round Stone fill by mortar
Anchor Bar D25 L=2m, include Boring and Mortar Fill