OQ’s RFQ Document Technical

Commercial

General
Item
reference (article, Tenderer’s Question OQ’s Answer
No.
page, section)

1 C4, Scope of Works., Article 9 Y Article 9 Procurement States that – “Contractor shall Approved preferred vendor list is attached. Also, if
Procurement supply all items only from OQ preferred vendor. In case bidder has another choice of a vendor or sub-contractor
of deviation from list, Contractor shall obtain prior shall get approved from OQ prior to engage them in the
approval from OQ before ordering.” job.

Tenderer would like to request for the Approved


Preferred vendor list of OQ. Kindly provide.

2 C4, Scope of Works., Article Article 7A GENERAL ENGINEERING SCOPE OF Bidder shall have the right to carry out in house
7A GENERAL WORK - “The Contractor shall nominate a competent Engineering or have the right to appoint an engineering
ENGINEERING SCOPE OF Engineering Consultant and obtain approval from OQ”. consultant (as subcontract) for the engineering part. In
WORK both case, bidder to take approval prior to commence the
Kindly clarify if the “Engineering Consultant” engineering job. Bidder to submit details of engineering
mentioned shall be inhouse engineering Team of the experience in Oil & Gas field along with the bid.
EPCC tenderer or should be a third-party engineering
consultant.