Client’s original comment KEI's reply to the original comment Contractor's follow-up Comment KEI's follow-up reply
No
Date: December 13th 2017 Date: December 14th 2017 Date: December 19th 2017 Date:
Clearly specify the pier height, capping beam dimensions Agreed. Please refer the annex (Part 4) to the Agreed
b-2
utilized for the design calculations. report. Revised accordingly.
Client’s original comment KEI's reply to the original comment Contractor's follow-up Comment KEI's follow-up reply
No
Date: December 13th 2017 Date: December 14th 2017 Date: December 19th 2017 Date:
Please clarify on the area of steel utilized for the calculation Agreed. But provided shear rf is sufficient.
b-7 of concrete shear resistance, as the reference guide specifies Corrected the relevant pages of the report and Agreed
a different criterion. are attached herewith. Revised accordingly.
Bending moment, axial and shear at the capping beam level Results for critical load combinations are
b-9 Agreed
to be provided for critical load case. attached herewith. Revised accordingly.
END OF COMMENTS