Unit No. / thermos OHS 839 Hourmeter (if applicable): N/A
Start date: 06-09-2020 Type of Maintenance Vacuum & paint Maintenance
Octavio Suarez, Brayan
End date: 07-02-2020 Specialist mechanic:
García, Ismael Jiménez Gómez
Structure / base: Patio OLAM Well: Patio estero
Driving diagnosis
Affected System Vacuum & paint Damaged part Structure
1. Reception Unit
Thermos in patio estero for maintenance of vacuum and painting of the structure.
06-09-2020
A safety meeting is held with all personnel involved in maintenance and operation work and the filling
of the AST in the work area. Diaphragm cleaning of Vacuum, vacuum cap cleaning, maintenance of
the thermo couple and vacuum pumps are connected to initiate the vacuum of the nitrogen thermos,
resulting in a good vacuum of the thermos leaving the vacuum on this day at 124 mbar.
06-10-2020
A safety meeting is held with all personnel involved in maintenance and operation work and the filling
of the AST in the work area. The vacuum system of the thermos is restarted and the inspection of the
thermos is carried out to rule out that there is no loss of vacuum in the structure of the thermos, leaving
the vacuum of the thermos at 0.020 mbar, the vacuum is left connected to the vacuum gauge, to make
the observation of the thermos so that it does not increase the mbar.
AV. EDZNA – N* 55,
Parque Industrial , Mundo Maya
C.P. 24153 Cd. del Carmen, Campeche
Tel: (938) 118 00 05. Fecha de creación: Feb-2018, Rev. 0
.
06-11-2020
A safety meeting is held with all personnel involved in maintenance and operation work and the filling
of the AST in the work área. Continuation of the observation of the vacuum of the thermos given the
result of 20 mbar, leaving the thermos with the vacuum in conditions to cool the thermos..
06-15-2020
A safety meeting is held with all personnel involved in maintenance and operation work and the filling
of the AST in the work área. Continuation of Carding of the OHS 839 thermos to remove corrosion
from the thermos.
06-16-2020
AV. EDZNA – N* 55,
Parque Industrial , Mundo Maya
C.P. 24153 Cd. del Carmen, Campeche
Tel: (938) 118 00 05. Fecha de creación: Feb-2018, Rev. 0
.
A safety meeting is held with all personnel involved in maintenance and operation work and the filling
of the AST in the work área Is continued with the cardeo of the thermos structure and the test is
carried out with the hydro San Blast, giving the result of a good cleaning of the structure of the
thermos.
06-17-2020
A safety meeting is held with all personnel involved in maintenance and operation work and the filling
of the AST in the work área. Is continued with the cardeo of the thermos structure It begins with the
application of primary on the structure
06-18-2020
A safety meeting is
held with all personnel involved in maintenance and operation work and the filling of the AST in the
work área.
Continuation of The
cleaning of the
structure and the
AV. EDZNA – N* 55,
Parque Industrial , Mundo Maya
C.P. 24153 Cd. del Carmen, Campeche
Tel: (938) 118 00 05. Fecha de creación: Feb-2018, Rev. 0
.
19-06-2020
A safety meeting is
held with all personnel
involved in maintenance and operation work and the filling of the AST in the work área. Cleaning of the
thermos is continued with a consumption of 253 kilos of sand to this day, continues the application of
the primary coating, concluding throughout the structure of the thermos. The inspection is carried out
for the certification of the nondestructive tests and the overpressure valves.
06-20-2020
A safety meeting is held with all personnel involved in maintenance and operation work and the filling
of the AST in the work area. It begins the Inspection staff with the NonDestructive Tests at the lifting
points of the Thermos.
22-06-2020
A safety meeting is
held with all personnel involved in maintenance and operation work and the filling of the AST in the
work area. PND (NonDestructive Testing) certification continues and Mapping is done to clean the
thermos by inspection staff.
06-23-2020
A safety meeting is
held with all personnel
involved in
maintenance and
operation work and
the filling of the AST in
the work area. The
metal sheets are
removed and the PND
(NonDestructive Testing) certification is concluded with the inspection staff. Start with applying finish to
the thermos.
06-24-2020
A safety meeting is held with all personnel involved in maintenance and operation work and the filling
of the AST in the work area. Continuation of the application of paint finish on the top and sides of the
thermos.
06-25-2020
A safety meeting is held with all personnel involved in maintenance and operation work and the filling
of the AST in the work area. Finishing with the first application of paint on the bottom and sides of the
thermos, waits for it to dry for the second application, and the replacement of the metallic sheets that
hold the spill tray of the valves is verified.
06-27-2020
A safety meeting is
held with all personnel
involved in
maintenance and
operation work and the
filling of the AST in the
work area. The tapes (decals and specs) are removed, the top grill is placed, waiting the Barton
installation, to begin maintenance the thermos.
06-29-2020
A safety meeting is
held with all personnel
involved in
maintenance and
operation work and the
filling of the AST in the
work area. It begins
with the second
application of paint
(Orange color), with
80% of application progress. It remains on hold to detail and replace the metal plates.
06-30-2020
A safety meeting is held with all personnel involved in maintenance and operation work and the filling
of the AST in the work area. Continuing with the application of paint to the structure of the thermos,
Barton's cleaning and installation is carried out, as well as the placement of the metal sheets, and
stickers..
07-01-2020
A safety meeting is held with all personnel involved in maintenance and operation work and the filling
of the AST in the work area. It concludes with the application of paint on the structure of the thermos,
waiting for drying. Pending the placement of the serpentine protector and pressure valve.
07-02-2020
A safety meeting is held with all personnel involved in maintenance and operation work and the filling
of the AST in the work area. The serpentine protector is placed, therefore, it is concluded with the
maintenance of Paint and Vacuum of the OHS 839 thermos.
3. Observation