You are on page 1of 3

Curriculum Vitae : UMER IJAZ

Postal Address : Tehsil & Disct.Gujrat Post Office ShaadiWaal. (Pakistan)


Direct. # :Africa+225079741330, Pak+923003298967
Email : umerislam789@gmail.com

OBJECTIVE
A highly motivated person with positive attitude to work & strong work ethics. A person who treats work pressure as a challenge, possesses inter personal skills
and enjoys dealing and meeting with people and adaptive person who is always striving to learn and improve upon existing skills.

JOB DESCRIPTION
Supervise all activities in Material Handling and arrangement, inventory, control in parts store, Inspection, Material loading and unloading local procurement,
General Administration; Fuel Oil activities, calculation and documentations.

PERSONAL INFORMATION
N.I.C.# : 34201-3651401-1
Date of Birt :8-09-1989
Domicile : Gujrat
Marital Status : Married
Religion :Islam
Nationality :Pakistani
Passport. # : DV1514011
Father’s Nam : Ijaz Ahmed

EDUCATION
2009
EDUCATION Grade BOARD
F.S.C B+ Islam Abad (Pak. Army)
Diploma in Procurement Stores 2011
& Material Management B+ MIIM. Islam Abad

EDUCATIONAL COURSES.

• English Course. 6 Months.


(From institute of AL-Rehber Bright Future English Course (Panu Aqil)
From the period of Jan-2007 to Jun-2007
• Computer Course. 6 Months.
(From institute of ALI Computer Academy (Panu Aqill)
From the period of Jun-2006 to Dec-2006

PROFESSIONAL COURSE & TRAININGS


• 2 Weeks Training for using online software “SAP” at Alfanar Construction Co., Project PE-135 site.
• 2 Weeks Training to operate the MMS (Material Management System) and Administration Network from Head Office of Engineering Kinetic (Pvt) Ltd.
• 3 weeks Training for MP2 from Korea Plant Service & Engineering Co., for Material Management System in warehouse.
• 2 weeks training from Korea Plant Service & Engineering Co., for Truck Scale Management System.
• 2 weeks Training for Fuel Oil activities for checking the Dip, Gravity, Temperature, Decanting and calculation.
• 3 weeks training for operating the Fork Lifter.
EXPERIENCE HISTORY (14 Years)
• Presently I am working as Store Keeper with Arabian Construction Company In West Africa (Country COTE D’Ivoire
/ Abidjan) for the Residence Colony and building Construction Projects from the period of April-2022 to till date.
• Worked with Engineering Kinetics Pvt Ltd Pakistan as senior store keeper in Central Store from the period of Jan 2019 to March-2022
• worked with Alfanar Construction Company Saudi Arabia, as store keeper at Project PE-156 for the construction of Sub Station 132/33 KVA in
TURAIF City from the period of Jun--2016 to December 2018
• Worked as Store Keeper in Saudi Arabia with ALFANAR Construction Co., at Project PE-151 for the construction of Sub Stations in AL-
NAMAS city for the construction 132/13.8 KVA substation from the period of Nov-2015 to May-20-2016
• worked with ALFANAR Construction Co., at Project PE-147 for the construction of Sub Stations in New Military City HAMEES MASHEET from
the period of May-13-2015 to Aug-2015.
• Worked at PAKISTAN ATOMIC ENERGY COMMISSION for construction of Fire Pump Station, SR, RS & RRM Buildings, Canal & Outfall
system with Engineering Kinetics (Pvt) Ltd as Senior Store Keeper from the period of March-15-2013 to April-2015
• Worked with Engineering Kinetics Pvt Ltd Head Office Lahore as Senior. Store Keeper from the period of Jan-1-2013 to March-14-2013
• Worked at Imperial Chemical Industry Soda Ash business Khewra Disct. Jehlum for construction of New Coal Fired Boiler Plant with
Engineering Kinetics (Pvt) Ltd as Sr.Store Keeper from the period of Nov-12-2012 to Dec-31-2012
• Worked at Dakhni Oil & Gas Development Co., for plant maintenance & road construction work with Engineering Kinetics (Pvt) Ltd As a
Store Keeper from the period of April-20-2012 to Nov-10-2012
• Worked at 175 MW Combined Cycle Power Plant with Korea Plant Service & Engineering Co., (PVT) Ltd for Operation & Maintenance
work as a Store Keeper from the period of Nov-2009 to -04-2012.
• Worked with SIEMENS Pakistan Engineering Co., at 175MW CCPP as a Assistant E & I (Electrical & Instrument) Warehouse
keeper from Oct-2009 to 23-Nov-2009.
• Worked with DOOSAN Heavy Industries & Construction Co., at Daharki 175MW Combined Cycle Power Project with Fauji Foundation
Power Company as a Material Controller from the period of Jan-2008 to 28- Sep-2009.
• Worked with Echo West International Construction Co., (Pvt) Ltd Pakistan at site 175 Megawatt Combined Cycle Power Plant as an
assistant Documents Controller from the period of Oct-2007 to dec-2007

JOB RESPONSIBILITIES
During my industrial career I have done work at following responsibilities and gained good level of skill and knowledge.

• Store documentation, materials, Tools & Assets controlling using online Software “SAP” in Arabian Construction Company C o u n t r y C o t e D ’ V i l o r e
West Africa .
Store documentation, materials, Tools & Assets controlling using online Software “SAP” in Alfanar Construction Company Saudi Arabia.
• Store documentation, materials, Tools & Assets controlling using Software “MMS” (Material Management System) in EKL Company Pakistan.
• Store documentation, materials, Tools & Assets controlling using Software “MP2” in Korea Plant Service & Engineering Co., Pakistan.
• Record of dispatch notes, Gate Passes for incoming & outgoing goods (Returnable & non-returnable) Prepare GRN (Goods Receiving Note) T.N (Transfer
Note) DMR (Daily Material Report) D.I (Demand Indents) ARN (Assets Receiving Note) ATN (Assets Transfer Note) MIR (Material Inspection Report) SIR
(Store Issuance Requisitions) Assets Disposal requests, tool cards and other related documents.
• Material Handling, Proper loading and unloading supervision and Storage the parts.
• Stock checking, Assets & Fixture, Supervision of site stores and warehouse.
• Strong aptitude to maintain material handling equipment and meet or exceed warehouse operation efficiency goals.
• Inventory of Material and proper handling.
• Inspected physical condition of warehouse equipment, prepared work orders, observation reports for repair and maintenance, requisitions for
Replacement of equipment’s.
• System administration, Route sorting, taking Reports from couriers, Data Entry & Emailing. Reports Making, Maintaining the Parts Store.
• Well organized, take initiative, flexible and hard work well under pressure.
• Maintained a clean, neat and orderly work area and assisted in maintaining the security and safety of warehouse.
• Office documentation keeping in a proper way. Mobilization & De Mobilization.
• Get quotations from suppliers & local procurement. Manage/ Supervise Store/ Warehouse staff.
• Operating the TSM System.(Truck Scale Management System)
• Operating the Fork Lifter (3 & 5 Tons) & Fuel Oil activities, (Checking the Dip, Gravity, Temperature & Decanting) record.

SAFETY
Aware from importance and requirements of safety in an industrial zoon specially in Warehouses andhave got safety Training from Engineering Kinetics Pvt
Lted Pakistan, Alfanar Construction Company Saudi Arabi, KEPCO-KPS(Korea Plant Service) & Engineering Co., SIEMENS PAKISTAN & DOOSAN Heavy
Industries & Construction Co.,At 175MW Combined Cycle PowerPlant Daharki (Sindh) Pakistan and Alfanar Construction company Saudi Arabia at sites.
• First Aid,
• Fire Fighting.
• Work Permit Procedure.
• Work at hight

COMPUTER SKILLS

• Use online software SAP MMS and MP2 for store inventory and management system.
• Able to prepay all kind of documents in MS Word, MS Excel, Power Point.
• Microsoft Office 97/2000/XP/2003 & Outlook.
• Microsoft Windows 98/XP & Internet

LANGUAGES

Fluent in
• English, Urdu, Punjabi & Sindhi Languages
COMMUNICATION
• Good inter personal communication.
• Fluent in English speaking, reading and writing as well as local language.

HOBBIES
Playing Football, Volley Ball, Reading educational & Informative Books, Running & Net Browsing to explore the new horizons of knowledge.

You might also like