Professional Documents
Culture Documents
Performance
Brief
FY2016/2017
Corporate Domiciles HQ
95 Sambong-ro, Suite 1503
Jongno-gu, Seoul, Rep. of Korea (03150)
Phone: +82-2-2615-1391
Fax: +82-2-2615-1392
URL: http://www.kyeam.com/
HQ, Seoul, Korea eMail: sales@kyeam.com
PART I.
SCENES OF RUBBER-LINING
PROCESSES
Rubber Lining Processes
with Emphasis on
Kyeam’s Specific Strengths
in Rubber-Lining
PART II.
RUBBER-LINING
BUSINESS PERFORMANCES
Rubber Lining Projects
Participated in by Kyeam
APPENDICES
I. MORPHOLOGIC RESTRAINTS
II. TECHNICAL DATA (1020HT)
PART I.
SCENES OF RUBBER-LINING
PROCESSES
SCENES OF
RUBBER LINING
PROCESSES
Processes (1/2)
- Internal Shot-Blasting
- Internal Primer/
Adhesive Application
edge cutting of rubber application of primer
Processes (2/2)
A Scenic View of
TAEAN TERMAL POWER PLANT
(PHOTO SOURCE: OHMYNEWS, KOREA)
Location
UMM WU’AL
Sirhan-Turaif, Kingdom of Saudi Arabia
PHOSPHATE PLANT EPC Contractor Hanwha Engineering and Construction Co., Ltd.
GYPSUM FGD EPC Contractor Hanwha Engineering and Construction Co., Ltd.
Client
UNIT 1 & 2
GS Donghae Electric Power Co., Ltd.
Nature of Project
PROJECT / SOUTH KOREA
Supply of Rubber Lined Spool for Desulfurization Unit
Erbil, Kurdistan Iraq Scope Preparation of Spool Drawing, Spool Fabrication with
Support Attachment, Rubber Lining, and Transportation to
the Job Site
TPP PROJECT EPC Contractor Hyundai Engineering and Construction, Co., Ltd.
4 x 350 MW / LIBYA Nature of Project Circulating Water Seawater supply and pretreatment
seawater fire pump
Rubber-Lining
FUTURE AND
FOR THE WORLD,
Performance
Brief
FY2016/2017