Rubber-Lining

Performance
Brief
FY2016/2017

Kyeam Technologies, Co., Ltd.


Company Name Kyeam Technologies Co., Ltd.
CORPORATE STYLE Date of Foundation March 23, 1998

AND President Chung, Hyun-Bong


Annual Turnover USD 31.5 Million (FY2015)
POINTS OF CONTACT Nature of Business
Manufacturing,Trading, and Engineering
(Domestic/Overseas)

Corporate Domiciles  HQ
95 Sambong-ro, Suite 1503
Jongno-gu, Seoul, Rep. of Korea (03150)
Phone: +82-2-2615-1391
Fax: +82-2-2615-1392
URL: http://www.kyeam.com/
HQ, Seoul, Korea eMail: sales@kyeam.com

 Boeun Factory (1st)


Boeun Factory 3667 Bocheong-daero, Hoein-myeon, Boeun-gun
Chungcheongbuk-do, Rep. of Korea (28927)

 Gimhae Factory (2nd)


Gimhae Factory
102-32, Seoburo-1499-beon-gil, Jucheon-myeon
Gimhae-si, Gyeongsangnam-do, Rep. of Korea
(50877)
TABLE OF CONTENTS,
RUBBER-LINING
PERFORMANCE BRIEF

PART I.
SCENES OF RUBBER-LINING
PROCESSES
Rubber Lining Processes
with Emphasis on
Kyeam’s Specific Strengths
in Rubber-Lining

PART II.
RUBBER-LINING
BUSINESS PERFORMANCES
Rubber Lining Projects
Participated in by Kyeam

APPENDICES
I. MORPHOLOGIC RESTRAINTS
II. TECHNICAL DATA (1020HT)
PART I.
SCENES OF RUBBER-LINING
PROCESSES
SCENES OF
RUBBER LINING
PROCESSES

General Rubber Lining


fabricated spool for rubber lining surface profile test after shot-blasting

Processes (1/2)

- Internal Shot-Blasting
- Internal Primer/
Adhesive Application
edge cutting of rubber application of primer

- Rubber Lining Layer Fixation

application of adhesive rubber lining layer fixation


SCENES OF
RUBBER LINING
PROCESSES

General Rubber Lining


open (local) curing autoclave curing with railed conveyance feeds

Processes (2/2)

- Curing: Open (Local) Curing


or Autoclave Curing
- Testings: Hardness, pin-hole (holiday) testing adhesion testing

Pinhole (before/after curing),


Thickness, and Adhesion
- External Shot Blasting
- External Painting
- Packing
painting completed for packing protective packing for flanged faces
SCENES OF
RUBBER LINING
PROCESSES

pipe-internal shot-blasted pipe-internal adhesive applied

Rubber Lining Processes


for Small-Diameter Pipes

- require special application


technologies for
∙ pre-fabrication of rubber tubes pre-fabricated rubber tubes fixation of a rubber tube to pipe with a rubber ball
by manual or extruder s

∙ rubber liner application


and fixation using rubber ball
or air pressure

∙ branch opening treatment

rubber-lined with branch treatment protective packing for flanged faces


PART II.
RUBBER-LINING
BUSINESS PERFORMANCES

A Scenic View of
TAEAN TERMAL POWER PLANT
(PHOTO SOURCE: OHMYNEWS, KOREA)
Location
UMM WU’AL
Sirhan-Turaif, Kingdom of Saudi Arabia

Client MA’ADEN (SAUDI ARABIAN MINING COMPANY)

PHOSPHATE PLANT EPC Contractor Hanwha Engineering and Construction Co., Ltd.

PROJECT/ SAUDI ARABIA


Nature of Project Supply of Rubber Lined Spool for Phosphoric Acid Plant

Scope Preparation of Spool Drawing, Supply of Piping Materials,


Rubber Lined Spacer Rings, Reactor Nozzles, Spool
Fabrication with Support Attachment, Rubber Lining,
Transportation to the Job Site, On-Site Repair of Rubber
Lined Spools, and On-Site Rubber Lined Works
Turaif Province, Saudi Arabia
Contract Period 28 JAN 2015 ~ 31 MAY 2016

Contract Total Area of Rubber Lining - 19,502 m2


Spool Fabrication - 166,939 dia.in.

Summary for Rubber Lining

- Size of Supply 1” ~ 80”

- Contract Summary Original: 28 JAN 2015 - 16,587 m2 (128,490 dia.in.)

Addendum: 10 NOV 2015 - 2,915 m2 (38,499 dia.in.)


- Project Status Completed as of 18 MAY 2016

- Rubber Material Natural Rubber


(Polycorp® TripleX™ 1020HT : 3-Layered 6mm)
Location
UMM WU’AL PAP
Sirhan-Turaif, Kingdom of Saudi Arabia

Client MA’ADEN (SAUDI ARABIAN MINING COMPANY)

GYPSUM FGD EPC Contractor Hanwha Engineering and Construction Co., Ltd.

PROJECT/ SAUDI ARABIA


Nature of Project Supply of Rubber Lined Spool for Gypsum FGD

Scope Preparation of Spool Drawing, Supply of Piping Materials,


Rubber Lined Spacer Rings, Reactor Nozzles, Spool
Fabrication with Support Attachment, Rubber Lining,
Transportation to the Job Site, On-Site Repair of Rubber
Lined Spools, and On-Site Rubber Lined Works
Turaif Province, Saudi Arabia
Contract Period 15 JAN 2016 ~ 31 MAY 2016

Contract Price 2,722 m2 (14,418 dia.in.)

Summary for Rubber Lining

- Size of Supply 1” ~ 80”

- Contract Summary Original: 15 JAN 2015 - 2,200 m2 (10,200 dia.in.)

Addendum: 10 NOV 2015 - 522 m2 (4,218 dia.in.)

- Project Status Completed as of 31 MAY 2016

- Rubber Material Natural Rubber


BUKPYEONG TPP Location Donghae City, Gangwon Province, South Korea

Client
UNIT 1 & 2
GS Donghae Electric Power Co., Ltd.

EPC Contractor STX Heavy Industries Co., Ltd.


PROJECT / SOUTH KOREA Nature of Project Supply of Rubber Lined Spool for Desulfurization Unit

Scope Preparation of Spool Drawing, Spool Fabrication with


Support Attachment, Rubber Lining, Ceramic Lining, and
Transportation to the Job Site

Contract Period 16 FEB 2015 ~ 31 AUG 2016

Contract Total 5,418 m2 (81,569 dia.in.)

Donghae City, South Korea

Summary for Rubber Lining

- Size of Supply 1” ~ 76”

- Contract Summary Original: 16 FEB 2016 - 5,418 m2 (81,569 dia.in.)

- Project Status Completed as of 20 FEB 2016

- Rubber Material BR 5T (Butyl Rubber)


Location
TAEAN TPP
Taean County, South Chungcheong Province, South Korea

Client Korea Western Power Co., Ltd.

UNIT 9 &10 EPC Contractor STX Heavy Industries Co., Ltd.

Nature of Project
PROJECT / SOUTH KOREA
Supply of Rubber Lined Spool for Desulfurization Unit

Scope Preparation of Spool Drawing, Spool Fabrication with


Support Attachment, Rubber Lining, and Transportation to
the Job Site

Contract Period 6 FEB 2015 ~ 30 APR 2015 (Contractually)

Contracts Total 7,271 m2 (97,278 dia.in.)

Taean County, South Korea

Summary for Rubber Lining

- Size of Supply 1” ~ 84”

- Contract Summary Original: 6 FEB 2016 - 7,271 m2 (97,278 dia.in.)

- Project Status Supply Under Progress

- Rubber Material BR 5T (Butyl Rubber)


Location
KHABAT TPP
Khabat, Kurdistan Region, Iraq

Client GAMA Power Systems Inc., Ministry of Electricity, Iraq

FGD PROJECT / IRAQ EPC Contractor STX Heavy Industries

Nature of Project Desulfurization Unit (FGD) for a Thermal Power Plant

Erbil, Kurdistan Iraq Scope Preparation of Spool Drawing, Spool Fabrication with
Support Attachment, Rubber Lining, and Transportation to
the Job Site

Contract Period JAN 2015 ~ APRIL 2016

Contracts Total 1,903 m2 (49,904 dia.in.)

Summary for Rubber Lining

- Primary Supply Rubber Lined Piping (1” ~ 26”)

- Contract Summary Original: 30 JAN 2015 - 1,490 m2 (38,930 dia.in.)

Addendum: 15 JAN 2016 - 413 m2 (10,974 dia.in)


- Project Status Completed as of APR 2016

- Rubber Material BR 5T (Butyl Rubber)


Location
AL KHALIJ
Sirte Province, Libya

Client GECOL (General Electricity Company of Libya)

TPP PROJECT EPC Contractor Hyundai Engineering and Construction, Co., Ltd.

4 x 350 MW / LIBYA Nature of Project Circulating Water Seawater supply and pretreatment
seawater fire pump

Scope Preparation of Spool Drawing, Spool Fabrication with


Support Attachment, Rubber Lining, and Transportation to
the Job Site
Sirte, Libya
Contract Period 21 DEC 2009 ~ 31 FEB 2011

Contracts Total 2,450 m2 (73,500 dia.in.)

Summary for Rubber Lining

- Size of Supply 1” ~ 24”

- Contract Summary Original: 21 DEC 2009 - 2,450 m2 (73,500 dia.in.)

- Project Status Completed as of 28 FEB 2011

- Rubber Material LN-67 (Neoprene) Hard Rubber


APPENDIX II.
LEAPING FOR THE

Rubber-Lining
FUTURE AND
FOR THE WORLD,

Performance
Brief
FY2016/2017

Copyright © Reserved 2016 by Kyeam Technologies Co., Ltd.