CONSTRUCTION OF TERMINAL SEWAGE

PUMPING STATION AT DOHA NORTH STW


PACKAGE-3
PROJECT ID: PA 2020 C 009 G

MATERIAL SUBMITTAL

Material Submittal for Fuel System

Contractors Name AL JABER ENGINEERING W.L.L.


Consultant: KHATIB & ALAMI CONSOLIDATED ENGINEERING COMPANY
Client Name: ASHGHAL (Public Works Authority)

Document preparation, verification and Signature


Name in print
approval
Prepared by QA/QC Engineer( unigaz)

Checked by Sr. Project Engineer

Verified by QA/QC Engineer

Approved by Project Manager

Revision Date Purpose

02 04/09/2022 For Review & Approval


Document No. : C823/3-CRS-001

Comment Response Sheet Revision No. : 01

Issue Date : 11 August 2021

Project Name: Construction of Terminal Pumping Station at Doha North STW Package 3-C823/3
Project ID/Code.: PA 2020 C 009 G
Document/Drawing Title: Material Submittal for Fuel System Date Received: 20 August 2022
Submittal No.: C823-3-DOC-MAT-MEC-021 Revision No.: 01

Comments Section/
No. K&A Comment Contractor’s Response Open/Close
by: Page
In accordance with P & ID no. C823-P03-STN-IC-
3301, Vendor supplied items are tentative. Noted and comply. The
calculation for fuel tank capacity is
Based on the above that AJE/OEM has to furnish updated as per the proposed Noted and Refer
Technical /
1 KC the basis/ calculation for the selection of tanks, generator consumption and Pump the comment No.
P&ID
pumps, piping and all other items. Also selection sheet, also pump curved 1.1
Consider fuel consumption by diesel generator added on the pump section Please
(approved) during the sizing of equipment. refer to section 5

Noted. Material submittal for diesel generator is Noted and Comply. The
still not approved. If any changes during the final documents will be revised incase
Technical /
1.1 KC approval of diesel generator, OEM / AJE shall revisit any kind of changes for the
P&ID
the calculations for the selection of tanks, pumps, generator model/fuel
piping and all other items. consumption

AJE/ Supplier has to furnish the readable print with


The shop drawings with detailed
the material submittal. It is better to split in two
design layouts and schematic
drawing sheets. drawing will be submitted Noted and Open
2 KC P & ID
separately for approval after comment.
P & ID should not be part of the technical finalization of the material
datasheet, furnish with a separate chapter number. approval.

C823-3-DOC-MAT-MEC-021 R.01 Page 1 of 14


Document No. : C823/3-CRS-001

Comment Response Sheet Revision No. : 01

Issue Date : 11 August 2021

The following details are not matching with


contract P&ID no. C823-P03-STN-IC-3301.
• Tag no.
• Pipe sizes Comply. Detailed schematic will be
• Calibrated dipstick provided along with shop drawing
3 KC P & ID • Type of valves showing the complete Noted and Open
• Location of HDPE Pipe arrangement of system as per comment
• DPSH across the duplex basket filter & actual site plan. Will include all the
manual change over. required details
• Tank – drain piping to be connected sump.
• PRV & PSH at the discharge side of the
pumps.
Level gauge is part of the tank
Level gauge for the tanks shall be transparent rigid
glass• type
4 KC Technical Pipe sizes not matching with P & ID no. from WOQOD, It will be delivered Closed
with graduated level markings.
C823-P03-STN-IC-3301. as per woqod standard

Color code/ painting details for material shall be as


Noted and comply. The fuel piping Open and refer
per QCS-2014 and project specification. Also,
5 KC Technical will be painted with DFT 40- 60 the comment no.
furnish the material list with color code and paint
µm, Grey Color, 3 Coats, 5.1
thickness.

The fuel piping will be painted


with DFT 60 μm, Grey Color, 5
Coats, Other equipment’s such as
Comment is not fully addressed. Furnish the full
5.1 KC Technical Tanks, Pumps will be supplied
material list with color code and paint thickness.
as painted as per the QCS (total
DFT 300 microns)

Noted and comply. The volume


calculation for the bund wall shall
be min 120% of the volume of fuel
6 KC Technical Bund wall sizing/volume calculation for the tanks. Closed
tank. please refer to bund wall
calculation sheet Please refer to
section 5 (Main tank , Day tank)

C823-3-DOC-MAT-MEC-021 R.01 Page 2 of 14


Document No. : C823/3-CRS-001

Comment Response Sheet Revision No. : 01

Issue Date : 11 August 2021

Technical AJE / OEM has to furnish the technical data sheet Noted and comply. Please refer to
7 KC Closed
data sheet for the materials instead of catalogue. section 5 attached datasheet

Following details shall be furnished with the


technical data sheets.
• Tag no & Size.
Technical Noted and comply. Please refer to
8 KC • Model/ serial no. Closed
data sheet section 5 attached datasheet
• Location
• Type of material & Grade.
• Technical details like flow, pressure etc.

Include the following details in the schedule: Gate valve (Ball Valve) is available
and NRV is added.
• Gate valve & NRV as per compliance
Material Noted and Comply. Open and refer the
9 KC statement and project P& ID.
schedule comment no. 9.1
• Quantity of items Added.
• Flexible hoses Please refer to section 5

For Quick operation ball valves are


Ball valves are not acceptable. Refer the QCS-2014,
Material suitable for the Fuel System and
9.1 KC Section 21, part 17, Clause no. 7.2.1. (d) Vi -
schedule the WOQOD tanks will be supplied
Provide gate valve as mentioned.
with ball valves

• Mention the grade of stainless steel Filling box is SS316L;


10 KC Filling box Closed
• Provide lock and Key. Comply

Noted and Comply Please refer to Open and refer the


11 KC Fusible Link Provide UL certificate and furnish technical details.
section 12 Test Reports comment no. 11.1

Details not available. Furnish the UL certificate for


11.1 KC Fusible Link Page number 434
fusible link.

C823-3-DOC-MAT-MEC-021 R.01 Page 3 of 14


Document No. : C823/3-CRS-001

Comment Response Sheet Revision No. : 01

Issue Date : 11 August 2021

Furnish the following documents for the pump


• Technical data sheet Noted and Comply.
• Basis of flow and pressure selection Refer Section 5.
Duplex Fuel • Head / Pressure loss calculation
12 KC
Pump • G.A. Drawing Flame Proof motor will be
• Cross-sectional drawing with parts details supplied
• Pump curve (Section 12)
• ATEX certificate according to zone -0
classification. Duplex fuel pump set origin
Please specify the country of origin for the duplex USA/INDIA
fuel pump set. (Section 11)
And include contact details for the Viking pumps for Please refer to (Section 5) Open and Refer
Duplex Fuel
13 KC future reference purpose. IDEX INDIA PVT LTD are the the comment no.
Pump set
Arrange the local supplier for the pumps instead of manufacturers of DFO Skids for 13.1
M/s. Index India Pvt. Ltd., India, due to major Viking Pump USA & India Letter
equipment of fuel system. from the VIKING PUMP is attached
(Section 5)

Please refer to the section 19 for


Provide reference document of Ashghal projects the slected previous Ashghal
Duplex Fuel where similar Viking pump & skid installed. And project approval for the submittal
13.1 KC
Pump set confirm that country of origin of Viking pump shall including VIKING pumps, The
be USA. Viking/USA will be supplied for the
project

Open and Refer


Technical Furnish the technical data sheet for Gate valve and Gate valve(Ball Valve) is available
13.A KC the comment no.
data sheet NRV. and NRV is added (Section 5)
9.1

C823-3-DOC-MAT-MEC-021 R.01 Page 4 of 14


Document No. : C823/3-CRS-001

Comment Response Sheet Revision No. : 01

Issue Date : 11 August 2021

Please be informed that the


AJE/ OEM has to provide Gate valves instead of ball
QCS WOQOD tanks will be supplied Open and Refer
valve as indicated in P & ID and compliance
14 KC Compliance with Liver ball valves and the the comment no.
statement which is more suitable for diesel
statement same will be supplied for the 9.1
application.
installation.
QCS Open and Refer
Furnish the compliance statement for QCS-2014, Noted and Comply DFT 40-60
15 KC Compliance the comment no.
Sec.21, Part-17, Clause no. 17.2.8 μm,3 Coats Grey Colour
statement 5.1

Noted and Comply. Spare part will


Open and Refer
AJE has to furnish spares in accordance with QCS- be provided In the Operation
16 KC Spares the comment no.
2014 and project specifications. manual and will be submitted
16.1
separately.

Not acceptable. Provide spare list and supply


Noted and Comply. The spare
16.1 KC Spares accordance with QCS-2014 and project
parts list is attached
specifications.
AJE/ OEM has to confirm that flange connection for
17 KC Technical the pipes & fittings are as per BS 1092, PN16, if Noted and Confirm Closed
applicable.

Noted and Comply. ATEX


Certification available for the
Technical Furnish Explosion Proof / ATEX Certification for the
18 KC major items such as solenoid valve
data sheet all material accordance with Zone-0 classification.
and ATG system Please refer to
section 12

AJE/OEM has to provide list of special tools and Special tools will be provided in Open and Refer
19 KC General tackles required for operation and maintenance of the O&M manual and will be the comment no.
fuel system. submitted separately 16.1

C823-3-DOC-MAT-MEC-021 R.01 Page 5 of 14


Document No. : C823/3-CRS-001

Comment Response Sheet Revision No. : 01

Issue Date : 11 August 2021

The detailed Method statement


OEM shall furnish the ITP (Inspection, test and plan)
20 KC Technical with ITP will be submitted Open
for the major equipment’s.
separately for Approval

Name plates Noted. Name plates for the Open and Refer
Name plates shall be as specified in QCS-2014,
21 KC and Data materials will be supplied as per the comment no.
Section 09, Part -01 for all materials.
Plates the manufacturer standard. 21.1

The sample name plate is


Name plates Not acceptable. Refer the QCS 2014, Section 09,
attached in Section 5. Technical
21.1 KC and Data Part -01 and comply. Also furnish the sample for
Data Sheet >Fuel Transfer Gear
Plates name plate details.
Pump
OEM has to be submit warranty certificate specific
Open and Refer
Warranty for this project. The below fields are the minimum Noted and comply. Please refer to
22 KC the comment no.
certificate requirement project name, code, Equipment section 15
22.1
details, Qty. as per QCS -2014 and project
specification and submit during the delivery time.
Noted and Comply. The final
Warranty Warranty certificate shall be signed & stamped and Warranty certificate will be
22.1 KC
certificate according to project requirement. submitted along with the O&M
manual
Commercial registration is expired on 21/03/2022, Noted and comply. updated
23 KC/MS General Closed
to be renewed and attached to the submittal. Please refer to section 9
Material Noted and comply. Updated
24 KC Highlight the proposed material in the catalogue. Closed
Catalogue Please refer to section 5
Original test certificates shall be submitted with Noted and refer
Noted and comply. Please refer to
25 KC Test reports project name, code, sign and stamped by OEM the comment no.
section 12
during the delivery time of the material. 25.1

C823-3-DOC-MAT-MEC-021 R.01 Page 6 of 14


Document No. : C823/3-CRS-001

Comment Response Sheet Revision No. : 01

Issue Date : 11 August 2021

The test certificate will be


Sample test certificates are provided with the
submitted for each items(Serial
material submittal and orginal test certificates shall
Number or Heater Number ) as
25.1 KC Test reports be submitted with project name, code, sign and
per the manufacturer standard
stamped by OEM during the delivery time of the
which will have the testing testing
material.
of the items.

IDEX INDIA PVT LTD are the


manufacturers of DFO Skids for Open and Refer
For Viking Pumps - Submit test report from the
26 KC Test reports Viking Pump USA & India the comment no.
pump manufacturer instead of the supplier.
Letter from the VIKING PUMP is 26.1
attached Please refer to section 5

Please refer to the section 19 for


Provide reference document of Ashghal projects the slected previous Ashghal
where similar Viking pump & skid installed. And project approval for the submittal
26 KC Test reports
confirm that country of origin of Viking pump shall including VIKING pumps, The
be USA. Viking/USA will be supplied for the
project
Scope of The activity shall include coordination with the ICA
27 SM Noted and comply Noted
works subcontractor and integration of signals to SCADA.

Submittal quality to be improved in general for all


submittals; carry out spell-checks, highlight only the Noted and comply Please refer to
28 SM BoQ Closed
items specific to this submittal in the BoQ etc. section 4
The BoQ item highlighted here is for Cranes!

The shop drawings with detailed Closed with


Fuel Oil The Vendor/Contractor shall note that the interface
design layouts and schematic reference to New
29 SM Schematic has to be with the SCADA System and not BMS as
drawing will be submitted Comment # 60
Drg indicated. Drawing to be updated.
separately for approval below

C823-3-DOC-MAT-MEC-021 R.01 Page 7 of 14


Document No. : C823/3-CRS-001

Comment Response Sheet Revision No. : 01

Issue Date : 11 August 2021

Confirm that all control actions are autonomous


Fuel Oil within the fuel control system and no external
30 SM Schematic intervention from the Pump Station Control System Noted and Confirm Closed
Drg will be required for the fuel system operation.
Signals for monitoring shall however be available on
Fuel Oil the Main SCADA.
Isn’t any interface connections to the Generator
31 SM Schematic Not applicable Noted
Control Panel required from the fuel control system?
Drg
Noted; Shall be
AJE to coordinate with the Vendor and ensure
reviewed when
Fuel Oil compliance to the Project requirements, including
details are
32 SM Schematic the LCP terminologies and tag nos., as applicable. Noted and comply
submitted. Refer
Drg Refer Project Control Philosophy and drawings for
to Comment # 60
the required minimum guidelines.
& 61 below
Closed with
Fuel Oil
Typo errors to be corrected – please do a spell check Noted and will be updated in the reference to New
33 SM Schematic
(e.g. Solenoid) shop drawings submission Comment # 60 &
Drg
61 below
Noted; AJE to
Fuel Oil The filling cabinet location needs consider and
Clarify Note # 18 on the drawing regarding ID
34 SM Schematic to be reviewed and co-ordinated advise during shop
Designer scope. What / who is ID designer?
Drg with Interior designer drawing
submittals.
Fuel Oil Noted; Refer
Consider using 3C x 2.5 mm2 FR cable for the power 2C and 4C cable will be used for
35 SM Schematic Comment # 60 &
supply. the system
Drg 61 below.
Noted; Shall be
reviewed when
Fuel Oil Noted and will be updated in the
Legend to be updated to include FR, RTD and other details are
36 SM Schematic shop drawings submission, will be
missing items submitted. Refer
Drg submitted separately for approval
to Comment # 60
& 61 below

C823-3-DOC-MAT-MEC-021 R.01 Page 8 of 14


Document No. : C823/3-CRS-001

Comment Response Sheet Revision No. : 01

Issue Date : 11 August 2021

Noted; Shall be
reviewed when
Fuel Oil Noted and will be updated in the
Cable and wire sizes indicated shall be standardized details are
37 SM Schematic shop drawings submission, will be
to one unit (preferably metric units) submitted. Refer
Drg submitted separately for approval
to Comment # 60
& 61 below
Noted; Shall be
On approval of the material submittal and the reviewed when
Fuel Oil
schematic, the Contract P&ID IC-3301 shall be Noted and will be part of the details are
38 SM Schematic
updated accordingly; besides updating the Legend shop drawing submission submitted. Refer
Drg
Sheet IC-0021 to Comment # 60
& 61 below
Noted; Shall be
Symbols used in general shall match the Contract
reviewed when
Fuel Oil drawings. Any additional legends and symbols are to
Noted and will be part of the details are
39 SM Schematic be incorporated on the Project main P&ID legend
shop drawing submission submitted. Refer
Drg sheet at a later date, once the various systems are
to Comment # 60
finalized and approved.
& 61 below
Noted; Shall be
Fuel Oil reviewed when
Schematic & Tag no. conventions shall follow the Project defined Noted and will be part of the details are
40 SM
Panel wiring norms. shop drawing submission submitted. Refer
Drg to Comment # 60
& 61 below
The wiring diagram, list of
materials for the control panel will
Noted; Shall be
be submitted along with the shop
Front view labels: Fuel Transfer Pump – delete “2” reviewed when
drawings with detailed design
Panel wiring and also instead of stating Duty/Standby, details are
41 SM layouts and schematic drawing
drawings recommend to change as Pump 1 & Pump 2, since submitted. Refer
will be submitted separately for
Pumps alternate duty each start. to Comment # 61
approval (The Control Panel
below
Customized for project operation
as per the final design)

C823-3-DOC-MAT-MEC-021 R.01 Page 9 of 14


Document No. : C823/3-CRS-001

Comment Response Sheet Revision No. : 01

Issue Date : 11 August 2021

Noted; Shall be
reviewed when
Panel wiring Power cable sizes are to be reviewed. Will 2 core Noted and will be part of the details are
42 SM/AN
drawings cable suffice for power feed? shop drawing submission submitted. Refer
to Comment # 61
below
Noted; Shall be
reviewed when
Panel wiring details are
43 SM Change BMS to PLC/SCADA Noted and Comply
drawings submitted. Refer
to Comment # 61
below
The Wiring diagram for the panel Noted; Shall be
attached in the submittal as reviewed when
Panel wiring Alternating relay circuit is missing; only the contacts sample , The final wiring diagram details are
44 SM
drawings are used! will be submitted along with the submitted. Refer
shop drawing prior to panel to Comment # 61
fabrication below
Noted; Shall be
reviewed when
Panel wiring SCADA interface potential free contacts for fuel details are
45 SM Noted and Comply
drawings filling pump to be corrected (correct the typo error). submitted. Refer
to Comment # 61
below
Interstitial
Open; Refer
Space Sensor Vendor to highlight the proposed specific options, Noted and Comply Please refer to
46 SM Comment # 46.1
& Bund Wall such as material of construction, output type etc. section 5
below
Sensor

C823-3-DOC-MAT-MEC-021 R.01 Page 10 of 14


Document No. : C823/3-CRS-001

Comment Response Sheet Revision No. : 01

Issue Date : 11 August 2021

Noted and Comply Please refer to


section 5. The main tank 50,000 L
Please clarify, if the proposed instrument is 2-wire or
will be single wall as per the
4-wire. Both options are seen highlighted!
46.1 WOQOD stranadard hence the
Also different models are listed on the technical data
Interstitial space sensor removed
sheet (LS-B, LS-I…); specify which model is proposed.
from the submittal, The 2 wire
output for the bundwall sensor

Material proposed is same as the level transmitter, The propsed level switch can
47 SM Level Switch which provides only a continuous signal and not provide continuous reading and 4 Noted; closed
discrete switch contact. Please amend. set points can be programmed

Differential
Please clarify the purpose of the differential air
48 SM Air Pressure Not applicable for the System Closed
switch.
Switch
Noted and Comply, Please refer to Open; Refer
Project Specific data sheets to be furnished; not just
49 the attached datasheets Please Comment # 49.1
generic literature or catalogues.
refer to section 5 below
Field
SM Instruments Not complied in full. Highlight specific features
- General proposed for the project. Example level probe shaft
Noted and Comply, Please refer to
49.1 material. Strike-out options that are not applicable
section 5
for better clarity. Also specific instrument model or
order code is to be furnished.
Open; Refer
Instruments and control panels shall comply to the Noted and Comply. Please refer to
50 Comment # 50.1
relevant sections of QCS 2014, as applicable section 8
QCS below
SM
Compliance Compliance as applicable to QCS 2014, Sections 10 Proposed control panel is
50.1 for Control Panels and Instruments as applicable complied with Fuel system
shall be provided. requirements and QCS
Contract requirements Noted; shall be
The referenced drawings shall be used as guideline
drawings reviewed when
51 SM and the minimum interface requirements indicated Noted.
ICA-3301 & the same are
shall be considered.
3302 submitted.
C823-3-DOC-MAT-MEC-021 R.01 Page 11 of 14
Document No. : C823/3-CRS-001

Comment Response Sheet Revision No. : 01

Issue Date : 11 August 2021

Ashghal approval and country of origin shall be Noted and Comply. Please refer to
52 Open
provided for proposed motor in the submittal. section 11

ASHGHAL Please refer to the section 19 for


AN Approval & Documents for proposed motor not found the
the slected previous Ashghals,The
COO section 11. AJE / OEM is required to clarify. OEM
52.1 same motor is used and
shall also provide the reference of the similar motor
apporoved The Viking/USA will be
supplied and installed in ASHGHAL projects.
supplied for the project

AJE / OEM is required to provide full compliance Noted and Comply. Please refer to
53 QCS 2014 Open
statement for motor QCS 2014 Section 21 Part 15. section 8
AN Section 21
Part 15 It shall be subject to fully compliant with the QCS Noted and Comply. Please refer to
53.1
2014 requirements. section 8
Noted and Comply. Please refer to
Temperature rise class is not indicating in the motors
54 section 5 (Motor technical Open
Temperature data sheet which need to be clarified.
AN datasheet)
Rise
No further comments subject to fully compliant with
54.1 Noted and Comply
the QCS requirements.
OEM is required to provide and confirm the motor
55 Noted and Confirm Open
Motor protection as per the QCS 2014 requirements.
AN
Protection It shall be subject to successful compliance as
55.1 Noted and Comply
confirmed in contractor’s remark column.
Motor routine test certificate shall be provided in Noted and Comply. Please refer to
56 Open
Test the submittal. section 12( Motor section)
AN
Certificate The test certificate with the specific motor number
56.1 Noted and Comply
shall be provided during the delivery of the
equipment st site.
Proposed GI / PVC Conduit shall be fully complied
57 AN Compliance with the QCS 2014 Section 21 Part 7. AJE / OEM is Noted and Confirm Closed
required to confirm

C823-3-DOC-MAT-MEC-021 R.01 Page 12 of 14


Document No. : C823/3-CRS-001

Comment Response Sheet Revision No. : 01

Issue Date : 11 August 2021

The location of Guaging panel and fuel control panel


is indicated in main tank room while proposed
enclosure in the submittal is not Exd. AJE / OEM is
58 Noted and Confirm Open
required to confirm and ensure the enclosure shall
be as per the hazardous area classification of the
project.
Guaging
panel and please be informed that the
AN
fuel control proposed automatic guaging panel
panel is ce atex certified and the
Please substantiate your confirmation by providing control panel ios ip 66 the control
58.1
the documents. panel ios ip 66
please refer to the section 12 <
control panel and Automatic Tank
Gauging System
The thermal overload relay ambient temperature
59 shall be as per the QCS 2014 Section 21 Part 3 Noted.
CI:3.2.6.1.d.
the shop drawings with detailed
Thermal design layouts and schematic
AN Overload The data sheet of overload relay is not supporting drawing showing all the applicable
Relay with your confirmation. OEM is required to clarify relays will be submitted
59.1
and amend accordingly. separately for approval (The
Control Panel Customized for
project operation as per the final
design)
Revision 01 - Comments

Reference to Comments above, where the OEM


response states that the details will be submitted as
P&ID’s &
part of shop drawings later. K&A has no objection to
60 SM/KC Schematic Noted and Comply
this proposal, subject to the condition that AJE/OEM
drawings
shall address all the comments during shop drawing
development.
C823-3-DOC-MAT-MEC-021 R.01 Page 13 of 14
Document No. : C823/3-CRS-001

Comment Response Sheet Revision No. : 01

Issue Date : 11 August 2021

Reference to Comments above, where the OEM


response states that the details will be submitted as
Panel wiring part of shop drawings later. K&A has no objection to
61 SM Noted and Comply
drawings this proposal, subject to the condition that AJE/OEM
shall address all the comments during shop drawing
development.
Switch breaking capacity shall be related to AC 23
Utilization
62 AN utilization category as per the QCS requirement. Noted and Comply
Category
OEM is required to confirm and amend accordingly.
The motor frame selection with IP 55 on page no.31
of data sheet is not matching with the selected
Motor motor at page no.35 of data sheet. OEM is required Motor wil be IP65 Frame E 160L to
63 AN
Selection to clarify and amend accordingly. Also the selection E200L
of the motor is not defined the number of pole.
Kindly clarify.

Status Code Legend:


A -Approved C –Revise and resubmit E-For information only
REVIEW STATUS C B –Approved with comments D -Rejected

Prepared & reviewed by:


Mechanical Engr.: Kiran Chaudhari Date:
Instrument Engr : Sunil Moorkanat Date:

Electrical Engineer: Asif Nawab Date:

Resident Engr.: Edward Rajasegaran Date:

Approved by:

Project Manager: Ma’en AbuAfifeh Date:

C823-3-DOC-MAT-MEC-021 R.01 Page 14 of 14


INDEX

1. CONTRACT DETAILS
2. LISTED IN PVL
3. SCOPE OF WORK
4. BOQ REFERNCE / SPECIFICATION SECTION / SPECIFIC
REFERNCE DRAWINGS
5. TECHNICAL DATA SHEET
6. COMPANY PROFILE
7. ORGANIZATION CHAT SHOWING QUALITY DEPARTMENT
8. COMPLIANCE STATEMENT
9. VALID CR COPY/COMPANY ID
10. MATERIAL CATALOG AND DATA SHEET
11. COUNTRY OF ORIGIN
12. TEST REPORT
13. SAMPLE WITH MATERIALS. COMPANY AND COUNTRY
DETAILS
14. SPARES
15. WARRANTY CERTIFICATE
16. VALID ISO AND OTHER MANAGEMENT CERTIFICATES
(9001, 14001 & 18001)
17. COPY OF VALID CERTIFICATE / APPROVAL OF THE FIRM
(MANUFACTURER / SUPPLIER) FROM CONCERNED
GOVERNMENT DEPARTMENT
18. LIST OF PROJECTS (COMPLETED AND ONGOING) COPY OF
APPROVAL
19. COPY OF PREVIOUS ASHGHAL APPROVAL
1. CONTRACT DETAILS
CONSTRUCTION OF TERMINAL SEWAGE
PROJECT NAME : PUMPING STATION AT DOHA NORTH STW
PACKAGE – 3, C823/3.

CLIENT : ASHGHAL (PUBLIC WORKS AUTHORITY)

KHATIB & ALAMI


CONSULTANT : CONSOLIDATED ENGINEERING COMPANY

CONTRACTOR : AL JABER ENGINEERING

MATERIAL SUBMITTAL : Fuel System


TITLE

MANUFACTURER : Varies

SUPPLIER : UNIGAZ

AREA OF APPLICATION : GENERATOR ROOM


2. LISTED IN PVL
Category:Ž‡…–”‹…ƒŽƒ–‡”‹ƒŽ•

Material Type:—„ƒ‹ƒ‡Ž‘ƒ”†ǡ ‡‡†‡”‹ŽŽƒ”ǡ‹•–”‹„—–‹‘„‘ƒ”†ǡ—•—…–•

Manufacturers Agents
Hager
Hager / Chaina Hager Electro B.V
Country: China Bldg. No.840, Office No.7, Concord Business Cen
Address:
Hager Metal Works Co Ltd , Longgang Industrial Park, Street,
XiashaCDistrict
Ring
Address:
, Shipai Town , Dongguan, China P.O. Box: 31830
P.O. Box: Telephone: (+974) 55682915
Telephone: +86 21 6332 0212, Mob:+86 21 6332 0212Fax: -
Fax: +86 21 6332 0253 Website: https://www.hager.com/
Website: www.hager.com Email: ethan.he@hagersh.com
Email: ethan.he@hagersh.com
Hager / Poland
Country: Poland
Address: Hager Polo Sp. Zo.o, Ul Fabryczna 10, 40-100 Tychy,Poland
P.O. Box:
Telephone: +48 32 32401 40
Fax: +48 32 32401 40
Website: www.hager.com
Email: sekretariat@hager.pl
Hager / France
Country: France
Hager Electro SAS , 132 Boulevard d'Europe, B.P. 78, 67212 Obernai,
Address:
France
P.O. Box:
Telephone: +33 (0)3 88 49 50 50
Fax: +33 (0)3 88 49 50 03
Website: www.hager.com
Email: info@hager.fr
Eaton

Orient Star International Electro-Mechanical Trading & Contractin


Eaten / Czech Republic
Address: Al Mansoura street, Doha , Qatar
Country: Czech Republic
P.O. Box: 5148
Address: Schrems – Czech Republic
Telephone: 44351564
P.O. Box: 193 00 - Praha 9
Fax: 44372967
Telephone: +43 50868-1154, Mob: +43 676 8995-1154
Website: http://www.gulfcable.com/Contact, www.orient
Fax: -
Email: orientstar@qatar.net.qa, trading@orientstarint.c
www.eaton.com or
Website:
http://www.eatonelektrotechnika.cz/cz/kontakty.html
Email: ReinhardMoerzinger@Eaton.com
PAC power & automation international / ABB
PAC power & automation international PAC power & Automation International
Country: Qatar Address: Workshop: St. 38 Industrial Area, Gate No. 43, D
Address: St. 38 Industrial Area, Gate No. 43, Doha,
P.O.Qatar.
Box: 40587
P.O. Box: 40587 Telephone: 44506084
Telephone: 44506084 Fax: 44683021
Fax: 44683021 Website:
Website: Email: info@pacqa.com
Email: info@pacqa.com
Schneider Electric, Swedwn
Electric House W.L.L
Address: St 49, Gate 52, Salwa Ind Area
P.O. Box: 24922
Schnieder Electric/ Qatar
Telephone: +974 44506535
Country: Qatar
Fax: +974 44501660
Address: Financial Square, Rowdat Al-Khail, C-Ring, Doha, Qatar
Website: www.schneider-electric.com, www.verger-delp
P.O. Box: 24795
Email:
Telephone: 44063000 , 44063047, Mob: 74785408 , 31292748
Verger et Delporte Qatar WLL
Fax: 44676936
Address: Street 43, Industrial area, Doha, Qatar
Website: www.schneider-electric.ae
P.O. Box: 40890
Email: bdelkrim.boukhaf@schneider-electric.com
Telephone: 44693940/44691749/44699657
Schneider Electric Hungaris Zrt
Fax: -
Country: Hungary
Website: Website:http://www.schneider-electric.com
Address: Gyongyosi Fioktelep H-3200 Gyongyos Kokut ut 10
Email:
P.O. Box: 3200
Jaidah Motors & Trading Co.- Electrical Division
Telephone: +36 37 887 500
Address: Industrial Area, Street 24,Gate:1, Doha, Qata
Fax: +36 37 887 501
P.O. Box: 150
Website: www.schneider-electric.ae
Telephone: +974 4463 8777
Email: Ae-ccc-gulf@ae.schneider-electric.com
Fax: +974 4460 4286
Website: www.jaidahelectrical.com
Email: Raja.j@jaidah.com.qa
Material Type:G.I. Conduits & Fittings

Manufacturers Agents

Barton

Barton/ UK AL BALAGH TRADING & CONTRACTING Co. W.L.L

Country: United Kingdom Address: D-Ring Road, Al Hilal Area, Doha, Qatar

Address: Rose Street, Bradley, Bilston, West Midlands,P.O.


WV14Box:
8TS, UK 5777 Doha, Qatar

P.O. Box: Telephone: 44665438

Telephone: +44 (0)1902 494 416 Fax: 44663657

Fax: - Website: www.albalagh.com

Website: www.hublebas.co.uk/index.aspx Email: trading@albalagh.com

Email: westsales@hublebas.co.uk

REXWAY

REXWAY Trade House Qatar Co. W.L.L

Country: Malaysia Address: SAFWA Bldg, Barwa Commercial Avenue , Doha , Q

INSTEEL (MALAYSIA) SDN. BHD., Lot 2-31, Jalan SU


P.O.7,Box:
Seksyen 26,22108
Off
Address:
Persiaran Tengku Ampuan, 40400 Shah Alam, Selangor Darul Ehsan, Malaysia
Telephone: +974 4007 5757
P.O. Box:
Fax: +974 4007 5758
Telephone: (+603) 5192 8003
Website: www.tradehouse-qatar.com
Fax: (+603) 5192 1023
Email: info@tradehouse-qatar.com
Website: www.insteelworld.com

Email: info@insteelworld.com

Thomas & Betts Corporation (a member of the ABB group)

Thomas & Betts Corporation Trade House Qatar Co. W.L.L

Country: United States Address: SAFWA Bldg, Barwa Commercial Avenue , Doha , Q

Address: 8155 T&B Boulevard, Memphis, TN 38125,P.O.


USABox: 22108

P.O. Box: Telephone: +974 4007 5757


Telephone: +1 901-252-5000 Fax: +974 4007 5758

Fax: +1 901-252-1301 Website: www.tradehouse-qatar.com

Website: www.tnb.com , webmaster@tnb.com Email: info@tradehouse-qatar.com

Email: elec_custserv@tnb.com

CALIBRE

Calibre Pipes & Accessories Calibre Pipes & Accessories

Country: Qatar Address: New Industrial Area, Street 12, Gate 74

Address: New Industrial Area, Street 12, Gate 74P.O. Box: 23214

P.O. Box: 23214 Telephone: 44214150

Telephone: 44214150 Fax: 44418507

Fax: 44418507 Website: www.calibre-int.com

Website: www.calibre-int.com Email: info@calibre-int.com

Email: info@calibre-int.com

SMARTr

SMARTr International Pte. Ltd AL BALAGH TRADING & CONTRACTING Co. W.L.L

Country: Singapore Address: D-Ring Road, Al Hilal Area, Doha, Qatar

Address: 66 Kian Teck Road, Singapore P.O. Box: 5777 Doha, Qatar

P.O. Box: 628796 Telephone: 44665438

Telephone: +65-62736606 Fax: 44663657

Fax: +65-62716606 Website: www.albalagh.com

Website: www.smartr.com.sg Email: trading@albalagh.com

Email: marketing@smartr.com.sg

03-09-2023

Expiry Date:
Cupra International SDN-BHD

Cupra International SDN-BHD Supreme Technologies W.L.L

Country: Malaysia Office No.25, West Corner Center Building, Salwa road,
Address:
Roundabout Doha-Qatar
No.61, Jalan Perindustrian 4/KU8, Kawasan Perindustrian Meru Selatan,
Address:
41050 port Klang, Selangor, Malaysia P.O. Box: 11289

P.O. Box: 41050 Telephone: 44971300, 55766837

Telephone: +603- 27856860; +601-23161077 Fax: 40390911

Fax: +603- 27856919 Website: info@supremetech.me

Website: www.cuprainternational.com Email: www.supremetech.me

Email: sales@cuprainternational.com

Expiry Date: 08-10-2023

Walsall

Walsall/ UK LAFFAN TRADING & CONTRACTING WLL

Country: United Kingdom Address: Al-Jazeera Petrol Station, Salwa Road, Doha, Qata

Address: Oldham · England P.O. Box: 6363

P.O. Box: Telephone: 44426102 , 44329738 , 44426102 , 44438330

Telephone: +44 161 6336431 Fax: 44320898

Fax: - Website:

Website: Email:

Email: pa-info@gb.pepperl-fuchs.com

Expiry Date: 20-11-2020

Walsall Conduits Limited/Caparo Engineering India Limited

Walsall Conduits Limited/Caparo Engineering India Limited Lusail Trading & Contracting Company

Product/Model Name: Flexible Conduits and GI Conduits & Fittings Salwa Road Sheika Ghalia Al- Thani Commercial Comple
Address:
Building 180 Unit 5
Country: India
P.O. Box: 21914
Address: Steel Tubes Road, Dewas, Madhya Pradesh 455001 India
P.O. Box: Telephone: +974 4451 2550

Telephone: +91 7272424333 Fax: +974 4492 9862

Fax: +91 9911566735 Website: www.lusail-wll.com

Website: www.caparo.co.in Email: info@lusail-wll.com

Email: sachin.srivastava@caparo.co.in

Expiry Date: 01-06-2024

Syarikat LanRic Industries Sdn. Bhd.

Syarikat LanRic Industries Sdn. Bhd. Powermax Trading & Contracting Co. W.L.L.

Product/Model Name: GI Conduits & Accessories Barwa Village Building No. 4 Shop No. 1 Street No. 294
Address:
Main Street Doha Qatar
Country: Malaysia
P.O. Box: 20198
Plot 171, Hala Perusahaan mengl embu 1, Falim 30200, Ipoh Perak
Address:
Malaysia Telephone: +974 4443 7586

P.O. Box: Fax: +974 4442 8421

Telephone: +605-2822361/362 Website: www.powermaxqatar.com

Fax: +605-2822363 Email: sales@powermaxqatar.com

Website: www.lanric.com

Email: liz@lanric.com

Expiry Date: 12-09-2024


Material Type:‘†—‹–Ƭ……‡••‘”‹‡•

Manufacturers Agents
Qatar Nat. Plastic Factory
Qatar Nat. Plastic Factory/ Qatar Qatar National Plastic Factory
Country: Qatar Address: New Industrial Area, Zone 81, Str. 4, Bldg 13
Address: New Industrial Area, Str. 4, Bldg 135
P.O. Box: 5615
P.O. Box: 5615 Telephone: +974 44689977
Telephone: +974 44689977 Fax: +974 44689922
Fax: +974 44689922 Website: www.qnplast.com
Website: http://www.qnplast.com Email: info@qnplast.com
Email: info@qnplast.com
Alkhyareen
Alkhyareen / Qatar Al Khayarin Electrical Trading
Country: Qatar Address: Gate 18, Street 22, New Industrial Area, Doha- S
Address: New Industrial Area , Street 22 , Gate
P.O.
18 Box: 37461
P.O. Box: 37461 Telephone: +974 4411 4320
Telephone: +974 4411 4320 Fax: +974 4411 4324
Fax: +974 4411 4324 Website: http://www.alkhayarinplastic.com/
Website: http://www.alkhayarinplastic.com/ Email: info@alkhayarinplastic.com
Email: info@alkhayarinplastic.com
3. SCOPE OF WORK
81,*$=4$7$5_

6FRSHRI:RUN

The diesel system includes the following sequence of 6FRSH of works.

™Provide Material submittal for the System.

™Provide shop drawing for the system.

™Procure all components for the diesel system


(Applicable with respect to the materials included in the offer)

™Installation of main tank

™Installation of leak detection system

™Installation of control system


™Installation of mechanical items like pumps, valves & piping’s
™Testing of entire diesel system
™Pre commissioning of diesel system
™Commissioning of diesel system
™Client approval to the system
™WOQOD inspection / approval
™Submitting As-built
™Training
™O&M Manual & Warranty certificates

x Related to Fuel Oil system is Included respect to the materials


¾ Note: All Work
included in the offer

UNIGAZ QATAR
PREQUALIFICATION
DOCUMENTS
4. BOQ REFERNCE / SPECIFICATION
SECTION / SPECIFIC REFERNCE DRAWINGS
STATE OF QATAR ANNEX 2: PRICING DOCUMENTS BILL NO. 4
ASHGHAL SECTION 3: BILL OF QUANTITIES

Item Item Description CESMM3 Unit Quantity Rate Amount


Ref. (QR)
BILL 4 - MECHANICAL WORKS
(Cont'd)
1 Supply, Delivery, Install, Testing &
commission New Mechanical Plant,
Equipment and associated for
Terminal Pumping Station.

Bulk Fuel Storage Tank

A 50,000 lit fuel capacity, welded mild steel N185 nr 2


construction suitably protected from
corrosion in accordance with BS 2594
shall be installed in the location indicated
in the drawings complete with pipes,
fittings, feed lines, vents. etc. with 600
mm inspection manhole with cover, 50
mm air vent pipe with screen outlets,
isolating valve, valve drain, electronic fuel
indicator with an audio/ visual alarm for
main fuel storage tank, access ladder and
maintenance platforms, to comply with
the Qatar Civil Defence Regulations for
generator installations, in accordance with
QCS 2014 (or latest) section 21 part 17;
per drawing reference C823-P03-CV-
3301 thru *CV-3311, *IC-3301, and *IC-
3302.

Fuel Storage Day Tanks (Vendor


Package)

Project ID: PA 2020 C 009 G A2: S3 B4-05


Construction of Terminal Sewage Pumping Station at Doha North STW Package-3 Revision: 0
STATE OF QATAR ANNEX 2: PRICING DOCUMENTS BILL NO. 4
ASHGHAL SECTION 3: BILL OF QUANTITIES

Item Item Description CESMM3 Unit Quantity Rate Amount


Ref. (QR)
B Two (2) units, day tanks each 3,000 lit N182 nr 2
fuel capacity, welded mild steel
construction suitably protected from
corrosion in accordance with BS 2594
shall be installed in the Generator Room
complete as per thte Vendor's package,
i.e., pipes, fittings, feed lines, vents. etc
with inspection manhole with cover, air
vent pipe with screen outlets, isolating
valve, valved drain, electronic fuel
indicator with an audio/ visual alarm for
main fuel storage tank, access ladder and
maintenance platforms, to comply with
the Qatar Civil Defence Regulations for
generator installations, in accordance with
QCS 2014 (or latest) section 21 part 17;
per drawing reference C823-P03-CV-
3301 thru *CV-3311, *IC-3301, and *IC-

Carried to Collection QR

Project ID: PA 2020 C 009 G A2: S3 B4-05


Construction of Terminal Sewage Pumping Station at Doha North STW Package-3 Revision: 0
STATE OF QATAR ANNEX 2: PRICING DOCUMENTS BILL NO. 4
ASHGHAL SECTION 3: BILL OF QUANTITIES
Item Item Description CESMM3 Unit Quantity Rate Amount
Ref. (QR)
BILL 4 - MECHANICAL WORKS
(Cont'd)
4 Supply of Spare Parts associated for
Terminal Pumping Station (Cont'd)

Valves, NRV, Air Valve

A Spare part Tools : QCS 2014 section 17, Z900 sum


parts - 5 Clause 4.(a).IV

Set of O-rings, gasket and seals valve - Z900 nr 1


motorised gate valve, manual gate, NRV,
air valve, vacuum valve - one set for each
type and size of valve

Fuel Transfer Pump

B Spare part Tools : QCS 2014 section 21, Z900 sum


parts 17 Clause 17.1.5.2.d

Surge Vessel.

C Spare part Tools : QCS 2014 section- 9, Z900 sum


parts - 6 Clause 6.2.5

Grab Type Screen.

D As per QCS 2014 Section-9, part - Z900 sum


1,Clause 1.1.4.10.h(v)

Lubrication

E All lubricants scheduled shall be provided Z900 sum


by the Contractor; any items which are
not specifically scheduled, but which are
deemed required to comply with QCS
2014 (or latest edition) Section 9 Clause
1.2.11 shall be provided by the Contractor
under the Contract without additional cost
to the Government.

Repair Kits

Project ID: PA 2020 C 009 G A2: S3 B4-22


Construction of Terminal Sewage Pumping Station at Doha North STW Package-3 Revision: 0
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

ISSUED FOR CONSTRUCTION

Rev. Date Revision Details Drawn Chkd. Appd.

E E
Public Works Authority
P.O.Box 22188
Tel. : (0974) 44950000
Fax. : (0974) 44950999
www.ashghal.gov.qa Qatar Deserves The Best

PA
PROJECTS AFFAIRS

DESIGNS DEPARTMENT
F F
Design Consultant :

Stantec UK Limited, Box : 207312, 9th Floor,


Al Mana Tower, C Ring Road, Doha-Qatar,
Tel : (+974) 44804622 Fax : (+974) 44368694
Project Name:
CONSTRUCTION OF TERMINAL
SEWAGE PUMPING STATION AT
DOHA NORTH STW PACKAGE 3
G G
C823/3
Project Code:
PA 2020 C 009 G
Drawing Title:

SHEEHANIYA TERMINAL PS
INSTRUMENTATION
FUEL TANK AND GENERATOR
P&ID - SHEET 1 OF 2
Drawn: Checked:
K. SHETTY I. KHAN
Designed: Approved:
H K. SHETTY K. PEZHGORSKI H
Date: Scale:
JUNE 2019 NTS
Status:
CONTRACT
Drawing Number: Revision:

C823-P03-STN-IC-3301 CA
1 2 3 4 5 6 7 8 9 10 11 12
1 2 3 4 5 6 7 8 9 10 11 12

A A

B B

C C

D D

ISSUED FOR CONSTRUCTION

Rev. Date Revision Details Drawn Chkd. Appd.

E E
Public Works Authority
P.O.Box 22188
Tel. : (0974) 44950000
Fax. : (0974) 44950999
www.ashghal.gov.qa Qatar Deserves The Best

PA
PROJECTS AFFAIRS

DESIGNS DEPARTMENT
F F
Design Consultant :

Stantec UK Limited, Box : 207312, 9th Floor,


Al Mana Tower, C Ring Road, Doha-Qatar,
Tel : (+974) 44804622 Fax : (+974) 44368694
Project Name:
CONSTRUCTION OF TERMINAL
SEWAGE PUMPING STATION AT
DOHA NORTH STW PACKAGE 3
G G
C823/3
Project Code:
PA 2020 C 009 G
Drawing Title:

SHEEHANIYA TERMINAL PS
INSTRUMENTATION
FUEL TANK AND GENERATOR
P&ID - SHEET 2 OF 2
Drawn: Checked:
K. SHETTY I. KHAN
Designed: Approved:
H K. SHETTY K. PEZHGORSKI H
Date: Scale:
JUNE 2019 NTS
Status:
CONTRACT
Drawing Number: Revision:

C823-P03-STN-IC-3302 CA
1 2 3 4 5 6 7 8 9 10 11 12
QCS 2014 Section 21: Electrical Works Page 1
Part 17: Standby Diesel Generator Set

17 STANDBY DIESEL GENERATOR SET ........................................................ 2

17.1 GENERAL ...................................................................................................... 2


17.1.1 General Reference 2
17.1.2 Description of Work 2
17.1.3 References 2
17.1.4 Quality Assurance 2
17.1.5 Submittals 3
17.1.6 Period of Maintenance 5
17.2 PRODUCTS ................................................................................................... 5

.L
17.2.1 Diesel Generator Set 5

.L
17.2.2 Control Panel 14
17.2.3 Automatic Transfer Switch (A.T.S.) 15

W
17.2.4 System Operation and Performance 16
17.2.5 Manual Operation 16

G
17.2.6 System Responsibility 16

IN
17.2.7 Installation 16
17.2.8 Paint Work R 17
17.2.9 Site Quality Control 17
EE
17.2.10 Commissioning 17
17.2.11 Training of Operation and Maintenance Personnel 18
17.2.12 Reference Data Sheet 19
IN
G
EN
R
BE
JA
AL
QCS 2014 Section 21: Electrical Works Page 2
Part 17: Standby Diesel Generator Set

17 STANDBY DIESEL GENERATOR SET


17.1 GENERAL

17.1.1 General Reference

1 The work of this Section is integral with the whole of the Project Documentation and is not
intended to be interpreted outside that context.

2 Co-ordinate the work with all other services affecting the work of this Section.

17.1.2 Description of Work

.L
1 The Contractor shall supply, install, commission, test and handover in good operable manner

.L
including 400 days guarantee and maintenance of 415 V mains failure, standby diesel

W
generator set and 5 years guarantee for electric motors, as per the Project Documentation.
The set shall be arranged for either automatic or manual start on mains failure, as indicated
on the Project Drawings. The set shall be complete with diesel engine, generator, control

G
panel, batteries, starting motor, built-in air cooled radiator, main fuel storage tank, daily fuel
storage tank, fuel transfer pumps and all other accessories as specified and mentioned in the

IN
BOQ.

2 Related Parts and Sections are as follows:


R
EE
This Section
Part 1 General Provisions for Electrical Installation
Part 6 Cables and Small Wiring
IN

Part 7 Conduits
Part 8 Trunking
G

Part 9 Cable Trays


EN

Part 22 Earthing and Bonding


17.1.3 References
R

1 The following standards or revised/updated are referred to in this Part


BE

BS 4999 ......................Alternators
BS 5514 ......................Engines
JA

17.1.4 Quality Assurance

1 Manufacturer's Qualification:
AL

(a) The Diesel Generator Set shall be designed and manufactured complete by a
manufacturer regularly engaged as a manufacturer of such equipment.
(b) The Diesel Generator Set Manufacturer shall have a proven manufacturing experience
of minimum 10 years in this field. Reference of previous approvals in similar
applications and environmental conditions shall be provided for Engineer’s review and
approval.
(c) The DG set manufacture shall have an approved ISO 9001 QA/QC procedure for
design, manufacturing and testing of complete DG set. The DG set Manufacturer shall
provide minimum the following documents as a part of submittal approval.
(i) Quality policy
(ii) Quality Policy manual
(iii) Manufacturing and storage facilities.
QCS 2014 Section 21: Electrical Works Page 3
Part 17: Standby Diesel Generator Set

(iv) Traceability of components.


(v) Design facilities.
(vi) Testing facilities.
(d) The Diesel Generator Set manufacturer shall have full Load testing facilities in his
premises for testing the full range of his products at full load as per the relevant BS/
ISO standards.

2 Installer's Qualification:

(a) all the Diesel Generator installation work shall be carried out by a Diesel Generator
sub-contractor. Diesel Generator sub-contractor shall be one who is normally an
agent representing one or more of the approved makes of D/G sets. Diesel

.L
Generator installation shall be supervised, checked and tested by a qualified
representative of the manufacturer and handover the works in perfect running order

.L
to the satisfaction of the Engineer.

W
3 Source Quality Control:

(a) The Diesel Generator Set Manufacturer shall test the complete Diesel Generator set at

G
the manufacturing facilities. The test shall be performed as per the latest BS/IEC
standard and the Factory Acceptance Procedure shall be approved by the

IN
Engineer/Client. Any additional test required by the Engineer during the FAT shall be
performed by the Diesel Generator Manufacturer in his cost. The Diesel Generator set
R
shall not be shipped from the manufacturing facilities until the test reports have been
submitted and approved by the Engineer.
EE

4 Local Agent:
IN

(a) the manufacturer should have an agent in Qatar who is well experienced in
installation and maintenance of diesel generators of the size specified herein. The
G

agent should have been associated with the manufacturer for a minimum period of
five years.
EN

5 Design Criteria:

(a) all materials and equipment shall comply with relevant IEC and BS specifications as
R

regards quality of materials, performance and proving tests.


BE

(b) the emergency power supply system and its components shall be such as may be
properly maintained and serviced without the necessity of carrying expensive spare
part stocks, or being subjected to interrupted service due to the lack of spare parts
JA

(c) emergency generator set shall be designed to allow easy replacement of major items
subject to wear.
AL

17.1.5 Submittals

1 Shop Drawings:

(a) Submit shop drawings for approval in accordance to Part 1


(b) Shop drawings shall be complete, as to be record drawings, not general outline
drawings used for sales and guide layouts
(c) Submit a complete wiring diagram for the generator set, drawn on a single standard
size sheet, showing the following:
(i) all components of:
 engine starting control
 engine alarm
 generator control
QCS 2014 Section 21: Electrical Works Page 4
Part 17: Standby Diesel Generator Set

 battery
 battery charger
 earthing
 transfer switch control relays
(ii) interior wiring, terminals and interconnecting wiring
(iii) certified dimensions and weights.
(d) submit a composite wiring diagram of the entire emergency transfer system showing
all wiring between the engine starting panel, engine generator set and the automatic
transfer switches

.L
(e) wiring diagrams shall clearly show:
(i) main current conductors, in heavy lines

.L
(ii) control conductors, with colour and/or number coding

W
(iii) location of relays and apparatus
(iv) description of function, type and catalogue, of all components.

G
(f) alternator Control Panel:

IN
(i) submit a schematic line diagram showing:
R
 Interlocks
EE
 Protection
 Instruments
IN

(g) submit general arrangement drawings of the generator installation and the generator
building layout.
G

2 Product Data submitted in accordance to Part 1.


EN

(a) submit curves showing the actual performance of a similar engine (same model,
stroke, etc.) to that proposed, superimposed on the standard published performance
curves for continuous, and maximum operation
R

(b) submit the detailed information together with manufacturer's catalogues for the
BE

following:
(i) generating set manufacturer
JA

(ii) name and Address


(iii) generating set Model No.
AL

(iv) diesel Engine


(v) radiator
(vi) fuel System
(vii) alternator
(viii) exciter
(ix) starting Battery
(x) control Panel
(xi) service Facilities
(c) test certificates
(d) list of spare parts
(e) certified factory test reports
QCS 2014 Section 21: Electrical Works Page 5
Part 17: Standby Diesel Generator Set

(f) instruction manuals for operation and maintenance


(g) parts catalogue with manufacturer address.

17.1.6 Period of Maintenance

1 During the maintenance period of 400 days the sub-contractor shall repair and replace
directly, at his own expense, any of the plant, material or work performed or furnished under
the respective works in the Project which may develop under the conditions provided for by
the Project and under proper use in the works or that portion thereof taken over by the
Engineer. The guarantee period for all electric motors shall be 5 years.

2 The sub-contractor shall obtain and submit to the Engineer all guarantees or certificates or
warranty available from the manufacturers, but only as supplementary to the sub-contractor's

.L
own liabilities under the Project and in no way invalidate them.

.L
3 The D/G sub-contractor shall be responsible for the satisfactory operation of the D/G
installation during the Maintenance and Guarantee Period. He shall carry out necessary

W
inspection, preventive maintenance and testing to keep the set ready all the time. The set
shall function satisfactorily during power failures. The D/G sub-contractor shall carry out

G
routine testing of the installation once in every month throughout the Maintenance and
Guarantee Period. The testing shall be carried in presence of Engineer. The sub-contractor

IN
shall himself provide all electrical and mechanical spare parts, grease, lubricating oils, touch-
up paints, etc., required for the maintenance of the D/G installation. The owner shall be
R
responsible only for providing diesel oil as and when required. The D/G sub-contractor shall
prepare log-books listed full details of maintenance work and each log-book entry shall be
EE
countersigned by the Engineer.

17.2 PRODUCTS
IN

17.2.1 Diesel Generator Set


G
EN

1 The Diesel Generator Set shall be of rugged reliable design and built for long trouble free
service under the worst specified climatic conditions and made by an approved reputable
manufacturer.
R

2 Rating:
BE

(a) The Diesel Generator Set output shall be design for prime rating as specified
elsewhere. Detailed design calculations for Engine, Alternator, Cooling system, battery,
etc shall be provided for Engineer’s approval for the proposed Diesel Generator set.
JA

(b) The rated output shall be as specified elsewhere or as indicated on the drawings,
415/240 Volts, 3 phase, 4 wire and 50 Hz or different voltage level as indicated
elsewhere in the Contract specifications (690 V or 3.3 KV).. The rated output shall
AL

mean the net full continuous derated output in Qatar at an ambient temperature up to
50°C at a relative humidity of 95%. The set shall also be capable of 110% load for one
hour under these conditions at the rated speed without undue heating of the engine or
alternator and without mechanical or electrical troubles.

3 Diesel Engine:

(a) The diesel engine shall be of the stationary heavy duty, turbo charged
compression/ignition, multi cylinder 4 stroke operation. The steel base frame shall be
provided with spring type vibration isolators. The engine shall be able to deliver full
load in the shortest possible time after start. The engine speed shall not exceed 1500
r.p.m. The engine construction shall be in such a way as to allow for dismantling of
any engine component for inspection or repair without undue complication i.e. without
dismantling of other non-defective parts. The crank case shall be provided with
inspection windows
QCS 2014 Section 21: Electrical Works Page 6
Part 17: Standby Diesel Generator Set

(b) starting system: The diesel engine shall be equipped with starting system detailed
hereunder and as per Engineer's approval.
(i) Battery Starting System:
 batteries for starting shall be of the nickel cadmium type, 24 Volt, heavy
duty diesel starting type and of sufficient capacity to allow 6 consecutive
start attempts each of 15 seconds with 1 minute intervals. It shall be
possible by means of a selector to alter the starting sequence to provide a
single start attempt of 1 minute before lockout and alarm. The battery
used for starting may also be used to energise the diesel plant control
system but shall have enough capacity remaining after 3 engine start
attempts to energise the system continuously for 24 hours. The control
system shall be suitable to continue operating correctly during the voltage

.L
dips occurring on the battery during the engine starts.
(c) Cooling System:

.L
(i) radiator : built-in type with sufficient capacity to dissipate the total joules per hour

W
rejected by the engine cooling system at 110 % full load

(ii) blower fan: to have sufficient pressure to circulate required quantity of air for

G
engine cooling. The fan shall be provided with a suitable guard. D/G room
o

IN
inside temperature should not exceed 56 C
(iii) jacket water heaters: to be provided on engine to facilitate quick starting
R
under low ambient conditions
EE
(iv) the cooling system shall be capable of keeping the temperature of cooling
water at safe limits at all conditions of load required in the specifications.
Maximum temperature of cooling water after 10 hours of continuous running
IN

at full load at worst Qatar climatic conditions shall not exceed the maximum
temperature limits of the diesel engine
G

(v) the cooling system shall include an engine shaft driven circulating water
pump. The water jacket of the engine cylinder shall be so constructed that
EN

the water in the jacket can be drained completely


(vi) the radiator finned tubes shall have a common inlet and common outlet
headers
R

(vii) drain valve and a filling valve shall be provided to the radiator for flushing
BE

and quick filling


(viii) Cooling water piping, complete with all necessary supports; control valves,
JA

flanges and fittings, thermometers, pressure gauges, relays etc., shall be


supplied and installed to form a complete engine water cooling line.
Piping shall be as of BS 1387
AL

(ix) the water pump discharge valve shall preferably be a globe valve, the other
valves shall be (sluice) gate valve.

(d) Fuel System


(i) The engine shall be suitable for running on diesel oil as described below:
- Specific gravity at 60F distillation : 0.834
(P.P. 123/40)
- IBM : 219 C
- 10% : 250 C
- 50% : 276 C
- 90% : 314 C
- F.E.P. : 342 C
- Flash Point PME : 189 C
- Sulphur : 1.1%
QCS 2014 Section 21: Electrical Works Page 7
Part 17: Standby Diesel Generator Set

- Calorific value BTU/lb. gross


carbon residue. : 19750
- 0.01/wt diesel index : 62
- Viscosity redwood seconds at 100F : 34
(ii) Daily Fuel Tank:
 Fuel supply to the engine shall be maintained by a separate day tank
located in the room. Daily fuel tank shall be sufficient capacity for
continuous run of 8 hours at full load, unless otherwise specified in the
Project Documentation. The daily service tank shall be manufactured
from mild steel to a rectangular shape in accordance with BS 799 and
shall be complete with the following minimum equipment and facilities:-
 Inspection cover

.L
 vent/breather pipe

.L
 filler pipe connection

W
 overflow connection
 drain valve and sump drain

G
 emergency dump valve operated by the fire alarm system and by a fusible

IN
link mounted over the diesel engine
 dial type contents gauge calibrated in gallons and litres
R
 level switches to control fuel transfer pump
EE

 level switches to operate high and low fuel level alarm circuits in the
diesel alternator set control panel
IN

 lifting lugs.
G

 the Contractor shall provide and install an external dump sump of


sufficient capacity to contain the contents of a full day tank and all
EN

pipework necessary to carry the dumped fuel quickly by gravity, to a safe


location in the event of a fire being detected in the generator house. The
sump shall be constructed to contain the fuel without leakage to the
surrounding ground and shall be provided with a lockable cover. Provision
R

to allow emptying of the sump by portable pump shall be provided.


BE

(iii) Main Fuel Storage Tank:


JA

 The Contractor shall supply and install a cylindrical diesel oil storage tank
with a capacity to operate the associated diesel generator set
continuously on full load for a minimum of 7 days, unless otherwise
AL

specified in the Project Documentation.


 the tank shall be welded mild steel construction suitably protected from
corrosion in accordance with BS. 2594 and shall be installed in the
location indicated on the drawings.
 The storage tank shall be complete with pipes, fittings, feed lines,
vents.etc. The tank shall be of the approved type located outside the
diesel engine room. The tank shall be provided with 600 mm inspection
manhole with cover, 50 mm filling pipe with cooped filling terminal, 50 mm
air vent pipe with screen outlets, isolating valve, valved drain etc.
 Electronic fuel indicator with an audio/visual alarm shall be provided for
main fuel storage tank
 Also the storage tank and its accessories must comply with the Qatar.Civil
Defence Regulations for generator installations.
QCS 2014 Section 21: Electrical Works Page 8
Part 17: Standby Diesel Generator Set

(iv) Duplex Diesel Oil Pumping Set:


 Provide packaged type duplex, self priming, fuel oil pumping and straining
set with a capacity of four times the total fuel consumption of engine at full
load for each individual Diesel Generator Set. Pump sets shall be factory
assembled, piped, wired and tested. Pumps shall be activated by a
switch in the day tank automatically. All pumps installed in the D/G room
shall be flame-proof and fire-resistant as per NFPA Regulations
 Piping shall be complete to suction, discharge and return line
connections. Provide gate valves and unions arranged to permit removal
of either pump while the system is in operation. Install check valves and
relief valves on pump outlet and gate valves prior to pressure gauges
 Suction strainer shall be flanged connection, duplex type, one-piece,
cast-iron body, ASTM A48 Class 30, with 1.2 mm perforation brass

.L
baskets
 Oil pump set shall be factory assembled on a structural steel channel

.L
beam base to include pumps, motors, flexible couplings and guards.
Pump set shall be suitable for diesel oil

W
 Suitable manually operated pump shall be provided.
 The installation of Diesel transfer pump set shall be subject of the

G
Engineer’s approval. There shall not be any possibility of flooding of the
diesel transfer pumps.

(v) Tank Gauges:


IN
R
 Provide as shown on the Drawings. Each gauge is to be provided with an
EE
aluminium case and calibrated to indicate level of fuel in the tank.
Mounted on gauges shall also be a high/low level alarm switch. The
switches and gauges shall be designed for operation from a 24 Volt DC,
IN

loop powered system. Locate indicating gauges as shown on the


Drawings or required
G

 Tank fittings and pressure fittings shall be made of solid bar stock to
EN

prevent leak possibilities.

(vi) Diesel Oil Piping:


R

 Provide all diesel oil piping from storage tank to day tank fill lines, water
BE

tight fill boxes, vents, vent caps, tank foot valves, and accessories
 Provide swing check valves and gate valves at pump inlets. Provide
approved anti-siphon valves at high points of suction lines. Provide
JA

whatever additional valves that may be required by local regulations


 All piping shall be provided with ground joint unions at piece of apparatus
AL

to facilitate connecting and disconnecting


 All piping, unless otherwise specified, shall be schedule 40 standard
weight black wrought iron pipe
 Steel vent pipelines shall run from the fuel oil storage tanks, carried to the
proper height within building construction and terminating with vent
fittings. Fittings shall be "Bronze Ventilating Brick" with thickness of 20
mesh bronze wire gauge in front of louvered opening.
(e) Lubricating System
(i) The lubricating oil system shall be forced fed type. The details of the system
shall be included in the offer. The shaft bearing lubricating shall be directly
fed from the lubricating oil pump and not through the main bearings
(ii) The lubricating oil shall be of a type readily available internationally
QCS 2014 Section 21: Electrical Works Page 9
Part 17: Standby Diesel Generator Set

(iii) The lubrication system shall be positive displacement type. By-pass


arrangement should be provided in case of filter clogging
(iv) A heat-exchanger shall be provided for cooling the lubricating oil and this
shall be of long-life type i.e. the system shall not require constant cleaning or
other maintenance work. A valve for taking oil sample shall be provided.
The coolant for the above shall be jacket water of the engine. That is, the
cooling system of the engine and the lube-oil heat-exchanger cooling system
shall work in parallel or in series. If the lube-oil pressure reaches low value,
the engine shall be shut down automatically and also immediately should
give audible alarm together with visual indication. The lube-oil system shall
be provided with means to monitor pressure at important points at the
engine-monitor panel

.L
(v) a large capacity oil sump shall be provided and incorporated in the
construction of the bed plate

.L
(vi) the system of lubrication shall ensure that adequate oil is pumped to all

W
rotating parts
(vii) The system shall incorporate a level dipstick, filler cap and tube and
crankcase breather pipe or outlet

G
(viii) the capacity of the lubricating oil system shall be sufficient to enable the

IN
engine to run continuously for 12 hours at any load without replenishment.
(ix) Suitable manual-pumping arrangement for easy draining of the whole
R
quantity of lube-oil into a drum shall be provided.
EE
(f) Exhaust System:
(i) Exhaust pipes shall be of Schedule 40 black steel and of adequate size to
IN

ensure that back pressure does not exceed the value specified by the
manufacturer
G

(ii) The exhaust pipe shall be connected through airtight flexible coupling to the
engine
EN

(iii) Exhaust pipes shall be adequately lagged with 75 mm thick (minimum) rock
wool covered with aluminium sheaths of minimum thickness 1.5 mm so that to
0
take care of exhaust gas temperature in pipes exceeding 500 C. When
R

exhaust pipes pass through walls or roof a suitable weatherproof sleeve or


BE

thimble shall be provided to isolate exhaust pipe from the building. A


silencer of heavy duty residential type shall be provided in the exhaust
system and it shall also be lagged. The operation of casting the sleeves in
JA

the concrete, if required, will be carried out by a civil contractor


(iv) Exhaust pipes and silencers shall be supported from the ceiling by special
vibration isolating hangers and the pipe shall be slanted away from the
AL

engine and a condensate trap fitted at the lowest points. Approved rain caps
shall be installed at the discharge end of the exhaust pipes on the roof.
(v) Suitable flexible expansion joints shall be provided along the pipe run to take
care of expansion requirements
(vi) the completed exhaust system shall be capable of limiting the noise level at
the external outlet to 65 dB (A) at three metres from the end of the exhaust
pipe
(vii) suitable guards shall be provided with the exhaust pipe to prevent small
animals/reptiles from entering.
(g) Filters: Cleanable/replaceable elements should be provided.
(i) Fuel Oil System
The system shall have the following filters fitted before the fuel injection pumps:
QCS 2014 Section 21: Electrical Works Page 10
Part 17: Standby Diesel Generator Set

 A primary fuel filter of ample capacity to prevent all particles of 10 microns


size or smaller.
 A secondary filter to prevent all particles down to 3 microns size or
smaller.
(ii) Lubricating Oil System
This system should have full flow filters of sufficient capacity
 Tenderers shall give full particulars of the filters used. It shall be
mentioned in if filter elements are cleanable for replaceable, in which case,
the working hours after which the element and the Lubricating oil is to be
replaced should be stated.
(iii) Intake and Exhaust System

.L
Air is inducted to the engine manifold through

.L
 Precleaner

W
 Large capacity air cleaner
 Both filters are required due to severity of dust storms and dust

G
suspensions in the air

IN
 The engine exhaust line shall be fitted with flexible fitting efficient silencer
to give efficient silencing with minimum back pressure and terminated
R
outside the engine room.
EE
(h) Ventilation:
(i) The following ventilation works are required for the diesel engine generator
room.
IN


G

Aluminium inlet louvres with washable metal filters shall be provided for
outside air intake into the engine room. Filters shall be sized to perform
EN

their duty with a face velocity not more than 1 metre per second when the
engine is running. Filters shall be installed in an appropriate arrangement
on the generator room walls. The total filter area shall consider air for
engine intakes and radiator cooling requirements. Filters with handles and
R

easily operated retaining latches shall be provided.


BE

 The radiator shall be provided with a motorised louvre, interlocked with


the generator, so that the generator will shut down in the event of the
louvre not opening on start up. The louvre shall be capable of being
JA

manually opened in the event of drive motor failure. Gravity louvres shall
not be allowed for the radiator exhaust.
AL

(i) Governing System:


(i) the engine shall run steadily at any load within its rating at its rated speed,
and the changes in speed due to change in load shall comply with BS
5514/77 for Class A1 or with ISO 3067
(ii) the governor should be of the electronic type to comply with BS 5514/77
Class A1.

(j) Coupling and Common Bed:


(i) the engine and the alternator shall be suitably coupled directly without
interposing gear arrangement
(ii) the common bed shall be provided with spring type anti-vibration mountings
devices for fixing to the floor
QCS 2014 Section 21: Electrical Works Page 11
Part 17: Standby Diesel Generator Set

(iii) the engine vibration shall be the minimum possible and shall comply with
the relevant BS. The vibratory force induced as the engine passed through
resonance revolutions during starting and stopping period shall not cause any
damage to the whole system

(k) Engine Control Panel: The engine-generator control panel shall be of rigid
and robust construction and rust-proof and shall be of the electronic modular
type utilising environmentally sealed, solid state, micro-processor based
modules for engine control and AC metering. The panel shall be capable of
operating under the operating temperature range of 0 degrees to + 70
degrees Celsius. Metering accuracy shall be 0.5% true RMS. The electronic
control system shall employ solid-state transducers for constant monitoring of
oil pressure and coolant temperature through a Single Sire Serial Data Link.

.L
Unless otherwise specified in the Project Documentation, the control panel shall
provide the following features:

.L
(i) automatic start/stop engine control with programmable safety shutdowns and

W
associated flashing LED indicators for low oil pressure, high coolant
temperature, overspeed overcrank and emergency stop

G
(ii) adjustable 1 to 60 second cycle cranking with rest periods

IN
(iii) cool-down timer, adjustable between 0 and 30 sec.
(iv) LCD digital readout for: R
 engine oil pressure (N/mg)
EE

 lubricant oil pressure gauge (N/mg)


0
 cooling temperature ( C)
IN

0
 exhaust gas temperature gauge ( C)
G

 exhaust turbo-blower pressure gauge (N/mg)


EN

 engine RPM
 system DC Volts
 engine run hours
R

 eight system diagnostic codes


BE

 generator AC Volts

JA

generator AC Amps
 Generator frequency
AL

The system diagnostic codes shall be designed to enhance the system protection and
to allow for trouble shooting by untrained personnel.

These signals shall be:

-loss of engine speed


-invalid engine control switch
-internal circuit fault
-loss of coolant temperature
-loss of data sending unit
-unscheduled engine shutdown
-invalid programming switch position
-loss of failure of programme setting

These panels shall be provided with the following control switches:


-engine control switch
QCS 2014 Section 21: Electrical Works Page 12
Part 17: Standby Diesel Generator Set

-ammeter -voltmeter phase selector


-emergency stop
-indicator/display test switch
-voltage adjust potentiometer
4 Alternator and Exciter

(a) the alternator shall be able to withstand the stresses caused by the sudden
application of the loads
(i) Type : Self excited, self ventilated, air cooled, splash-
proof, synchronous alternator
(ii) Output : As per Project Documentation, at Qatar Climatic
Condition

.L
(iii) Voltage : 415V(Or as indicated in Project documents)

.L
(iv) Frequency : 50 Hz

W
(v) No. of poles : 4
(vi) No. of phases : 3, (ungraded neutral to be brought out)

G
(vii) Power factor : 80% lagging

IN
(viii) Commercial efficiency not less than 90 % (including excitation and field losses)
(ix) Voltage regulation : Automatic and static.
R
EE
(b) Class F insulation shall be provided for the alternator and exciter windings with the
temperature rise as Class B and de-rated for the ambient conditions.
IN

(c) the alternator shall be suitable for continuous running duty type S1, BS 2613 (latest
edition)
G

(d) the alternator unit shall be capable of giving 110% of nominal rated output for one
hour under site conditions. The rotor shall be capable of withstanding an over-speed
EN

test of 15% for 5 minutes


(e) distortion of no-load voltage wave form at alternator terminals shall be within 5 %
from the sinusoidal wave form
R

(f) voltage adjustable range of the output voltage by adjusting the exciter shall be not
BE

less than 3 % of rated voltage at rated load and not less than ± 5 % of rated voltage
under no-load conditions. This adjustment shall be able to be performed from panel
JA

(g) mounted handle or knob


(h) the voltage of the alternator shall be automatically controlled by electronic static
AL

circuits
(i) the alternator shall not be switched on the load until terminal voltage has reached at
least 90 % of the nominal value. It is essential that the voltage regulation equipment
shall have sufficient fast response time so that the alternator is ready to accept load
in the shortest possible time
(j) the voltage regulator shall be designed to maintain the alternator terminal voltage
constant within ± 1 % of the nominal value from no load to full load within normal
variations of engine speed with change in load
(k) the exciter shall be brushless, self excited, rotor mounted type. The rectifying
elements shall be silicon. The silicon diodes of the three phase rectified bridge
assembly shall be protected against surges and overloads such that the generator will
continue to run with a diode failure. Diodes shall have heat sinks suitable for the
ambient conditions described. Means shall be provided to indicate exciter diode
failure on the remote control panel
QCS 2014 Section 21: Electrical Works Page 13
Part 17: Standby Diesel Generator Set

(l) the unit shall be suitably protected so that when there is a sudden variation of load,
the sudden increase of field current in the rotor shall be curtailed and thus the speed
build up of the engine and the voltage build up of generator shall vary
proportionately
(m) alternator protection. The alternator shall be provided with protection against over
speed, over voltage, over current, short circuit, reverse power, single phasing earth
fault and any other found necessary. The neutral points of alternators shall be solid
by connecting to earth
(n) terminals with cable end boxes shall be provided respectively for the alternator and
exciter
(o) the cooling air for alternator and exciter shall be drawn through openings at the non-
drive end and exhausted sideways at the driving end

.L
(p) the alternator shall be fitted with anti-condensation heater to keep the winding in

.L
good, dry and safe condition. The anti-condensation heater shall be automatically cut-
off when the machine is running. Necessary on-off switches shall be provided on the

W
control panel and the operation status of the heater shall be indicated
(q) temperature Rise: Alternator components shall be sound electrically and

G
mechanically in continuous operation lasting over 24 hours at the rated output

IN
(r) insulation Resistance: Insulation resistance of the machine at strategic points shall
be provided along with the submission R
(s) dielectric Strength: The Dielectric strength, the voltage of testing and test procedure
at various points of the machine shall be submitted with the shop drawings
EE

(t) radio and television interference suppression devices shall be provided in accordance
with the requirements of BS. 800. Components used for suppression shall be to BS
IN

613
(u) vibration at the fixed components of the alternator under excited no-load
G

operation shall be as per relevant BS.


EN

(v) terminal symbols for the alternator shall be in accordance with BS


requirements
(w) panel Wiring:
R

(i) all wiring of battery charger, exciter and control panel shall be P.V.C tropical
BE

grade of adequate current carrying capacity to prevent over-heating under


worst climatic conditions
JA

(ii) all wiring shall conform to the relevant BS and at least 50 % derated with
2
minimum size of 2.5 mm or its equivalent.
(x) terminal Board
AL

(i) terminal boards shall have pairs of terminals for Incoming and Outgoing
wires and not more than two wires shall be connected to any one terminal
(ii) insulating barriers shall be provided between adjacent connectors. Labels for
wiring designation marks shall be provided on the fixed portion of the
terminal boards as well as wires. No live metal shall be exposed at the back
of the terminal boards
(iii) terminal boards having pressure type terminal lusts or equivalent shall be
used so that no terminal clamp is necessary. 10 % spare terminals shall be
provided for each terminal board assembly.
QCS 2014 Section 21: Electrical Works Page 14
Part 17: Standby Diesel Generator Set

5 Guards

(a) Suitable guards with brackets and securing arrangements of substantial construction
shall protect all exposed rotating or moving parts. All guards shall be mechanically
fixed to the generator set. Special attention shall be given to guarding the flywheel-
coupling and the radiator fan drive.

17.2.2 Control Panel

1 Cabinet

(a) heavy gauge, 2.5 mm thick, sheet steel construction, totally enclosed, dust and water
protected and vermin proof to IP 55

.L
(b) a hinged, lockable door shall give access to control and instruments
(c) "live" parts shall be secured to prevent inadvertent contact with them

.L
(d) controls for diesel engine, alternator, exciter, meters and alarm device shall be

W
positioned to give ample space for removing and installing components.

2 Control Panel Equipment and Instrumentation

G
(a) control panel shall include: (unless otherwise specified in the Project Documentation)

IN
(i) 3 pole air circuit breaker with over-current, short circuit and earth fault
protection as specified in this specification. (unless part of a main
R
switchboard, as indicated on the drawings)
EE
(ii) busbar system as specified in this specification (unless part of a main
switchboard, as indicated on the drawings)
IN

(iii) voltmeter (0-500V) with selector switch to read phase to phase and phase to
neutral voltages
G

(iv) ammeters of suitable range 3 Nos.


EN

(v) frequency meter of range 45 - 55 Hz


(vi) duty selector switch OFF/TEST/MANUAL/AUTO key operated
(vii) solid state voltage and frequency sensing relays
R

(viii) microprocessor control unit incorporating, but not limited to the following:
BE

 30 sec engine warm-up with override


 engine minimum run time of 10 minutes
JA

 engine cool down time of 10 minutes


 return to mains time delay of 30 sec.
AL

 80% stand-by voltage setting before load transfer


 80% stand-by frequency setting before load transfer
 auto exerciser of seven days from initial command that allows operation
 with or without load transfer
 controls for remote operation and alarm signalling to remote SCADA/PLC
(ix) current transformer for measuring and protection devices
(x) watt meter for unbalanced phases
(xi) voltage trimmer
QCS 2014 Section 21: Electrical Works Page 15
Part 17: Standby Diesel Generator Set

(xii) visual and audible alarm for engine starting, engine running overspeed, high
water temperature, low oil pressure, failure to start, engine stalling or shut down,
low fuel level in tanks, overvoltage and alternator overload.
(xiii) indicator lamps for supply available, battery charger and cooling water
heater
(xiv) manual start, stop, emergency OFF and lamp test push-buttons
(xv) manual and automatic service push-buttons
(xvi) control switch for alternator circuit breaker, ON and OFF
(xvii) mimic diagram with moving coil indicator for position of air circuit breaker
(xviii) battery charger, automatic type, nominal current 10 Amps. for charging

.L
24 volts nickel cadmium starter battery and all required instruments

.L
(xix) all other accessories, fuses, terminal boards, small wiring, etc.

W
17.2.3 Automatic Transfer Switch (A.T.S.)

1 he A.T.S. shall consist of 4 pole, 3 phase, break before make except for the neutral, ted as

G
shown on the Drawings in accordance with QGEWC regulations

IN
2 with the A.T.S. provide manual change-over switches to by-pass the A.T.S. in case of
emergency, maintenance or repair
R
EE
3 the arrangement, wiring and components shall satisfy the requirements of the Diesel
generator Manufacturer. His written approval shall be submitted
IN

4 control voltage of A.T.S. shall be normally fed from the main supply, in case of failure
of the main supply it shall be fed automatically from the emergency supply.
G

5 in addition to transfer switches the A.T.S. arrangement shall be equipped with the
EN

following:

(a) a selector switch to control the operation of A.T.S. on normal, emergency,


automatic and OFF
R

(b) adjustable - 3 phase voltage sensing relays sense failure in a phase/phases


BE

and voltage drop below 70 % of the normal voltage (pick-up and drop-out
voltages and adjustable within the range 70 - 100 % of the normal voltage)
JA

(c) visual Mechanical Indicator for transfer switch position


(d) indicator lamps to show transfer switch position normal, emergency and OFF.
AL

(e) an adjustable time delay relay of 1 - 3 seconds for starting signal to the
Generator set after cutting of main supply
(f) an adjustable time delay relay of 0 - 3 minutes which allows A.T.S. from
Normal to Emergency after the voltage build up relay of the generator has
sensed 90 % rated voltage when frequency within 90 % rated of rated
frequency
(g) an adjustable time delay relay of 1 - 10 minutes to allow A.T.S. from
Emergency to Normal
(h) an adjustable time delay relay of 0.5 - 5 seconds to prevent instantaneous
transition from EMERGENCY to NORMAL i.e. the delay allows time sufficient
For the residual motor voltage to decay to a safe switching level.
QCS 2014 Section 21: Electrical Works Page 16
Part 17: Standby Diesel Generator Set

17.2.4 System Operation and Performance

1 The normal mode of system operation shall provide for unattended automatic transfer of load
for the emergency power system. Emergency power shall be supplied to the system
emergency loads within 10 seconds after interruption of the normal service. Upon receiving a
signal from the ATS indicating a failure or normal power from transformer, the system control
unit will signal engine generator to start. Generator circuit breakers are open at this time and
the emergency busbar is dead. The generating set to reach approximately 90% of rated
frequency and voltage signals to start sensor. The sensor then inhibits the operation of
sensors and initiates a closing signal to circuit breaker, connecting this generating set to the
emergency busbar. The priority control then initiates operation of the designated transfer
switch, applying load up to the total kW rating of the generating set.

.L
2 If the generating set fails to start after cranking for the suitable cranking period, it shall be
locked off the busbar and the overcrank light on its switchboard shall light and the alarm

.L
sound. The control prevents critical transfer switch from operating. The generating set may
receive troubleshooting signals after placing its engine control function switch in the "OFF"

W
position. When the generating set is operational, it may again be placed into automatic
operation by returning its function switch to the "remote" position.

G
3 If a generating set stalls and shuts down during normal operation, its respective switchboard

IN
circuit breaker shall open, removing it from the busbar. The appropriate failure light operates
and the alarm sounds. The load shedding contacts in the control close, tripping a breaker in
the load circuits, reducing system load to the rating of the remaining available generating
R
capacity. After the generating set is made operable, it can be automatically reconnected to
EE
the busbar by resetting the load shed switch and engine control switch.

4 After normal power has been restored and the time delay on stop has expired, it shall be
IN

possible to manually shut down the generator and restore the mains power.
G

5 Under circumstance or condition operation of an emergency stop push button shall


immediately shut down the engine.
EN

17.2.5 Manual Operation

1 The manual operation of the Diesel Generator Set shall have the following features:
R
BE

(a) the emergency power system shall have the capacity of being manually operated.
The generator may be started by engine control switch located on the engine control
unit. Once started and stable, the generator may be manually connected to the
JA

emergency busbar through generator circuit breaker


(b) the generator control unit shall be equipped with a generator breaker control switch,
engine speed adjusting potentiometer and a generator voltage adjust thermostat and
AL

facilitate.

17.2.6 System Responsibility

1 The generating set, switchboard and automatic transfer switches shall be interconnected
according to building load requirements and to manufacturer's recommendations, to prevent
the emergency generating system from stalling or faltering due to momentary or temporary
overloads beyond system rating, from distribution faults, motor starting loads.

17.2.7 Installation

1 Product Delivery, Storage Handling:

(a) lift all generator equipment using eyes, yokes and skids provided by the manufacturer
(b) do not store equipment assemblies exposed to weather
QCS 2014 Section 21: Electrical Works Page 17
Part 17: Standby Diesel Generator Set

(c) physically protected all generator equipment against damage from work of other
trades
(d) cover all generator equipment with suitable material to avoid damage to finish.
(e) Contractor shall submit the calculation to prove the adequacy of capacity of the crane
he intends to use for installation of the D-G set

2 Installation:

(a) the engine and generator shall be properly aligned and mounted on a common steel
base through resilient mountings to prevent vibrations. The whole set shall be fixed
on the concrete slabs through suitable number of adjustable spring type vibration
isolators. Foundation and other builder's work shall be as recommended by the
manufacturer and approved by the Engineer

.L
(b) except as may be described in this Section or shown on the drawings carry out

.L
installation strictly in accordance with the manufacturer's recommendation.

W
3 Control Boards:

(a) run all outgoing cables from the generator to the control boards in the floor trench as

G
indicated on the Project Drawings.

IN
4 Record Print:

(a)
R
fix record print of each generator set, framed behind non-glare plexiglass, on a wall
near the generator control room.
EE

17.2.8 Paint Work


IN

1 Paint work of each set shall be of the highest quality to withstand the worst weather
conditions specified. All steel works such as tanks, pipes, frames, louvers, ladders, platform,
G

etc. shall be given two undercoats of anti-rust paint and two enamel finishing.
EN

2 The diesel generator set, day tank internal metalworks and control panel shall be finished to
BS 4800, shade 14E53.

17.2.9 Site Quality Control


R
BE

1 Final Testing:

(a) testing shall be carried out at full load after completion of installation by the Engine
JA

manufacturer's qualified representative in the presence of the Engineer


(b) if the above cannot be done then testing shall be done at the manufacturer/supplier's
premises at full load in the presence of the Engineer. All arrangements and costs
AL

incurred by such a test shall be responsibility of the sub-contractor.

17.2.10 Commissioning

1 Simulated Power Failure Test:

(a) engine-generator shall be made ready for automatic operation and started by means
of the test transfer switch on the automatic transfer switch. Unit shall run for the
duration of all time delays and then automatically shut-down. This test shall be made
with unit operating, and twice with unit simulated for a starting failure.

2 Testing of the Set:

(a) Engine:
(i) the engine shall be tested at site before and after erection to BS 649 and
amendments or equivalent including items which are said to be subject to
QCS 2014 Section 21: Electrical Works Page 18
Part 17: Standby Diesel Generator Set

mutual agreement. The test shall include inspection, after testing the
following parts
(ii) subsequent running test of eight hours shall be carried out of the set
(iii) the engine shall be subjected to vigorous performance tests at site to the
satisfaction of the Engineer and the main items shall include:
 Output characteristics
 Temperature rise
 Checking of valve clearance, fuel pump setting, governor setting, pipeline
connections, exhaust piping and flexible connections
 Checking the base and set are level in all directions, checking alignment

.L
of engine and generator and vibration isolators location and proper
installation

.L
 Checking of proper operation of engine safety devices

W
 Checking of fuel pipelines, fuel pumps, tank level gauges and level control
switches operation.

G
(b) Alternator and Exciter:

IN
(i) the alternator and exciter shall be tested to BS 5000, P.99 amendments
thereof R
(ii) tests at site before erection and after erection prior to handing over shall be
EE
carried out to the satisfaction of the Engineer. The main items of tests
deemed necessary by the Engineer shall be carried out at the expense of the
Contractor. The performance test shall be for 24 hours under the worst
IN

climatic conditions prevailing in Qatar


(iii) the Contractor shall be fully responsible to provide all the necessary facilities
G

for the test at his own expense.


EN

17.2.11 Training of Operation and Maintenance Personnel

1 The Contractor shall train a number of persons who will be selected by the Engineer for the
R

operation and maintenance of all the works within the Project before these works are handed
over to the Engineer.
BE

2 The training has to be carried out by qualified staff of the Contractor for each specified
service and shall be provided for a one month period following the certificate of completion.
JA
AL
QCS 2014 Section 21: Electrical Works Page 19
Part 17: Standby Diesel Generator Set

17.2.12 Reference Data Sheet

1 This Form or similar is to be completed by the Electrical sub-contractor as Well as D/G sub-
contractor and to be submitted for approval to the Engineer unless otherwise Specified.

---------------------------------------------------------------------------------------------------------------------------
1. Name and Address of
D/G sub-contractor

.L
.L
2. Detail of work in hand
now with proposed

W
D/G sub-contractor
---------------------------------------------------------------------------------------------------------------------------
Name of Government Amount of D/G

G
Project Installation Works
---------------------------------------------------------------------------------------------------------------------------

IN
a.
----------------------------------------------------------------------------------------------------------------
R
b.
----------------------------------------------------------------------------------------------------------------
EE

c.
----------------------------------------------------------------------------------------------------------------
d.
IN

----------------------------------------------------------------------------------------------------------------
e.
G

----------------------------------------------------------------------------------------------------------------
EN

We confirm that the Statements given above are true, to the best of our knowledge and it
is known to us that Engineer reserves the right to refuse to award sub-contract to us if
the above Statements are found to be incorrect.
R

Name of Electrical Contractor Name of D/G sub-contractor


BE

Signature Signature
JA
AL

Position in company of Position in company of


person signing person signing

END OF PART
5. TECHNICAL DATA SHEET
MATERIAL SCHEDULE

S.No. Material Description QTY Size Manufacturer/Supplier Country of Origin Model

1) Main Fuel Tank and accessories


1 50,000 Lit ABGST 2 50,000 Lit WOQOD (Factory as per WOQOD Selection)
2 Vent 4 Varies Morrision Bros USA 354-Series
3 Fill Box with CAMLOCK Adaptor 1 3" Unigaz QATAR N/A
4 Flexible Hoses Lot Varies Poly Hose INDIA PH442 -Series
2) Generator Day tank accessories
5 Daily Tank 3,000 Liters 2 3,000 Lit by Geneartor Supplier
6 Solenoid Valve 2 1''-2'' SMS TORK TURKEY S4020 Series,
7 Check Valves(NRV) 4 1''-3'' Crane UK D138
8 Y-strainer 4 1''-2'' Crane UK D297
9 Ball Valve Lot 1/2''-3'' Apollo USA 80-100 Series
10 Firematic Valve 2 1'' Morrision Bros USA 346DI Series
11 Fire Safe Valve 2 1'' BI-TORQ USA FLP‐LT‐059
12 Duplex FUEL OIL FILTER 1 set 10''‐14'' PARKER USA FBO series
3) Automatic Tank Gauging System
13 Automatic Tank gauging panel 1 N/A North Falcon Turkey/Italy Genesis 7M
14 Level transmitter 2 N/A North Falcon Turkey/Italy NF‐RS
15 Bund wall sensor 4 N/A North Falcon Turkey/Italy LS‐B
16 Electronic tank display 1 N/A North Falcon Turkey/Italy Genesis 5M
17 Level Switch 2 N/A North Falcon Turkey/Italy NF‐RSJr
4) Control Panel & Accessories
18 Control Panel N/A SCHNEIDER europe varies as per design
19 Duplex Supply Transfer Pump 1 set (D/S) N/A VIKING INDIA/USA GG4195
20 Cable Lot 1.5 mm2 NORDEN/FIRECEL/DRAKA UK/ITALY 2C & 4C
21 Communication Cable Lot 2C & 4C OMNTEC/Westpinn/Norden USA/UK 22AWG
22 Conduits Lot 25mm DELTA/CUPRA/REXWAY MALAYSIA CLASS 4
5) Piping & Accessories
21 CS Pipes Sch 40 Lot 1''-4'' Interpipe/Pietra Ukraine/Italy CS SCH 40
22 Welded Fittings Lot 2''-4'' TTU Thailand ASTM A 234
23 Threaded Fittings Lot 1''-2'' BIS Thailand ASME B16.3, Class 150
24 Paint Lot 40‐60 μm JOTUN QATAR Grey color
81,*$=4$7$5_0$7(5,$/

5/LW $%*67
6$03/(

Pre-Qualification Documents
Project: Construction of Terminal Pumping Station at Doha North STW Package 3-C823/3
Client: M/s Ashghal (PWA)
Subject: Calculation for Fuel Tank Capacity
Input:
Generator Consumption:

Generator 1: (Model: C1675 D5A) 309 LPH

Generator 2: (Model: C1100 D5B) 208 LPH

Total Generator Consumption 517 LPH

Day Tank Operation Hours 8 HRS

Main Tank Operation Hours: 24H/7 DAYS

Calculation

309 L/H x 8H 2,472 L Liters Day tank required for Generator 1


208 L/H x 8H 1,664 L Liters Day tank required for Generator 2

7 Days x 24 H 168 H Hours for 7 Days Capacity for Total Generator Consumption
Liters Main Tank required for
517 L/H x 168 H 86,856 L
Total Generator Consumption

Main Tank Capacity (Manufacture: WOQOD)

❖ Capacity = 50,000 Liters x 2 Nos


❖ Quantity = 02
❖ Type: Above Ground Tank
Day Tank Capacity (

❖ Capacity = 3,000 Liters


❖ Quantity = 02 (01 / Generator)
❖ Type: Above Ground Tank

Supply Pump Capacity


❖ Supply Pump - As per QCS = Generator Consumption x 4 = 517 x 4 = 2,068 L/h = 34.4 Liter/Minutes
❖ Proposed pump: Model =GG4195 Capacity = 35.2 L/m @ 2 Bar

--------------------------------------------------------------------------------------------------------------

Legend: L = Liters H = Hours Reference: QCS, NFPA


Project: Construction of Terminal Pumping Station at Doha North STW Package 3-C823/3
Client: M/s Ashghal (PWA)
Subject: Bund Wall Capcity Calculation

Bund wall
Bund
Capacity
Tank Capacity
Tank Required (120% Bund wall size Remarks
S/N Capacity (m³)
Quantity of tank size) LxWxH (mm) (if B > A)
(Liters)
(m³)
B
A
Bund wall size
1 50000 1 60000 12900x6000x800 61.92
Acceptable
Bund wall size
2 50000 1 60000 12900x6000x800 61.92
Acceptable
Bund wall size
3 3000 1 3600 3000X2500X600 4.50
Acceptable
Bund wall size
4 3000 1 3600 3000X2500X600 4.50
Acceptable

--------------------------------------------------------------------------------------------------------------

Legend: L = Liters H = Hours Reference: QCS, NFPA


UNIGAZ QATAR | MATERIAL SUBMITTAL

VENT

MATERIAL SUBMITTAL
Model 354 Updraft Vent
SPECIFICATION SHEET

Application
Atmospheric updraft vents are installed on the top of storage tank
vent pipes on underground and aboveground fuel storage tanks.

Features and Details


‡ Directs vapors outward and upward in accordance with NFPA 30
‡ Protects the vent line from debris and insects
‡ Water-resistant rain cap sheds water away from the vent line
‡ Slip-on design with set screws for easy installation
‡ Internal drain channels water penetration out through weep hole 354 (2Ǝ)

‡ 354T is compatible with DEF

Materials of Construction
354
‡ Body and cap... aluminum die cast
‡ Screen... 40 mesh stainless steel
354T
‡ %RG\DQGFDS7HÀRQ® coated black aluminum
‡ Screen... 40 mesh stainless steel
354T (2Ǝ)
‡”–‹Ƥ…ƒ–‹‘•ƒ†‹•–‹‰•
‡ CARB 89-12 (1½ƎDQGƎPRGHOV

9HQWLQJ&DSDFLW\ 6&)+
,WHP1XPEHU 6L]H VOLSRQ :HLJKW OEV #36,
$9 òƎ  
$9 Ǝ  
$9 Ǝ  
$9 Ǝ  116,900

7$9 Ǝ  


7$9 Ǝ  

NOTE
2SHQYHQWVZLOODOORZXQUHVWULFWHGHYDSRUDWLRQRISURGXFW

:$51,1*'2127),//2581/2$')8(/)520$6725$*(7$1.81/(66,7,6&(57$,17+$77+(7$1.9(176:,//23(5$7(3523(5/<
Morrison tank vents are designed only for use on shop fabricated atmospheric tanks which have been built and tested in accordance with UL 142, NFPA 30 &
$DQG$3,DQGLQDFFRUGDQFHZLWKDOODSSOLFDEOHORFDOVWDWHDQGIHGHUDOODZV,QQRUPDORSHUDWLRQGXVWDQGGHEULVFDQDFFXPXODWHLQYHQWRSHQLQJV
and block air passages. Certain atmospheric conditions such as a sudden drop in temperature, below freezing temperatures, and freezing rain can cause
moisture to enter the vent and freeze which can restrict internal movement of vent mechanisms and block air passages. All storage tank vent air passages
PXVWEHFRPSOHWHO\IUHHRIUHVWULFWLRQDQGDOOYHQWPHFKDQLVPVPXVWKDYHIUHHPRYHPHQWLQRUGHUWRLQVXUHSURSHURSHUDWLRQ$Q\UHVWULFWLRQRIDLUÀRZFDQ
FDXVHH[FHVVLYHSUHVVXUHRUYDFXXPWREXLOGXSLQWKHVWRUDJHWDQNZKLFKFDQUHVXOWLQVWUXFWXUDOGDPDJHWRWKHWDQNIXHOVSLOODJHSURSHUW\GDPDJH¿UH
injury, and death. Monthly inspection, and immediate inspection during freezing conditions, by someone familiar with the proper operation of storage tank
YHQWVLVUHTXLUHGWRLQVXUHYHQWLQJGHYLFHVDUHIXQFWLRQLQJSURSHUO\EHIRUH¿OOLQJRUXQORDGLQJDWDQN1RUPDOYHQWVVXFKDVSUHVVXUHYDFXXPDQGXSGUDIW
YHQWVIRUDERYHJURXQGVWRUDJHWDQNVVKRXOGEHVL]HGDFFRUGLQJWR1)3$  

570 E. 7th Street, P.O. Box 238 | Dubuque, IA 52004-0238


t. 563.583.5701 | 800.553.4840 | f. 563.583.5028
www.morbros.com
UNIGAZ QATAR | MATERIAL SUBMITTAL

FILL BOX

MATERIAL SUBMITTAL
Stainless Steel filling Box
UNIGAZ QATAR | MATERIAL SUBMITTAL

FLEXIBLE HOSE

MATERIAL SUBMITTAL
UNIGAZ QATAR | MATERIAL SUBMITTAL

'$<7$1.
By Generator Supplier

MATERIAL SUBMITTAL
Project: Construction of Terminal Pumping Station at Doha North STW Package 3-C823/3
Client: M/s Ashghal (PWA)
Subject: Bund Wall Capcity Calculation

Bund wall
Bund
Capacity
Tank Capacity
Tank Required (120% Bund wall size Remarks
S/N Capacity (m³)
Quantity of tank size) LxWxH (mm) (if B > A)
(Liters)
(m³)
B
A
Bund wall size
1 50000 1 60000 12900x6000x800 61.92
Acceptable
Bund wall size
2 50000 1 60000 12900x6000x800 61.92
Acceptable
Bund wall size
3 3000 1 3600 3000X2500X600 4.50
Acceptable
Bund wall size
4 3000 1 3600 3000X2500X600 4.50
Acceptable

--------------------------------------------------------------------------------------------------------------

Legend: L = Liters H = Hours Reference: QCS, NFPA


UNIGAZ QATAR | MATERIAL SUBMITTAL

SOLENOID VALVE

MATERIAL SUBMITTAL
SERVO ASSIST SOLENOID VALVE
S1000 SERIES (3/8", 1/2", 3/4",1", 11/4", 11/2", 2")
NORMALLY CLOSED
GENERAL FEATURES
• Wide pressure range, flow rate and orifis options. 2 WAY
• Solenoid valves are used with filters.
PILOT OPERATED
• Solenoid valves can be mounted in any position without
affecting its operation, coil to be used in a vertical position. ΔP=0
• No pressure difference is required.

ELECTRICAL CHARACTERISTICS
Continuous Duty : ED %100
Coil Insulation Class : H (180°C)(IEC 85)
Coil Impregnation : Polyester Fiber Glass ZERO DIFFERENTIAL
Ambient Temperature : -10°C, +60°C PRESSURE
Protection Degree : IP65 (ISO 60529) On request;IP68
Electric Plug Connection : DIN 46340 3– Poles Connector(DIN43650)
Connector Specification : ISO 4400 / EN 175301-803 Form A,
Spade Plug (Cable Ø6-8 mm)
Electrical Safety : IEC 335
Standard Voltages : For C40; AC 12V 15VA, 24V 15VA, 48V 15VA,
110V 15VA, 230V 15VA, 230V 24VA
DC 12V 18W, 24V 18W, 48V 18W, 110V 18W
Dimensions (mm)
For C50; AC 24V 35VA, 110V 30VA,
120V 35VA, 230V 35VA, 230V 42VA G A B C D E H I K
DC 12V 40W, 24V 40W 3/8" 72 97.7 32 45 94.8 76 109 52.5
On request other voltages 1/2" 80 99.2 32 45 96.2 76 110.5 52.5

Voltages Tolerance : AC -15%, +10% DC -5%, +10% 3/4" 78 106 32 45 97.2 76 117.3 52.5

Frequency : 50 Hz (60 Hz…) 1" 85 112.5 32 45 98.7 76 123.8 52.5

On request; Connector with LED, PWM Socket 11/4" 149 185.5 103 110 63 - - -

Specify coil voltage with order. 11/2" 149 185.5 103 110 63 - - -
2" 149 185.5 103 110 63 - - -

Nominal Cold/ Current Surface


MATERIALS IN CONTACT WITH FLUID Coils Inrush Holding Temperature
Values Hot (A) (0C)
Body : Brass COLD 19,56 19,56 1,63 20
Internal Parts : Stainless Steel C40012VDC18W 12VDC 18W
HOT 14,52 14,52 1,21 106
Sealing : NBR on request; EPDM, VITON COLD 20,88 20,88 0,87 25
C40024VDC18W 24VDC 18W
Shading Ring : Copper (EN 12735-1) HOT 14,64 14,64 0,61 116
Seats, Core Tube, Springs: Stainless Steel C40110VDC18W 110VDC 18W
COLD 19,96 19,96 0,18 23
HOT 13,56 13,56 0,123 115
COLD 23,81 16,43 1,3 25
C40012VAC15VA 12VAC 15VA
HOT - 15,86 1,262 79
OPTIONS COLD 25,82 15,02 0,62 22
Female connection: BSP; (On request NPT) C40024VAC15VA 24VAC 15VA
HOT - 13,91 0,57 81
• On request valf CR-Ni coating, PTFE coating COLD 30,65 15,17 0,137 24
C40110VAC15VA 110VAC 15VA
• On request Atex (exproof) coil (For C40 only) HOT - 13,96 0,126 80
COLD 31,4 15,64 0,068 25
C40230VAC15VA 230VAC 15VA
HOT - 14,41 0,063 80
COLD 45,1 23,92 0,0154 23
TECHNICAL FEATURES C40230VAC15VA 230VAC 24VA
HOT - 21,62 0,0154 100
Max. Viscosity : 5°E (~37cST veya mm2/s)
Response Time : Opening time : 400 ms – 1600 ms Nominal Cold/ Current Surface
Coils Inrush Inrush Temperature
Closing Time : 1000 ms - 2000 ms Values Hot (A) (0C)
COLD 43,32 43,32 3,61 24
C50012VDC40W 12VDC 40W
SEALS FEATURES HOT 30,05 30,05 2,50 95
NBR : -10°C...+80°C C50024VDC40W 24VDC 40W
COLD 41,52 41,52 1,73 24
EPDM : -10°C...+130°C HOT 30,20 30,20 1,26 95

VİTON : -10°C...+160°C COLD 40,80 36,15 1,50 24


C50024VAC35VA 24VAC 35VA
HOT 140,32 31,68 1,32 90
PTFE : -10°C...+160°C
COLD 39,60 29,92 0,27 24
RUBY : -10°C...+160°C C50110VAC30VA 110VAC 30VA
HOT 36,85 27,94 0,25 92
COLD 45,24 37,56 0,31 24
C50120VAC35VA 120VAC 35VA
HOT 42,48 35,04 0,29 99
COLD 43,24 36,57 0,16 24
C50230VAC35VA 230VAC 35VA
HOT 41,40 34,73 0,15 102
COLD 50,60 43,93 0,19 24
C50230VAC42VA 230VAC 42VA
HOT 46,69 40,94 0,18 106

Solenoid Vave Valve Type/ Connection Orifis Pressure


Kv Seal Weight Coil
Symbol Order No Size Size min/max

Water
Air, Gas
EPDM
Vıton
NBR

Liquid Lt/min
S1000 G mm Kg
Not: Please look catalogues for more
details. Min. Bar Max. Bar Max. Bar
S1000.02.125 3/8'' 12,5 0 16 16 48 2.55 C40
STANDARDS
• Standard tube connection G (BSP) (ISO S1000.03.145 1/2'' 14,5 0 16 16 70 3.65 C40
228-1) and other tube connections (NPT S1000.04.170 3/4'' 17 0 16 16 70 3.55 C40
(ANSI 1.20.3)) are available on request. S1000.05.170 1'' 17 0 16 16 90 3.98 C40
• TORK solenoid valves 97/23/EC, are
S1000.06.460 11/4'' 46 0 16 3 450 3.50 C50
available for pressure equipment directive
(PED) and 2006/95/ECC low voltage S1000.07.460 11/3'' 46 0 16 3 450 3.20 C50
directive (LVD). S1000.08.460 2'' 46 0 16 3 450 2.98 C50

www.smstork.com
UNIGAZ QATAR | MATERIAL SUBMITTAL

Check Valves

MATERIAL SUBMITTAL
J4XXXX CFS_PD 2015_genvalves.qxp_Layout 1 18/01/2017 09:41 Page 90

CHECK VALVES

D138 D138

Bronze Swing Check Valve with Metal Disc


PN25
GENERAL VALVES

Features & Benefits


• Check valves permit flow in one direction only and close automatically
if flow reverses.
• Entirely automatic in action, depending upon pressure and velocity
of flow within the line to perform their functions of opening and closing
• The Crane D138 Bronze check valve is of the swing variety.
• This valve carries the British Standards Institution kitemark

Materials
NO. MATERIAL SIZES Dimensional Drawing
Body Bronze BS EN 1982 CC491K All
Cap Bronze BS EN 1982 CC491K All
Disc Brass BS EN 12164 CW614N 3/
8 -1
Disc Bronze BS EN 1982 CC491K 1 1/
4 -3
Hinge Bronze BS EN 1982 CC491K All
Hinge Pin Stainless Steel 3/
8 -2
Hinge Pin Stainless Steel ASTM A182 Gr.F316 21/2 & 3
Hinge Nut Brass BS EN 12164 CW614N All
ID Plate Aluminium All
Drive Pin Steel - Electro Brassed All
Hinge Pin Plug Brass BS EN 12164 CW614N 21/2 & 3

Dimensions & Weights


SIZE WEIGHT A B
(inch) (kg) (mm) (mm)
3/ 0.19 48 33
8
1/ 0.32 58 38
2
3/ 0.43 66 42
4

1 0.61 80 49
11/4 1.01 89 56
11/2 1.34 95 65
2 2.12 108 76
21/2 4.08 155 98
3 5.76 190 99 Pressure/Temperature Ratings
TEMPERATURE (°C) -10 to 100 110 120 186
PRESSURE (BAR) 25.0 23.4 21.8 10.5

Intermediate pressure ratings shall be determined by


interpolation.

PRESSURE RATING: PN25 SPECIFICATION: Metal Disc, Screwed in Cap, BSI Kitemark approved.
TEMPERATURE OPERATING RANGE: -10 To 180°c Valves are manufactured in accordance with BS5154:1991 PN25
UK END CONNECTION: Taper threaded to BS EN 10226-2 (ISO 7-1) for Series B ratings.
formerly BS 21 This valve is not suitable for use on Group 1 gases or unstable fluids, as
US END CONNECTION: ANSI B1.20.1 (please add suffix AT to defined by the Pressure Equipment Directive 97/23/EC.*
denote American Thread)
Vaild as of 201216

OPERATOR: Swing Type Check Valve


* See page 251 for more information

Every effort has been made to ensure that the information contained in this publication is accurate at the time of publishing. Crane Ltd assumes no responsibility or liability for typographical errors or
omissions or for any misinterpretation of the information within the publication and reserves the right to change without notice.

90 TECHNICAL HELPLINE: +44 (0)1473 277400


E: enquiries@cranefs.com W: www.cranefs.com
UNIGAZ QATAR | MATERIAL SUBMITTAL

Y STRAINER

MATERIAL SUBMITTAL
00
STRAINERS

D297
PN32

Bronze Strainer
Scale and dirt in piping systems cause endless trouble and frequently
serious damage to pipeline equipment. Installation of Crane
strainers will help eliminate the problems caused by foreign matter within
piping systems.
The Crane D297 features: Perforated stainless steel screen, Robust
design, Low flow resistance, High Quality Materials, WRAS approved.

Materials
PART MATERIAL SIZES

Body Bronze BS EN 1982 CC491K All


Cap Bronze BS EN 1982 CC491K All
D297
Gasket Asbestos Free (WRAS) All
ID. Plate Aluminium All Dimensional Drawing
Pin Steel - Electro Brassed All
B
Screen Stainless Steel Type 304 All A

Dimensions and Weights C A/F HEX

SIZE WEIGHT A B C D E
(kg) (mm) (mm) (mm) (mm) (mm)

WITHDRAWAL DISTANCE
1
/2|| 0.38 71 79 30 51 61

E APPROX.
3
/4|| 0.63 86 96 38 64 77
1|| 0.96 101 110 47 72 92 THREADED BSEN10226
formerly BS 21 (ISO 7) TAPER
11/4|| 1.81 134 144 56 100 128 OR ANSI B1.20.1 TAPER
11/2|| 2.43 148 157 65 109 139
2|| 4.13 176 183 79 126 160
OPTIONAL BSP TAPPING

Pressure/Temperature Ratings
TEMPERATURE (°C) -10 to 100 200

PRESSURE (BAR) 32 14
Intermediate pressure ratings shall be determined
by interpolation

PRESSURE RATING: PN32 SPECIFICATION:


UK END CONNECTION: Taper threaded to BS EN 10226-2 (ISO 7-1) Strainers fitted with stainless steel perforated strainer element with 0.75mm
formerly BS 21 diameter holes.
US END CONNECTION: ANSI B1.20.1 (please add suffix AT to Screens fitted into Crane Strainers conform to the high standards of
denote American Thread) materials and workmanship associated with all Crane products.
This strainer is not suitable for use on group 1 gasses or unstable fluids, as
defined by the Pressure Equipment Directive 97/23/EC.
Temperature operating range: -10 to 200°C.

Every effort has been made to ensure that the information contained in this publication is accurate at the time of publishing. Crane Ltd assumes no responsibility or liability for typographical errors or omissions or for
any misinterpretation of the information within the publication and reserves the right to change without notice.

68 TECHNICAL HELPLINE: +44 (0)1473 277400 68


www.cranefs.com
UNIGAZ QATAR | MATERIAL SUBMITTAL

BALL VALVE

MATERIAL SUBMITTAL
80-100 series
Bronze LP-Gas Ball Valve
Female NPT Thread, 600 CWP (psig), Cold Non-Shock. 250 psig LP-Gas.
150 psig Saturated Steam.
Vacuum Service to 29 inches Hg.
MSS SP-110 compliant. LISTED

FEATURES ul listings
• UL Listed for LP-Gas, natural gas, flammable liquid and heated oil • Guide YSDT: LP-Gas shut-off valve.
• Large ports to reduce pressure drop • Guide YRPV: Gas shut-off valve for use with natural and
• Reinforced seats manufactured gases.
• Blow-out-proof stem design • Guide YRBX: Flammable liquid shutoff valve.
• Adjustable packing gland • Guide MHKZ: No. 6 oil at 250ºF.
• Two piece bronze body

OPTIONS AVAILABLE: (More information in Section J)


(SUFFIX) OPTION SIZES
-01 Standard Configuration All
-07- Tee Handle, Steel 1/4” to 3”
-27- SS Latch-Lock Lever & Nut 1/4” to 3”

STANDARD MATERIAL LIST


Part MATERIAL
1 Lever and grip Steel, zinc plated w/vinyl
2 Stem packing RPTFE
3 Stem bearing RPTFE
4 Ball B16, chrome plated
5 Seat (2) RPTFE
6 Retainer B16 or B584-C84400
7 Gland nut B16
8 Stem B16
9 Lever nut Steel, zinc plated
10 Seal PTFE (1.25” to 3”)
11 Body B584-C84400

Note: 250 psig Max. UL Listing.

product SIZE A B C D E Wt.


NUMBER
80-101-01 1/4” 0.37 1.03 2.06 1.75 3.87 0.60
80-102-01 3/8” 0.37 1.03 2.06 1.75 3.87 0.56
80-103-01 1/2” 0.50 1.12 2.25 1.81 3.87 0.63
80-104-01 3/4” 0.68 1.50 3.00 2.12 4.87 1.39
80-105-01 1” 0.87 1.68 3.37 2.25 4.87 1.72
80-106-01 1.25” 1.00 2.00 4.00 2.62 5.50 3.26
80-107-01 1.5” 1.25 2.18 4.37 2.87 5.50 4.57
80-108-01 2” 1.50 2.34 4.68 3.06 5.50 5.56
80-109-01 2.5” 2.50 3.25 6.50 4.12 8.00 17.25
80-100-01 3” 2.50 3.37 6.75 4.12 8.00 18.60

For Pressure/Temperature Ratings,Refer to Page m-10, Graph No. 4

Copyright ©2013 Apollo Valves, Manufactured by Conbraco Industries - Printed in the USA
H-29
flow data
For Apollo® Ball Valves
The listed Cv “factors” are derived from actual flow testing, in the Apollo® Ball Valve Division, Conbraco Industries, Inc., Pageland, South Carolina.
These tests were completed using standard “off the shelf” valves with no special preparation and utilizing standard schedule 40 pipe. It should
be understood that these factors are for the valve only and also include the connection configuration. The flow testing is done utilizing water
as a fluid media and is a direct statement of the gallons of water flowed per minute with a 1 psig pressure differential across the valve/
connection unit. Line pressure is not a factor. Because the Cv is a factor, the formula can be used to estimate flow of most media for valve sizing.

flow of liquid flow of gas

√ √
∆P (∆P) (P2)
Q = CV Q = 1360 CV
SpGr (SpGr) (T)

or ∆P = (Q) (SpGr) or ∆P = 5.4 x 10 (SpGr) (T) (Q)2


2 -7

(Cv)2 (Cv)2 (P2)


Where: Where:
Q = flow in US gpm Q = flow in SCFH
ΔP = pressure drop (psig) ΔP = pressure drop (psig)
SpGr = specific gravity at flowing temperature SpGr = specific gravity (based on air = 1.0)
Cv = valve constant P2 = outlet pressure–psia (psig + 14.7)
T = (temp. °F + 460)
Cv = valve constant

Cv FACTORS FOR APOLLO VALVES


size (in.) 1/4 3/8 1/2 3/4 1 1.25 1.5 2 2.5 3 4 6 8 10 12
Valve
32-100/200 Series 5.1 6.6 8 24 30 45 55 95 -- -- -- -- -- -- --
64-100/200 Series 6 7 19 34 50 104 268 309 629 1018 1622 -- -- -- --
64W Series -- -- -- -- -- -- -- -- 629 1018 1622 -- -- -- --
70B-140 Series 8.4 7.2 15 30 43 48 84 108 190 370 670 -- -- -- --
70-100/200 Series 8.4 7.2 15 30 43 48 84 108 190 370 670 -- -- -- ---
70-300/400 Series -- -- 15 30 43 48 84 108­ -- -- -- -- -- -- --
70-600 Series 2.3 4.5 5.4 12 14 21 34 47 -- -- -- -- -- -- --
70-800 Series 8.4 7.2 15 30 43 48 84 -- -- -- -- -- -- -- --
71AR Series -- -- -- 30 43 48 84 108 190 370 -- -- -- -- --
71-100/200 Series -- -- -- 30 43 48 84 108 190 370 -- -- -- -- --
72-100/900 Series -- -- 26 48 65 125 170 216 -- -- -- -- -- -- --
73A-100 Series 8.4 7.2 15 30 43 48 84 108 -- -- -- -- -- -- --
73-300/400 Series -- -- 26 48 65 125 170 216 -- -- -- -- -- -- --
74-100 Series 8.4 7.2 15 30 43 48 84 108 190 370 670 -- -- -- --
75-100 Series 8.4 7.2 15 30 43 48 84 108 190 370 670 -- -- -- --
76AR Series 8.4 7.2 15 30 43 48 84 108 190 370 670 -- -- -- --
76F-100 Series 8.1 15 15 51 68 125 177 389 -- -- -- -- -- -- --
76-100 Series 8.4 7.2 15 30 43 48 84 108 190 370 -- -- -- -- --
76-300/400 Series -- -- 26 48 65 125 170 216 -- -- -- -- -- -- --
76-600 Series 2.3 4.5 5.4 12 14 21 34 47 -- -- -- -- -- -- --
7K-100 Series -- -- 15 51 68 125 177 389 503 -- -- -- -- -- --
77AR Series 8.1 15 15 51 68 125 177 389 -- -- -- -- -- -- --
77C-100/200 Series 4.5 7.2 16 36 68 125 177 389 503 -- -- -- -- -- --
77D-140 Series 4.5 7.2 16 36 68 125 177 389 -- -- -- -- -- -- --
77D-640 Series -- -- -- 11 24 35 -- -- -- -- -- -- -- -- --
77G-UL Series 4.5 7.2 16 36 68 125 177 389 503 -- -- -- -- -- --
77W Series -- -- 16 36 68 125 177 389 -- -- -- -- -- -- --
77X Series -- -- 16 36 68 -- -- -- -- -- -- -- -- -- --
77-100/200 Series 8.1 15 15 51 68 125 177 389 503 -- -- -- -- -- --
79 Series 8.5 8.5 9.8 32 44 66 148 218 440 390 -- -- -- -- --
continued on next page

Copyright ©2013 Apollo Valves, Manufactured by Conbraco Industries - Printed in the USA
M-3
flow data
For Apollo® Ball Valves

Cv FACTORS FOR APOLLO VALVES (continued from page M-3)


size (in.) 1/4 3/8 1/2 3/4 1 1.25 1.5 2 2.5 3 4 6 8 10 12
Valve
80/81 Series 8.4 7.2 15 30 43 48 84 108 190 370 -- -- -- -- --
82-100/200 Series 8.1 14 26 51 68 120 170 376 510 996 1893 -- -- -- --
83A/83B Series 8.1 14 26 51 68 120 170 376 -- -- -- -- -- -- --
83R-100/200 Series -- -- -- -- -- -- 170 376 -- 996 1893 -- -- -- --
86A/86B Series 8.1 14 26 51 68 120 170 376 -- -- -- -- -- -- --
86R-100/200 Series -- -- -- -- -- -- 170 376 -- 996 1893 -- -- -- --
87A-100 Series -- -- -- -- -- -- 86 104 234 375 673 1099 1902 3890 --
87A-200 Series -- -- 15 19 75 -- 195 410 545 1021 2016 4837 9250 15170 22390
87A-700 Series -- -- -- -- -- -- 86 104 234 375 673 1099 1902 3890 --
87A-900 Series -- -- 15 19 75 -- 195 410 545 1021 2016 4837 9250 15170 22390
87B-100 Series -- -- -- -- -- -- -- -- -- 375 673 1099 1902 3890 --
88A-100 Series -- -- -- -- -- -- 86 104 234 375 673 1099 1902 3890 --
88A-200 Series -- -- 15 19 75 -- 195 410 545 1021 2016 4837 9250 15170 22390
88A-700 Series -- -- -- -- -- -- 86 104 234 375 673 1099 1902 3890 --
88A-900 Series -- -- 15 19 75 -- 195 410 545 1021 2016 4837 9250 15170 22390
88B-100 Series -- -- -- -- -- -- -- -- -- 375 673 1099 1902 3890 --
89-100 Series 8.4 7.2 15 30 43 48 84 108 190 370 -- -- -- -- --
9A-100 Series 8.3 6.7 5.7 10 16 25 40 62 -- -- -- -- -- -- --
91-100 Series 8.3 6.7 5.7 10 16 25 40 62 -- -- -- -- -- -- --
92-100 Series 8.3 6.7 5.7 10 16 25 40 62 -- -- -- -- -- -- --
93-100 Series 8.3 6.7 5.7 10 16 25 40 62 -- -- -- -- -- -- --
94A-100/200 Series 6 7 19 34 50 104 268 309 629 1018 1622 -- -- -- --
95-100/200 Series -- -- 15 51 68 -- -- -- -- -- -- -- -- -- --
95A-300/400 Series -- -- 19 34 50 -- -- -- -- -- -- -- -- -- --
96-100 Series 8.3 6.7 5.7 10 16 25 40 62 -- -- -- -- -- -- --
399-100 Series 8.4 7.2 15 30 43 48 84 108 190 370 -- -- -- -- --
489-100 Series 8.4 7.2 15 30 43 48 84 108 190 370 -- -- -- -- --

M-4 www.apollovalves.com Customer Service (704) 841-6000


pressure temperature ratings
400# Bronze (GRAPH 3)

600# Bronze (GRAPH 4)

M-10 www.apollovalves.com Customer Service (704) 841-6000


UNIGAZ QATAR | MATERIAL SUBMITTAL

FIREMATIC VALVE

MATERIAL SUBMITTAL
UNIGAZ QATAR | MATERIAL SUBMITTAL

FIRE SAFE VALVE

MATERIAL SUBMITTAL
)86,%/(/,1.
3$&.$*(6:,7+9$/9(

)/3/76(5,(6µ7+528*+µ137
3$57180%(56
)/3/7 ;;;%9)6 LQFOXGHV66SLHFH$3,ÀUHVDIHYDOYH
)/3/7 ;;;%9): LQFOXGHV:&%66SLHFH$3,ÀUHVDIHYDOYH
6HOHFWDOLQNWHPSHUDWXUHIURPWKHFKDUWEHORZ
;;;YDOYHVL]H LH µ µ µ

/,1.3$57 /,1.<,(/' 0$;,080$0%,(17


180%(5 7(03(5$785( 7(03(5$785(
)/ ƒ)ƒ& ƒ)ƒ&
723:
723:25.6:,7+ )/ ƒ)ƒ& ƒ)ƒ&
$3,),5(6$)(
$3, 
%$//9$/9(
%$/ )/ ƒ)ƒ& ƒ)ƒ&
/LQNVKRZQIRULOOXVWUDWLRQSXUSRVHVRQO\
)/ ƒ)ƒ& ƒ)ƒ&

127(/LQNVPXVWEHUHSODFHGRQDQDQQXDOEDVLVDVSDUWRIDUHJXODU
PDLQWHQDQFHSURJUDP/LQNVDUHQRWUDWHGIRUXVHLQFRUURVLYHDWPRVSKHUHV

12
7
8
10
11 10
8
4 6
D 6
10 7

1 5
E

C 2
3 9
SAFETY LINK
A FOR SHIPPING
TOP VIEW ARMED PURPOSES ONLY

SIDE VIEW
B
%,//2)0$7(5,$/6
',0(16,216 
635,1*3$&.
&$5%2167((/  75,33(5$50
&$5%21
02817,1*%5$&.(7 67((/
6,=( µ µ µ
635,1*3$&.$50,1* 62/'(5('
$     &$5%2167((/  )86,%/(/,1.
$66(0%/< 0(7$/
%    
9$/9(23(1&/26( 67$,1/(66

/(9(5 67$,1/(66
6723 67((/ 5(7$,1,1*$50 67((/
&   
 (32;<&2$7(' )86,%/(/,1. 67$,1/(66
'     
635,1*3$&. 67((/ 678'6 67((/
(     9$/9(+$1'/(
67$,1/(66
 63$&(5
67$,1/(66
67((/ 67((/
:(,*+7
/%6    67$,1/(66 &$5%21
 )/02817,1*3/$7(  6$)(7</,1.
67((/ 67((/

7KHSROLF\RI$9.&DUER%RQGLVRQHRIFRQWLQXRXVLPSURYHPHQW:HUHVHUYHWKHULJKWWRDOWHUWKHSURGXFWDVGHVFULEHGDQGLOOXVWUDWHGZLWKRXWQRWLFH

$9.&DUER%RQG%,7254Š9DOYH$XWRPDWLRQ‡32%R[‡1/LQODU'U‡/D)R[,/‡ZZZELWRUTFRP

Fusible Link Temperature Selection Chart
FL-1: for 05 through 10 Spring Packs (LT, MT)
LINK PART LINK YIELD MAXIMUM AMBIENT
NUMBER TEMPERATURE TEMPERATURE
FL-1-165 165°F/74°C 135°F/57°C
FL-1-212 212°F/100°C 185°F/82°C
FL-1-286 286°F/138°C 253°F/123°C
FL-1-360 360°F/182°C 330°F/166°C

Please consult factory for special order links

• Factory Mutual approved; UL and C-UL Listed • Fusible Link Halves: Stainless Steel
• Minimum Continuous Load: 5 lbs. (2,3 kg) • Fusible Assembly: Solder, Copper, Stainless Steel
• Maximum Continuous Load: 50 lbs. (22,7 kg)

NOTE: Model FL-1 Fusible Links are not rated for use in corrosive atmospheres.

K-Style: for 12 through 14X Spring Packs (HT, BT)


LINK PART LINK YIELD MAXIMUM AMBIENT
NUMBER TEMPERATURE TEMPERATURE
110135 135°F/57°C 104°F/41°C
314165 165°F/74°C 135°F/57°C
110212 212°F/100°C 185°F/82°C
110280 280°F/138°C 253°F/123°C
110360 360°F/182°C 330°F/166°C

Please consult factory for special order links

• Minimum Load: 3 lbs. (1.36 kg.) • UL listed


• Maximum Load : 50 lbs. (22.68 kg.) • Corrosion resistant bronze construction

WS-Style: for 14 through 20 Spring Packs (BT)

LINK PART NUMBER LINK YIELD TEMPERATURE MAX. AMBIENT TEMP.

WS2-72 162° F / 72° C 109° F / 42° C


WS2-93 200° F / 93° C 145° F / 63° C
NOTE: CANNOT BE USED ON FM-
APPROVED ASSEMBLIES WS2-141 286° F / 141° C 232° F / 111° C
WS2-182 360° F / 182° C 305° F / 152° C

Please consult factory for special order links


WS-style links are used primarily on the BT series design. Links are stacked to provide sure holding until yield
temperature is reached.

BI-TORQ® Valve Automation and our soldered fusible link manufacturers suggest the annual
replacement of fusible links as part of scheduled plant maintenance.

1N050 Linlar Drive tel: 630-208-9343


P.O. Box 309 fax: 630-232-6235

La Fox, Il 60147 www.bitorq.com


UNIGAZ QATAR | MATERIAL SUBMITTAL

'83/(;
FILTER

MATERIAL SUBMITTAL
TURBINE SERIES

The First Name


The high grade aluminium
components and powder coat
In Fuel Filtration
paints mean that
corrosion is never a worry. Is Also The Most
A durable single bolt mounting
Improved
bracket doubles resistance to
vibration fatigue.
Every engine runs better with a system that cleans fuel,
removes water, heats fuel and senses when it’s time for service.
Aquabloc media sheds water and keeps
engines waterproof, rustproof and The system is the Racor Turbine Series and it’s the most
dirtproof.
complete, most efficient, most reliable high-capacity engine

300-watt heaters start you in the cold protection you can install. A system that protects your
– thermostats are standard to meet the
requirements of today’s electronic engines. investment in engines and fuel.

Polymer bowl withstands impact


and temperature extremes.

Self-venting drain. A single End caps are colour-coded for easy identification and
twist makes draining clean, application – red for 30 micron primary filtration, blue for
fast and easy.
10 micron primary or secondary, and brown for 2 micron
secondary/final filtration.

Use original Racor filter


elements to ensure
With an Aquabloc II replacement element, premium performance.
you get a complete kit with all the seals
you need.

Aquabloc II media is a blend of high


grade cellulose compounded with
resins and a special chemical
treatment.

Aquabloc II elements filter harmful


tiny particles of dirt and algae from
fuel. Aquabloc II elements are
An integral bail handle
rustproof – with polymer end
makes changeouts easy.
caps that won’t ever corrode.

14
TURBINE SERIES
500FG 900FH 1000FH 75900FHX 751000FHX 791000FHV

MODEL 500FG 900FH 1000FH 75500FGX 75900FHX 731000FH 751000FHX 771000FH 791000FHV
Maximum 60 gph 90 gph 180 gph 120 gph 180 gph 360 gph 180 / 360 gph 540 gph 360 / 540 gph
Flow Rate 227 lph 341 lph 681 lph 454 lph 681 lph 1363 lph 681 / 1363 lph 2044 lph 1363 / 2044 lph
Height 11.5" / 292 mm 17" / 432 mm 22" / 559 mm 11.5" / 292 mm 17" / 432 mm 22" / 559 mm 22" / 559 mm 22" / 559 mm 22" / 559 mm
Width 5.8" / 147 mm 6" / 152 mm 6" / 152 mm 14.5" / 368 mm 18.75" / 476 mm 16.5" / 419 mm 18.75" / 476 mm 21.5" / 546 mm 21.5" / 546 mm
Depth 4.8" / 122 mm 7" / 178 mm 7" / 178 mm 9.5" / 241 mm 11" / 279 mm 12" / 305 mm 11" / 279 mm 12" / 305 mm 12" / 305 mm
Weight 4 lbs / 1.7 kgs 6 lbs / 2.7 kgs 10 lbs / 4.5 kgs 17 lbs / 7.7 kgs 23 lbs / 10.4 kgs 26 lbs / 11.8 kgs 30 lbs / 13.6 kgs 39 lbs / 17.7 kgs 52 lbs / 23.6 kgs
Port Size Std. 3/4"-16 UNF 7/8"-14 UNF 7/8"-14 UNF 3/4"-16 UNF 7/8"-14 UNF 1 3/4" NPT 7/8"-14 UNF 1 1"-11 1/2 NPT 3/4" NPT
(Option) 16 mm x 1.5 22 mm x 1.5 22 mm x 1.5
Clean Pressure 0.25 psi 0.34 psi 0.49 psi 0.70 psi 1.7 psi 1.7 psi 3.7 psi 1.7 psi 2.5 psi
Drop 1.72 kPa 2.4 kPa 3.4 kPa 4.83 kPa 11.7 kPa 11.7 kPa 25.5 kPa 11.7 kPa 17.2 kPa
Maximum 15 psi 15 psi 15 psi 15 psi 15 psi 15 psi 15 psi 15 psi 15 psi
Operating Pres. 103 kPa 103 kPa 103 kPa 103 kPa 103 kPa 103 kPa 103 kPa 103 kPa 103 kPa
Element # 2010 2040 2020 2010 2040 2020 2020 2020 2020
Element 4" / 102 mm 5" / 127 mm 10" / 254 mm 4" / 102 mm 5" / 127 mm 10" / 254 mm 10" / 254 mm 10" / 254 mm 10" / 254 mm
Removal
Clearance

Notes: (1) Male “JIC” 37" fittings. Manifold Units:


(2) Flow rates shown for one/both filters on-line. • 75500, 75900 and 751000 double manifolds with shutoff valve.
(3) Flow rates shown for two/all filters on-line. • 731000 double manifold without shutoff valves.
For accurate fuel flow rates consult your engine manual, • 791000 triple manifold with shutoff valves.
engine manufacturer's agent or Racor distributor. • 771000 triple manifold without shutoff valves.

For complete part numbers references please refer to www.racor.com and select 7480 product catalogue from the literature tab.
15
UNIGAZ QATAR | MATERIAL SUBMITTAL

AUTOMATIC TANK GAUGING


PANEL

MATERIAL SUBMITTAL
GENESYS+ 7M
GENERAL
Wet stock management up to 32 tanks
Wide graphical display with capacitive graphical 7” TFT 1280x800 touch screen
Easy and smart configuration tools through local graphical interface
Remote web-configuration and web-monitoring
Host communication protocols Gilbarco, Veeder-Root & Modbus
Automatic reconciliation
Dynamic and statically leakage tests
Tank auto-calibration
Deliveries, trends, events, alarms recording
Product level/mm Interface level/mm (water presence detection) display
Gross and compensated volume at 15 °C or 20 °C in liters
Product mean temperature 5 temp. sensors
Volume of empty part in liters (ullage)

SYSTEM
Quad Core Cortex-A9 1.4 GHz
A MMC Boot (Operating System, Application, Configuration is stored at internal memory. SD Card
only for initialization)
1 GB RAM Memory
Internal storage event recording
Gigabit ethernet as default

MECHANICAL
Metal Enclosure
Enclosure dimensions 300 x 180 x 70 mm

ELECTRICAL
Power supply 210-230 Vac
N.2 Digital Input
N.4 Digital Output
Can be extended to N.8 DI and N.16 DO with external I/O Module
RS 485 field bus wiring
N. 2 RS 232 (communication to POS and/or serial printer) Ethernet port
N. 1 USB ports

GENESYS+ 7M BASIC

OPTIONAL (ADDITIONALS)
Embedded GPRS
HDMI Output
GPS
Bluetooth
UNIGAZ QATAR | MATERIAL SUBMITTAL

LEVEL TRANSMITTER

MATERIAL SUBMITTAL
NF-RS
Wired Fuel & Water Probe
NF - RS 5M
GENESYS+
GENERAL
NF RS wired fuel &water probe is a level sensor which measures the level of fuel and
water and the temperature of the liquid in the tank. The measurements are transmitted
via RS485 wired bus.
It’s electronics is based on a powerful microprocessor technology and the
measurements are accurate and sensitive.
Measurement accuracy: +/- 0,5 mm.
Measurement resolution: +/- 0,05 mm.
Temperature accuracy: +/- 0,2°C
It is intrinsically safe suitable for 0 zone, hazardous areas.
Full stainless steel execution
Ultra compact design
Measuring range 0,4 m up to 5,5 m

COMMUNICATION
Baudrate : 9600
Databit : 8
Stopbit : 1
Parity : None
Transmission is wired, maximum transmission distance: up to 1 Km based on standard
of RS485 interface with proper data cable.
Proprietary Rs485 data protocol .
The serial number is unique and corresponds to the probe address for the consequent
configuration into the electronics control.

ELECTRICAL
Ultra low power mode
Nominal power supply 12 Vdc (30Vmax) through an intrinsically safe barrier.
Consumption in normal functioning <15 mA @ 12 Vdc(25mA LPM)
Consumption in sleep mode functioning < 200 uA @12 Vdc
Ui = 30V
Ii = 100mA
Ci = trascurabile/negligible
Li = trascurabile/negligible

MECHANICAL
Stainless steel case, IP68.
Probe shaft Stainless Steel AISI 304 / 316
Dimensions might change according to the shaft length up
p to 500 cm.

ENVIRONMENTAL
Operating Temperature Range: Tamb = -40 +80°C
UNIGAZ QATAR | MATERIAL SUBMITTAL

BUND WALL SENSOR

MATERIAL SUBMITTAL
LS SERIES

GENERAL
Providing a wide range of applications with its polyamide material construction, LS series is level
switches ensuring Normally On or Normally Off contact. it may be attached to the reservoir on the
top or bottom. PP (Polypropylene} material is suitable tor water and dilute acid applications and PA
(Polyamide} material for oil and fuel applications.

Material : PP or PA

Temperature (max.) : -20°c +80 °C

Connection: M8 Thread

Output: 2-Wire or 4-Wire

Quantity of Contact: 1 x NO or NC

Electrical Connection: 250 VAC / 200 VOC 1,5 A Dry Contact

APPLICATIONS
Interstitial space of double wall tanks
Containment sumps
Dispenser pans
Other applications requiring the detection of a liquid leak

LS-B LS-I

www.northfalconenergy.com
DUDULLU OSB DES-1/10 ISTANBUL TURKEY
UNIGAZ QATAR | MATERIAL SUBMITTAL

ELECTRONIC TANK DISPLAY

MATERIAL SUBMITTAL
GENESYS+ 5M
GENERAL
Wet stock management up to 32 tanks
Wide graphical display with capacitive graphical 5” TFT 800x600 touch screen
Easy and smart configuration tools through local graphical interface
Remote web-configuration and web-monitoring
Host communication protocols Gilbarco, Veeder-Root & Modbus
Automatic reconciliation
Dynamic and statically leakage tests
Tank auto-calibration
Deliveries, trends, events, alarms recording
Product level/mm Interface level/mm (water presence detection) display
Gross and compensated volume at 15 °C or 20 °C in liters
Product mean temperature 5 temp. sensors
Volume of empty part in liters (ullage)

SYSTEM 
Quad Core Cortex-A9 1.4 GHz
A MMC Boot (Operating System, Application, Configuration is stored at internal memory. SD Card
only for initialization)
1 GB RAM Memory
Internal storage event recording
Gigabit ethernet as default

MECHANICAL
Metal Enclosure
Enclosure dimensions 300 x 180 x 70 mm

ELECTRICAL
Power supply 210-230 Vac
Can be extended to N.8 DI and N.16 DO with external I/O Module
RS 485 field bus wiring
N. 2 RS 232 (communication to POS and/or serial printer) Ethernet port
N. 1 USB ports

GENESYS+ 5M BASIC

OPTIONAL (ADDITIONALS)
Embedded GPRS
HDMI Output
GPS
Bluetooth
4 Digital Input + 2 Digital Output

www.northfalconenergy.com
DUDULLU OSB DES-1/10 ISTANBUL TURKEY
UNIGAZ QATAR | MATERIAL SUBMITTAL

LEVEL SWITCH

MATERIAL SUBMITTAL
NF-RSJr
Wired Fuel Sensor
NF - RSJr
GENERAL
NF RS  wired fuel sensor is a level sensor which measures the level of fuel and the
temperature of the liquid in the tank. The measurements are transmitted via RS485
wired bus.
It’s electronics is based on a powerful microprocessor technology and the
measurements are accurate and sensitive.
Measurement accuracy: +/- 0,5 mm.
Measurement resolution: +/- 0,05 mm.
Temperature accuracy: +/- 0,2°C
It is intrinsically safe suitable for 0 zone, hazardous areas.
Full stainless steel execution
Ultra compact design
Measuring range 0,4 m up to 5,5 m

COMMUNICATION
Baudrate : 9600
Databit : 8
Stopbit : 1
Parity : None
Transmission is wired, maximum transmission distance: up to 1 Km based on standard
of RS485 interface with proper data cable.
Proprietary Rs485 data protocol .
The serial number is unique and corresponds to the probe address for the consequent
configuration into the electronics control.

ELECTRICAL
Ultra low power mode
Nominal power supply 12 Vdc (30Vmax) through an intrinsically safe barrier.
Consumption in normal functioning <15 mA @ 12 Vdc(25mA LPM)
Consumption in sleep mode functioning < 200 uA @12 Vdc
Ui = 30V
Ii = 100mA
Ci = trascurabile/negligible
Li = trascurabile/negligible

MECHANICAL
Stainless steel case, IP68.
Probe shaft Stainless Steel AISI 304 / 316
Dimensions might change according to the shaft length up to 500 cm.

ENVIRONMENTAL
Operating Temperature Range: Tamb = -40 +80°C
| UNIGAZ QATAR |

CONTROL PANEL

MATERIAL SUBMITTAL
Electric transformers
Voltage Stabilizers
Frequency converters
UPS, Inverters, Power supplies

Single phase isolation safety transformers TE range


Natural air cooling AN type, resin impregnated and tropicalized.
Separated copper windings

TECHNICAL SPECIFICATION:
Rated power from 50VA to 3000VA
Input voltage 220-230-240-380-400-415V *
Output voltage 12+12 (24)V or 24+24 (48)V or 55/110V or 110+110 (220)V *
Frequency 50/60 Hz
Grade of protection IP00
Protection class I
Isolation class E
Winding isolation class F-H
Max ambient temperature 40°C
Max temperature rise 90°C
Max full load voltage regulation 3,5%
Short circuit voltage 6% max
Efficiency > 95%
Applied standards CEI EN61558-2-4 or CEI- EN61558-2-6

* different input/output voltages available on request last 3/4 digits of part numbers changing according to voltage combination

FEATURES
Earth connection
Wiring connections on two sides
Rating label

PART NUMBERS

Power Output (secondary) voltage V


VA 12+12 (24) 24+24 (48) 55/110 110+110 (220)
50 TE009001 TE009002 TE009003 TE009004
100 TE029001 TE029002 TE029003 TE029004
200 TE059001 TE059002 TE059003 TE059004
300 TE079001 TE079002 TE079003 TE079004
500 TE119001 TE119002 TE119003 TE119004
630 TE145001 TE145002 TE145003 TE145004
750 TE169001 TE169002 TE169003 TE169004
1000 TE179001 TE179002 TE179003 TE179004
1500 TE199001 TE199002 TE199003 TE199004
2000 TE219001 TE219002 TE219003 TE219004
3000 TE249001 TE249002 TE249003 TE249004

K-FACTOR SRL unipersonale - Via Giotto 9 42014 Castellarano (RE) - Italy - VAT# IT 02422010369

ISO9001
Electric transformers
Voltage Stabilizers
Frequency converters
UPS, Inverters, Power supplies

ELECTRICAL CHARACTERISTIC

Power Voltage regulation Efficiency SCV losses Inrush power VA


VA Cos-phi=1 Cos-phi=0.45 Cos-phi=1 Cos-phi=0.45 % W Cos-phi=1 Cos-phi=0.45
50 6.6 2.6 0.80 0.61 11 7 85 125
100 5.2 2.3 0.84 0.71 8.5 15 230 310
200 4.5 2.2 0.85 0.73 5.8 21 590 830
300 5.3 2.8 0.88 0.77 4.6 26 745 910
500 4.1 2.2 0.91 0.82 4.5 46 1180 1500
630 3.8 2.1 0.91 0.83 4.3 50 1820 2350
750 3.1 2.0 0.93 0.84 3.9 55 2020 2680
1000 2.5 1.5 0.94 0.87 3.9 58 2690 3390
1500 1.7 1.5 0.94 0.87 3.7 77 4040 4980
2000 1.7 1.5 0.95 0.88 3.5 93 5600 6400
3000 1.7 1.5 0.95 0.87 3.5 120 9400 11600

DIMENSIONS AND WEIGHT

Power dimensions mm. weight


VA a b c d e F Kg
50 77 90 75 56 47 4 1.1
100 86 100 82 63 55 5 2.2
200 98 110 90 78 70 5 3.5
300 122 110 112 90 76 6 4.5
500 122 120 112 90 86 6 6.0
630 152 120 145 125 93 6 8.0
750 152 120 145 125 93 6 8.9
1000 152 130 145 125 103 6 11.0
1500 152 130 145 125 103 6 12.5
2000 182 150 170 150 122 8 18.0
3000 194 150 180 160 125 8 21.2

On request a version with copper earthed screen between the windings is available

K-FACTOR SRL unipersonale - Via Giotto 9 42014 Castellarano (RE) - Italy - VAT# IT 02422010369

ISO9001
Sample
UNIGAZ QATAR | MATERIAL SUBMITTAL

FUEAL TRANSFER
GEAR PUMP

MATERIAL SUBMITTAL
SAMPLE NAME PUMP PLATES

Note: Kindly consider the above model and series as sample for reference.
VIKING PUMP, INC.
A Unit of IDEX Corporation
406 State Street
Cedar Falls, IA 50613-0008 U.S.A.
Phone: 319-266-1741
Fax: 319-273-8157 International Fax: 319-273-8414
www.vikingpump.com

To whom it may concern

Subject: Letter of Authorization

Date: June 7, 2021

Dear Sir / Madam,

With reference to the subject enquiry, we wish to confirm that IDEX INDIA PVT LTD are the
manufacturers of DFO Skids for Viking Pump USA & India & hereby are authorized to supply
DFO skids in the Qatar region.

For the subject project, we are hereby authorize M/S Diligent Trading & Contracting to supply
(DFO skids, Spares Parts & Services) as per IDEX Corporation USA Global Sales Policy and
Standards. These supplies are covered under Viking Pump Inc standard sales warranty terms.

This letter is valid till the further notice unless otherwise notified. Pl feel free to contact us for
any clarification.

Khurram Hashmi
Regional Sales Manager-Viking Pump
IDEX Middle East
SUPPLY PUMP - HEAD LOSS CALCULATION (Longest route)
PROJECT NAME : Construction of Terminal Pumping Station at Doha North STW Package 3-C823/3
Design Data FUEL PUMP selected : GG4195
Fluid: Diesel Supply Pump from Main Tank to Day tank
Viscosity : 7Cps Pump Flow (L/s) 0.586
Sp. Gravity : 0.85 Pump Pressure (Bar) 2 bar
Temp.: 50 deg Pipe size ( mm) 40
Flow friction
Pipe Size Nos of Equivalen
Length rate Velocity(V) Re factor Friction Loss
Node Description (D) Fittings t length
(Q) (f)
mm m No. m L/s m/s / / m
Horizintal
1 pipe 40 15 15 0.586 0.47 3115.60 0.04 0.183
90 degree
2 elbow 40 8 7.2 0.586 0.47 3115.60 0.04 0.088
3 ball valve 40 4 1.2 0.586 0.47 3115.60 0.04 0.015
4 Y Strainer 40 2 6.8 0.586 0.47 3115.60 0.04 0.083
check valve 40 1 2.9 0.586 0.47 3115.60 0.04 0.035

Calculation Frictional Head Loss ( m) 0.404


10 % For Site Modification 0.445
Static Head (m) 4
Residual Pressure at discharge (m) 4
10 % Safey Factor 9.289
Total Head (m) 10.683
Total Head (Bar) 1.1
Based on the above calculation pump selected model GG4195 , 0.586 L/S at 1.5 Bar
Reference:
Friction Loss:f (L/D) x (v²/2g) ----- Bernoulli equation
f = friction factor=Ft= 1 / [1.8 Log (Re/7)]² -----------Simplified Colebrook equation
V = velocity of fluid (m/s) = Q/A (area cross section) A= π r^2
Re=D * V / μ ------------ Reynolds number
μ =0.00006458 ft2/s = 0.0000060 m2/s ------------ Kinematic Viscosity
L = length of pipe work (m)
D = inner diameter of pipe work (m)
g = acceleration due to gravity (m/s²) = 9.8
2- NFPA - 15 , Table 8.5.2.1: Equivalent pipe length.
Curve Generator | Curve Generator https://www.vikingpumpcurve.com/

Pump Series Pump Size Viscosity Units Differential Pressure Units Specific Gravity

4195 GG 7 cP 1.5 BAR 0.85

Speed (RPM) Flow Rate Units Notes

1450 L/min Customer, Application, etc

Input Speed: 1450 (RPM) Calculated Flow: 35.9 (L/min) Power at Input Speed: 0.02 (BHP) / NPSHr: 5.6 (Ft H2O)
0.01 (kW)

PERFORM ANCE CURVES

1 of 2 8/1/2022, 2:14 PM
Curve Generator | Curve Generator https://www.vikingpumpcurve.com/

2 of 2 8/1/2022, 2:14 PM
UNIGAZ QATAR | MATERIAL SUBMITTAL

CS PIPE SCH 40

MATERIAL SUBMITTAL
Oil and Gas Pipes
SEAMLESS PIPES
ASTM A 106/A106 M,
ASTM A 53/A 53 M, ASTM A 333/A 333 M
Application: for producing structures, as well as for steam, water, gas and air pipelines for operations at
low temperatures, and also in general machine-building and tool-making.
Steel grade — A, B, C, Gr 6

Pipe dimensions and weight according to ANSI/ASME B 36.10 M


Outside dismeter Wall thickness Weight per length unit
Nominal size Weight class Schedule
in mm in mm lb/ft kg/m
0.109 2.77 1.41 2.09 10
0.114 2.90 1.46 2.18 30
1 1.315 33.4
0.133 3.38 1.68 2.50 STD 40
0.179 4.55 2.17 3.23 XS 80
0.109 2.77 1.81 2.69 10
0.117 2.97 1.93 2.87 30
1¼ 1.660 42.2
0.140. 3.56 2.27 3.39 STD 40
0.191 4.85 3.00 4.47 XS 80
0.109 2.77 2.09 3.11 10
0.125 3.18 2.37 3.53 30
1½ 1.900 48.3
0.145 3.68 2.72 4.05 STD 40
0.200 5.08 3.63 5.41 XS 80
0.109 2.77 2.64 3.93 10
0.125 3.18 3.01 4.48 30
0.141 3.58 3.36 5.01
0.154 3.91 3.66 5.44 STD 40
2 2.375 60.3
0.172 4.37 4.05 6.03
0.188 4.78 4.39 6.54
0.218 5.54 5.03 7.48 XS 80
0.250 6.35 5.68 8.45
0.120 3.05 3.53 5.26 10
0.156 3.96 4.53 6.74
0.172 4.37 4.97 7.40
0.188 4.78 5.40 8.04 30
2½ 2.875 73.0 0.203 5.16 5.80 8.63 STD 40
0.216 5.49 6.13 9.14
0.250 6.35 7.01 10.44
0.276 7.01 7.67 11.41 XS 80
0.375 9.52 10.02 14.9 160
0.141 3.58 5.06 7.53
0.156 3.96 5.58 8.29
0.172 4.37 6.11 9.11
0.188 4.78 6.66 9.92 30
0.216 5.49 7.58 11.29 STD 40
3 3.500 88.9
0.250 6.35 8.69 12.93
0.281 7.14 9.67 14.40
0.300 7.62 10.26 15.27 XS 80
0.438 11.13 14.34 21.35 160
0.600 15.24 16.60 27.68 XXS
0.156 3.96 6.41 9.53
0.172 4.37 7.03 10.48
0.188 4.78 7.66 11.41 30
3½ 4.000 101.6 0.226 5.74 9.12 13.57 STD 40
0.250 6.35 10.02 14.92
0.281 7.14 11.17 16.63
0.318 8.08 12.52 18.63 XS 80

— Upon agreement

5
Pipe dimensions and weight
Outside dismeter Wall thickness Weight per length unit
Nominal size Weight class Schedule
in mm in mm lb/ft kg/m
0.156 3.96 7.24 10.78
0.172 4.37 7.95 11.85
0.188 4.78 8.67 12.91 30
0.203 5.16 9.32 13.89
0.219 5.56 10.02 14.91
0.237 6.02 10.80 16.07 STD 40
4 4.500 114.3 0.250 6.35 11.36 16.91
0.281 7.14 12.67 18.87
0.312 7.92 13.97 20.78
0.337 8.56 15.00 22.32 XS 80
0.438 11.13 19.02 28.37 120
0.531 13.49 22.53 33.54 160
0.674 17.19 27.59 41.03 XXS
0.258 6.55 14.63 21.76 STD 40
0.375 9.52 20.79 30.85 XS 80
5 5.563 141.3 0.500 12.7 27.06 40.28 120
0.626 15.88 32.99 49.10 160
0.750 19.05 38.59 57.43 XXS
0.172 4.37 11.87 17.67
0.188 4.78 12.94 19.28
0.203 5.16 13.94 20.76
0.219 5.56 15.00 22.31
0.250 6.35 17.04 25.36
0.280 7.11 18.99 28.26 STD 40
0.312 7.92 21.06 31.32
0.344 8.74 23.10 34.39
6 6.625 168.3
0.375 9.52 25.05 37.28
0.432 10.97 28.60 42.56 XS 80
0.500 12.70 32.74 48.73
0.562 14.27 36.43 54.20 120
0.719 18.26 45.39 67.56 160
0.750 19.05 47.10 70.12
0.864 21.95 53.21 79.22 XXS
0.875 22.23 53.78 80.08
0.250 6.35 22.38 33.31 20
0.277 7.04 24.72 36.31 30
0.312 7.92 27.73 41.24
0.322 8.18 28.58 42.55 STD 40
0.344 8.74 30.45 45.34
0.375 9.52 33.07 49.20
0.406 10.31 35.67 53.08 60
0.438 11.13 38.33 57.08
8 8.625 219.1
0.500 12.70 43.43 64.64 XS 80
0.562 14.27 48.44 72.08
0.594 15.09 51.00 75.92 100
0.719 18.26 60.77 90.44 120
0.812 20.62 67.82 100.92 140
0.875 22.22 72.49 107.88 XXS
0.906 23.02 74.76 111.27 160
1.000 25.40 81.51 121.33
0.250 6.35 28.06 41.76 20
0.279 7.09 31.23 46.49
0.307 7.80 34.27 51.01 30
10 10.750 273.0
0.344 8.74 38.27 56.96
0.365 9.27 40.52 60.29 STD 40
0.438 11.13 48.28 71.87

6
Pipe dimensions and weight
Outside dismeter Wall thickness Weight per length unit
Nominal size Weight class Schedule
in mm in mm lb/ft kg/m
0.500 12.70 54.79 81.52 XS 60
0.594 15.09 64.49 95.97 80
0.719 18.26 77.10 114.70 100
0.844 21.44 89.38 133.00 120
1.000 25.40 104.23 155.09 XXS 140
1.125 28.58 115.75 172.27 160
1.250 31.75 126.54 188.90
0.281 7.14 37.46 55.76
0.312 7.92 41.48 61.70
0.330 8.38 43.81 65.19 30
0.344 8.74 45.69 67.91
0.375 9.53 49.61 73.86 STD
0.406 10.31 53.57 79.71 40
0.438 11.13 57.65 85.82
0.500 12.70 65.48 97.44 XS
0.562 14.27 73.22 108.93 60
0.625 15.88 81.01 120.59
12 12.750 323.8 0.688 17.48 88.71 132.05 80
0.750 19.05 95.21 143.17
0.812 20.62 103.63 154.17
0.844 21.44 107.42 159.87 100
0.875 22.23 111.08 165.33
0.983 23.83 118.44 176.29
1.000 25.40 125.61 186.92 XXS 120
1.062 26.97 132.69 197.43
1.125 28.58 139.81 208.08 140
1.250 31.75 153.67 228.68
1.312 33.32 160.42 238.69 160
0.312 7.92 45.61 67.9 20
0.344 8.74 50.17 74.76
0.375 9.53 54.57 81.33 STD 30
0.406 10.31 59.00 87.79
0.438 11.13 63.44 94.55 40
0.469 11.91 67.84 100.95
0.500 12.7 72.16 107.40
0.562 14.27 80.73 120.12
0.594 15.09 85.05 126.71 60
0.625 15.88 89.36 133.04
14 14.000 355.6 0.688 17.48 97.91 144.76
0.750 19.05 106.13 158.10 80
0.875 22.23 122.17 182.76
0.938 23.83 194.96 130.85 100
1.094 27.79 224.65 150.79 120
1.250 31.75 253.56 170.21 140
1.406 35.71 281.70 189.11 160
2.000 50.8 381.83 256.32
2.125 53.97 401.50 269.50
2.200 55.88 413.01 277.25
2.500 63.5 457.40 307.05
0.344 8.8 57.57 85.71
0.375 9.53 62.64 93.27 STD 30
0.406 10.31 67.68 100.71
0.438 11.13 72.86 108.49
16 16 406.4
0.469 11.91 77.87 115.87
0.500 12.7 82.85 123.31 XS 40
0.562 14.27 92.75 138
0.625 15.88 102.72 152.94

— Upon agreement

7
Pipe dimensions and weight
Outside dismeter Wall thickness Weight per length unit
Nominal size Weight class Schedule
in mm in mm lb/ft kg/m
0.656 16.66 107.76 160.13 60
0.688 17.48 112.62 167.66
0.750 19.05 122.27 181.98
0.812 20.62 131.84 196.18 80
0.844 21.44 136.74 203.54
0.875 22.23 141.48 210.61
0.938 23.83 151.03 224.83
16 16 406.4 1.000 25.4 160.35 238.66 100
1.031 26.19 164.98 245.57
1.062 26.97 169.59 252.37
1.125 28.58 178.89 266.3
1.188 30.18 188.11 280.01 120
1.219 30.96 192.61 286.66
1.250 31.75 197.1 293.35 140
1.438 36.53 223.85 333.21
— Upon agreement

DIN EN 10255
UNALLOYED STEEL TUBES SUITABLE FOR WELDING AND THREADING

Application: for transportation fluids and general purpose

Dimensions and weight for Hot rolled

Outside diametr, mm Н (heavy-weight) М (medium-weight)

Nominal size, mm Steel grades

Weight per
Wall thickness, Weight per
max. min. Wall thickness. mm length unit,
mm length unit, kg/m
kg/m
26.9 27.3 26.3 3.2 1.87 2.6 1.56
33.7 34.2 33.3 4.0 2.9 3.2 2.41
42.4 42.9 42.0 4.0 3.79 3.2 3.1
48.3 48.8 47.9 4.0 4.37 3.2 3.56
60.3 60.8 59.7 4.5 6.19 3.6 5.03
S 195 Т
76.1 76.6 75.3 4.5 7.93 3.6 6.42
88.9 89.5 88.0 5.0 10.3 4.0 8.36
114.3 115.0 113.1 5.4 14.5 4.5 12.2
139.7 140.8 138.5 5.4 17.9 5.0 16.66
165.1 166.5 163.9 5.4 21.3 5.0 19.88
— Upon agreement

Dimensions and weight for Hot rolled – Type L and L1


Type L Type L1
Outside diametr, mm
Nominal size, mm Weight per Weight per Steel grades
Wall thickness,
Wall thickness, mm length unit, length unit,
mm
max. min. kg/m kg/m

26.9 27.1 26.4 2.3 1.40 2.3 1.39


33.7 34.0 33.2 2.9 2.2 2.9 2.2
42.4 42.7 41.9 2.9 2.82 2.9 2.82
48.3 48.6 47.8 2.9 3.25 2.9 3.24
60.3 60.7 59.6 3.2 4.51 3.2 4.49
76.1 76.3 75.2 3.2 5.75 3.2 5.73 S 195 Т
88.9 89.4 87.9 3.2 6.79 3.6 7.55
101.6 101.2 100.3 3.6 8.70 - -
114.3 114.9 113 3.6 9.83 4.0 10.8
139.7 140.8 138.5 4.5 15.0 - -
165.1 166.5 163.9 4.5 17.8 - -
— Upon agreement

8
9
CARBON STEEL GRADE B PIPES - ASTM A53M, A106M, API 5L, Seamless

Maximum Allowable Operating Pressure (MPa)


Nominal Outside Wall Temperature (°C)
Size Diameter Thickness -29 to +38 204 260 343 371 399 427
Schedule
(DN) (NPS) (mm) (mm) Maximum Allowable Stress (MPa)
137.9 137.9 130.3 117.2 113.8 89.6 74.5
15 ½ 21.3 STD 40 2.77 34.5 34.5 32.6 29.3 28.5 22.4 18.6
STD 40 2.87 28.1 28.1 26.5 23.8 23.1 18.2 15.1
20 ¾ 26.7
XS 80 3.91 39.4 39.4 37.2 33.5 32.5 25.6 21.3
STD 40 3.38 26.3 26.3 24.8 22.3 21.7 17.1 14.2
25 1 33.4
XS 80 4.55 36.3 36.3 34.3 30.9 30.0 23.6 19.6
STD 40 3.56 21.6 21.6 20.4 18.4 17.8 14.1 11.7
32 1¼ 42.2 XS 80 4.85 30.2 30.2 28.5 25.6 24.9 19.6 16.3
160 6.35 40.6 40.6 38.4 34.5 33.5 26.4 21.9
STD 40 3.68 19.4 19.4 18.4 16.5 16.0 12.6 10.5
40 1½ 48.3 XS 80 5.08 27.4 27.4 25.9 23.3 22.6 17.8 14.8
160 7.14 39.8 39.8 37.6 33.8 32.8 25.9 21.5
STD 40 3.91 16.4 16.4 15.5 13.9 13.5 10.7 8.9
50 2 60.3 XS 80 5.54 23.7 23.7 22.4 20.1 19.5 15.4 12.8
160 8.74 38.9 38.9 36.8 33.1 32.1 25.3 21.0
STD 40 5.16 17.9 17.9 17.0 15.3 14.8 11.7 9.7
65 2½ 73.0 XS 80 7.01 24.8 24.8 23.5 21.1 20.5 16.1 13.4
160 9.53 34.7 34.7 32.8 29.5 28.6 22.5 18.7
STD 40 5.49 15.6 15.6 14.7 13.2 12.8 10.1 8.4
80 3 88.9 XS 80 7.62 22.0 22.0 20.8 18.7 18.2 14.3 11.9
160 11.13 33.1 33.1 31.3 28.1 27.3 21.5 17.9
STD 40 6.02 13.2 13.2 12.5 11.2 10.9 8.6 7.1
XS 80 8.56 19.1 19.1 18.0 16.2 15.7 12.4 10.3
100 4 114.3 120 11.13 25.2 25.2 23.8 21.4 20.8 16.4 13.6
160 13.49 31.0 31.0 29.3 26.4 25.6 20.2 16.8
XXS 17.12 40.4 40.4 38.2 34.3 33.3 26.2 21.8
STD 40 6.55 11.6 11.6 10.9 9.8 9.5 7.5 6.2
XS 80 9.53 17.1 17.1 16.1 14.5 14.1 11.1 9.2
125 5 141.3 120 12.7 23.1 23.1 21.9 19.7 19.1 15.0 12.5
160 15.88 29.4 29.4 27.8 25.0 24.3 19.1 15.9
XXS 19.05 35.9 35.9 33.9 30.5 29.6 23.4 19.4
STD 40 7.11 10.5 10.5 9.9 8.9 8.7 6.8 5.7
XS 80 10.97 16.5 16.5 15.6 14.0 13.6 10.7 8.9
150 6 168.3
120 14.27 21.8 21.8 20.6 18.5 17.9 14.1 11.7
XXS 160 18.26 28.3 28.3 26.8 24.1 23.4 18.4 15.3
20 6.35 7.1 7.1 6.7 6.1 5.9 4.6 3.9
30 7.04 7.9 7.9 7.5 6.7 6.5 5.2 4.3
STD 40 8.18 9.3 9.3 8.7 7.9 7.6 6.0 5.0
60 10.31 11.7 11.7 11.1 10.0 9.7 7.6 6.3
XS 80 12.7 14.6 14.6 13.8 12.4 12.0 9.5 7.9
200 8 219.1
100 15.09 17.5 17.5 16.5 14.8 14.4 11.4 9.4
120 18.26 21.4 21.4 20.2 18.2 17.6 13.9 11.5
140 20.62 24.3 24.3 23.0 20.7 20.1 15.8 13.1
XXS 22.23 26.4 26.4 24.9 22.4 21.7 17.1 14.2
160 23.01 27.4 27.4 25.8 23.3 22.6 17.8 14.8
Important - refer to the associated Notes on page 1.

Page 1 of 3 www.pietraspa.com 72
SEAMLESS Pipes & Tubes
Engineered for diverse applications

MAHARASHTRA SEAMLESS LIMITED


An ISO 9001:2008 Company
******************
I) Hot Finished Pipes and Tubes
Carbon & Alloy Steel:
Outside Diameter (OD) 26mm - 508.0mm
Wall Thickness (WT) 2.8mm - 40mm
II) Cold Pilgered / Cold Drawn Tubes
Carbon & Alloy Steel:
Outside Diameter (OD) 10mm - 101mm
Wall Thickness (WT) 1mm - 10mm
III) OIL Country Tubular Goods (OCTG)
A) Size Range
- Line Pipes - Plain End Upto 20" (508 mm)
Outside Diameter
- Threaded and Coupled
with API Line Pipe threads upto
12" (323.9 mm) Outside Diameter
- Casing Upto 133/8" (339.72 mm) Outside
Diameter Plain End / Threaded and
Coupled with STC, LC & BC Threads
- Tubing NUE / EUE upto 4½" Outside Diameter
Plain End or Threaded & Coupled with
API Round Threads
- Drill Pipes - Internal Upset (IU) 3½” to 4½”
- External Upset (EU) 27/8” to 4½”
- Internal - External Upset (IEU)
Plug Mill Technology 4½” to 5”
B) API Grades
Plug Mill Process is a proven process for - Line Pipes (API - 5L) All Grades upto X-70 / X-70Q
manufacturing of higher diameter Seamless Pipes - Casing & Tubing (API 5CT)
by heating round billets up to the plastic stage of
steel and piercing in a Cross Roll Piercer. Further Yield Strength (ksi) 40 55 65 80 90 95 110 125
elongation is achieved through a Plug Mill in which Group 1 H 40 J 55 N 80
the thick wall hot hollow will be rolled through a pair K 55
Group 2 R 95
of Top and Bottom Rolls with a plug inside to control M 65 L 80 C 90
T 95
C110
the ID and achieve better internal surface finish. Group 3 P 110
Group 4 Q125
World Class Reelers are used to improve the wall
thickness circumferentially, to achieve close - Proprietary Grades
tolerance on the Wall Thickness. As the OD and the High Collapse Casing MAHA HC L80
ID are controlled by external and internal toolings MAHA HC P110
during hot rolling in Plug Mill and Reeler, the pipe - Drill Pipes (API 5DP) Gr. E, X,G,S
will have closer tolerances, to cater to the - Sour Service NACE (MR - 0175)
requirements of OCTG and other applications.

PLUG MILL PROCESS

Billets Heating Billet Centering Piercing Elongation Plug Rolling Reeler Rolling Reheating

Tempering Furnace Quenching Austenising Furnace Hydrotesting / NDT Straightening End Cutting Cooling Bed Sizing

Hot Sizing Straightening End Cutting NDT Threading Coupling Screw up Drift Testing Hydrostatic Testing Finishing & Despatch
Maharashtra Seamless Ltd, India

Maharashtra Seamless Limited (“MSL”) a flag-ship company of DP Jindal Group (with combined turnover of around USD 1 Billion)
established for over 25 years is pioneer in manufacturing Seamless/Welded Steel Pipe & OCTG in India. It is the largest manufacturer of
Seamless Steel Pipe and Tubes in India both in terms of capacity and product range. The company specializes in providing Piping
Solutions (Steel, Alloy) to Oil and Gas (Exploration, Drilling Transmission etc.), Petrochemical, Structural & Mechanical Sectors across
the globe.

Product Profile:
Sr. Piping Variant Dimensional Standards & Grades Critical Application Annual
No. Capability (Outer Production
Diameter) Capacity
1 Seamless Line Pipe ½” - 14”  API 5L (Grade-B to X-70)  Sour, Non Sour 550,000 MT
 ASTM (A106 Gr-B, A 53, A333 Gr-6  Structural
 EN 10216, EN10210, EN 10255, EN Application
10297.  Mechanical
 ASME/ASTMSA/A-53/106/  Boiler
178/179/192/209/210/213/ 214/335 Application
2 Seamless Tubing 2 3/8”- 4 ½”  API 5CT (J55, K55, N80Q, N80, L80,  EUE, NUE
P110, Q125, T95, C110).
3 Seamless Casing 4 ½” - 13 3/8”  API 5CT (J55, K55, N80Q, N80, L80,  High Collapse,
P110, Q125, T95, C110). Special Drift.
 API Connections (BTC, LTC, STC)
4 Coupling Stock Pipe 2 3/8”- 13 3/8”  API 5CT (J55, K55, N80Q, N80, L80,  For BTC, LTC, STC
and Finished Coupling P110, Q125, T95, C110). connections

5 Drill Pipes 2 3/8 to 5 ½”  API 5D, E, X, G & S PSL 1, 2, 3  IUE, EUE & IEUE

6 ERW Line Pipes 8” - 20”  API 5L (Grade-B to X-70)  Sour, Non Sour 200,000 MT
7 ERW Casings 8 5/8”, 9 5/8” & 10  API 5CT (J55 & N-80)
¾”
8 External Coating 1” – 48”  DIN 30670 & DIN 30678 Coating Thickness 300 Sq. Mtr / Hour
 3 Layer PE,  Upto 3.7mm
 3 Layer PP  Upto 3.7mm
 Single layer FBE  Upto 0.5mm
 Dual Layer FBE  Upto 1mm
9 Internal Epoxy Coating 6”-22”  DIN 30670 & DIN 30678  Upto 50 – 60 125 Sq. Mtr / Hour
micron

 Major Quality Accreditations: “MSL” manufacturing facilities are accredited with renowned international agencies for
certifications of API 5L, API 5CT, API 5DP, Quality Systems ISO 9001:2008, Environment Management ISO 14001:2008 and
Occupational Health and Safety management Systems OHSAS 18001:2007, PED Certificate, CE Certificate for structur al pipes.

 Major International Client Approvals: “MSL” products are on approved list of various national and International end-user Oil
and Gas companies for their Exploration and transportation programs. Our list of clients includes Shell Global Services, Petroleum
Development Company-Oman, Statoil-USA, Kuwait Oil Company-Kuwait, Saudi Aramco-Saudi Arabia, Exxon Mobil-USA, Joint
Operations-Kuwait, Occidental -Oman to name a few.

 International Exposure : “MSL” is exporting close to 40% of its turnover to International markets in USA, Canada, Mexico,
Columbia, Brazil, Italy, Spain, Poland, Kuwait, Oman, UAE, Saudi Arabia, Egypt, Vietnam, East Africa etc.

Please write to us at contact@mahaseam.com or sales@gvnfuels.com for all your export related enquiries or any other information
desired by your goodself. For detailed overview, pls. visit our website www.jindal.com.
DIMENSION AND WEIGHT
Nominal SCHEDULE WALL THICKNESS (mm) / WEIGHT (kg/m)
Pipe Size OD Sch Sch Sch Sch STD Sch XS Sch Sch Sch Sch Sch Sch XXS
mm/inch mm 5 10 20 30 40 60 80 100 120 140 160
6 10.3 - 1.24 - - 1.73 1.73 2.41 - 2.41 - - - - -
1/8 - 0.28 - - 0.37 0.37 0.47 - 0.47 - - - - -
8 13.7 - 1.65 - - 2.24 2.24 3.02 - 3.02 - - - - -
1/4 - 0.49 - - 0.63 0.63 0.80 - 0.80 - - - - -
10 17.1 - 1.65 - - 2.31 2.31 3.20 - 3.20 - - - - -
3/8 - 0.63 - - 0.84 0.84 1.10 - 1.10 - - - - -
15 21.3 1.65 2.11 - - 2.77 2.77 3.73 - 3.73 - - - 4.78 7.47
1/2 0.80 1.00 - - 1.27 1.27 1.62 - 1.62 - - - 1.95 2.55
20 26.7 1.65 2.11 - - 2.87 2.87 3.91 - 3.91 - - - 5.56 7.82
3/4 1.03 1.28 - - 1.69 1.69 2.20 - 2.20 - - - 2.90 3.64
25 33.4 1.65 2.77 - - 3.38 3.38 4.55 - 4.55 - - - 6.35 9.09
1 1.29 2.09 - - 2.50 2.50 3.24 - 3.24 - - - 4.24 5.45
32 42.2 1.65 2.77 - - 3.56 3.56 4.85 - 4.85 - - - 6.35 9.70
11/4 1.65 2.69 - - 3.39 3.39 4.47 - 4.47 - - - 5.61 7.77
40 48.3 1.65 2.77 - - 3.68 3.68 5.08 - 5.08 - - - 7.14 10.15
11/2 1.90 3.11 - - 4.05 4.05 5.41 - 5.41 - - - 7.25 9.55
50 60.3 1.65 2.77 - - 3.91 3.91 5.54 - 5.54 - - - 8.74 11.07
2 2.39 3.93 - - 5.44 5.44 7.48 - 7.48 - - - 11.11 13.44
65 73.0 2.11 3.05 - - 5.16 5.16 7.01 - 7.01 - - - 9.53 14.02
21/2 3.69 5.26 - - 8.63 8.63 11.41 - 11.41 - - - 14.92 20.39
80 88.9 2.11 3.05 - - 5.49 5.49 7.62 - 7.62 - - - 11.13 15.24
3 4.52 6.46 - - 11.29 11.29 15.27 - 15.27 - - - 21.35 27.68
90 101.6 2.11 3.05 - - 5.74 5.74 8.08 - 8.08 - - - - -
31/2 5.18 7.41 - - 13.57 13.57 18.64 - 18.64 - - - - -
100 114.3 2.11 3.05 - - 6.02 6.02 8.56 - 8.56 - 11.13 - 13.49 17.12
4 5.84 8.37 - - 16.08 16.08 22.32 - 22.32 - 28.32 - 33.54 41.03
125 141.3 2.77 3.40 - - 6.55 6.55 9.53 - 9.53 - 12.70 - 15.88 19.05
5 9.46 11.56 - - 21.77 21.77 30.97 - 30.97 - 40.28 - 49.12 57.43
150 168.30 2.77 3.40 - - 7.11 7.11 10.97 - 10.97 - 14.27 - 18.26 21.95
6 11.31 13.83 - - 28.26 28.26 42.56 - 42.56 - 54.21 - 67.57 79.22
200 219.10 - - 6.35 7.04 8.18 8.18 12.70 10.31 12.70 15.09 18.26 20.62 23.01 22.23
8 - - 33.32 36.82 42.55 42.55 64.64 53.09 64.64 75.92 90.44 100.93 111.27 107.93
250 273.00 3.40 4.19 6.35 7.80 9.27 9.27 12.70 12.70 15.09 18.26 21.44 25.40 28.58 25.40
10 22.61 27.78 41.76 51.01 60.29 60.29 81.53 81.53 95.98 114.71 133.01 155.10 172.27 155.10
300 323.80 - - - 8.38 9.53 10.31 12.70 14.27 17.48 21.44 25.40 28.58 33.32 25.40
12 - - - 65.19 73.86 79.71 97.44 108.93 132.05 159.87 186.92 208.08 238.69 186.92
350 355.60 - - - 9.53 9.53 11.13 12.70 15.09 19.05 23.83 27.79 31.75 35.71 -
14 - - - 81.33 81.33 94.55 107.40 126.72 158.11 194.98 224.66 253.58 281.72 -
400 406.40 - - - 9.53 9.53 12.70 12.70 16.66 21.44 - - - - -
16 - - - 93.27 93.27 123.31 123.31 160.12 203.54 - - - - -
450 457.00 - - 9.53 11.13 9.53 14.27 12.70 19.05 23.83 - - - - -
18 - - 105.17 122.38 105.17 155.81 139.16 205.75 254.57 - - - - -
500 508.00 - - 9.53 12.70 9.53 15.09 12.70 20.62 26.19 - - - - -
20 - - 117.15 155.13 117.15 183.43 155.13 247.84 311.19 - - - - -
NOTE : Weights are specified for Plain end Pipes.
Applications & Specifications:

AUTOMOTIVE INDUSTRY
HYDROCARBON PROCESS
OIL & GAS SECTOR

API 5L/ ISO 3183 ASTM : A-53, A-333, A-334, ASTM : A-519
A-335 SAE : 1010, 1012,
IS/ ISO 3183
BS : 3602 (Pt-I), 3603 1020, 1040,
API 5CT INDUSTRY 1518, 4130
IS : 6286
API 5DP
DIN : 2391, 1629
BS : 980, 6323 (Pt-V)
IS : 3601, 3074

MECHANICAL, STRUCTURAL,
& GENERAL ENGINEERING
BOILER, HEAT EXCHANGER,
SUPER HEATER & CONDENSER

WATER & SEWAGE

ASTM : A-106, A-178, A-179, IS : 1239 (Pt-I), 3589, IS 4270 ASTM : A-500, A-501,
A-192, A-209, A-210, A-213, A-519
BS : 1387
A-214
DIN : 1629, 1630,
DIN : 2440, 2441
BS : 3059 (Pt-I & Pt-II), 2391, 17100,
EN 10216 (Pt-I & Pt-II) 17200
3602 (Pt-1)
BS : 980, 1775,
IS : 1914, 2416, 11714, 4923 3601, 6323
DIN : 17175 IS : 1161, 3601, 9295
HYDRAULIC CYLINDER
WATER WELL
RAILWAYS

IS : 4270 SAE : 1026, 1518


IS : 1239 (Pt-I), 1161
ASTM : A-589 IS : 6631
BS : 980
DIN : 1629
RDSO : ETI / OHE / 11
BEARING INDUSTRY

SAE : 52100
DIN : 100 Cr6
Corporate Office:

Plot No. 30, Institutional Sector - 44, Gurgaon-122 002, Haryana (India)
Tel.: +91 124 2574325 / 26, 4624000 Fax: +91 124 2574327
e-mail: contact@mahaseam.com
website: www.jindal.com
MSL # 13-113

Regd.Office & Works


Pipe Nagar, Village Sukeli, N.H.-17, B.K.G. Road, Distt. Raigad - 402 126,
Maharashtra (India)
Tel.: +91 2194 238511 /12 /16
Fax: +91 2194 238513
e-mail: seamless@sancharnet.in

Branch Offices:
Mumbai Kolkata Chennai
402, Sarjan Plaza, 100, Dr. Annie Besant Road, Sukh Sagar Apartment, 3A, Royal Court, No-44, 3rd Floor,
Opp. Telco Show Room, Worli, Flat No. 8 A&B, 8th Floor, Venkatanarayana Road, T. Nagar, Chennai - 600
2/5 Sarat Bose Road, 017 (India)
Mumbai - 400 018 (India)
Tel.: +91 44 24342231, 24328747
Tel.: +91 22 24902570 /72 /74 Kolkata -700 020 (India)
Tel.: +91 33 24559982, 32588626 Fax : +91 44 24347990
Fax : +91 22 24925473 e-mail: chennai@mahaseam.com
Fax : +91 33 24742290
e-mail: mslmum@mtnl.net.in
e-mail: kolkata@mahaseam.com
74
75
Dimensional range, weight and maximum length according to
ASTM A 53:2006, ASTM A 106:2006, ASTM A 333:2005

Size Outside diameter Wall thickness Weight Max. length


Weight Schedule
class No.
NPS in mm in mm lb/ft kg/m Ft m

0.109 2.77 0.85 1.27 STD 40 29.53 9.0


1/2 0.840 21.3
0.147 3.73 1.09 1.62 XS 80 29.53 9.0
0.113 2.87 1.13 1.69 STD 40 31.17 9.5
3/4 1.050 26.7
0.154 3.91 1.48 2.20 XS 80 31.17 9.5
0.133 3.38 1.68 2.50 STD 40 31.17 9.5
1 1.315 33.4
0.179 4.55 2.17 3.24 XS 80 31.17 9.5
0.140 3.56 2.27 3.39 STD 40 31.17 9.5
1 1/4 1.660 42.2
0.191 4.85 3.00 4.47 XS 80 31.17 9.5
0.145 3.68 2.72 4.05 STD 40 31.17 9.5
1 1/2 1.900 48.3
0.200 5.08 3.63 5.41 XS 80 31.17 9.5
0.154 3.91 3.66 5.44 STD 40 41.01 12.5
2 2.375 60.3
0.218 5.54 5.03 7.48 XS 80 41.01 12.5
0.203 5.16 5.80 8.63 STD 40 39.37 12.0
2 1/2 2.875 73.0
0.276 7.01 7.67 11.41 XS 80 39.37 12.0
0.125 3.18 4.51 6.72 ... ... 39.37 12.0
0.156 3.96 5.58 8.29 ... ... 41.01 12.5
0.188 4.78 6.66 9.92 ... ... 41.01 12.5
0.216 5.49 7.58 11.29 STD 40 41.01 12.5
3 3.500 88.9
0.250 6.35 8.69 12.93 ... ... 41.01 12.5
0.281 7.14 9.67 14.40 ... ... 41.01 12.5
0.300 7.62 10.26 15.27 XS 80 41.01 12.5
0.438 11.13 14.34 21.35 ... 160 36.09 11.5
0.156 3.96 6.41 9.53 ... ... 41.01 12.5
0.188 4.78 7.66 11.41 ... ... 41.01 12.5
0.226 5.74 9.12 13.57 STD 40 41.01 12.5
3 1/2 4.000 101.6
0.250 6.35 10.02 14.92 ... ... 41.01 12.5
0.281 7.14 11.17 16.63 ... ... 41.01 12.5
0.318 8.08 12.52 18.63 XS 80 39.37 12.0
0.156 3.96 7.24 10.78 ... ... 39.37 12.0
0.188 4.78 8.67 12.91 ... ... 39.37 12.0
0.219 5.56 10.02 14.91 ... ... 39.37 12.0
0.237 6.02 10.80 16.07 STD 40 41.01 12.5
4 4.500 114.3 0.250 6.35 11.36 16.90 ... ... 41.01 12.5
0.281 7.14 12.67 18.87 ... ... 41.01 12.5
0.312 7.92 13.97 20.78 ... ... 41.01 12.5
0.337 8.56 15.00 22.32 XS 80 41.01 12.5
0.438 11.13 19.02 28.32 ... 120 41.01 12.5

76
UNIGAZ QATAR | MATERIAL SUBMITTAL

WELDED FITTINGS

MATERIAL SUBMITTAL
UNIGAZ QATAR | MATERIAL SUBMITTAL

THREADED FITTINGS

MATERIAL SUBMITTAL
| UNIGAZ QATAR |

PAINT

MATERIAL SUBMITTAL
 !"!
A389 6      8 012345637589
37 
#$%&'()(!
#&('%!'*&)!(
+,5-.5-.3.7/8.08189 97.843156 .023 6. 8.08375945.67.,3-.3.448--.7595-,./57,.7353.448--.3 7 975895.+8.8 .
2- 6.3-.780837.59.3718-, 350. 9953891 97-5
P)%*
J3359 F
Q 0811 96 6.783.78-56 .6 0R.396.-2 3-7320723 5
B387 0759 F
@257384 .783.3./56 .3394 .87.5962-73534.-7320723 -5
STUVW

:))&(;*'&!<!*
=886.>8145397./57,.?@A.=
A.+574 ..B337.5CDD.783.63.-8456-
E, 9.2- 6.3-.337.87.39.3389 6.-0, 1 .7,5-.137 3534.,3-.7, .78448/594.0 37575037589F
G.H8/.=431 .@3 36.59.300836390 ./57,.I?.
53 0759 .783.J3359 .IK251 975.A389 6.59.300836390 ./57,.337-..
396..87.A99 ..87..6JL.DD.=+B.>86 .83.B337-..396..87.A99 ..87.6JL.=+B>./, 9.59.08145390 ./57,.
6JL.DD.=+B.>86 .>,5.M
>89-247.823.N8729.3 3 - 973759 .783.6 7354-5
A665758934.0 37575037 -.396.338934-.13.8 .39354384 .89.3 K2 -75
O((%&*
300836594.78.084823.0336.396.J247508483.6962-73.7597594.--7 1.1J>6

#&('%!'!
#&()&!P *!X"!'&' *&)!(
@8456-.8.98421 6@L.CCC DY..Z
[48--.4 9 4.1[?. D.\ 6@L.MC 448--.1DGM
=43-,.8597 6@L.C b.J 7,86. .\>

9-57 03402437 6 CR4]4
2L>G?@]^894._894 ?@.IBA.1 7,86.`.17 -7 6 `DD.4]4
2L>GI? 6I
.1DD]]I? .103402437 6 `C`.4]4
2L>G>,593 [d]+.CbMGDDb.16@L.MbDG .17 -7 6 `.4]4
+, .38956 6.6373.5-.75034.783.730783.38620 6.386207-.-28a 07.78.-454,7.933537589.6  96594.89.0848235
A44.6373.5-.93456.783.15 6.35975
[48--.6 -0357589F.A00836594.78.N8729.B 37831390 .>837594-c.6 759575895


37 .87.5--2 F M.e89 18 3.D B34 F.]
+,5-.+ 0,95034.
373.@, 7.-2 3- 6 -.7,8- .3 9582-4.5--2 65
+, .+ 0,95034.
373.@, 7.1+
@ .5-.3 0811 96 6.78.8 .3 36.59.089a2907589./57,.7, .@37 7.
373.@, 7.1@
@ .396.7, .
A45037589.[256 .1A[ .783.7,5-.3862075.=83.823.9 33 -7.48034.N8729.87750 .4 3- .95-57.823./ 8-57 .37.///5a87295081
01234526796
6 311

14 6026

57
35241126

0-526712141125.526
5464 1
!"#$%% /0 ; 60 8
&$!"#$%% 10 ; 230 8
' $($!)%*$)+#,)$ 2345 ; 147 9:

.621166
54
'(%$!@$)%#,)+ $%(#($%@A%$P@$#*(+@!)%@)!$%% )A$!$)#4+)#+$$()#
!(#)#)(#G
.621166
546-
6<71
.621166
54
<
6
1 =545 >12141
?()$+%@)!$% ?$)#4+)#+@#+)),$+!(*)A$ ?$)#4+)#+@#+)),$+!(*)A$
!()#,BCDE23F//;/6G2H !()#,BCDE23F//;/6G2H

I7526
54
I7526
541
3
' $*(+@!!)#A$)**$+A
D*)J K%$)$%%%*)G
L@% J M$!($#+$+(%*$!()#,)#+%))$)%G?)$@%A$)"$#()! $N$$
%*$!$++!"#$%%G
M($J O)A$@%$+G?)$@%A$)"$#()! $N$$%*$!$++!"#$%%G

2
5Q54 6
5R<-S71T
U$#,@)+'(*!()?(*V /*)B%H
U$#,@)+?(*L 2 *)B%H

035441WX716454 7S14

' ##$J Y(@#' ##$Z(G2[

]554 6
6.65716-
Z(\\$*B#! :2000HJ 25;2F

)$(%%@$J 1Z(N$A$3026 U),$J3:5


' %'$! #!)))D $$%@*$%$+$%(%$*$N(@%%%@$+G
' $'$! #!)))D $$B'DH%$!($#+$+(A$$)+#!(#^@#!(#_$D)$))D $$BDDH)#+$
V**!)(#`@+$BV`H(%*(+@!Ga((@#$)$%(!)Y(@#(!$4*$)%$N%(@_$A%$)___G^(@#G!(
01234526796
6 311

14 6026

 !!  "# $%&'()$&&*!

9+54 64,54 
5-1
<=
6
1
1-16
1 >?@, AB@, C?@,
./001"23 )7%1 $7%1 8& !
456623 $91 :7%1 81
D3E0F !!  $91 ;1 81
D!2(02/E!0 $92 ;2 82
D3!H20!H! 2 !2202 *2!E1 !2!3'IJ%KF2
EH/1DLMH/1*207
./001"23#M1/23!HI1!H1*I!1/!H2E! *!E
05!7
456623#G!!  ! '/10!H0 ///!0I!1*  5F
! *!1*13!02 H7
D3E0F !!  #M11! I2'/1N00'**!27
D!2(02/E!0#G!!  ! '/10!H0'* 3N*21!22
E! ( 2! 7

O42
54
5-164 
75P1
654

1-16
1 AB@,
!/ 91

Q16
1=5=
6421
01-16
1
,4
54= 16T
D3F *1!0 $)&RS $9& RS
5 *2! N7$17
M1 *!2!/*0!E**!7U1!0**! 3//1
 *7

2
2-6
5<575
+
D*2!H10N*/10!H3 FE!*! 2*00'2!
0 '!!I!11!*207. N *1I'I7S0V/*0!/!03 
0 2!7
E!0# !0*N3F!0!!0F*N3F*N3 !0
.'W0# *N3F*31

D/!# JXE ')&$: H#8(%


M1!M01!0D.1*21*E!3!27
M1M01!0D.1MD."!0 22'2!0Y0!I!11./3D.1.D."21
U**!0!Z!2UZ"/1!*207L30V//!0F*E!!I'!III7Y70
01234526796
6 311

14 6026

626 54 
5267
N7O1 501124
65412
75
12 75
12
3+/"&#,'"!4,9 876: ;7<=
3+/"&#4,5 678 67;
!"!#$%&%"'!&("#'&)*!!"!'""&$"+!$+,"'-$."+#%$# '"+"&(
#!'"&/"!$+ )


6 1
,&#'! !>!&#$+"''&#"+'?$!+"!$+"&/"!$+ )@,!'+!"$+&$+"#&(A'A?
+!$"!#,"'"+#"?"(%&&' %"!"+#$/+$!$+)4+!"$+& !>-,!!$/!(' #)B"+#
?$!'"&)
317175116
CDEF
3+/"&#,'"!4,9 <8+!HI
3+/"&#4,5 8G+!HI
J+"&-!'&'$"%$%'"+>#$'!"!#&!&>('"/$"!$+)">$$+$%
$%A!&"%!&!,"$+!K"$!($>L'!!&M$+ ,'!$+)

F6
54
$,&#'!$%&,&% $+" +()",,$'"!&"+#,&"!&">!&"$+#AP,&$+'#"+#"
!'",">$$!("+#K$,+!!$P7!$&"+#",,(!'"!$+/ '&&'!("+#"''&#$+/!Q!+R!'+$'"
#'+!"!$+)9,,$'"!&"+#,&"!&" ",,&,&$"!,&+",&!'!$+K$,+!?+ $+/!$
,&#'!)$/$#$+$/$+>" #+!'&&+!-+?#/%!,&#'!)9+(// !##$"!$+!$!
!$!'+#$!$+ ">%&?"&##!!& ,+ $>Q!+&,& +!"!$%&",,&">%&'+'$+/
!?&-)

S167
3642611

3" > &!,&'"!$+"&(+!$' #$,"(#+!'+!"$+&)T +#&?+!$"!#'+#$!$+ )U
+!$+",&"($!)9$#-$+'+!"'!)V,$"/+!-$+#$#$"!(>&#?$!$!">
'"+ &A","+#?"!&)W( #>?% #?$!?"!&"+##$'""!!+!$+/!$#$"!()

F7X656
54
Y+",,$'">A,&#'!,&$"&$("+!%& " ,&$&&"+!$%$+/ "("$/!'&"&$"!$+ 
%&>"!'!>"!')V',&#'!"(%"#"+#'"-?+P, #!+$/!"+#?"!&$+/)

9522765O1

U"!%$ Z G*>&<=6: 3"/Z87;


$'+$'"U"!"V!,&# ! ,&$ ($ #)
'+$'"U"!"V!HUVI$&'+##!>&"#$+'+L+'!$+?$!!V"%!(U"!"V!HVUVI"+#!
9,,$'"!$+[$#H9[I%&!$,&#'!)\&(&+"& !'"Q!+%%$'A," $$!&?> $!"!???)L!+)'
01234526796
6 311

14 6026

!"#$%&"'()* #+% *%,# 


-!!*.-!/&"'- "!! 0 #  "!+- "!
" " ! %, &"'!*/&"!#",#%"1"*,- "!
*/2- "!$,%-* !-*,)*!*1"/&"$
#!##$)""!/
3"**),!"*&"-!!#"!#*"%*,- "! 
 -!!--*!-!!/
4,!!,%)*#"#"!"+5#*63 7# 8
$)**-$*/

9": ;<$%=>?@ A#:BCB


!!*9D"- -$"*," /
!!*9D69D8!  % !E"!)D,9D6D9D8 
F--*!G"6FG8- "!/H,"*!*&"!+-*$")%)))/E"/!
 !
H389 6     8 012345637589
37 
"#$%&"%'%
"%(&$&)%* (
+,5-.5-.3.7/8.08189 97.843156 .023 6.,54,.184 02433./ 54,7. 8.08375945.
-549 6.3-.3.351 3.683.9 /.
089-732075895.739.8 .2- 6.3-.351 3.3-.3.337.86.3.0814 7 .--7 1.59.3718-, 350.396.511 3- 6. 9953891 97-5
:257384 .683.38 34.3 33 6.033889.-7 4.-73594 --.-7 4.342159521.08903 7 .4349395- 6.-7 4.-,8.351 6.
-7 4.396.7, 31344.-33 6.;590.-28-7337 -5
Q*$)
:257384 .683.-732072334.-7 4.396.5594.78.8 . 8- 6.78.08338-59 . 9953891 97-.2.78.9 3.,54,.396.511 3- 65
R 0811 96 6.683.866-,83 . 9953891 97-.3 659 35 -.8/ 3.4397-.83564 -.82546594-.396.159594. G251 975
STUVW

<**%(=)&%> )
?, 9.2- 6.3-.337.86.39.3389 6.-0, 1 .7,5-.137 3534.,3-.7, .68448/594.0 37565037589@
A.B8/.C431 .:3 36.59.300836390 ./57,.DE.
53 0759 .683.F3359 .DG251 975.H389 6.59.300836390 ./57,.337-.I.
396..86.H99 ..86..JFK.LL.C+M.786 .83.M337-.I.396..86.H99 ..86.JFK.C+M7./, 9.59.08145390 ./57,.
JFK.LL.C+M.786 .7,5.N
789-247.823.O8729.3 3 - 973759 .683.6 7354-5
H665758934.0 37565037 -.396.338934-.13.8 .39354384 .89.3 G2 -75
P(($%)
43 .3 6

"%(&$& 
"%(*%Q )X! &%& )%* (
:8456-.8.98421 J:K.]]] IY..Z
[48--.4 9 4.1[E. L.\ J:K.N] 1377.1LA]I
C43-,.8597 J:K.] c.F 7,86. I.\7

9-57 03402437 6 ]d4^4
2K7AE:^_894.`894 E:.DMH.1 7,86.a.17 -7 6 aaL.4^4
2K7ADE JD
.1LL^I^DE .103402437 6 aI .4^4
2K7A7,593 [f^+.]cNIALLc.1J:K.NcLA .17 -7 6 aI.4^4
+, .38956 6.6373.5-.75034.683.630783.38620 6.386207-.-28b 07.78.-454,7.933537589.6  96594.89.0848235
H44.6373.5-.93456.683.15 6.35975
[48--.6 -0357589@.H00836594.78.O8729.M 36831390 .7837594-e.6 659575895


37 .86.5--2 @ a.H242-7.L M34 @.^I
+,5-.+ 0,95034.
373.:, 7.-2 3- 6 -.7,8- .3 9582-4.5--2 65
+, .+ 0,95034.
373.:, 7.1+
: .5-.3 0811 96 6.78.8 .3 36.59.089b2907589./57,.7, .:36 7.
373.:, 7.1:
: .396.7, .
H45037589.[256 .1H[ .683.7,5-.3862075.C83.823.9 33 -7.48034.O8729.86650 .4 3- .95-57.823./ 8-57 .37.///5b87295081
01234526796
6 311

14 6 51

57
35241126

0-526712141125.526
5464 1
!"#$%% /0 : 50 7
&$!"#$%% 10 : 230 7
' $($!)%*$)+#,)$ 2341 : 146 89

.621166
54
'(%$!F$)%#,)+ $%(#($%FD%$TF$#*(+F!)%F)!$%% )D$!$)#4+)#+$$()#
!(#)#)(#I
.621166
546-
6;71
.621166
54
;
6
1 <545 =12141
C)D(#%$$ >3?@>A1602:2B >)3E?@>A1602:2B
>)#$%%%$$ ' $%F)!$% )D$)#+()! #$ JD)%H$D)%!$)##,()! $H$)
)D)+$+G#(#:$)!)D)%H$% %F)!$*($F%#,)**(H$+#(#:
(D(#+$+D$)! #$()#+ $)!)D)%H$$+)G ! %
)D)%H$*)+%(*))%!)!  %F)D$()! $H$)% )*)#+
*)$#($%F)!$)#+($(H$ )#,F)%F)!$*($I
)*(% ($%F)!$I
JF#F ' $%F)!$% )D$)#+()! #$ JD)%H$D)%!$)##,()! $H$)
)D)+$+G#(#:$)!)D)%H$% %F)!$*($F%#,)**(H$+#(#:
(D(#+$+D$)! #$()#+ $)!)D)%H$$+)G ! %
)D)%H$*)+%(*))%!)!  %F)D$()! $H$)% )*)#+
*)$#($%F)!$)#+($(H$ )#,F)%F)!$*($I
)*(% ($%F)!$I
K)H)#%$+%$$ ' $%F)!$% )D$!$)#4+)#+ L, DF% D)%#,F%#,#(#:
)**$)G)(F, )#++F*($I $)!)D)%H$$)H#,)!$)#4
(F, )#+$H$#*)$#I
> (**$+%$$ 4!$)#)#+#)!% (**$I JD)%H$%G$*()$#)H$
D)%$+(>)3?@>A1602:2B()
$)%M0N($%F)!$I
C()$+%F)!$% C$)#4+)#+F#+)),$+!(*)D$ C$)#4+)#+F#+)),$+!(*)D$
!()#,?@>A23O//:/5I2B !()#,?@>A23O//:/5I2B
C(#!$$ P(%F$!(#$#)QF6NI P#F/G$$"%!F#,IP(%F$
P$! )#!)*$*)$$$Q%#, !(#$#)QF6NIR$*)$$
!(#!$$%F)!$D%!)DD#,4#$$+$ %F)!$D$)#%($#!(%$+D)%
,F#4$! )#!)+%!,#+#,I % ((+)(#+,#+#,)#+($
)**(*)$$)#%()D)+$$
%F(F#+#,!(#!$$)#+($(H$
))#!$I
A*F*$()#!$4#!F+#,)+ $%(#4!((%(#*($!(#4$)$%%)#!$)#+! $!)$%%)#!$%
)! $H$+G$!($#+$+%F)!$*$*))(#I

S7526
54

)$(%%F$U 3/JF,F%302M R),$U396


' %'$! #!)))> $$%F*$%$+$%(%$*$H(F%%%F$+I
' $'$! #!)))> $$?'>B%$!($#+$+(D$$)+#!(#VF#!(#G$>)$))> $$?>>B)#+$
J**!)(#KF+$?JKB(%*(+F!IW((F#$)$%(!)X(F#(!$4*$)%$H%(FG$D%$)GGGIV(F#I!(
01234526796
6 311

14 6 51
7526
541
3
!"#!$%#&
'!&( )*!%$***!&+
,*( -.."/*%!%"0!"*.!$$!!*+1!.*#!2"!%3
*%/%&/%$.%2"**+

2
5454 6
55678719
:"0!:%.1.; <!=*>
:"0!1., ? !=*>

035441@A716454 7814

%""( B"%""C+?D

H554 6
6I657167
CEE$%=%"F?GGG>( ?JK?L
:**!"EE$=.%"%..>( ?JG#!FM?GG*%

9754 64A54 
51
6
6
1
116
1 QRSA TUSA VRSA
'/!=>& M ? OG.%"
N!$2K"K& ?< P+J O
W&3!X.%"%.. Y < O
W%F/*3% ?< D O
].!^%..3!%"0%"3!$*X/;$%!%"_%=;_>/%*+
W&%"0!"%"0%.*!.%"""$$.!*!"$!%3.%%&#$[YJ\X!"
!!3!0/W]!"0/+
'/!=>&(*!/&%"0["*$%0**[%!/%"0*"$!3!"%.%"3!$
!2%"**+
N!$2K"K&(Z%"%..%.#/!%"0!"$!".!$/!//%[%.!"".!2*X
%.%"*&*%!$!.!0+
W&3!X.%"%..(**%.!$$[#/"^!!"#!$%+
W%F/*3%(Z%"%..%.#/!%"0!"#.!""$&^*%""
"3%"."F.%.+

W!/%**( M<;0*MG?D :!0(OFJ


%*"%!$W!!'****3%*$&%**+
"%!$W!!'=W'>%*.."#!%""`"%"[%'!/&W!!'='W'>!"
;$%!%"_%=;_>/%*+]&"!*$!$B"//%X$!*3%*%[#*%![[[+`"+.
01234526796
6 311

14 6 51

42
54
5164 
751
654

1'16
1 ()*+
 !"# $ %&$
 

:16
1;5;
6421
01'16
1
+4
54; 16@
9178-$241# >?&<= >A& <=
$$12!82-/-1 B& <= C& <=
-D$41-"1!"1- $-E5>"15
F$41-"122!1-1  41#3414125G2#41412$-72"1-2
$41-"125
,-#-./0122- 3-1"2$$12 $41-"12!4 !. 24###$#-
- !/1$$12 2# 2- 11$ 56-122- #2" #!07-#-.272$5
"2!-24-1-272$8 2"1-#-.2272$-32$-1-122- #5

2
2'6
5H575
I
94 !. -#"-E42"1#-.272$83-1"241$12- !4#-2#- 0"2!
#$0- /241!"#5J$E-$42-12/ 0/5= -#K" 124##272$
1#$$ !- 5
13"2#-L 4E784E7$-2#8N#4E78N#2#-
J"02M" #-L -#17#84E7847"1- 8472E- 

62@6 54 O
I'5267P
U71 5Q124
6541;
O75
1;P O75
1;P
 ."-1!1$1=$4G AS>C BS?&
 ."-1!=$4R >SA >SB
F3"$2-!21-#17$-!#"125,-#-3-1- 24-#D2N- !!3"$2#- 3-17
!"#-1."- 25


6 1
F41!"#$"2021!-##1!- #/- -1."- 25T4# -12-!178#8/
3 -!24-#- !-/-71$2"1#2-- !.  5= -12$"20D4.7#2!56- !
/#-15
3177516
()*+

9-22"L ?AG"."2?&>V -.LASB


F2F# #-9--J2"412!22413"2722"!5
FF# #-9--JWF9JX21#$$ !!01-!# Y" # /J-79--JWJ9JX- !
G44#- Z"!WGZX1241!"#5[17"1-12#-K" #84-232"1/02-///5Y" 5#$
01234526796
6 311

14 6 51
!"# !%&'()
!"$ !%&'()
*(!+%(,!,-(&-.-.,/,%%(&!%/0-!,--(-%!12&/!3((&-.
-.4%&.%%&"%5-%0((/6,%%!7(",%!1

86
594
2&("!,%(.!"!.((!-(!-012&""-,%!(!"%!((&--/%4:",&3
%&,"/-%05"%%!:;(%""-0%&,!%(,!,%-0,,!%!<!%=(%,&,-
!,%%!1#""-,%!(!"%!((&--(""!"%"(!-"!%,%!5"%>&(%&(
"!,%12&(-(3/(!%&,%+!>-!.%&"!,%1#0((%3%!%!(%
%&(%,!%!((&--/.!>%!%&("!(/-<!%"(%%3.!""!3-/.!,!,
%&>!+1

?167
364@6A1
B
-(!/(3%&",%!0!%,(("-0!%&,!%1C(>--3%-%,!%!(1D!
!%&-("0(%1#3!(+,!%,%1E"--!%&(+(&!-%-0/!3>%&(%/-
,-(4(!">%1F0((&!-/>--.-(&>%&>%,-%%%!(!&%%-01

8979G656
594
H&""-,/-4"!,%("-0%.!(("(!%.!-(0&3(-&%,!-!3%!(
.!/%,&%!/%,&1E,&"!,%(0.,&-+>&:"!(%!(-&%>%&1

95@27651
2&.!%!%&(!,%(3%!%&/(%!.<!%=(+!>-4/(!-/!%!0%(%
",%,-:",1<!%=("!,%(,!(((7.(&!!(((,&4"!,%(!.%
(,!%!(/0!<!%=(,!%!-1<!%,!%%0%&/%%&5-%0!.%&"!,%
%(-.1I!"!,%3%!(0/"-%!%!,!"-0>%&-!,-5%(1<!%(3(
%&&%%!,&%&3%>%&!%.%&!%,1
C(((&!-->0(,!(-%<!%.!(",.,,!%&-(%/-%0!.%&("!,%.!%&(
(",.,""-,%!",%,(1
*.%&(0,!((%,0/%>..%-(((!.%&(!,%4%&F-(&'C%J!)
3(!>--"3-1

D%!.((K #(%LMN KO;O


2&(2,&,-D%E&%("((%&!("3!(-0((1
2&2,&,-D%E&%'2DE)(,!%!/,!6,%!>%&%&E.%0D%E&%'EDE)%&
#""-,%!P'#P).!%&("!,%1Q!0!(%-!,-<!%!..,4"-(3(%!>/(%%>>>16!%1,!
Technical Data Sheet

Approved 553 1,2,5 553 Thinner ^(ValidationDate) 1

Jotun Thinner No. 17

Product description
This is a paint thinner. Designed to improve the flow of a range of Jotun epoxy products. Can also be used as
cleaner for pumps and tools before and after painting.

Typical use
Specially suitable as thinner for epoxies and similar type products except Tankguard series. Recommended
usage as per the specific datasheet or application guide of the product one wish to apply.
Other

Colours
clear

Product data
Property Test/Standard Description
Solids by volume ISO 3233 0± 2 %
Flash point ISO 3679 Method 1 25 °C
Density calculated 0,9 kg/l
VOC-US/Hong Kong US EPA method 24 (tested) 856 g/l
VOC-EU IED (2010/75/EU) (calculated) 866 g/l
VOC-China GB/T 23985-2009 (ISO 11890-1) (tested) 860 g/l

The provided data is typical for factory produced products, subject to slight variation depending on colour.

Packaging (typical)
Volume Size of containers
(litres) (litres)

Jotun Thinner No. 17 5/20 5/20

The volume stated is for factory made colours. Note that local variants in pack size and filled volumes can vary
due to local regulations.

Storage
The product must be stored in accordance with national regulations. Keep the containers in a dry, cool, well
ventilated space and away from sources of heat and ignition. Containers must be kept tightly closed. Handle
with care.

Shelf life at 23 °C

Date of issue: 30 January 2017 Page: 1/2

This Technical Data Sheet supersedes those previously issued.


The Technical Data Sheet (TDS) is recommended to be read in conjunction with the Safety Data Sheet (SDS) and the
Application Guide (AG) for this product. For your nearest local Jotun office, please visit our website at www.jotun.com
Technical Data Sheet
Jotun Thinner No. 17

Jotun Thinner No. 17 48 month(s)

In some markets commercial shelf life can be dictated shorter by local legislation. The above is minimum shelf
life, thereafter the paint quality is subject to re-inspection.

Caution
This product is for professional use only. The applicators and operators shall be trained, experienced and have
the capability and equipment to mix/stir and apply the coatings correctly and according to Jotun's technical
documentation. Applicators and operators shall use appropriate personal protection equipment when using this
product. This guideline is given based on the current knowledge of the product. Any suggested deviation to suit
the site conditions shall be forwarded to the responsible Jotun representative for approval before commencing
the work.

Health and safety


Please observe the precautionary notices displayed on the container. Use under well ventilated conditions. Do
not inhale spray mist. Avoid skin contact. Spillage on the skin should immediately be removed with suitable
cleanser, soap and water. Eyes should be well flushed with water and medical attention sought immediately.

Colour variation
When applicable, products primarily meant for use as primers or antifoulings may have slight colour variations
from batch to batch. Such products may fade and chalk when exposed to sunlight and weathering.

Disclaimer
The information in this document is given to the best of Jotun's knowledge, based on laboratory testing and
practical experience. Jotun's products are considered as semi-finished goods and as such, products are often
used under conditions beyond Jotun's control. Jotun cannot guarantee anything but the quality of the product
itself. Minor product variations may be implemented in order to comply with local requirements. Jotun reserves
the right to change the given data without further notice.

Users should always consult Jotun for specific guidance on the general suitability of this product for their needs
and specific application practices.

If there is any inconsistency between different language issues of this document, the English (United Kingdom)
version will prevail.

Date of issue: 30 January 2017 Page: 2/2

This Technical Data Sheet supersedes those previously issued.


The Technical Data Sheet (TDS) is recommended to be read in conjunction with the Safety Data Sheet (SDS) and the
Application Guide (AG) for this product. For your nearest local Jotun office, please visit our website at www.jotun.com
6. COMPANY PROFILE
UnigazGroup
Corporate profile

It's all about Networking


We at Unigaz have a long history in the world of Gas that extends to more than 60 years.
We started as a family business in Lebanon in 1957 and throughout the years with the
challenges coming across, we have managed to be among the pioneers in the
LPG busines across the Middle East; the world’s largest exporter of LPG.

We believe that the key factor for our success is our clear mission and vision that we are
highly committed to. Our Mission is to be the first choice for gas solutions and services in
the Middle East driven by our expertise and committed to our values and heritage.

Our Vision is to expand Unigaz business while creating value to our customers through
our highly skilled and professional team.

Our customers do not see us as gas providers only, yet we’re considered as their
strategic partner in every step across the way of establishing reliable and safe gas
systems that fulfill their needs. Our ultimate goal in Unigaz is to promote the usage of
LPG as an alternative clean source to better protect our environment and the world we
live in.

Mahmoud Sidani
Chairman of the Board of Directors
Unigaz Group
Celebrating
the 60th Anniversary
Long history in providing
the region with boundless gas solutions.

Image of Unigaz Storage Plant in 1957, Lebanon 1


Unigaz was established in 1957 under the Sidani Group.
Unigaz is one of the few companies in the Middle East to offer a comprehensive
range of gas services:
Import Liquefied Petroleum Gas (LPG), Storage, Distribution, Design,
Installation of LPG and Natural Gas networks, commissioning and
operating the whole system, in addition to the supply of LPG. With a
successful track record of performance, and a reliable service offering
to our clients, Unigaz has grown rapidly over the years, and has
expanded its geographical presence to become one of the pioneers
in the LPG industry in the regional market of the Middle East, which
is considered as the world’s largest exporter of LPG.
Unigaz International is also expanding its operations into the African
markets in countries as Nigeria, Mozambique and others.

60 Years
of Success
What we do best…

Specialized Engineering and Contracting Services


Gas networks design, installation and maintenance (LPG, NG, SNG)
Fuel System networks design, installation and maintenance
Provide B2B consultations to real estate developers on the best practices in building
city gas networks
Distribution and Operation Services
Trading of Liquefied Petroleum Gas (LPG)
Gas Storage Utility Build-up and Management
LPG Bulk Distribution
Build-up and Operation of LPG Cylinder Filling Stations
Cylinder Distribution Management (SaaS Platform)

Areas of Expertise

Unigaz tailor-made solutions are segmented and designed to meet different channel needs:

Industrial City Gas Network


Residential Hospitality & projects
Commercial

Tapping into New Sectors

Water Renewable
Treatment Energy
Solutions

60 Years
of Success 3
Unigaz Identity
Our identity is a fusion of what we have been doing in the field of Gas for the past 60 years and how
we’re willing to build on it in order to cope with the evolving market needs across different territories.

Our Mission
To be the First Choice for gas solutions and services in the Middle East driven by our expertise and
committed to our heritage.

Our Vision
Expanding Unigaz business and Creating Value to our customers; by providing
convenient safe gas solutions and adopting the most efficient and reliable
processes through our motivated and highly skilled team.

Mission
& Vision
Our Philosophy Our Values
We encourage Diversity to bring across Coaching. Accountability. Recognition.
Innovation that will lead us to Prosperity Dedication. Knowledge. Efficiency. Practicality.

Our Commitment to Environment


Unigaz promotes through its communication the LPG as
clean lower-carbon and efficient energy that offers benefits
to the consumer, industry and the environment in many
applications versus other pollutant energies.

Mission
& Vision 5
Our Presence
Lebanon
Unigaz Industrial

Jordan
Al Nokhba Eng.

Iraq
Unigaz Iraq

UAE
Arabian Unigaz

Qatar
Unigaz Qatar

Oman
Unigaz Oman

KSA
Unigaz Arabia

Regional
Presence
Unigaz has rapidly spread its presence in the Middle East region in the past years
across 3 main sub-regions:

Levant Sub-region
Unigaz Industrial Lebanon
Unigaz Jordan Jordan

Central Sub-region
Unigaz Iraq Kurdistan, Erbil
Unigaz Iraq Iraq, Baghdad

GCC Sub-region
Unigaz Arabia Kingdom of Saudi Arabia
Arabian Unigaz United Arab Emirates
Unigaz Oman Sultanate of Oman
Unigaz Qatar State of Qatar

Our Local Agents


Nigeria Iran
Congo Turkey
Tanzania Tunis
Mozambique Algeria
Djibuti Morocco
Eretria Mauritania
Sudan Senegal
Egypt Ghana

7
Unigaz Expertise
A diversified service offering from Household to Mega Factories and City Scale Networks

Residential
Gas for Household
Cylinder filling and distribution for 10Kg and 12.5Kg
Design and Installation of safe and secure central gas systems
Gas storage capacities from 200 to 5,000 Liters
Usage of gas for different applications:
Central Heating - Boilers
Power Generation
Hot Water Generation
Fireplace and Chimneys
BBQ and many more

Hospitality
Gas for Commercial Outlets and Restaurants
Cylinder filling and distribution for 35Kg
Design and Installation of safe and secure central gas systems
Gas storage capacities from 500 to 5,000 Liters
7/24 Supply and Service

Gas for Malls and Hotels

Design and Installation of safe and secure central gas networks based
on NFPA regulations.
Gas Detection system connected to fire fighting system
7/24 LPG supply by certified PED-ADR Tankers
Customer Relationship Management tool
Periodic check-up and maintenance

Unigaz
Expertise
Industries
Gas for for Governmental Facilities and Industrial Factories

Design and Installation of safe and secure central gas networks based
on NFPA regulations.
Large Gas storage capacities from 5,000 to 500,000 Liters
Vaporizing System
Back-up system for Natural Gas interruptions
Remote Metering System
LPG system with high flow capacities
7/24 Supply and Service

Gas for Agriculture Farms and Industrial Machineries

Gas Cylinders for Fork lifters


Design and Installation of central gas network for Agricultural Farms
Gas storage capacities from 5,000 to 100,000 Liters
Gas detection system connected to fire fighting system
Periodic check-up and maintenance

City Networks
Gas for Integrated Communities with Innovative Solutions

Suitable for Residential and Commercial compounds


HDPE piping network with 50 years guarantee
Centralized storage facility of up to 500,000 Liters
Adopt the most advanced innovative solutions:

Pre-paid BMS Connectable GSM Reading Wi-fi Reading


Billing Systems Meters Meters

Unigaz
Expertise 9
LEBANON JORDAN IRAQ
Gas Import Gas Import
Gas Storage Gas Storage
Cylinder Filling Cylinder Filling
Gas Bulk Supply

Gas Bulk Supply Gas Bulk Supply

Gas Network Design Gas Network Design Gas Network Design


Installation Installation Installation
Maintenance Maintenance Maintenance
Central Gas Central Gas Central Gas
Systems Systems Systems
Heating Heating Heating

Trading of Gas Trading of Gas Trading of Gas


Accessories Accessories Accessories

Water Treatment Water Treatment Water Treatment


Solutions Solutions Solutions

Renewable Energy Renewable Energy Renewable Energy


Solutions Solutions Solutions
Unigaz Activities per Country
Our regional expertise in different fields of gas services
helped us to share best practices with our regional customers

UAE QATAR OMAN


Gas Import
Gas Storage
Cylinder Filling
Gas Bulk Supply

Gas Bulk Supply


Gas and Fuel
Network Design
Installation
Gas Network Design Maintenance Gas Network Design
Installation Installation
Maintenance Maintenance

Trading of Gas Trading of Gas


Accessories Accessories

Trading of Gas
Water Treatment Water Treatment
Accessories
Solutions Solutions

Renewable Energy Renewable Energy


Solutions Solutions

KSA REGIONAL
Energy Consultancy

Specialized Engineering
Gas Network Design & Contracting Services
Installation
Maintenance
Distribution
& Operation Services

Project Concept
Development

Unigaz
Activities 11
Wherever you are… We deliver gas to you
With Unigaz LPG Barge for Islands
Unigaz Major Projects
Through applying the best in class processes and high quality of services,
Unigaz was able to win key gas projects in the Middle East .

The One and only in the region


Unigaz LPG Barge is all about
convenience

Available in Qatar and GCC


Transport LPG gas to islands
LPG Capacity of 20,000L
Equipped with:
Safety System
Fire detection and fighting system
Pneumatic Valves

Al Abdali Downtown Bismaya City Banana Island


Amman, Jordan Baghdad, Iraq Qatar
1.8 million Sqm area 100,000 Residential Units Resorts + Restaurants

Zaitunay Bay Boulevard Mall Royal Opera House


Beirut, Lebanon Doha, Qatar Muscat, Oman
Marina + 17 Restaurants Mall + 70 Restaurants Central Kitchen

Pepsi Oman Factory Emirates National Schools Wadi Hills Residence


Muscat, Oman Abu Dhabi, UAE Beirut, Lebanon
7 Buildings

13
We Care...
To promote LP gas as a clean energy
for everyone... every where!
Some of Our Customers in the Middle East region
One of our main pillars in retaining our customers is Trust. We highly believe
in maintaining customer satisfaction to lead us towards success.

Unigaz
Clients 15
Unigaz Offices in the Middle East
Our Local Offices

UnigazUAE Office 402, Capital Golden Tower, Business Bay


Dubai, UAE.
Tel. +971 44539277
Email: info.uae@unigaz.net

UnigazQatar Office No. 12, 4th Floor Al Qamra Holding,Bldg. 53, Al


Difaaf Street,Zone 38 P.O. Box: 63711 .
Tel. No: +974 44514044 ,Email: info.qatar@unigaz.net

Lebanese Village Compound, Bldg. F1, Floor 8 Aprt. 2.


UnigazIraq Erbil, Iraq
Tel. +964 7703591352
Email: info.Iraq@unigaz.net

Khalda, English School Circle, Al Bouz bldg 2nd Fl.


UnigazJordan Amman, Jordan.
Tel. +962 6 5339608
Email: info.jordan@unigaz.net

Industrial Gas Compnay s.a.l


UnigazLebanon Shell Street, Bourj Hammoud, Beirut, Lebanon
Tel. +961 1 24 11 11
Email: info.lebanon@unigaz.net

Abu Nayyan Trading, King Abdul Aziz Street Riyadh,


UnigazKSA Kingdom of Saudi Arabia
Tel. +966 11 477 9111
Email: info.ksa@unigaz.net

Lammet Baushar Bldg. No. 404.


UnigazOman Near Baushar Traffic Lights-Facing Dolphin Village
Muscat, Sultanate Of Oman
Tel. +968 24238180
Email: info.oman@unigaz.net

Unigaz International LTD.


UnigazRegional Office 509, Al Tajer Bldg. Clemenceau,
Beirut, Lebanon
Tel. +961 370 621/ 622
Email: info@unigaz.net
UNIGAZ QATAR | COMPANY
PROFILE

SELECTED PROJECTS

FUEL SYSTEM – BANANA ISLAND

Special Project

Project Banana Island – Fuel System


Location Banana Island, Doha
Client Private Engineering Office (PEO)
Main Contractor Urbacon Trading & Contracting
Operator Anantara
Scope of Works Detailed Design, Engineering, Supply, Installation, Testing & Commissioning
of Fuel System up to WOQOD Approval

FUEL SYSTEM – BANANA ISLAND


Special

UNIGAZ QATAR
COMPANY
PROFILE
UNIGAZ QATAR | COMPANY
PROFILE

SELECTED PROJECTS

FUEL SYSTEM – KAHRAMAA TOWERS

Project Construction of Kahramaa New Tower


Location Qatar
Client Qatar General Electricity and Water Authority
Main Contractor SEG Qatar
Scope of Works Detailed Design, Engineering, Supply, Installation, Testing & Commissioning
of Fuel System up to WOQOD Approval

FUEL SYSTEM – DOHA OASIS

Project Doha Oasis Mixed Use Development


Location Doha, Qatar
Client Halul Real Investment Company
Main Contractor Redco Construction Almana
Consultant AECOM Middle East Ltd.
Scope of Works Detailed Design, Engineering, Supply, Delivery to Site, Installation, Testing &
Commissioning, Handing Over, Warranty & Maintenance of Diesel Fuel
System

UNIGAZ QATAR
COMPANY
PROFILE
UNIGAZ QATAR | COMPANY
PROFILE
SELECTED PROJECTS

FUEL SYSTEM – Coast Guard


Special Project

Project Coast Guard – Fuel System


Location Al Daayen,Smaysma,El Khor
Client Private Engineering Office (PEO)
Main Contractor Generic engineering technologies
Operator PEO
Scope of Works Detailed Design, Engineering, Supply, Installation, Testing &
Commissioning of Fuel System up to WOQOD Approval

FUEL SYSTEM – Supreme Education Council

Project Supreme Education Council – Fuel System


Location Duhail
Client Supreme Education Council
Main Contractor Al Huda
Operator Supreme Education Council
Scope of Works Detailed Design, Engineering, Supply, Installation, Testing &
Commissioning of Fuel System up to WOQOD Approval

UNIGAZ QATAR
COMPANY PROFILE
7. ORGANIZATION CHA5T SHOWING QUALITY
DEPARTMENT
Organization Structure 2021 – Unigaz Qatar

Group CEO

Country
Manager

Sales Chief Operations


CDD Head HR Head CR Manager
Manager Accountant Manager

CR Division Projects Division

Public
Sr. Sales Billing Accountant Procurement Projects Mechanical Projects Projects
Call Agent Relations
Officer Officer (2) (2) In Charge Coordinator Engineer Engineer Engineer (2)
Officer

Cylinder Sales Collection Admin Admin Maintenance Planning Site QAQC Design
Office Boy
Drivers (2) Engineer Driver Assistant Assistant (2) Engineer Engineer Engineer (3) Engineer Engineer

Team Supervisor / Safety


Storekeeper Draftsman
Leaders Team leader Officer

Store Mechanical
Electricians Welders Drivers
Assistant Technicians

Drivers Helpers Pipe Fitters Helpers

Cylinder Sales Human Customer Accounting Operations


Distribution Resources Relations
PROJECT ORGANIZATION CHART

COUNTRY MANAGER
HAYTHAM ZAKARIA SAAB
haytham.saab@unigaz.net

OPERATIONS MANAGER
AHMAD JOUNI
ahmad.jouni@unigaz.net (50242858)

Sr.Project Engineer MECHANICAL ENGINEER Sr. Electrical Engineer PROCUREMENT ENGINEERING HSE OFFICER
Ahmed Ghazi Arun Nair ABDUL HAMID SUKUMAR JAGADHEESH SHAMSAD
a.ghazi@unigaz.net arun.nair@unigaz.net mohamed.abdelhamid@unigaz.net murugesan.sukumaran@unigaz.net jegadeesh.manickam@unigaz.net
shamsad.koya@unigaz.net
55467013 50050836 66005280 33219788 66150335
33369334

QAQC ENGINEER Procurement DESIGN&DRAFTING


RASHID T Assistant BINU
muhammad.rashid.thime
x SUPERVISOR x SUPERVISOR rogeline.dimaano@unigaz.net sijo.john@unigaz.net
rpan@unigaz.net x WELDER x ELECTRICIAN 33519859 7785 4538
55474016 x PIPE FITTER x HELPER
x HELPER

Office No.12,4th Floor,AlQamra Holding,Bldg.53,Zone 38,P.O.Box: 63711lTel: 44514044 l Fax: 44514041 l www.unigaz.net
Lebanon l Syria l Jordan l K.S.A l U.A.E l Qatar l Oman l Iraq
8. COMPLIANCE STATEMENT
COMPLIANCE STATEMENT

PROJECT : Terminal Sewage Pumping Station at Doha North STW Package 3

ITEM : FUEL OIL PIPING SYSTEM

S/N DESCRIPTION / SPECIFICATION COMPLY REMARKS

QCS-2014
Section 21, Part 17,
17.2 PRODUCTS
17.2.1 DIESEL GENERATOR SET
17.2.1.(d)ii Daily Fuel tank
Fuel supply to the engine shall be maintained by a separate day tank
located in the room. Daily fuel tank shall be sufficient capacity for
continuous run of 8 hours at full load, unless otherwise specified in the
Noted and Comply
Project Documentation. The daily service tank shall be manufactured
from mild steel to a rectangular shape in accordance with BS 799 and
shall be complete with the following minimum equipment and facilities:-
Inspection cover Noted and Comply
vent/breather pipe Noted and Comply
filler pipe connection Noted and Comply
overflow connection Noted and Comply
drain valve and sump drain Noted and Comply
emergency dump valve operated by the fire alarm system and by a fusible
Noted and Comply
link mounted over the diesel engine
dial type contents gauge calibrated in gallons and litres Comply ATG system will be provided
Will be provided, Integrated with ATG
level switches to control fuel transfer pump Comply
panel
level switches to operate high and low fuel level alarm circuits in the Level switch will be integrated with
Comply
diesel alternator set control panel ATG panel
lifting lugs. Comply
the Contractor shall provide and install an external dump sump As per the IFC Drawing The fuel from
of sufficient capacity to contain the contents of a full day tank and all the day tank will drain to the main
pipework necessary to carry the dumped fuel quickly by gravity, to a safe tank during any emergency event of
location in the event of a fire being detected in the generator house. The Comply fire
sump shall be constructed to contain the fuel without leakage to the Fusible link valve will open during fire
surrounding ground and shall be provided with a lockable cover. Provision to drain the fuel
to allow emptying of the sump by portable pump shall be provided.
17.2.1.(d)iii Main Fuel Storage Tank:
The Contractor shall supply and install a cylindrical diesel oil storage tank
The Main Tank will be provided by
with a capacity to operate the associated diesel generator set
Comply WOQOD and The capacity proposed
continuously on full load for a minimum of 7 days, unless otherwise
as per the IFC
specified in the Project Documentation.
the tank shall be welded mild steel construction suitably protected from
corrosion in accordance with BS. 2594 and shall be installed in the location Comply
indicated on the drawings.
The storage tank shall be complete with pipes, fittings, feed lines,
vents.etc. The tank shall be of the approved type located outside the
diesel engine room. The tank shall be provided with 600 mm inspection Comply
manhole with cover, 50 mm filling pipe with cooped filling terminal, 50 mm
air vent pipe with screen outlets, isolating valve, valved drain etc.
Electronic fuel indicator with an audio/visual alarm shall be provided for
Comply
main fuel storage tank
Also the storage tank and its accessories must comply with the Qatar.Civil
Comply
Defence Regulations for generator installations.
17.2.1.(d)iv Duplex Diesel Oil Pumping Set:
Provide packaged type duplex, self priming, fuel oil pumping and straining
set with a capacity of four times the total fuel consumption of engine at full
load for each individual Diesel Generator Set. Pump sets shall be factory
Comply
assembled, piped, wired and tested. Pumps shall be activated by a
switch in the day tank automatically. All pumps installed in the D/G room
shall be flame-proof and fire-resistant as per NFPA Regulations
Piping shall be complete to suction, discharge and return line
connections. Provide gate valves and unions arranged to permit removal
Comply
of either pump while the system is in operation. Install check valves and
relief valves on pump outlet and gate valves prior to pressure gauges
Suction strainer shall be flanged connection, duplex type, one-piece,
cast-iron body, ASTM A48 Class 30, with 1.2 mm perforation brass Comply
baskets
COMPLIANCE STATEMENT

PROJECT : Terminal Sewage Pumping Station at Doha North STW Package 3

ITEM : FUEL OIL PIPING SYSTEM

S/N DESCRIPTION / SPECIFICATION COMPLY REMARKS

Oil pump set shall be factory assembled on a structural steel channel


beam base to include pumps, motors, flexible couplings and guards. Comply
Pump set shall be suitable for diesel oil

Suitable manually operated pump shall be provided. Noted as Comply Duty and stand by pump will be provided

The installation of Diesel transfer pump set shall be subject of the Engineer’s
approval. There shall not be any possibility of flooding of the Comply
diesel tTransfer pumps.
17.2.1.(d)v Tank Gauges:
Provide as shown on the Drawings. Each gauge is to be provided with an
aluminium case and calibrated to indicate level of fuel in the tank.
Mounted on gauges shall also be a high/low level alarm switch. The Automatic Tank gauging system will
Comply
switches and gauges shall be designed for operation from a 24 Volt DC, be provided
loop powered system. Locate indicating gauges as shown on the
Drawings or required
Tank fittings and pressure fittings shall be made of solid bar stock to
Comply
prevent leak possibilities.
7.2.1.(d)vi Diesel Oil Piping:
Provide all diesel oil piping from storage tank to day tank fill lines, water
Comply
tight fill boxes, vents, vent caps, tank foot valves, and accessories
Provide swing check valves and gate valves at pump inlets. Provide Check & ball valves are provided. Anti-
approved anti-siphon valves at high points of suction lines. Provide Noted and Comply siphon is not required as the supply
whatever additional valves that may be required by local regulations line located at the tank bottom.
All piping shall be provided with ground joint unions at piece of apparatus to
Comply
facilitate connecting and disconnecting
All piping, unless otherwise specified, shall be schedule 40 standard
Comply
weight black wrought iron pipe
Steel vent pipelines shall run from the fuel oil storage tanks, carried to the
proper height within building construction and terminating with vent fittings.
Comply
Fittings shall be "Bronze Ventilating Brick" with thickness of 20 mesh
bronze wire gauge in front of louvered opening.
Project : Terminal Sewage Pumping Station at Doha North STW Package 3
System : FUEL OIL PIPING SYSTEM

SL.NO DESCRIPTION

QCS 2014, Section 21, Part 15


15.2.2 Induction Motors

1 General
RESPONSE Remark
motors shall be supplied by the manufacturer of the driven Comply,
equipment as specified in this section, and specifically
A outlined in the driven equipment specifications

all motors shall be suitable for operation on a 415V or 690V, Comply, the motor operation is
50 Hz 3 phase supply.
415V,50 Hz, 3 Ph
Different voltage levels may be used as indicated in particular
B
specifications or drawings

C All motors shall be capable of starting 10 times per hour. The Comply
stalled motor current shall not exceed 6 times full load
current

All motors shall be commercially silent in operation and run


free from vibration and the rotors shall be perfectly balanced
both statically and dynamically and shall be tested and
D
adjusted for dynamic balance in
Comply
an approved manner
All motors shall be fitted with anti-condensation heaters of a
size to maintain the temperature of the windings 5 °C above
ambient. Each heater shall be provided with a switch and
automatic control to disconnect it when its motor is in
E
operation
Noted as Comply

F Terminal Boxes

Terminal boxes shall be cast iron and shall be designed to Noted as Comply for induction motors
accept XLPE or PVC armoured cable as detailed in the
Contract. On non- submersible motors, terminal boxes shall
(i) be mounted on the right hand side when viewed from the
driving end of the motor, unless otherwise required by the
Contract.

The motor stool base where appropriate shall be drilled at Comply


works vertically below the terminal box gland for the passage
(ii) of the cables and the edges of the hole slightly countersunk
or the hole bushed.

Motor terminals shall be stud-type, substantially designed, Comply


anchored to a carrier terminal block and insulated from the
(iii) motor frame.
Terminals shall be identified in accordance with BS 4999 Part
108 or
equivalent. A separate earth stud shall be included on each
terminal box. Heater terminals shall be shrouded and
prominently labelled.

Adequate space and glanding arrangements shall be


provided, particularly on smaller motors requiring glanding
and terminating of steel wire armoured cable for star/delta
(iv) Comply
starting, anti-condensation heating and thermistor winding
protection devices.
Where a common terminal box is used for main, heater and
thermistor cable terminations, a permanent warning label
(v) shall be fixed to the terminal box cover. In addition, heater Comply
and thermistor cable terminations shall be clearly marked to
identify their separate functions and operating voltages
(vi) Terminal box covers shall be gasketed to provide a degree of Comply
protection equivalent to or better than that of the motor.

For Ex 'd' flameproof motors, terminal boxes may employ


Type 'e' increased safety protection, utilising indirect cable
(vii) entry to the flameproof enclosure. However, this must be of Comply
the same type used
to obtain the potentially explosive hazardous area motor
tifi motor
ti
3.3kV cable termination boxes shall be high fault level Not Applicable, since the power
type, with segregated phases, pressure relief diaphragm and
(viii) consumption is very low
sealing chamber.

arrangements shall be made with the manufacturer so that Noted as comply


the Engineer shall witness motor tests for motors with power
G larger than 75 kW as specified in the FAT testing paragraph.

The motors shall run in ball and/or roller bearings and the Comply
H weight of the motor shall be carried by thrust bearings
incorporated in the motor body

Bearings shall be grease lubricated using hydraulic type Comply


nipples which are freely accessible without any dismantling,
I or otherwise piped out to a readily accessible location

“Sealed for Life” bearings shall not normally be used. Comply, the shaft guard provided in
However, for small motors the Engineer may allow the use of
the skid
J sealed for life
bearings.
Project Terminal Sewage Pumping Station at Doha North STW Package 3

Fuel : FUEL OIL PIPING SYSTEM


SN Description Compliance Remarks
Section 21: Electrical Works
Part 04: Motor Starters
4 LOW VOLTAGE MOTOR STARTERS (<1000V)
4.1 GENERAL
4.1.1 Scope
1 This Part includes the supply and installation of motor
4.1.2 References
1 The following standards or
supplementary means
assembly
Noted
BS EN 60947-4 Contactors and motor Starters
BS EN 60947-1, IEC 947 Low Voltage switchgear and
4.2 PRODUCTS
4.2.1 Starters

Motor starters shall be rated to carry the full load


current of its rated duty at its most severe load
conditions. All starters shall be capable of at least 20
1 starts per hour at 100 % full load torque unless Complied
otherwise specified.

2 In accordance with the current QGEWC regulations, Complied


motors up to and including 11 kW shall
be started direct on line. Motors above 11 kW shall
incorporate assisted starting.

Motor starters shall be housed in a separate cubicle Proposed Motor starters are housed
Complied as
3 compartment of the relevant motor control centre and in small control panel
noted
each starter cubicle shall contain the following general purpose enclosures.
1 no. triple pole ACB or MCCB or fuse switch, as Incomer MCB is provided for
indicated on the Project Documents, externally protection.
Complied as
a operated and interlocked with the cubicle door. There
noted
shall be provision for
padlocking in the OFF position.
b 1 no. starter, comprising one of the following types, as
indicated on the Project
i direct on line Complied
ii star/delta Not
iii close transition star/delta Not
iv reduced voltage “soft start” Not
v VFD control as per part 5 Not
c 1 no. motor protection relay, as specified in Part 3 Not
Applicable
SN Description Compliance Remarks
d 1 no. set of auxiliary relays and timers required to Complied
provide the necessary indication
and control sequence
e 1 no. set of main motor terminals and auxiliary Complied
terminals for remote controls and
indications.
f 1 no. set of terminals for remote lock-off stop push Complied
g 1 no. control circuit transformer, where applicable Complied
h 1 no. anti-condensation heater Complied
i 1 no. set of power factor correction capacitors with Not
separate fuses for all drives above Applicable
11 kW, to give a power factor of not less than 0.85.

j Thermistor relays where applicable Not


Applicable
k Bearing Vibration/temperature relays where Not
applicable Applicable
l Pump protection relays for submersible pumps>2.2kW
(moisture within the oil chamber, moisture within the Not
cable connection box, mechanical seal failure, Applicable
temperature rise of the hydraulic driven end bearing,
4 The components of the starter shall be type tested and Complied
ASTA certified to achieve Type 2 coordination
in accordance with IEC 947.

5 The following equipment shall be mounted on the


door of the starter cubicle, or as otherwise
indicated in the Project Drawings or Project
Documentation.
1 no. Ammeter with selector switch for Motors with
P<10 KW , and 3 no. A meters for motors with P>10
KW,, 96 X 96, with 240° scale fitted with suppressed
6xFLC scale to read motor running and starting
a current, with an adjustable red pointer to indicate full Complied
load current. The scale range shall be such that normal
full load current gives
approximately 60% full scale deflection.

b 3 no. pilot lamps to indicate “SUPPLY ON” () and 1 no Complied


lamp to indicate “MOTOR
RUNNING” (Green) and “MOTOR STOP (White)”
c 1 no. pilot lamp to indicate “MOTOR FAILED” (Amber) Complied

d “X” no pilot alarm indication lamps (a separate lamp Not


e 1 no. “Hand/OFF/AUTO” Selector switch Complied
f 1 set “Start/Stop” push button Complied
g 1 no. externally operated overload reset push button Not
Applicable
h 1 no. motor heater and cubicle heater humidistat Not
controlled “OFF/AUTO” control Applicable
switch.
i 1 no. electronic hour counter reading to 99999 hours Not
with analogue display, memory Applicable
and battery backup with reset button
j lamp test push button Complied
k 1 duty label Complied
All motors shall have local emergency stop push
l buttons on MCC and near the motor. For small motors, Complied By Contractor
2.2KW & lower, local isolator shall be enough. For
All starters shall contain a totally enclosed dust proof
timer, or the operation will be controlled by a timer in
the automatic section, which shall prevent pump(s)
starting after a power failure until after a pre-set time
has elapsed. The timer(s) or contacts shall be
adjustable in the range 50 to 200 percent of the
anticipated maximum delay which shall be taken as Not
6 twice the total time required for all pumps to start and Applicable
run steadily having been started consecutively. The
timer(s) or contacts shall be set to give individual
sequential start after a power failure with no drive
starting until its predecessor has
reached full steady running.

4.2.2 DOL Starters


1 DOL starters shall consist of a TP contactor for Complied
switching direct on line in accordance with BS EN
2 d f be dselected
Contactors shall h forl category AC-3 duty. Complied
4.2.3 Star Delta Starters
1 Star-delta starters shall be provided with contactors as
for DOL starters, arranged in such a manner
2 The period hof running in star and the
b transition
f h dtime
l
shall be controlled by adjustable solid state type
timers.

For closed transition type star-delta starters, further


requirements shall be wire wound or pressed sheet
resistor banks of sufficient thermal rating to allow
three (3) consecutive starts of 30 seconds period
Not
followed by a 15 minutes rest and another 30 seconds
Applicable
starting period. They shall also be of sufficient thermal
rating to allow 10 starts per hour in line with the pump
and starter specification unless otherwise specified.
3 Resistance values shall be chosen to give a high
starting current with low transient current. A thermal
cut out shall be provided for transient resistance
banks. Starter cubicles
incorporating resistor banks shall be well ventilated
and vermin proof with ventilation louvres.

4.2.4 Reduced Voltage “Soft Starters” Not


Solid-state reduced voltage motor starters shall be
closed transition, shunt duty type with isolation
contactor and bypass contactor. When the motor
reaches full speed, the bypass contactor bypasses the
soft starter power section. The solid-state power
1 section shall consist of six silicon controlled rectifiers
(two per phase connected back to back, in reverse
parallel configuration) to provide soft
start. The starters shall conform to the latest IEC
Standards.
The starters shall use the current limit method of
starting with the current adjustable between 150
percent and 425 percent of full load current of the
motor. At turn-on, the control ramps up to the current
limit in approximately 1 second and maintains that
current until the motor comes up to full speed. If a
problem exists and the motor fails to reach rated
speed within a predetermined period of time, the
control will shutdown. The starter shall provide a
smooth, stepless acceleration and deceleration of the
load from start to full speed and from full speed to
2 stop. The starter shall be equipped with metal oxide
varistor type surge suppressers across the SCR to
protect against voltage transients and
resistor/capacitor scrubber networks to protect
against false firing of the SCR. Each SCR heat sink shall
have a temperature sensor that shall shut the starter
down in the event of an over temperature condition.
When a starter failure occurs, the actual problem shall
be indicated by an LED Not
on the control panel front. Applicable

There shall be a overcurrent protective device, which


shall provide over current protection and main
disconnect function for the control unit. The position
of the operating handle shall indicate “ON” or “OFF”
position of the protective device and include provision
3 for padlocking in the “OFF” position.
This protective device shall be equipped with a shunt
trip and shall trip when there is a SCR or plant
power failure. Motor space heaters shall be energised
when the motor is not running.

The reduced voltage starters shall be equipped with


micro-processor controlled motor protection relays to
control, monitor and protect the motors. The relay
shall monitor three phase current and voltage and
make trip and alarm decisions based on pre-
programmed motor current and voltage conditions.
Control functions shall include start detection, starter
transition, incomplete sequence and number of starts
4 per hour. The relay shall monitor and display load
current of each phase, percent of full load current of
each phase and running time. The relay shall protect
the motor against time overcurrent, instantaneous
overcurrent, underload, phase unbalance, earth fault,
phase loss
and phase reversal.
The manufacturer shall supply certified test results to
confirm that the controller has been tested to
substantiate designs according to applicable
standards. The tests shall verify not only the
5 performance of the unit and integrated assembly, but
also the suitability of the enclosure venting, rigidity
and bus bracing. In addition, the unit shall be factory
tested in accordance with applicable
standards.

6 Manufacturer shall be prepared to show proper


evidence of having tested for noise immunity on
both input and output power connections.

7 The softstarter shall be supplied factory configured


ready to commission, without requiring any
parametering or reconfiguration at site.

8 The softstarter shall have the following protective Not


feature as minimum:- Applicable
a over temperature
b overload
c jam
d stall
e phase Loss
p phase reversal
g shorted SCR
9 The softstarter shall have the following control feature
as minimum:-
10 kick start 0-85% locked rotor torque – 0 to 2 seconds

11 ramp start 0-85% locked rotor torque – 1 to 60


seconds
12 current limit start 0-85% locked rotor current – 1 to 60
S
13 soft stop 0 to 60 seconds
14 The softstarter shall be provided with high speed fuses
as recommended.
4.3 INSTALLATION
1 The Contractor shall submit details of proposed
equipment and method of installation to the
Engineer and QGEWC for approval prior to
commencement of installation work.

Provide all the motor control equipment installations,


wiring installations and tests, including connections
and interconnections for the electrical controls as
indicated, specified and required. Assure proper fits Contractors
for all equipment and materials in the spaces shown Scope
on the Drawings. The starter can be installed in a
2 separate cubicle for MCC or can be an item in the
Distribution Board, as per the Project Documentation.
The installation procedures as applicable for MCC and
DB shall also in
general applicable for motor starter items.
SN Description Compliance Remarks
Equipment shall be installed level and securely
attached to the cubicle frames. The sections shall be
joined together with bolts, nuts and washers to form a
Contractors
3 complete unit assembly. Floor standing equipment
Scope
shall be installed on concrete plinths as shown on the
Drawings.

4.3.2 Earth Bonding


Each Medium Voltage/MCC switchgear panel or
section shall be individually connected (at both end of
the panel earthing bar) to two separate earthing pits
trough the main earth bar located in the electrical or
1 cable basement rooms. The earthing cable size shall be
provided using a professional international recognized
cable size design software subject to the Engineer’s
approval.
Complied as Since these are small control panels,
2 Medium Voltage/MCC switchgear panel earthing
noted separate earth terminal is provided.
conductor to earthing bar and earthing pit is to be
sized for maximum earth fault current for 5 seconds
with final conductor temperature not exceeding 160 °C
or sized not less than 20 mm² per 100 kVA of
transformer rating, and with a minimum of 95
mm².

3 Each panel section shall be cross bonded to adjacent


panel section earthing terminal.
END OF PART
Project Terminal Sewage Pumping Station at Doha North STW Package 3

System FUEL OIL PIPING SYSTEM


SN Description Compliance Remarks
Section 21: Electrical Works
Part 03: Protective Devices
3.1 GENERAL
3.1.1 Scope
1 This Part shall specify the requirements for protective devices.
3.1.2 General Reference
1 The work of this Part is integral with the whole of the Project Documentation and is not intended to be interpreted
outside that context.
Noted
2 Co-ordinate the work with all other services affecting the work of this Section.
3.1.3 Ratings
Drawings. However, the protective device ratings shall be confirmed based on the equipment and items being provided by the
1 Contractor. Contractor shall provide calculation and justification for proposing any change in the rating.

3.1.14 Standards
1 The following standards shall be followed:
BS EN 60255-6, IEC 255 Electrical relays
BS EN 60269, IEC 269 Cartridge fuses for voltages up to and including 1000VAC and 1500 V AC
BS EN 60898, IEC 157-1A Miniature and Moulded Case Circuit Breakers For relevant material
Comply as applicable within our scope of
BS EN 60947, IEC 947-2 Low Voltage circuit breakers
supply
BS EN 61008-1 Earth Leakage circuit breakers
BS EN 61810-1 Electrical Relays
BS88 Cartridge fuses
3.1.5 Overcurrent Protective Device Co-ordination
1 The Contractor shall carry out and provide an overcurrent protective device. Co-ordination study as part of his
material submission, as outlined below:
2 Properly co-ordinated automatically operated overcurrent protective devices shall be provided for this Project. The overcurrent protective Comply
devices shown on the Drawings shall be co-ordinated for adequate continuous current and interrupting capacity to assure proper
overcurrent protective devices operation under normal and fault conditions in the system

All overcurrent protective devices on this Project and the first upstream device of the existing electrical system shall be co-ordinated so Comply using
that they will perform as follows. When two or more overcurrent protective devices (including the first upstream protective device of the Manufacturer`s
3 existing system) in series with each other experience current flow greater than their rated current, the device with the lowest rated proprietery software
current shall trip and/or open the circuit first and thereby prevent the higher rated devices from operating. and our standard
formats
The Supplier of the overcurrent protective devices shall prepare a co-ordination study to verify the above stated performance
4 requirements. The study shall be documented by the Supplier and the documents shall include but not be limited to the following:

SN Description Compliance Remarks


composite drawing or drawings (on full size, reproducible, log-log paper) showing the entire new electrical system (including the first
upstream protective device of the existing system) showing all protective device curves (including motor overloads), short circuit duties, Comply using
a motor starting curves and damage curves for motors, equipment and conductors. This drawing or drawings shall show that all protective Manufacturer`s
devices are properly co-ordinated to perform as stated above proprietery software
and our standard
b manufacturer`s overcurrent operating curves (on full size, reproducible, log-log paper) for each overcurrent formats
device. In the case of fuses, both minimum melt and maximum clearing time curves shall be included
reproducible copies of all Project single line diagrams so marked to show short circuit duties at all switchboards and motor control
c centres, and which operating curve applies to each overcurrent device on the diagram (the operating curves shall also be Comply
correspondingly marked)
d a tabulation of the short circuit duties at all switchboards and motor control centres, sizes and ratings of all overcurrent protective Comply
devices and the required settings of all of the adjustable overcurrent protective devices so that the performance requirements are met.
Protective devices which have earth fault protection features are specifically required to meet this performance requirement.

This documented co-ordination study shall be submitted for review before the overcurrent devices are supplied for the Project. The study shall be
5 Comply as noted submitted after receipt
of final drawings for
6 The breaking performance of ACB’s and MCCB’s shall be such that service breaking capacity ICS should be Comply
equal to or greater than ultimate breaking capacity ICU.
3.1.6 Quality Assurance
1 The suppliers manufacturing facility shall be certified to the ISO - 9001 series of standards from the International Noted
Standards Organisation.
3.1.7 Manufacturers
1 Preference will be given to one manufacturer of ACB, MCCB and MCB to ensure proper co-ordination in Noted
accordance with Clause 3.1 above.
3.2 PRODUCTS
3.2.1 Air Circuit Breakers Not Applicable
3.2.2 Moulded Case Circuit Breakers Not Applicable
3.2.3 Miniature Circuit Breakers
1 These shall be type C for general purpose uses, suitable for the load they feed, and shall have short circuit rating Comply
of 10 kA.
2 They shall be fault rated so that fuse backup protection is not required. Comply
3 They shall be rated in accordance with BS EN 60898, IEC 898. Comply
4 They shall include the following minimum features: Comply
(a) magnetic and thermal trip elements
(b) trip-free mechanisms Comply
(c) locking of facilities with detachable proprietary brackets and clearly marked ratings.
5 RCBO shall comply with BS EN 61008-1 & BS EN 61009-1 Comply
3.2.4 MCB/ELCB
SN Description Compliance Remarks
1 Combined MCB/ELCB units shall be provided for final circuits supplying socket outlets, water heaters and water Comply
pumps.
2 The units shall have a trip sensitivity of 30 mA. Comply
3.2.5 Earth Leakage Circuit Breakers (ELCB)
Current operated earth leakage circuit breakers shall provide accident protection by interrupting dangerous contact with voltage which
1 may be present in faulty electrical equipment as a result of frame faults, insufficient insulation or misuse. Comply

2 The ELCB shall also provide high degree of protection against earth leakage, fire and electric shock. It shall withstand at least 10 kA or Comply
as specified in the project documents. The breakers shall comply with BS EN 61008-1 and the recommended specification CEE 227 of
the IEC on rules of approval of electrical equipment.

The breaker shall consist of a core balance transformer, a tripping coil with contact assembly, main supply contacts, ON/OFF switch, a
3 test button and a trip free mechanism all enclosed in a robust body of all insulated material. Comply

4 Degree of Protection against earth leakage throughout the electrical installation shall be as indicated on the Comply
Drawings. Unless otherwise indicated, ELCB shall have 30 mA trip settings.
5 The breaker protecting lighting and or power circuits shall be mounted in the panel board enclosure. Comply
3.2.6 Overload Relays
1 Thermal Overload Relay Comply
thermal overload relay where specified shall be of Bi-metallic inverse time-lag type, which shall be used with a contactor in the starter
a circuit enabling switching device to open both control and power circuit (fully isolating the power to the motor terminal box) when the Comply
current in the relay exceeds a predetermined value.
b the thermal overload relay shall fully comply with the requirement of BS EN 60255-8 Comply
c the thermal overload relay shall be simple and robust suitable for direct contactor mounting or if to be mounted Comply
separately shall be used with manufacturer supplied links and associated attachment.
d the thermal overload relay shall be designed to include ambient temperature compensation feature from – 20 Deg Comply as Noted Temperature -20Deg
C to + 65 Deg C eliminating the need of any calibration in the field during operation. to +50Deg
e the thermal overload relay shall provide the following protections:-
(i) over-current/Overload Comply
(ii) single phasing/Phase failure Comply
the thermal overload relay shall have MAN/AUTO field convertible Reset button located on top of the relay for resetting of the relay after
f trip. Additionally a facility shall be provided on the door of starter compartment to reset the relay if so required/specified. Comply

the thermal overload relay shall have two characteristics, the one when the relay bi-metals are in cold state that will break the contacts
of the relay within 8-10 seconds and the other when in hot state the contacts breaking shall be reduced to approximately one third of the
g tripping time as indicated for the cold characteristics. The tripping time may be allowed to vary depending upon the starting of the motor Comply
such as normal/heavy-duty.
h the thermal overload relay shall have been type tested and ASTA certified to achieve Type 2 co-ordination in Comply
accordance with BS EN 60947.
i thermal overload relays shall be used for motors rating up to and including 11 kW. Comply
2 Electronic Motor Protection Relay Not Applicable
3.2.7 Fuses Not Applicable
3.2.8 Fuse Switches Not Applicable
3.2.9 Isolating Switches
The switch when used alone as explained above as an Isolator shall confirm to the utilization category AC23 and shall fully comply with
1 the requirement specified for isolating functions specially the isolating distance in accordance with the applicable standard. Comply

2 terminals. Comply
3 The Isolator shall be capable of carrying currents under normal circuit conditions and carrying for specified time Comply
currents under abnormal conditions such as those of short-circuit.
4 All other features of the Isolator shall be same as specified above for combination fuse switch unit. Comply
3.2.10 Stop Lock-off Push Buttons
1 Stop lock-off push buttons for motors shall be the mushroom headed red stay-put type with automatic latching, the Comply
units having to be key operated to be released.
2 Push buttons shall be housed in a surface mounting weatherproof enclosure to IP 65. Comply
3 Push buttons shall be UV stabilised. Comply
3.2.11 Control Relays/Auxiliary Relays/Interposing Relays
1 All auxiliary relays shall mainly comply with BS EN 116000 and BS EN 116205-7. Comply
2 Where similar relays have different operating voltages and/or different contact configurations, they shall be non- Comply
interchangeable.
3 Voltage at nominal operating temperature and shall not „drop-out‟ at greater than 60 % of the nominal coil voltage. Comply
4 Relays shall be continuously rated and capable of sustaining a voltage 10 % in excess of the nominal coil voltage. Comply
5 Relays shall be fully encapsulated and be of the plug-in type, with terminals protected to a minimum of IP2X. Comply
6 Plug-in relays shall be fitted with transparent dust-proof covers. External connections shall be screw clamp Comply
terminals, which are easily accessible with the relay in position.
7 Relays shall include the provision for manual operation. Comply
8 The pin configuration of the relay shall be printed on the casing and on the bases in order to ensure correct pin Comply
alignment.
9 Relays shall be suitable for operation at plus 10% and minus 20% of their nominal rated voltage.
10 The contacts configuration shall be either normally open/normally closed or changeover contact combinations. Comply
11 The contact material used in the Relay for general logic design shall be AgCdO. Specific applications requiring Comply as applicable
extra low switching current shall have GOLD Flash contacts for minimal voltage drop across the contacts.
It will not be permitted to use mixed voltages on the different contacts of a particular relay. If necessary additional relays shall be used
12 by employing good engineering practices such as operation of add-on relay through auxiliary contact of main relay. Comply

13 Relays Coil shall be vacuum impregnated ensuring satisfactorily operation for the adverse climatic conditions as Comply
specified.
14 The relays shall be mounted on DIN Rail. Comply
15 Relays shall be secured to their bases by retaining bar or clip to prevent malfunction due to the relay being Comply
loosened in its base.
16 Care shall be taken to ensure that relay contacts and associated wiring are suitably fused protected. Comply
All type of relays shall have a means of visual indication e.g. light emitting diode (LED) or neon bulb mounted within their clear covers
17 connected directly across the relay coil to indicate when the relay is energized. These indicators shall be easily seen when the relay Comply
compartment door is opened.
18 reference. Comply
19 Where remote supply voltages are used, a warning label engraved in English and Arabic shall be fitted, clearly Comply English lables shall be
identifying the source of supply. provided as
standard practice
20 The relay shall be designed for minimum 1 Million mechanical operation and 200,000+ electrical operations at Comply
rated load.
3.2.12 Protection Relays
1 Protection relays shall comply with BS EN 60225-6, BS EN 61810-1, IEC 255. Comply
2 Secondary injection shall be easily possible by means of purpose-made voltage and/or current plug-in type test terminal blocks which Comply
automatically open circuit or short circuit the integral voltage transformers or current
transformers respectively and provide termination‟s for the test supply. Disconnection of any permanent wiring will not be acceptable.

3.2.13 Alarm System


1 Auxiliary relays and auxiliary contacts and circuit breakers shall be provided as necessary and if indicated to Comply as applicable
transmit alarm signals to remote control buildings.
2 Alarms shall be as indicated on the Contract Drawings and shall be selected from:
(a) circuit breaker tripped Comply
(b) power failure Comply
(c) standby generator failed-to-start. Comply
3.2.14 Padlocks Not Applicable
3.2.15 Hours Run Meters Not Applicable
3.2.16 Thermistor relay Not Applicable
3.2.17 Moisture and mechanical seal leakage protection Not Applicable
3.2.18 Timers
Timers shall be plug-in or surface-mounting types; solid state microprocessor based employing CMOS IC technology.
1 Comply

2 Timers shall be suitable for operation on a nominal 240 V AC, 110V AC, 24 V AC/DC or other voltage as specified Comply
or deemed necessary for the safe operation.
3 Timers shall have linearly calibrated scales, in units of time, each scale division being a maximum of 5% of full Comply
scale. Repeat accuracy shall be within 0.5% of full scale.
4 Timers shall be provided with “energized” and “timed out” indicators. Comply
5 Plug-in timers shall be fitted with transparent dust-proof covers. External connections shall be screw clamp Comply
terminals which are easily accessible with the timer in position
6 Timers shall be secured to their bases by retaining bar or clip to prevent malfunction due to the relay being Comply
loosened in its base.
7 The pin configuration shall be printed on the casing of the timer and on its associated bases in order to ensure Comply
correct pin alignment.
8 Timer shall be provided with 10 Amps. Rated output relay with DPDT contacts. Comply
9 Unless specified otherwise, timers shall be provided for circuits that require delay on operate, delay on release, Comply
and star-delta starting of a 3-phase induction motor.
10 Multifunction timing relay programmable where specified shall be provided to the satisfaction of the engineer. Comply as per project
SLD
11 mentioned in the particular requirements and the same shall be subjected to the review and approval by the Noted.
engineer.
END OF PART
9. VALID CR COPY/COMPANY ID
‫>‪<Bar Code‬‬

‫ﻣﺴﺘﺨﺮﺝ ﺑﺒﻌﺾ ﺑﻴﺎﻧﺎﺕ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ‬

‫ﺗﺎﺭﻳﺦ ﺍﻟﻄﺒﺎﻋﺔ‪2022/02/21 :‬‬


‫ﻣﺴﺘﺨﺮﺝ ﺑﺒﻌﺾ ﺑﻴﺎﻧﺎﺕ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺮﻯ‬

‫*‪*35195‬‬
‫‪5000983254‬‬ ‫ﺭﻗﻢ ﺍﻟﺘﺴﺠﻴﻞ ﺍﻟﻀﺮﻳﺒﻲ‪:‬‬ ‫‪35195‬‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ‪:‬‬
‫ﺍﻟﺴﻤﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ‪:‬‬ ‫ﺷﺮﻛﺔ ﻳﻮﻧﻴﻐﺎﺯ ﻗﻄﺮ ﺍﻟﻤﺤﺪﻭﺩﺓ‬ ‫ﺍﻷﺳﻢ ﺍﻟﺘﺠﺎﺭﻯ‪:‬‬
‫‪21/03/2023‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻧﺘﻬﺎﺀ ﺍﻟﺴﺠﻞ‪:‬‬ ‫‪22/03/2007‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻧﺸﺎﺀ ﺍﻟﺴﺠﻞ‪:‬‬
‫‪200000‬‬ ‫ﺭﺍﺱ ﺍﻟﻤﺎﻝ‪:‬‬ ‫ﺷﺮﻛﺔ ﺫﺍﺕ ﻣﺴﺌﻮﻟﻴﺔ ﻣﺤﺪﻭﺩﺓ‬ ‫ﺍﻟﺸﻜﻞ ﺍﻟﻘﺎﻧﻮﻧﻰ‪:‬‬
‫ﻗﻄﺮ‬ ‫ﺟﻨﺴﻴﺔ ﺍﻟﻤﻨﺸﺄﺓ‪:‬‬ ‫ﻧﺸﻂ‬ ‫ﺣﺎﻟﺔ ﺍﻟﺴﺠﻞ‪:‬‬
‫‪0‬‬ ‫ﻋﺪﺩ ﺍﻟﻔﺮﻭﻉ‪:‬‬
‫ﻣﻌﻠﻮﻣﺎﺕ ﺍﻻﺗﺼﺎﻝ‬
‫‪4622772/5336620‬‬ ‫ﺃﺭﻗﺎﻡ ﺍﻻﺗﺼﺎﻝ‪:‬‬ ‫‪63711‬‬ ‫ﺻﻨﺪﻭﻕ ﺍﻟﺒﺮﻳﺪ‪:‬‬

‫ﺍﻟﺸﺮﻛﺎﺀ‬

‫ﺍﻟﺤﺎﻟﺔ‬ ‫ﺍﻟﻨﺴﺒﺔ‬ ‫ﺍﻟﺠﻨﺴﻴﺔ‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ‬ ‫ﺭﻗﻢ ﺍﻹﺛﺒﺎﺕ‬ ‫ﺍﻷﺳﻢ‬


‫ﻧﺸﻂ‬ ‫‪51‬‬ ‫ﻗﻄﺮ‬ ‫‪56144‬‬ ‫ﺍﺑﻮﻋﻴﺴﻰ ﻏﻮﻟﻒ )ﻣﺮﻫﻮﻥ ﻟﺼﺎﻟﺢ ﺑﻨﻚ ﻗﻄﺮ‬
‫ﺍﻟﻮﻃﻨﻲ(‬
‫ﻧﺸﻂ‬ ‫‪49‬‬ ‫ﻟﺒﻨﺎﻥ‬ ‫‪1902066‬‬ ‫ﻳﻮﻧﻴﻐﺎﺯ ﺍﻧﺘﺮﻧﺎﺷﻮﺗﺎﻝ ﻫﻮﻟﺪﻧﻎ ﺵ‪.‬ﻡ‪.‬ﻝ‬

‫ﺍﻟﻤﺪﺭﺍﺀ )ﺍﻟﻤﺨﻮﻟﻮﻥ ﺑﺎﻟﺘﻮﻗﻴﻊ(‬

‫ﺍﻟﺼﻔﺔ )ﺍﻟﺼﻼﺣﻴﺔ(‬ ‫ﺍﻟﺠﻨﺴﻴﺔ‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ‬ ‫ﺭﻗﻢ ﺍﻹﺛﺒﺎﺕ‬ ‫ﺍﻷﺳﻢ‬

‫‪Page 1 of 2‬‬
‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ‪35195 :‬‬

‫ﺗﺸﻬﺪ ﻏﺮﻓﺔ ﺗﺠﺎﺭﺓ ﻭ ﺻﻨﺎﻋﺔ ﻗﻄﺮ ﺑﺎﻥ ﺍﻟﻤﻨﺸﺎﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺍﻋﻼﻩ ﺳﺠﻠﺖ ﻟﺪﻳﻨﺎ‬
‫‪Qatar Chamber certifies that the above mentioned establishment has been registered‬‬
‫>‪<Bar Code‬‬

‫ﻣﺴﺘﺨﺮﺝ ﺑﺒﻌﺾ ﺑﻴﺎﻧﺎﺕ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ‬

‫ﺻﻼﺣﻴﺎﺕ ﻛﺎﻣﻠﺔ ﻭﻣﻄﻠﻘﺔ ‪ -‬ﻣﺪﻳﺮ‬ ‫ﻟﺒﻨﺎﻥ‬ ‫‪28442200720‬‬ ‫ﻫﻴﺜﻢ ﺯﻛﺮﻳﺎ ﺻﻌﺐ‬


‫ﺻﻼﺣﻴﺎﺕ ﻛﺎﻣﻠﺔ ﻭﻣﻄﻠﻘﺔ ‪ -‬ﻣﺪﻳﺮ‬ ‫ﻗﻄﺮ‬ ‫‪26940000073‬‬ ‫ﻧﺒﻴﻞ ﻋﺒﺪﺍﻟﺮﺣﻴﻢ ﻣﺤﻤﺪ ﺍﺑﻮﻋﻴﺴﻰ‬
‫ﺻﻼﺣﻴﺎﺕ ﻛﺎﻣﻠﺔ ﻭﻣﻄﻠﻘﺔ ‪ -‬ﻣﺪﻳﺮ‬ ‫ﻓﺮﻧﺴﺎ‬ ‫‪27925000089‬‬ ‫ﻣﺮﻭﺍﻥ ﺳﻴﺪﺍﻧﻰ‬
‫ﺻﻼﺣﻴﺎﺕ ﻛﺎﻣﻠﺔ ﻭﻣﻄﻠﻘﺔ ‪ -‬ﻣﺪﻳﺮ‬ ‫ﻗﻄﺮ‬ ‫‪26740000085‬‬ ‫ﺍﺷﺮﻑ ﻋﺒﺪﺍﻟﺮﺣﻴﻢ ﻣﺤﻤﺪ ﺍﺑﻮﻋﻴﺴﻰ‬

‫ﺍﻷﻧﺸﻄﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ‬

‫ﺇﺳﻢ ﺍﻟﻨﺸﺎﻁ‬ ‫ﺍﻟﺮﻗﻢ‬ ‫ﺇﺳﻢ ﺍﻟﻨﺸﺎﻁ‬ ‫ﺍﻟﺮﻗﻢ‬


‫ﻣﻘﺎﻭﻻﺕ ﺍﻧﺸﺎﺀ ﺧﻄﻮﻁ ﺍﻧﺎﺑﻴﺐ ﺍﻟﻨﻔﻂ ﻭﺍﻟﻐﺎﺯ ﺍﻟﻄﺒﻴﻌﻲ‬ ‫‪4100003‬‬ ‫ﺍﻟﺘﺠﺎﺭﺓ ﻓﻲ ﺍﺳﻄﻮﺍﻧﺎﺕ ﺍﻟﺒﻮﺗﻮﺟﺎﺯ ﺍﻟﺸﻔﺎﻑ‬ ‫‪4661903‬‬
‫ﻣﻘﺎﻭﻻﺕ ﻛﻬﺮﺑﺎﺋﻴﺔ ﻭﺻﺤﻴﺔ‬ ‫‪4251101‬‬ ‫ﺗﺠﺎﺭﺓ ﺍﻟﺨﺰﺍﻧﺎﺕ ﻭﺍﻟﺼﻬﺎﺭﻳﺞ ﻭﺍﻟﺼﻮﺍﻣﻊ‬ ‫‪2002098‬‬
‫ﺍﻋﻤﺎﻝ ﺻﻴﺎﻧﻪ ﻭ ﺣﻤﺎﻳﻪ ﻭ ﻃﻼﺀ ﺍﻧﺎﺑﻴﺐ ﺍﻟﻨﻔﻂ ﻭﺍﻟﻐﺎﺯ‬ ‫‪0910001‬‬ ‫ﺍﻋﻤﺎﻝ ﺗﻤﺪﻳﺪ ﺷﺒﻜﻪ ﺍﻟﻤﻴﺎﻩ ﺍﻟﻰ ﺍﻟﻤﺒﺎﻧﻰ ﻭﺍﻟﻤﻨﺸﺎﺕ‬ ‫‪411000‬‬
‫ﺍﻟﺘﺤﻜﻢ ﻓﻲ ﺍﻧﻈﻤﺔ ﺍﻟﻐﺎﺯ‬ ‫‪458051‬‬ ‫ﺻﻴﺎﻧﺔ ﺍﻟﻤﻌﺪﺍﺕ ﺍﻟﺜﻘﻴﻠﺔ ﻟﻤﺼﺎﻧﻊ ﺍﻟﻨﻔﻂ ﻭﺍﻟﻐﺎﺯ‬ ‫‪2003153‬‬

‫‪Page 2 of 2‬‬
‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ‪35195 :‬‬

‫ﺗﺸﻬﺪ ﻏﺮﻓﺔ ﺗﺠﺎﺭﺓ ﻭ ﺻﻨﺎﻋﺔ ﻗﻄﺮ ﺑﺎﻥ ﺍﻟﻤﻨﺸﺎﺓ ﺍﻟﻤﺬﻛﻮﺭﺓ ﺍﻋﻼﻩ ﺳﺠﻠﺖ ﻟﺪﻳﻨﺎ‬
‫‪Qatar Chamber certifies that the above mentioned establishment has been registered‬‬
‫>‪<Bar Code‬‬
‫‪2022/03/17‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻟﻄﺒﺎﻋﺔ‪:‬‬
‫‪No 1 of 1‬‬ ‫ﺻﻔﺤﺔ ﺭﻗﻢ‪:‬‬

‫ﺭﺧﺼﺔ ﺗﺠﺎﺭﻳﺔ‬

‫*‪*35513‬‬
‫‪2015/04/09‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﺻﺪﺍﺭ ﺍﻟﺮﺧﺼﺔ‪:‬‬ ‫‪35513‬‬ ‫ﺭﻗﻢ ﺍﻟﺮﺧﺼﺔ‪:‬‬
‫‪2023/04/17‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻧﺘﻬﺎﺀ ﺍﻟﺮﺧﺼﺔ‪:‬‬ ‫ﺷﺮﻛﺔ ﻳﻮﻧﻴﻐﺎﺯ ﻗﻄﺮ ﺍﻟﻤﺤﺪﻭﺩﺓ‬ ‫ﺍﻷﺳﻢ ﺍﻟﺘﺠﺎﺭﻯ‪:‬‬
‫‪35195‬‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻯ‪:‬‬ ‫ﺷﺮﻛﺔ‬ ‫ﻧﻮﻉ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﺘﺠﺎﺭﻳﺔ‪:‬‬
‫ﺍﻟﺴﻤﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ‪:‬‬

‫ﺑﻴﺎﻧﺎﺕ ﺍﻟﻤﺪﻳﺮ ﺍﻟﻤﺴﺆﻭﻝ ‪:‬‬


‫ﺍﺷﺮﻑ ﻋﺒﺪﺍﻟﺮﺣﻴﻢ ﻣﺤﻤﺪ ﺍﺑﻮﻋﻴﺴﻰ‬ ‫ﺍﺳﻢ ﺍﻟﻤﺪﻳﺮ ﺍﻟﻤﺴﺌﻮﻝ‪:‬‬
‫ﻗﻄﺮ‬ ‫ﺟﻨﺴﻴﺔ ﺍﻟﻤﺪﻳﺮ ﺍﻟﻤﺴﺌﻮﻝ‪:‬‬ ‫‪26740000085‬‬ ‫ﺭﻗﻢ ﺍﻹﺛﺒﺎﺕ‪:‬‬
‫ﻧﻤﻮﺫﺝ ﺧﺘﻢ ﺍﻟﻤﻨﺸﺄﺓ ﺍﻟﺘﺠﺎﺭﻳﺔ ‪:‬‬ ‫ﺑﻴﺎﻧﺎﺕ ﺍﻟﻤﻮﻗﻊ ‪:‬‬
‫ﻋﻘﺎﺭ ﺭﻗﻢ‪:‬‬ ‫ﺗﺠﺎﺭﻱ‬ ‫ﺗﺼﻨﻴﻒ ﺍﻟﻤﻮﻗﻊ‪:‬‬
‫ﺭﻗﻢ ﺍﻟﺪﻭﺭ‪ /‬ﺍﻟﻮﺣﺪﺓ‪:‬‬ ‫ﻣﻜﺘﺐ ﺗﺠﺎﺭﻱ‬ ‫ﻧﻮﻉ ﺍﻟﻤﻮﻗﻊ‪:‬‬
‫ﺍﻟﺼﺎﻟﻮﻥ ﺍﻻﺯﺭﻕ‬ ‫ﺍﺳﻢ ﻣﺎﻟﻚ ﺍﻟﻌﻘﺎﺭ ‪:‬‬ ‫‪ 23‬ﻻ ﻳﻮﺟﺪ‬ ‫ﺍﻟﻤﻨﻄﻘﺔ‪:‬‬
‫ﻧﻮﻉ ﺍﻟﺮﺧﺼﺔ ‪:‬‬ ‫ﺍﻟﻤﺪﻳﻨﺔ‬ ‫ﺍﻟﺸﺎﺭﻉ‪:‬‬
‫‪16-‬ﺍﻟﻐﺎﻧﻢ ﺍﻟﻘﺪﻳﻢ‬
‫)ﺟﻨﻮﺑﺎ( ‪-220 -‬ﺍﻟﻄﺮﻳﻖ‬ ‫ﻭﺻﻒ ﺍﻟﻌﻨﻮﺍﻥ ‪:‬‬ ‫‪231‬‬ ‫ﺭﻗﻢ ﺍﻟﺸﺎﺭﻉ ‪:‬‬
‫ﺍﻟﺪﺍﺋﺮﻱ ﺍﻟﺜﺎﻧﻲ‬
‫ﺍﻷﻧﺸﻄﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ ‪:‬‬

‫ﺇﺳﻢ ﺍﻟﻨﺸﺎﻁ‬ ‫ﺭﻗﻢ ﺍﻟﻨﺸﺎﻁ‬ ‫ﺇﺳﻢ ﺍﻟﻨﺸﺎﻁ‬ ‫ﺭﻗﻢ ﺍﻟﻨﺸﺎﻁ‬


‫ﻣﻘﺎﻭﻻﺕ ﺍﻧﺸﺎﺀ ﺧﻄﻮﻁ ﺍﻧﺎﺑﻴﺐ ﺍﻟﻨﻔﻂ‬ ‫‪4100003‬‬ ‫ﺍﻟﺘﺠﺎﺭﺓ ﻓﻲ ﺍﺳﻄﻮﺍﻧﺎﺕ ﺍﻟﺒﻮﺗﻮﺟﺎﺯ ﺍﻟﺸﻔﺎﻑ‬ ‫‪4661903‬‬
‫ﻭﺍﻟﻐﺎﺯ ﺍﻟﻄﺒﻴﻌﻲ‬ ‫ﺗﺠﺎﺭﺓ ﺍﻟﺨﺰﺍﻧﺎﺕ ﻭﺍﻟﺼﻬﺎﺭﻳﺞ ﻭﺍﻟﺼﻮﺍﻣﻊ‬ ‫‪2002098‬‬
‫ﻣﻘﺎﻭﻻﺕ ﻛﻬﺮﺑﺎﺋﻴﺔ ﻭﺻﺤﻴﺔ‬ ‫‪4251101‬‬ ‫ﺍﻋﻤﺎﻝ ﺗﻤﺪﻳﺪ ﺷﺒﻜﻪ ﺍﻟﻤﻴﺎﻩ ﺍﻟﻰ ﺍﻟﻤﺒﺎﻧﻰ‬ ‫‪411000‬‬
‫ﺍﻋﻤﺎﻝ ﺻﻴﺎﻧﻪ ﻭ ﺣﻤﺎﻳﻪ ﻭ ﻃﻼﺀ ﺍﻧﺎﺑﻴﺐ‬ ‫‪0910001‬‬ ‫ﻭﺍﻟﻤﻨﺸﺎﺕ‬
‫ﺍﻟﻨﻔﻂ ﻭﺍﻟﻐﺎﺯ‬ ‫ﺻﻴﺎﻧﺔ ﺍﻟﻤﻌﺪﺍﺕ ﺍﻟﺜﻘﻴﻠﺔ ﻟﻤﺼﺎﻧﻊ ﺍﻟﻨﻔﻂ‬ ‫‪2003153‬‬
‫ﺍﻟﺘﺤﻜﻢ ﻓﻲ ﺍﻧﻈﻤﺔ ﺍﻟﻐﺎﺯ‬ ‫‪458051‬‬ ‫ﻭﺍﻟﻐﺎﺯ‬

‫ﻣﺪﻳﺮ ﺇﺩﺍﺭﺓ ﺍﻟﺘﺴﺠﻴﻞ ﻭﺍﻟﺘﺮﺍﺧﻴﺺ ﺍﻟﺘﺠﺎﺭﻳﺔ‬


10. MATERIAL CATALOG AND DATA SHEET
Similar to Section 5
11. COUNTRY OF ORIGIN
UNIGAZ QATAR | MATERIAL SUBMITTAL

MAIN TANK

MATERIAL SUBMITTAL
UNIGAZ QATAR | MATERIAL SUBMITTAL

SUPPLY BY WOQOD
Documents will be provide along with
delivery

MATERIAL SUBMITTAL
UNIGAZ QATAR |
PREQUALIFICATION

VENT

Brand: MORRISON BROS

UNIGAZ QATAR
readan
3826 Sul!arloaf Pkwy, Frederick, MD-21704
Tel: +l 301 7988102 Fax N0:+1 240 341 1400,Email:sales@readaninternatlonal.eom
" Reliable Dartner assiting In the grDwth of your business
Packing List
To: Diligent Trading & Contracting WLL
North Shamal Road, Exit No-10,
Al Khartiyat Street No-455, Building N0:29
Office no: 7
Doha,Qatar
Contact Person :Kumar
Procurement Manager
Petrochemical Division
Email: fuel@dillgentqatar.com
Mob +974 3007 1232
Tel +974 44663404

Your Ref: DGC/PO-PT/RDN-001/20 Date :10/16/2020


Our Ref: RD-2597 Invoice No: 10308
Payment terms: Wire with Order I
Po Number Item UOM Qty HTS coo Description Packing Details
Morrison Bros. 9095SA 2 In. AST overfill Prevention
DGC/PO-PT/RDN-001/21 1 EA 15 7310.29.0000 USA Valve for Direct Fill Part no: 9095SA0200AV

Morrison Bros. 2 in. 354 Serles Slip on Updraft Vent.


DGC/PO-PT/RON-001/22 2 EA 73 848140.0000 Thalland 3540200AV one Pallet_31" X 31" X42"·
Morrison Bros 346-DI Series Female NPTExternal 137 LBS/59.85 KGS
DGC/PO-PT/RDN-001/23 3 EA 34 8481.40.0000 USA Emergency Valve; Slze=l in.346Dl-1100 AV One pallet-48"X40" X29"·
Morrison 3 Inch 10 Gallon Remote fill Box Only 715 5- 502 LBS/230 KGS
DGC/PO-PT/RDN-001/24 4 EA 1 7310.29.0000 USA TT3-0000-0
Morrison 1.5" External Emergency Valve 346DI0400AV
DGC/PO-PT/RDN-001/25 5 EA 7 848140.0000 Thalland
DGC/PO-PT/RON-001/26 6 EA 1 8481.80.9000 Ar11:entlna Morrison 2" Solenoid Valve 710-0200 lV
Manufacturer: Morrison Brothers Co
One PaUet_ 31" X 31" X42"· 137LBS/59.85 KGS
One pallet-48 "X 40" X29"- 502 LBS/230 ICGS
Gross-ight- 2 pallets- 639LBS/289.85 KGS
Netweight-2 pallets- 639 LBS/289.85 KGS

Readan International LLC


� o� 1"' o..,.J,_crt\ 3826 Sugarloaf Pkwy
Hy1ittsville Chamber of
Commerce
Frederick, MD 21704
Cherry Street, Hyattsville
MD-20781
USA
.
�--""�
George Augustin..-
-· A.. •. �I .•.c:.\" 1n.•

Authorised Signatory
Readan international

3826 Sugarloaf Pkwy, Frederick, MD-21704


Tel: +1 301798 8102 Fax N0:+1 240 341 1400,Emall:sales@readaninternational.com
UNIGAZ QATAR |
PREQUALIFICATION

Solenoid Valve

UNIGAZ QATAR
UNIGAZ QATAR | MATERIAL SUBMITTAL

Check Valves(NRV) &


Y STRAINER

MATERIAL SUBMITTAL
1 Consignor
CRANE FLUID SYSTEMS No. RA 127375 ORIGINAL
CRANE HOUSE
EPSILON TERRACE, WEST ROAD,
IPSWICH
IP3 9FJ, UNITED KINGDOM
EUROPEAN COMMUNITY
2 Consignee

AL RIYADH TRADING & CONTRACTING CO


PO BOX 1174
DOHA CERTIFICATE OF ORIGIN
QATAR
QATAR
3 Country of Origin
uropean Community - United Kingdom, Italy

4 Transport details (Optional) 5 Remarks


-SEAFREIGHT-

6 Item number; marks, numbers, number and kind of packages; description of goods 7 Quantity

AL RIYADH -48- CASES Total Gross: 23190 KG


ATC/2018-039, ATC/2018-040
ATC/2018-0061, ATC/20198-113 BRONZE AND CAST IRON VALVES
ATC/2017-189, ATC/2018-119 Total Net: 21172 KG
ATC/2018-092, ATC/2018-010
ATC/2018-102 Total Cube: 39.36 M3
DOHA
QATAR

CASE NO:
370862, 370907, 370909, 370910, 371229, 371443, 371559, 371560, 371561, 371562, 371563,
371564, 371608, 371609, 371610, 371746, 371793, 371794, 372149, 372150, 370440, 370441,
370442, 370443, 370444, 370445, 370446, 370450, 370451, 370452, 370466, 370720, 370721,
370722, 370724, 370726, 370916, 370924, 370925, 370926, 370927, 370928, 370929, 370930,
370941, 371289, 372875
8 BOXES OF CATALOGUES

8 THE UNDERSIGNED AUTHORITY CERTIFIES THAT THE GOODS DESCRIBED ABOVE ORIGINATE IN THE COUNTRY SHOWN IN BOX 3

NORTHAMPTONSHIRE CHAMBER OF COMMERCE

1 9 JUL ZT13

J? r l, ·- � \,\ f I r-. f) �
0

AU-P---:OJz:�:i;D �-1,,1, .l (!�"·

DTINJ5/5/2 Nationwide Prml


UNIGAZ QATAR |
PREQUALIFICATION

Ball Valve

Brand: Apollo

UNIGAZ QATAR
Manufactured by Conbraco Industries, Inc.
P.O. Box 125 Pageland S.C. 29728
Phone: [843] 672-6161
Fax: [843] 672-1648
www.apollovalves.com

Certificate of Origin

Customer: SUPER TECHNICAL FZCO Date: 03/03/14

CII Order# : 290055 PO# : STFZGD9028

Part# : Qty: Description:

80-105-01 10 BALL VALVE, 1" NPTF, 600 PSI WOG, SP, BRONZE BODY, CHROME BALL
RPTFE SEATS & PKG., LEVER OPERATED, LP GAS, UL LISTED, APOLLO - USA

80-107-01 30 BALL VALVE, 1.1/2" NPTF, 600 PSI WOG, SP, BRONZE BODY, CHROME BALL,
RPTFE SEATS & PKG., LEVER OPERATED, LP GAS, UL LISTED, APOLLO - USA

Country of Origin: United States


This is to certify that the above materials comply with the requirements of the applicable purchase order and the
codes and ratings shown in our published catalog of products manufactured by Conbraco Industries, Inc. or as
otherwise specified above. All products are manufactured, tested and assembled in the United States of
America. All products have met the inspection requirements.

Respectfully,

John C. Regan
Corporate Quality Assurance Manager ES-1513 REV. A

181
Office Address: 701 Matthews Mint Hill Road | Matthews, NC 28105
ISO 9001: 2008 Certified
UNIGAZ QATAR | MATERIAL SUBMITTAL

FIREMATIC VALVE

MATERIAL SUBMITTAL
readan
3826 Sul!arloaf Pkwy, Frederick, MD-21704
Tel: +l 301 7988102 Fax N0:+1 240 341 1400,Email:sales@readaninternatlonal.eom
" Reliable Dartner assiting In the grDwth of your business
Packing List
To: Diligent Trading & Contracting WLL
North Shamal Road, Exit No-10,
Al Khartiyat Street No-455, Building N0:29
Office no: 7
Doha,Qatar
Contact Person :Kumar
Procurement Manager
Petrochemical Division
Email: fuel@dillgentqatar.com
Mob +974 3007 1232
Tel +974 44663404

Your Ref: DGC/PO-PT/RDN-001/20 Date :10/16/2020


Our Ref: RD-2597 Invoice No: 10308
Payment terms: Wire with Order I
Po Number Item UOM Qty HTS coo Description Packing Details
Morrison Bros. 9095SA 2 In. AST overfill Prevention
DGC/PO-PT/RDN-001/21 1 EA 15 7310.29.0000 USA Valve for Direct Fill Part no: 9095SA0200AV

Morrison Bros. 2 in. 354 Serles Slip on Updraft Vent.


DGC/PO-PT/RON-001/22 2 EA 73 848140.0000 Thalland 3540200AV one Pallet_31" X 31" X42"·
Morrison Bros 346-DI Series Female NPTExternal 137 LBS/59.85 KGS
DGC/PO-PT/RDN-001/23 3 EA 34 8481.40.0000 USA Emergency Valve; Slze=l in.346Dl-1100 AV One pallet-48"X40" X29"·
Morrison 3 Inch 10 Gallon Remote fill Box Only 715 5- 502 LBS/230 KGS
DGC/PO-PT/RDN-001/24 4 EA 1 7310.29.0000 USA TT3-0000-0
Morrison 1.5" External Emergency Valve 346DI0400AV
DGC/PO-PT/RDN-001/25 5 EA 7 848140.0000 Thalland
DGC/PO-PT/RON-001/26 6 EA 1 8481.80.9000 Ar11:entlna Morrison 2" Solenoid Valve 710-0200 lV
Manufacturer: Morrison Brothers Co
One PaUet_ 31" X 31" X42"· 137LBS/59.85 KGS
One pallet-48 "X 40" X29"- 502 LBS/230 ICGS
Gross-ight- 2 pallets- 639LBS/289.85 KGS
Netweight-2 pallets- 639 LBS/289.85 KGS

Readan International LLC


� o� 1"' o..,.J,_crt\ 3826 Sugarloaf Pkwy
Hy1ittsville Chamber of
Commerce
Frederick, MD 21704
Cherry Street, Hyattsville
MD-20781
USA
.
�--""�
George Augustin..-
-· A.. •. �I .•.c:.\" 1n.•

Authorised Signatory
Readan international

3826 Sugarloaf Pkwy, Frederick, MD-21704


Tel: +1 301798 8102 Fax N0:+1 240 341 1400,Emall:sales@readaninternational.com
UNIGAZ QATAR | MATERIAL SUBMITTAL

Fire Safe Valve

MATERIAL SUBMITTAL
UNIGAZ QATAR | MATERIAL SUBMITTAL

'83/(;
FILTER

MATERIAL SUBMITTAL
UNIGAZ QATAR | MATERIAL SUBMITTAL

AUTOMATIC TANK
GAUGING SYSTEM

MATERIAL SUBMITTAL
1 111 111ı I I mı ı ı 111111111111111 11111 1111 1 1 1111
(253)8682022062758S0345565
1. İhracatçı ORJİNAL
Consignor
Expediteur
NO S 0345565 ORIGINAL
ORIGINAL

NORTH FALCON ENERJİ SAN VE TİC LTD ŞTİ


DUDULLU OSB MAH. DES-1 CAD.
Nü:10/1 ÜMRANİYE/İSTANBUL MENŞE ŞAHADETNAMESİ
CERTIFICATE OF ORIGIN
2. Alıcı CERTIFICAT D'ORIGINE
Consignee
Destinataire

3. Menşe Ülkesi
Country of Origin ITALY
S FLO TRADING WLL
OFFICE #5, BUILDING 54, STREET 830 ZONE 17 Pays d' origine
DOHA QATAR

4. Taşımaya İlişkin Bilgiler (Tercihe Bağlı) 5. Gözlemler


Transport Details (Optional) Remarks
lnformations relatives au transport (mention facultative) Remarques

BY AIR

6. Sıra No; kolilerin marka ve işaretleri, sayı ve türleri; eşyanın tanımı 7. Miktar
ltem number; marks, numbers, number and kind of packages; description of goods Quantity
Numero d'ordre - Marques, numeros, nombre et nature des colis - Designation des marchandises Quantite

ADDR: 1- 1 BOX 10,00 KGS

'ALISONIC DELPHI RS485 PROBE 1750mm (ORIGIN ITALY)


SIBYLLA CONSOLE (ORIGIN ITALY)
MARS CONSOLE (ORIGIN ITALY)'
20-01118 /CWT

8. Yukarıda Tanımlanan Eşyaların 3 Nolu Kutuda Belirtilen Ülke Menşeli Olduğu Tasdik Olunur.
The Undersigned Authority Certifies That The Goods Described Above Originate In The Country Shown ln Box 3
L'autorite soussignee certifie que !es marchandises designees ci-dessus sont originaires du pays figurant dans la case No 3

ISTANBUL CHAMBER OF COMMERCE


ISTANBUL 28.07.2020

Düzenleme Yeri ve Tarihi, İsim, İmza ve Yetkili Merciinin Mührü


Place and date of issue, name, signature and stamp of competent authority
Lieu et date de delivrance, designation, signature et cachet de J'autorite competente
ANKARA FOAM-03122783040
UNIGAZ QATAR |
PREQUALIFICATION

Control Panel

UNIGAZ QATAR
Gulf Countries

to / à : Whom so ever it may concern Date : 01st Apr 2018


cc : Ref : VP_010117
page : 1 of 2
from / de : Prasad Venugopal
tel : +974 4406 3000
fax : +974 4467 6936
e-mail : Prasad.venugopal@schneider-electric.com

subject / objet : Product Country of Origin

Dear Sir,

Schneider Electric, head quartered in France, has more than 180 manufacturing plants
worldwide. All Schneider Electric manufacturing facilities have a Quality system in place and are
accredited to ISO 9001, ISO 14001 and ISO 18001 standards.

These facilities are wholly owned and operated by Schneider Electric with state-of-the-art
machines, tools, jigs, etc. All products fully comply with international standards to which they are
type tested and are guaranteed by Schneider Electric.

The Products manufactured in any of the facilities (in Europe, USA, Far East, etc) carry the
same Warranty conditions and are fully supported with a strong local presence close to the
customers. Such facilities have been set up in order to serve our customers better by being
closer to them, understanding their needs and providing them faster response.

Reference Description Country Of Origin


NW, NT (800-6300)Amp Range Masterpact Air Circuit Breakers France
NSX (100-250)Amp Range MCCB, (16-250)Amp Poland
NSX (400-630)Amp Range MCCB, 400Amp & 630Amp Italy
NS ( 800 – 3200) Amp Range MCCB , 800Amp to 3200Amp France
INS ( 40 - 2500A) Amp Range Isolator , 40Amp to 2500Amp Poland
Reference Description Country Of Origin
Blokset Enclosure systems Enclosure system Oman
Prisma TT Enclosure systems Enclosure system Oman
PPN Sub Main Distribution Board Powerline Plus - SMDB Oman
DBGV- Final Distribution Boards DisBo Extra - DB Taiwan
iC60 MCB's Acti9 MCB's Bulgaria
Universal Enclosure system Enclosure system Spain
iC60 RCBO's Acti9 RCBO Thailand
iC60 RCCB’s Acti9 RCCB Spain
ISW Isolator Acti9 Isolator Hungary
LC1D series Contactors Contactors France / Czech Republic / Indonesia
LC1F series Contactors Contactors Czech Republic
LRD Relays Over Load Relays France
BLR series Capacitors Capacitor banks India
LVR series Reactors Reactors Czech Republic
VPL series Power factor controller Varplus Power Factor Controller Germany
XB7 series indication lamps Indication lamps Indonesia
XB5 / XB5 series PB & SS Push buttons & Selector Switches France
PM1000/1200/5000 series Meters Power Meters India
PM8000 series Meters Power Meters Canada
A9N series Fuses Fuses and Fuse base Belgium
NSY series screw terminals Screw Terminals Germany / Turkey
RXM series Relays Miniature Relays Indonesia
RE 17 / 22 series Timers Timers Indonesia
CCT series Photo cells Photo Cells Germany
CAD series Relays Relays France
GV2 / GV3 series Breakers Motor Protection Circuit Breakers France
ATS series Soft Starters Soft Starters France / Indonesia

We are at your disposal for any further clarification on this.

Best Regards

__________________________________
Prasad Venugopal
Senior Sales Manager – Panel Builders
UNIGAZ QATAR | MATERIAL
SUBMITTAL

Fuel Transfer Pump

Pre-Qualification Documents
No 2 5 3 3 9
1. Goods consigned from (Exporter's business name, address. country)
j Reference No.

CERTIFICATE OF ORIGIN
(NON PREFERENTIAL)
MAYYANNA INTERNATIONAL (Combined Declaration and Certificate)
MAYYANNA BUILDING TC 38/862 Issued in India
MARAKKADA ROAD CHALA P O TRIVANDRUM
THIRUVANANTHAPURAM KERALA 695036 - INDIA

2. Goods consigned to (Consignee's name, address. country)

ESTO: 1929
DILIGENT TRADING & CONTRACTING W.LL
PO BOX 15202, DOHA
QATAR
The Memon
Chamber of Commerce
Patharia Palace, 75, Moha mmedali Road,
MUMBAI - 400 003. (INDIA)
Tel.: 2342 1109 • Fax : 2341 3661
E-mail : info@memonchamber.com
3. Means of transport and route (as far as known)- 4. For Official use

BY SEA
FROM NHAVA SHEVA, INDIA TO HAMAD PORT - QATAR

5. Item 6. Marks and 7. Number and kind of packages, 8. Origin 9. Gross weight 10. Number and
No. numbers of description of goods criteria or other quantity date of invoices
packages

24 BOXES TOTAL24 BOXES ONLY


1 4-1062-2231-674-llHOOONOO - VIKING PUMP, "INDIA" GROSS WT INV/DTC-2011003
AND
GG4195 SIMPLEX W!TH MOTOR - H.S.CODE: 84136090
"USA"
3655.000
2 41062223167411011981 - VIKING PUMP, GG4195 DUPLEX KG DT.
W!TH MOTOR - H.S.CODE: 84136090 41412223165311D22Bll - 01.12.2020
VIKING PUMP, GG4195 DUPLEX WITH WITH MOTOR - H.S.COOE:
3 T NET WT
84136090 414872231609L812511D0081 - VIKING PUMP, Hl4195 2752.000
4 DUPLEX WITH MOTOR - H.S.COOE: 84136090 KG
4-1062·223167411Dl200N01· VIKING PUMP, GG4195 DUPLEX
5 WITH lHP 4P MOTOR - H.5.CODE: 84136090
IE2 FLP FOOT MOUNTED 4 POLE 1500 RPM KW- 0.75 HP 1 FRAME E80
6 CGL MOTOR - H.S.CODE: 85015110
IE2 FLP FOOT MOUNTED 4 POLE 1500 RPM- 2HP 1 FRAME
7 E80 CGL MOTOR - H.5.CODE: 85015120
JE2 FLP FOOT MOUNTED 4 POLE 1500 RPM 5 HP l FRAME
8 Ell2 CGL MOTOR - H.5.CODE: 85015120
FORGED CARBON STEEL F!TIJNGS CL3000 ELBOWS TEE
9 UNION ETC FREE SAMPLES · H.S.CODE: 73079290

11. Certification 12. Declaration by the exporter


It is hereby certified.on the basis of control carried out, that the declaration by the The undersigned hereby declares that the
exporter is correct above details and statements are correct and
that they comply with the origin requirements
for exports to

QATAR

Importing Country

Authorised Signatory
The Memon Chamber of Commerce
Date: Mumbai. India Place, date and signature of authorised signatory
UNIGAZ QATAR | MATERIAL SUBMITTAL

CABLE

MATERIAL SUBMITTAL
UNIGAZ QATAR |
PREQUALIFICATION

Signal Cables

Brand: Omntec

UNIGAZ QATAR
UNIGAZ QATAR |
PREQUALIFICATION

GI Conduits & Fittings

UNIGAZ QATAR
UNIGAZ QATAR | MATERIAL SUBMITTAL

CS PIPE SCH 40

MATERIAL SUBMITTAL
1. Goods consigned from (Exporter's business name, address, Rererence Nc B2ll
countrY) LLc'TNTERPIPE UKRAINE"
eA912ooc
05g ZZZ 4
Pisazhevskogo str., I a, 49005, Dnipro,
Ukraine
CERTIFICATE OF ORIGIN
2. Goods consigned to (Consignee's name, address, country)
Diligent Trading and Contracting W,L.L,
P.0 BOX 15202, TEL: +97444663404,
NORTH-SHAMAL ROAD, ALKHARTIYAT STREET45s,
tssued in UKRAINE
ico!ntry)
DOHA.QATAR

3. Means of transport and route (as far as known) For official use

By sea kansport

5, ltem 6. Marks and 7. Number and kind of packages; desmiption of goods B. Gross 9. Number
num- numbers of weight and date
ber packages or other of invoices
quantity
gross / net
49 bundles weight, kg
1. Seamless steel holrolled pipes for oil and gas pipelines with plastic caps 97446t MES19t0066
as per API Spec 5L -2012/ ASTM A106/A106M-2018/ASME 96956 dd 28.01.2019
SA1 O6iSA1 O6M.2O1 7/ASTM A53/A53M-20,I 8/ASME SA53/SA53M.201 7/ NACE
MRO175/lSO 15156-2:201S/NACE MRO103-2012, PSLI, steel BX42
dia. 33,4 - 114,3 x 3,38 - 6,02 mm

Certification 11. Declaration by the exporter


It is hereby ce carried out, The undersigndO frereUy declares that lle-qfop,g.details and
that the statements are correct; that all the/g@g-sdmere,}-Need in
and lndustry UKR+6"->E-B{{'-\
T
""*-:l
49044
'*'^lf€'- {':'l: s:.::\
il$ .&L-tffi:,f,
:.t Norba Q.V. (rmponine ccuirry&
rlphedgfa Si/dn
p. A,V.

Place and date, signature and stahp ofCertilyild;nii,i,iiti' pia;;;;e;;i;.;b;rurr,rr,rr,,rn.o#1J9""99t4'4ge""?YflW


UNIGAZ QATAR |
PREQUALIFICATION

CS Fittings

Brand:TTU/BIS/BOTHWELL

UNIGAZ QATAR
12. TEST REPORT
UNIGAZ QATAR | MATERIAL SUBMITTAL

MAIN TANK

MATERIAL SUBMITTAL
UNIGAZ QATAR | MATERIAL SUBMITTAL

SUPPLY BY WOQOD
Documents will be provide along with
delivery

MATERIAL SUBMITTAL
UNIGAZ QATAR |
PREQUALIFICATION

VENT

Brand: MORRISON BROS

UNIGAZ QATAR
UNIGAZ QATAR |
PREQUALIFICATION

Solenoid Valve

UNIGAZ QATAR
fluid under control

DISTRIBUTOR
smstork.com

DISTRIBUTOR CERTIFICATE
This ceritificate confirms that
WAAREE QATAR WLL

is an official distributor of
SMS TORK ENDÜSTRİYEL OTOMASYON ÜRÜNLERİ SAN. TİC. LTD. ŞTİ.

on the territory of QATAR for TORK products.

GENERAL MANAGER
ENVER KAYA
Sms Tork Endüstriyel Otomasyon Ürünleri
San. Tic. Ltd. Şti.

Date of Issued: 21 April 2021- Valid Till: 31 December 2021

www.smstork.com
UNIGAZ QATAR | MATERIAL SUBMITTAL

Y STRAINER

MATERIAL SUBMITTAL
TELEPHONE: 00 44 (0) 1473 277300
FAX: 00 44 (0) 1743 277301

WEST ROAD . IPSWICH . SUFFOLK . IP3 9FJ

CERTIFICATE OF CONFORMITY
We hereby certify that the products detailed heron confirm in all respects to the
requirements of the Purchase Order.
Products are constructed from materials, which conform to the relevant product
standards and have been pressure tested, where applicable, to the appropriate
test specification.

BS EN 10204 2.1

Customer Customer Ref:


AL-RIYADH TRADING & CONT CO W.L.L.
15B RING ROAD
DOHA JADEED
DOHA
QATAR
Sales Order:

Product Description: Date: 20th JUNE 2016

FM276 50MM – 300MM PN16 DUCTILE IRON STRAINER

Body Material: Ductile Iron BS EN 1563 EN GLS-500-7


Cap Material (DN50 - DN300): Ductile Iron BS EN 1563 EN GLS-500-7
Strainer Screen Material: Stainless Steel AISI Type 304

End flanges conform to BS EN 1092-2 PN16

Pressure Testing as per BS EN 12266-1:


Shell: 24.0 Bar Hydrostatic

F629 DN50 – DN600 PN16 GEARBOX OPERATED BUTTERFLY VALVE

Conforms to: BS EN 593: 2009

Body Material: Ductile Iron ASTM A536 (Epoxy Paint)


Disc Material: Aluminium Bronze BS EN 1982 CC333G
Shaft Material: Stainless Steel Type 410

Flanges conform to BS EN 1092-2 PN10 or PN16

Pressure testing as per BS EN 12266-1:


Shell: 24.0 Bar Hydrostatic
Seat: 17.6 Bar Hydrostatic

A DIVISION OF CRANE LTD. REGISTERED OFFICE: AS ABOVE. REGISTERED IN ENGLAND 98677


TELEPHONE: 00 44 (0) 1473 277300
FAX: 00 44 (0) 1743 277301

. SUFFOLK . IP3 9FJ


WEST ROAD . IPSWICH

D171 ¼” – 2” PN20 BRONZE BALL VALVE

Body Material: Bronze BS EN 1982 CC491K

Seat Retainer Material: Bronze BS EN 1982 CC491K


Stem Material: DZR Brass BS EN 12164 CW602N
Taper threaded to BS EN 10226-2

Pressure Testing as per BS EN 12266-1:

Shell: 6.0 Bar Pneumatic


Seat: 6.0 Bar Pneumatic

DM900 DN20 - DN600 PN25 FLOW MEASUREMENT DEVICE

Manufactured to BS 7350

MATERIAL SPECIFICATION:
SHELL MATERIAL MEETS THE REQUIREMENTS OF BS970 GRADE 316

TEST SPECIFICATION:
PRESSURE TESTING NOT APPLICABLE

D297 PN16 ½” – 2” BRONZE STRAINER

Body Material: Bronze BS EN 1982 CC499K


Strainer Material: Stainless Steel Grade 304
Cap Material: Bronze BS EN 1982 CC491 K

Threads conforms to BS EN 10226-2

Pressure Tested as per BS EN 12266-1


Shell: 6.0 Bar Pneumatic

D931 ½” – 2” PN25 WRAS APPROVED FIXED ORIFICE DOUBLE REGULATING VALVE

Manufactured to BS 7350

Body Material: Bronze BS EN 1982 CC491K


Bonnet Material: DZR Brass BS EN 12165 CW602N
Stem Material: DZR Brass BS EN 12165 CW602N

Sizes ½” & ¾” threads conform to BS EN ISO 228


Sizes 1” to 2” threads conform to BS EN 10226-2

Pressure Testing as per BS EN 12266-1:


Shell: 6.0 Bar Pneumatic
Seat: 6.0 Bar Pneumatic
A DIVISION OF CRANE LTD. REGISTERED OFFICE: AS ABOVE. REGISTERED IN ENGLAND 98677
UNIGAZ QATAR |
PREQUALIFICATION

Ball Valve

Brand: Apollo

UNIGAZ QATAR
Page 1 of 1

Material Certification

Customer #: 1052960 CII Order #: 406832 PO #: STFZGD15022 Date: 3/04/2020

Part # : Qty: Description: Country of Origin:


8010501 25 BV,1"NPT,UL,BRZ United States

Component: Material:
GLAND,PKG,1-24X.515,BRS Brass,C36000,ASTM B16
NUT,FLG,7/16-20,STL,ZN PLT, Steel,Plated
PACKING,STEM,BV,RPTFE RPTFE
BEARING,STEM,BV,RPTFE RPTFE
SEAT,RPTFE,BV RPTFE
STEM,1-1/2",70 SER,BRS Brass,C36000,ASTM B16
BALL,BRS,CHRM PLTD Brass,C36000,ASTM B16
RETAINER,3"NPT,BRZ,70 SER Bronze,C84400,ASTM B584
BODY,3"NPT,BRZ,70100 Bronze,C84400,ASTM B584
HANDLE,LVR,L-BV,CS,ZN Steel,Plated
VINYL PLASTISOL,YELLOW, Polyvinyl Chloride

This is to certify that the above materials comply with the requirements of the applicable purchase order and the codes and ratings
shown in our published catalog of products manufactured by Conbraco Industries Inc. or as otherwise specified above. All products
have met the inspection requirements.

Respectfully,

David J. Michaels
Quality Director

ISO 9001: 2015 Certified

Powered by TCPDF (www.tcpdf.org)


Page 1 of 1

Certificate of Compliance

Customer #: 1052960 CII Order #: 406832 PO #: STFZGD15022 Date: 3/04/2020

Part # : Qty: Description:


8010501 25 BV,1"NPT,UL,BRZ

Apollo products comply with the requirements of this purchase order and have been tested and confirmed to meet all relevant approvals
and certifications stated in our published literature.

Respectfully,

David J. Michaels
Quality Director ES-1510 Rev. A

ISO 9001: 2015 Certified

Powered by TCPDF (www.tcpdf.org)


UNIGAZ QATAR | MATERIAL SUBMITTAL

FIREMATIC VALVE

MATERIAL SUBMITTAL
UNIGAZ QATAR | MATERIAL SUBMITTAL

Fire Safe Valve

MATERIAL SUBMITTAL
UNIGAZ QATAR | MATERIAL SUBMITTAL

'83/(;
FILTER

MATERIAL SUBMITTAL
UNIGAZ QATAR | MATERIAL SUBMITTAL

AUTOMATIC TANK
GAUGING SYSTEM

MATERIAL SUBMITTAL
DECLARATION OF QUALITY AND CONFORMITY

The products below are manufactured in Italy in compliance


with the provisions of the following directives and technical
standards:

EN 60079-11:2012- ISO9001:2015

NO PRODUCT CODE CERTIFIED PRODUCT DESCRIPTION


1 NFG5M CE, ATEX Barrier NF Genesy+ 5M ATG Console
2 NFG7M CE, ATEX Barrier NF Genesy+ 7M ATG Console
3 NFIO CE NF I/O Box
4 NF RS CE, ATEX NF RS Magnetostrictive Probe
5 NF RSJr CE, ATEX NF RS Jr Level Sensor
6 NFLEAK CE NF Leak Sensor

For any further clarification please do not hesitate to contact the undersigned, we
look forward to work with you.

Kind Regards,

Doruk Dogan
Managing Director

NORTH FALCON ENERJI SAN. TIC. LTD. STI.


DUDULLU OSB, DES-1 / 10 WWW.NORTHFALCONENERGY.COM
UMRANIYE/ISTANBUL TURKEY
CONSOLE TEST REPORT

Device Name Genesys 7M


Device SN 21085
Test Date 19.04.2021
Ethernet OK
USB OK
Voltage OK
5V OK
3.8V OK
3.3V OK
12V OK
RS232 OK
RS485 OK
12V RS485 OK
GPRS to Server OK
Screen Outputs OK
Relays OK
Digital Inputs OK
Connectors OK
SD Cart Connection OK

TEST SUMMARY PASSED


Probe TEST REPORT
Data 24/06/2020
Probe Address 080857

mm Probe mm Test Delta mm


105.77 106.49 0.72
441.71 441.70 -0.01
776.30 776.40 0.10
1.111.38 1.111.46 0.08
1.445.76 1.445.84 0.08
1.781.04 1.781.17 0.13
2.116.28 2.116.20 -0.08
2.450.78 2.450.76 -0.02
2.786.32 2.786.20 -0.12
3.120.71 3.120.61 -0.10
2.786.23 2.786.21 -0.02
2.450.78 2.450.78 0.00
2.116.09 2.116.13 0.04
1.781.04 1.781.24 0.20
1.445.66 1.445.83 0.17
1.111.38 1.111.47 0.09
776.30 776.39 0.09
441.61 441.77 0.16
106.24 106.48 0.24
Probe TEST REPORT
Data 24/06/2020
Probe Address 080857

mm Probe mm Test Delta mm

-1

-2

-3

-4

-5
500 1.000 1.500 2.000 2.500 3.000
| UNIGAZ QATAR |

CONTROL PANEL

MATERIAL SUBMITTAL
UNIGAZ QATAR | MATERIAL
SUBMITTAL

Fuel Transfer Pump

Pre-Qualification Documents
IDEX INDIA PVT. LTD.
Survey No. 256, Manjusar GIDC, Savli
Vadodara:391770
An ISO 9001 - 2008

TEST CERTIFICATE FOR VIKING PUMP


Report No.: IDEX/PT/21005628/002 Date :- 17-11-2021
Customer: MAYYANNA INTERNATIONAL Drawing No :- VIKPSLAY-142
VIKING PUMP GG4195 WITH 1HP 4P
P.O: 2110018 Item Desc. MOTOR & DUPLEX SKID
Item No :- 410622231674LB12511D120B1 procedure no WI-VIKP-09
Tag No.: N/A QTY 1 nos

Performance Test
Pump 1 Serial no:- V.2111011414 , Motor 1 Serial no :- UHAM14402
Pump 2 Serial no:- V.2111011415 , Motor 2 Serial No :- UHAM14719

Sr. No RPM Diff. Pressure (Bar) Flow (GPM) Flow (LPM) Noise Level (dB) Remarks

1 1450 2 20.43 77.35 74.17 ACCEPTED


2 1450 4 19.62 74.30 74.83 ACCEPTED
3 1450 6 17.98 68.10 75.34 ACCEPTED

RV SET pressure at 8 Bar verified and found satisfactory


Performance Test Carried at 46cP Lube Oil
Note:-
R.V TEST has been Carried out at fully closed Discharge Valve

TPIA
Remark (If
any)

For, IDEX For, Customer

Inspected by – Sagar Patel


UNIGAZ QATAR | MATERIAL SUBMITTAL

CABLE

MATERIAL SUBMITTAL
‫‪2021-01-31‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻟﻄﺒﺎﻋﺔ ‪:‬‬ ‫ﻭﺯﺍﺭﺓ ﺍﻟﺪﺍﺧﻠﻴــــﺔ‬
‫‪AM 11:18‬‬ ‫ﻭﻗـﺖ ﺍﻟﻄﺒﺎﻋﺔ ‪:‬‬ ‫ﺍﻻﺩﺍﺭﺓ ﺍﻟﻌﺎﻣﺓ ﻟﻟﺩﻓﺎﻉ ﺍﻟﻣﺩﻧﻲ‬
‫‪PAC21001174‬‬ ‫ﺭﻗــﻢ ﺍﻟﻄﻠـﺐ ‪:‬‬ ‫ﺍﺩﺍﺭﺓ ﺍﻟﻮﻗﺎﻳﺔ‬

‫ﺷﻬــــــﺎﺩﺓ ﻋﺪﻡ ﻣﻤﺎﻧﻌﺔ‬

‫‪ :‬ﺍﻋﺘﻤﺎﺩ ﻣﻨﺘﺞ‬ ‫ﻧﻮﻉ ﺍﻟﺸﻬﺎﺩﺓ‬

‫ﺑﻴﺎﻧﺎﺕ ﺍﻟﻤﻨﺸﺄﺓ‬

‫‪ :‬ﺭﻭﺍﺑﻰ ﻟﻼﻧﻈﻤﻪ ﺍﻻﻟﻜﺘﺮﻭﻧﻴﻪ ﻭﺍﻟﻜﺎﺑﻼﺕ ﺭﺳﻜﻮ ﺍﻟﺨﻠﻴﺞ‬ ‫ﺍﻹﺳﻢ ﺍﻟﺘﺠﺎﺭﻱ‬


‫‪9521 :‬‬ ‫ﺭﻗﻢ ﺍﻟﺮﺧﺼﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ‬ ‫‪37463 :‬‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ‬
‫‪:‬‬ ‫ﺭﻗﻢ ﺍﻟﻬﺎﺗﻒ‬ ‫‪12-7839-00 :‬‬ ‫ﺭﻗﻢ ﻗﻴﺪ ﺍﻟﻤﻨﺸﺄﺓ‬
‫‪:‬‬ ‫ﺍﻟﺒﺮﻳﺪ ﺍﻹﻟﻜﺘﺮﻭﻧﻲ‬
‫‪Fire Detection and Alarm System :‬‬ ‫ﺍﻟﺘﺼﻨﻴﻒ‬
‫‪Cables (Fire Rated - Fire Alarm & Communication) & Accessories :‬‬ ‫ﺇﺳﻢ ﺍﻟﻤﻨﺘﺞ‬

‫ﺗﻔﺎﺻﻴﻞ ﺍﻟﺸﻬﺎﺩﺓ‬

‫ﺗﻢ ﻣﺮﺍﺟﻌﺔ ﺍﻟﻄﻠﺐ ﺍﻟﻤﻘﺪﻡ ﻭﺍﺗﻀﺢ ﺑﺄﻧﻪ ﻻ ﻣﺎﻧﻊ ﻣﻦ ﺍﻋﺘﻤﺎﺩ ﺍﻟﻤﻨﺘﺞ ‪/‬ﺍﻟﻤﻨﺘﺠﺎﺕ ﺍﻟﻤﻮﺿﺤﻪ ﻓﻰ ﺍﻟﺘﻘﺮﻳﺮ ﺍﻟﻔﻨﻰ ﺍﻟﻤﺮﻓﻖ ﺑﻨﺎﺀ ﻋﻠﻰ ﺍﻋﺘﻤﺎﺩﻩ ﻣﻦ ﻗﺒﻞ ﺍﻟﻬﻴﺌﻪ‬
‫ﺍﻟﻤﺨﺘﺒﺮﻳﺔ ﺍﻟﻤﻮﺿﺤﻪ ﻓﻰ ﺍﻟﺘﻘﺮﺭ ﺍﻟﻔﻨﻲ ﺍﻟﻤﺮﻓﻖ‪.‬‬

‫ﻣﻼﺣﻈﺎﺕ‬

‫‪ .1‬ﻳﺠﺐ ﻋﻠﻰ ﺍﻟﺸﺮﻛﻪ ﺍﻻﻟﺘﺰﺍﻡ ﻭﺍﻟﻌﻤﻞ ﺑﻤﺎ ﺟﺎﺀ ﻓﻲ ﺍﺷﺘﺮﺍﻃﺎﺕ ﻗﺴﻢ ﺃﻧﻈﻤﺔ ﺍﻟﺴﻼﻣﻪ ﺍﻟﺘﻲ ﺗﻢ ﺍﻻﻃﻼﻉ ﻭﺍﻟﻤﻮﺍﻓﻘﺔ ﻋﻠﻴﻬﺎ ﻣﻦ ﺧﻼﻝ ﺍﻟﻤﻮﻗﻊ‪.‬‬
‫‪ .2‬ﻳﺠﺐ ﺍﻥ ﻳﻘﻮﻡ ﺑﺘﺮﻛﻴﺐ ﻫﺬﺍ ﺍﻟﻤﻨﺘﺞ ﻣﻦ ﻗﺒﻞ ﻣﻬﻨﺪﺳﻴﻦ ﻭﻓﻨﻴﻴﻦ ﻣﻌﺘﻤﺪﻳﻦ ﻣﻦ ﺍﻹﺩﺍﺭﺓ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺪﻓﺎﻉ ﺍﻟﻤﺪﻧﻲ‪.‬‬
‫‪ .3‬ﻳﺠﺐ ﺍﻥ ﻳﺤﻤﻞ ﺍﻟﻤﻨﺘﺞ ﺍﻟﻌﻼﻣﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ ﻟﻠﻬﻴﺌﻪ ﺍﻟﻤﺨﺘﺒﺮﻳﺔ ﺍﻟﻤﻌﺘﻤﺪﺓ ﻭﺍﻟﻤﻮﺿﺤﻪ ﻓﻲ ﺍﻟﺘﻘﺮﻳﺮ ﺍﻟﻔﻨﻲ ﺍﻟﻤﺮﻓﻖ ‪.‬‬

‫‪2023-01-31‬‬ ‫‪:‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻹﻧﺘﻬﺎﺀ‬ ‫‪2021-01-31‬‬ ‫‪:‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻻﻋﺘﻤﺎﺩ‬

‫ﻉ‪/‬‬

‫ﻣﺪﻳﺮ ﺍﺩﺍﺭﺓ ﺍﻟﻮﻗﺎﻳﺔ‬

‫ﺍﻻﺩﺍﺭﺓ ﺍﻟﻌﺎﻣﺓ ﻟﻟﺩﻓﺎﻉ ﺍﻟﻣﺩﻧﻲ‬

‫‪Page 1 of 2‬‬
‫ﻭﺯﺍﺭﺓ ﺍﻟﺪﺍﺧﻠﻴﺔ‬
DATE : 2021-01-31 : ‫ﺍﻟﺘﺎﺭﻳـــــــﺦ‬
‫ﺍﻹﺩﺍﺭﺓ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺪﻓﺎﻉ ﺍﻟﻤﺪﻧﻲ‬
PERMIT # PAC21001174 : ‫ﺭﻗﻢ ﺍﻟﻄﻠﺐ‬
‫ﺇﺩﺍﺭﺓ ﺍﻟﻮﻗﺎﻳﺔ‬

TECHNICAL REPORT ‫ﺍﻟﺘﻘﺮﻳﺮ ﺍﻟﻔﻨﻲ‬


Cables (Fire Rated - Fire Alarm & Communication) &
PRODUCT ‫ﻣﻨﺘﺞ‬
Accessories
PRODUCT APPLICATION Fire Detection and Alarm System ‫ﺗﺼﻨﻴﻒ ﺍﻟﻤﻌﺪﺓ‬
APPLICANT / P.O BOX ‫ ﺭﺳﻜﻮ ﺍﻟﺨﻠﻴﺞ‬- ‫ﺭﻭﺍﺑﻰ ﻟﻼﻧﻈﻤﻪ ﺍﻻﻟﻜﺘﺮﻭﻧﻴﻪ ﻭﺍﻟﻜﺎﺑﻼﺕ‬ ‫ﻣﻘﺪﻡ ﺍﻟﻄﻠﺐ‬
MANUFACTURER / LOCATION Draka UK Limited / U K ‫ ﺑﻠﺪ ﺍﻟﺼﻨﻊ‬/ ‫ﺍﻟﺸﺮﻛﺔ ﺍﻟﻤﺼﻨﻌﺔ‬
‫ﺍﻟﻮﺻﻒ‬ ‫ﺍﻟﻤﻮﺩﻳﻞ‬
Fire Resistant Cables; Fire Rating: 950C for 3 hours; Voltage Rating: 300/500V
FT30 SAFFIRE
Conductor Sizes (mm) 1.5, 2.5 & 4.0; No. of Core: 2, 3 & 4; Solid / Stranded
3RD PARTY CERTIFICATE / LOSS PREVENTION ‫ﺷﻬﺎﺩﺓ ﺍﻟﻤﺨﺘﺒﺮﺍﺕ ﺍﻟﻤﺴﺎﻧﺪﺓ‬
APPROVAL 1134k/01 CERTIFICATION BOARD
(LPCB-BRE) ( ‫)ﻣﻦ ﻫﻴﺌﺎﺕ ﻣﻌﺘﻤﺪﺓ‬

RECOMMENDATIONS ‫ﺍﻟﺘﻮﺻﻴﺎﺕ‬
Notes:
1.This product approval shall comply with the Design, Inspection, Installation, Testing and Maintenance requirements of
NFPA 70 (and/or other related NFPA Codes / Standards), other acceptable International Codes / Standards, Local
Regulations, Listing Instructions and/or Manufacturer's Published Instructions subject to the technical review and approval
of the Authority Having Jurisdiction / Qatar Civil Defence.

2.Meets the requirements of BS 7629-1:1997, EN 50200:2006, EN 50200:2006 Annex E, BS 5839-1:2013

/‫ﻉ‬

‫ﻣﺪﻳﺮ ﺍﺩﺍﺭﺓ ﺍﻟﻮﻗﺎﻳﺔ‬

‫ﺍﻻﺩﺍﺭﺓ ﺍﻟﻌﺎﻣﺓ ﻟﻟﺩﻓﺎﻉ ﺍﻟﻣﺩﻧﻲ‬

Page 2 of 2
‫‪2022-06-07‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻟﻄﺒﺎﻋﺔ ‪:‬‬ ‫ﻭﺯﺍﺭﺓ ﺍﻟﺪﺍﺧﻠﻴــــﺔ‬
‫‪AM 10:11‬‬ ‫ﻭﻗـﺖ ﺍﻟﻄﺒﺎﻋﺔ ‪:‬‬ ‫ﺍﻻﺩﺍﺭﺓ ﺍﻟﻌﺎﻣﺓ ﻟﻟﺩﻓﺎﻉ ﺍﻟﻣﺩﻧﻲ‬
‫‪PAC22005898‬‬ ‫ﺭﻗــﻢ ﺍﻟﻄﻠـﺐ ‪:‬‬ ‫ﺍﺩﺍﺭﺓ ﺍﻟﻮﻗﺎﻳﺔ‬

‫ﺷﻬــــــﺎﺩﺓ ﻋﺪﻡ ﻣﻤﺎﻧﻌﺔ‬

‫‪ :‬ﺍﻋﺘﻤﺎﺩ ﻣﻨﺘﺞ‬ ‫ﻧﻮﻉ ﺍﻟﺸﻬﺎﺩﺓ‬

‫ﺑﻴﺎﻧﺎﺕ ﺍﻟﻤﻨﺸﺄﺓ‬

‫‪ ( :‬ﺷﺮﻛﻪ ﺍﻟﺸﻘﻴﺮﻱ ﻟﻠﺘﺠﺎﺭﻩ ﻭﺍﻟﻤﻘﺎﻭﻻﺕ ( ﺍﻟﻴﻜﺘﺮﺍ‬ ‫ﺍﻹﺳﻢ ﺍﻟﺘﺠﺎﺭﻱ‬


‫‪31342 :‬‬ ‫ﺭﻗﻢ ﺍﻟﺮﺧﺼﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ‬ ‫‪26812 :‬‬ ‫ﺭﻗﻢ ﺍﻟﺴﺠﻞ ﺍﻟﺘﺠﺎﺭﻱ‬
‫‪:‬‬ ‫ﺭﻗﻢ ﺍﻟﻬﺎﺗﻒ‬ ‫‪11-3818-00 :‬‬ ‫ﺭﻗﻢ ﻗﻴﺪ ﺍﻟﻤﻨﺸﺄﺓ‬
‫‪:‬‬ ‫ﺍﻟﺒﺮﻳﺪ ﺍﻹﻟﻜﺘﺮﻭﻧﻲ‬
‫‪Fire Detection and Alarm System :‬‬ ‫ﺍﻟﺘﺼﻨﻴﻒ‬
‫‪Cables (Fire Rated / Fire Classified - Electrical) & Accessories :‬‬ ‫ﺇﺳﻢ ﺍﻟﻤﻨﺘﺞ‬

‫ﺗﻔﺎﺻﻴﻞ ﺍﻟﺸﻬﺎﺩﺓ‬

‫ﺗﻢ ﻣﺮﺍﺟﻌﺔ ﺍﻟﻄﻠﺐ ﺍﻟﻤﻘﺪﻡ ﻭﺍﺗﻀﺢ ﺑﺄﻧﻪ ﻻ ﻣﺎﻧﻊ ﻣﻦ ﺍﻋﺘﻤﺎﺩ ﺍﻟﻤﻨﺘﺞ ‪/‬ﺍﻟﻤﻨﺘﺠﺎﺕ ﺍﻟﻤﻮﺿﺤﻪ ﻓﻰ ﺍﻟﺘﻘﺮﻳﺮ ﺍﻟﻔﻨﻰ ﺍﻟﻤﺮﻓﻖ ﺑﻨﺎﺀ ﻋﻠﻰ ﺍﻋﺘﻤﺎﺩﻩ ﻣﻦ ﻗﺒﻞ ﺍﻟﻬﻴﺌﻪ‬
‫ﺍﻟﻤﺨﺘﺒﺮﻳﺔ ﺍﻟﻤﻮﺿﺤﻪ ﻓﻰ ﺍﻟﺘﻘﺮﺭ ﺍﻟﻔﻨﻲ ﺍﻟﻤﺮﻓﻖ‪.‬‬

‫ﻣﻼﺣﻈﺎﺕ‬

‫‪ .1‬ﻳﺠﺐ ﻋﻠﻰ ﺍﻟﺸﺮﻛﻪ ﺍﻻﻟﺘﺰﺍﻡ ﻭﺍﻟﻌﻤﻞ ﺑﻤﺎ ﺟﺎﺀ ﻓﻲ ﺍﺷﺘﺮﺍﻃﺎﺕ ﻗﺴﻢ ﺃﻧﻈﻤﺔ ﺍﻟﺴﻼﻣﻪ ﺍﻟﺘﻲ ﺗﻢ ﺍﻻﻃﻼﻉ ﻭﺍﻟﻤﻮﺍﻓﻘﺔ ﻋﻠﻴﻬﺎ ﻣﻦ ﺧﻼﻝ ﺍﻟﻤﻮﻗﻊ‪.‬‬
‫‪ .2‬ﻳﺠﺐ ﺍﻥ ﻳﻘﻮﻡ ﺑﺘﺮﻛﻴﺐ ﻫﺬﺍ ﺍﻟﻤﻨﺘﺞ ﻣﻦ ﻗﺒﻞ ﻣﻬﻨﺪﺳﻴﻦ ﻭﻓﻨﻴﻴﻦ ﻣﻌﺘﻤﺪﻳﻦ ﻣﻦ ﺍﻹﺩﺍﺭﺓ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺪﻓﺎﻉ ﺍﻟﻤﺪﻧﻲ‪.‬‬
‫‪ .3‬ﻳﺠﺐ ﺍﻥ ﻳﺤﻤﻞ ﺍﻟﻤﻨﺘﺞ ﺍﻟﻌﻼﻣﺔ ﺍﻟﺘﺠﺎﺭﻳﺔ ﻟﻠﻬﻴﺌﻪ ﺍﻟﻤﺨﺘﺒﺮﻳﺔ ﺍﻟﻤﻌﺘﻤﺪﺓ ﻭﺍﻟﻤﻮﺿﺤﻪ ﻓﻲ ﺍﻟﺘﻘﺮﻳﺮ ﺍﻟﻔﻨﻲ ﺍﻟﻤﺮﻓﻖ ‪.‬‬

‫‪2024-06-06‬‬ ‫‪:‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻹﻧﺘﻬﺎﺀ‬ ‫‪2022-06-07‬‬ ‫‪:‬‬ ‫ﺗﺎﺭﻳﺦ ﺍﻻﻋﺘﻤﺎﺩ‬

‫ﻉ‪/‬‬

‫ﻣﺪﻳﺮ ﺍﺩﺍﺭﺓ ﺍﻻﺗﺼﺎﻻﺕ‬

‫‪Page 1 of 2‬‬
‫ﻭﺯﺍﺭﺓ ﺍﻟﺪﺍﺧﻠﻴﺔ‬
DATE : 2022-06-07 : ‫ﺍﻟﺘﺎﺭﻳـــــــﺦ‬
‫ﺍﻹﺩﺍﺭﺓ ﺍﻟﻌﺎﻣﺔ ﻟﻠﺪﻓﺎﻉ ﺍﻟﻤﺪﻧﻲ‬
PERMIT # PAC22005898 : ‫ﺭﻗﻢ ﺍﻟﻄﻠﺐ‬
‫ﺇﺩﺍﺭﺓ ﺍﻟﻮﻗﺎﻳﺔ‬

TECHNICAL REPORT ‫ﺍﻟﺘﻘﺮﻳﺮ ﺍﻟﻔﻨﻲ‬


Cables (Fire Rated / Fire Classified - Electrical) &
PRODUCT ‫ﻣﻨﺘﺞ‬
Accessories
PRODUCT APPLICATION Fire Detection and Alarm System ‫ﺗﺼﻨﻴﻒ ﺍﻟﻤﻌﺪﺓ‬
APPLICANT / P.O BOX ‫( ﺷﺮﻛﻪ ﺍﻟﺸﻘﻴﺮﻱ ﻟﻠﺘﺠﺎﺭﻩ ﻭﺍﻟﻤﻘﺎﻭﻻﺕ ( ﺍﻟﻴﻜﺘﺮﺍ‬ ‫ﻣﻘﺪﻡ ﺍﻟﻄﻠﺐ‬
MANUFACTURER / LOCATION Norden Communication UK Ltd / U K ‫ ﺑﻠﺪ ﺍﻟﺼﻨﻊ‬/ ‫ﺍﻟﺸﺮﻛﺔ ﺍﻟﻤﺼﻨﻌﺔ‬
‫ﺍﻟﻮﺻﻒ‬ ‫ﺍﻟﻤﻮﺩﻳﻞ‬

Power-limited Fire Alarm Cable (Riser) / Shielded


FPLR
Cable Sizes (mm): 1.5, No. of Core. 2, Voltage Rating: 300 / 600
Trademark and/or Tradename: "NORDEN"
3RD PARTY CERTIFICATE /
Underwriters Laboratories ‫ﺷﻬﺎﺩﺓ ﺍﻟﻤﺨﺘﺒﺮﺍﺕ ﺍﻟﻤﺴﺎﻧﺪﺓ‬
APPROVAL HNIR.E465991
(UL) ( ‫)ﻣﻦ ﻫﻴﺌﺎﺕ ﻣﻌﺘﻤﺪﺓ‬

RECOMMENDATIONS ‫ﺍﻟﺘﻮﺻﻴﺎﺕ‬
Notes:
1.This product approval shall comply with the Design, Inspection, Installation, Testing and Maintenance requirements of
NFPA 70 (and/or other related NFPA Codes / Standards), other acceptable International Codes / Standards, Local
Regulations, Listing Instructions and/or Manufacturer's Published Instructions subject to the technical review and approval
of the Authority Having Jurisdiction / Qatar Civil Defence.

2.The basic standard used to investigate products in this category is ANSI/UL 1424, "Cables for Power-Limited Fire-Alarm
Circuits."

/‫ﻉ‬

‫ﻣﺪﻳﺮ ﺍﺩﺍﺭﺓ ﺍﻻﺗﺼﺎﻻﺕ‬

Page 2 of 2
UNIGAZ QATAR |
PREQUALIFICATION

GI Conduits & Fittings

UNIGAZ QATAR
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
Scanned by CamScanner
UNIGAZ QATAR | MATERIAL SUBMITTAL

CS PIPE SCH 40

MATERIAL SUBMITTAL
11118

MHTEPnAMn 06lQEa80 C OrPAHM'IEHHOM OTBETOBEHHOCTblO
"MHTEPJJAin HMKO TblO&"
HVIK0Tbl06 Yl(paMHa,r.HMKOnOJ\b,np.Tpy6HMKOB,S6
TE!ll./(f>aKC +38 (05662) 2-10-70

MHCllEl<UM()HHblH CEPTMG>lllKAT Na 6102


INSPECTION CERTIFICATE NII 6102
EN 10204-2004/3.1

rpy30llOIIY'laTell KottlpaKT No ME020/0219


BUYER Contract#
3ae011aroii 331<33 NI007732
ClpaHS Production order II
Country

='�NII
TpaHCl1(lpTHOII
AE1572HC/AE5853XX JIMcr 1 JIMcroe 1
Sheet Sheets
21.11.2020.-.
=
ICnacc
HaMUeHO&aHNe N k0,11 TOeapa HaNYeHOBaHNe CTaJIA"PTOII noc:naa, T1111pe:n.6w
Descrlp11on and code of goods Specifications Class of Thread type
delivery
API Spec SL · 2018/ ASTM A106/A106M-2019a/ ASME SA106/SA106M-
Tpy6bl cram,Hble 6eauoBHble ropsNell3TIIHble AJIA
2019/ASTM A53/A53M-2020/ ASME SA53/SA53M-2019/ DIN EN 10216-
HeCj,rera30npoBOAOB PSL1
2:2020/ ISO 3183:2019/ ANSI/NACE MR0175/ISO 15156-2:2015/ ANSI/NACE
Seamless steel hot-rolled pipes for oil and gas pipelines
MR0103/ISO
N9 Ho11ep Ho11epa MapicacranN Ho11ep H011ep Pas11ep1,1
J1()3. naKera Tpyfi n,��4 nnaea, JlaP1l4M Difflnnc"nns
Item Bundle# Pipe# Heat# Inspection .....--,.,.
--1111fo1H3 AflllH3 OOlll3ll WT
�alCTlNl!Cltllii eec
ICpaTiroe creHKM A1111H3 Actual w.:,iaht
No o6o3H3'teHMe Lot# OD wr length !Total lenott piece 6pvno oross tterro net
Brief 1111 MIi M II icr icr
Desionation mm mm m m ko ko
1. 20-12-26375 B/ P265GH TC1 1204104 8692 114.3 6.02 6.00 96,56 16 1 585 1 575
2. 20-12-26376 Bl P265GH TC1 1204104 8692 114.3 6.02 6.00 96,56 16 1 585 1 575
NPS4 Sch40STD TOTALJMToro 193,12 32 3170 3150
BUNDLES/11AKETOB 2
3. 2Q-12-25604 B/ P265GH TC1 1204037 8504 60.3 3.91 6.00 367,83 61 1 985 1 975
4. 2Q-12-25600 B/ P265GH TC1 1204037 8503 60.3 3.91 6.00 367,83 61 1 980 1 970
NPS2 Sch40STD TOTAUMTOro 735,66 122 3965 3945
BUNDLES/JlAKETOB 2
TOTALMToro 928,78 154 7135 7 095
BUNDLES/nAKETOB 4

� INTERPIPE LIMITED LIABILITY COMPANY


"INTERPIPE NIKO TUBE"
� NIKOTUBE UKRAINE,Nikopol, 56,Trubnikov ave. Tel./fax +38 (05662) 2-10-70
MHTEPnAM1n 061.1.tECTBO C orPAHlifl.lEHHOH OTBETCTBEHHOCTblO
"lifHTEPnAHn HlifKO Tbl06"
Hv1KO Tbl06 YKpa111Ha,r.HL11KOnO�b,np.Tpy6HIIIKOB,56
Te�./q>aKC +38 (0566) 639-379

IIIHCnEKl.llllOHHbllit CEPTIIICl>IIIKAT Nl! 1059


INSPECTION CERTIFICATE N21059
EN 10204-2004/3.1

rpy,onofl}"<ar011•
BUYER KoHrpaKT Ne MEO21/0005
Contract#
3aBOACKOL< 3aKa3 N<009751
CTpaHa Production order #
Country

TpaHcnopTHoe
if.'i;'/:0"�,N> BT6494CNBT0441 XO fil1CT 1 fil1CTOB 1
Sheet Sheets

g:;: 04.03.2021 r.

Knacc
HaMMeHOBaHMe " KOA roeapa HaMMeHOBaHMe CTaHAapTOB nOC'HBKM T11n pe3b6b1
Description and code of goods Specifications Class of Thread type
delivery
API Spec SL- 2018/ ASTM A106/A106M-2019a/ ASME SA106/SA106M-
Tpy6bl CT8JlbHbl8 fieCWOBHble ropR4eKaTaHble A11R
2019/ASTM A53/A53M-2020/ ASME SA53/SA53M-2019/ DIN EN 10216·
Hecj>rera3onpoeoAOB PSL1
2:2020/ ISO 3183:20191 ANSI/NACE MR0175/ISO 15156-2:2015/ ANSI/NACE
Seamless steel hot-rolled pipes for oil and gas pipelines
MR0103/ISO
Ne HoMep HoMepa MapKa cra1111 Ho!,Aep HoMep Pa3Mepb1
no3. naKeTa rpy6 Gra.fo nnaeKw napr1111 Dimensinn<
A113MeTp TOJ1U1�fla A1111Ha 06U,laR <t>aKTwYeCKH� sec
tern Bundle# Pipe# •paTKoe Heat# Inspection WT
CTeHKM AJ111Ha Actual weiaht
No 0Q03Ha4BHl1e Lot# OD wr lenath Total lenath piece 6ovrro aros.sl Herra net
Brief MM MM M M •r Kr
Desionation mm mm m m ko ko
1. 21-12-03280 Bi P265GH TC1 1210679 1234 48.3 3.68 6.00-6.10 548,28 91 2 215 2 205
2. 21-12-03279 Bi P265GH TC1 1210679 1234 48.3 3.68 6.00-6.10 548,28 91 2 210 2 200
3. 21-12-03281 Bi P265GH TC1 1210679 1235 48.3 3.68 6.00-6.10 548,28 91 2 220 2 210
4. 21-12-03285 Bi P265GH TC1 1210679 1239 48.3 3.68 6.00-6.10 548,28 91 2 200 2 190
5. 21-12-03284 Bi P265GH TC1 1210679 1235 48.3 3.68 6.00-6.10 548,28 91 2 205 2 195
6. 21-12-03286 Bi P265GH TC1 1210679 1239 48.3 3.68 6.00-6.10 548,28 91 2 205 2 19.5
7. 21-12-03287 Bi P265GH TC1 1210679 1240 48.3 3.68 6.00-6.10 524,18 87 2 115 2 105
8. 21-12-03272 Bi P265GH TC1 1210679 1230 48.3 3.68 6.00-6.10 548,28 91 2 215 2 205
9. 21-12-03288 Bi P265GH TC1 1210679 1240 48.3 3.68 6.00-6.10 439,83 73 1 780 1 770
NPS 1 1i2 Sch 40 STD TOTAUMTOro 4801,97 797 19 365 19 275
BUNDLES/nAKETOB 9

INTERPIPE LIMITED LIABILITY COMPANY


"INTERPIPE NIKO TUBE"
NIKO TUBE UKRAINE, Nikopol, 56,Trubnikov ave. Tel./fax +38 (0566) 639-379
MHCnEKl.lMOHHblM CEPTMCl>MKAT N21059 n1-1CT 1 n1-1CTOB 1
INSPECTION CERTIFICATE N21059 Sheet Sheets
XI-IMMYeCKM� coCTaB no cepr1-1cp1-1KaTHblM AaHHblM Ha 3arOTOBKY M pe3ynbTaTbl KOHTpons XMMMYeCKOro COCTasa Meranna rpy6
Heat analysis ace, to the billet manufacturer certificate & results of chemical analysis of pipes
HoMep na6oparop1-1s XMMI-IYeCKI-I� COCTaB B % Chemical composition % 3aBOA
nnaeK� Laboratory C Mn Si p s
Cr Ni Cu Mo Ti V Nb Al CE 1-13rOTOBMTenb 3aroTOBKI-I
Heat# x100 x100 x100 x1000 x1000 x100 x100 x100 x1000 x1000 x1000 x1000 x1000 x100 Steel supplier
min - - - - - - - - - - - - - -
max - - - - - - - - - - - - - 43
1210679 DneprSteel 18 47 23 4 10 9 11 17 12 3 1 2 35 30 "MP"DNEPROSTEEL"LLC
'NIKOTUBE* 19 48 24 7 10 9 11 16 11 4 1 1 37 31 OOO"M3"AHenpocranb"
NIKOTUBE* 19 48 24 6 10 9 11 16 11 1 1
4 38 31
A►iam-13 nnaslG-1 cornacHo cepr�Q:n11<ara 3aBOAa.H3f0T0BMTem:1n-leat analysis ace.to u,e manufacturer certi 1cate.•-control analysis of p1pesr-KoHTP0JlbHbllii aHanl,13 or rpyo.
Cranb np011!3Be,QeHa MeT0,Q0M nnaeneHMR B 311eKTpo,Qyroeo'1 ne41,1 C noCJ1e.qyto1.4""1 HenpepblBHOiil pa3m1BK0'1. Cranb no/lH0CTblO paCK1,1CJ18HH8fl M Me/1K038pHL11CT8$1, Cranb
paCKMcneHHas amoMMHl-leM. A,qpec 3aso11a 1,13roros1-1rens 3aroros,1-1: Y•pa1-1Ha, 49051, r.):1HenponerpoaCK, yn.BMHOKyposa, 4/ Steel has been produced by the EAF with continuous
casting process. Steel is fully killed and made to fine grain practice. Aluminium killed steel. The address of steel supplier. Ukraine,49051, Dnipropetrovsk, 4 Vinokurova str.
npvi pao-rere ymepoAHOro 3KBLIIBaneHTa Mcn0nb3oBaHa ¢,opMyna:/\Nhen calculating the carbon equivalent the following fom1ula was used:
CE=C+Mn/6+(Cr+Mo+V)/5+(Ni+Cu)/15
Pe3ynbTaTb1 11cnb1TaHMii rpy6 • Test results for pipes
MexaH1-1YecKMe csoi.lCTBa Mechanical Propertties
LllcnblTaHMe Ha paCTsJKeH1-1e Tensile test LllcnblTaHMe Ha y11ap /Impact test

s
N
0-
Cl. N•
4)
s
i :ll 4)
.
C: ....,.
t; ..c: cr;o s
:,: 4) s E
0 0) Cl. C: C::,: c 0 .,
:,: C: i'! er: �c: "E 4) 4) z
0 :r -�
HoMep ,
0 4) �
Cl. iii
.,_
" ..c:
, Cl
>-
:gi
0 mi&
I�&

'C:
'iii
s Cp.3HaYeHMe
lil 1/)
Cl. 1/)
\0 C:
napTMM 'o:
... ,.
0 4)
Lot#
C: 4)
�1iC:

1::- C:
4) I!!
C: "'C
3i g>
C: .Q
� UJ
�!l
�� ...
m :;
Cl.
0
Average
.,a. ·uE
:ii 4)
4) 4) Cl. 4) :,:
a. I­
C
4)-
c::t.� "0 4) Cl.
�u 4)

I .., Cl.
8.
c

0
�(J)

MPa MPa % MM/ MM/ MM/ HRB HRC I • l % MM/


min 415 265 mm mm mm min mm
max 570 100 22
1230 500 350 33.0 L 19 50 79 79 79 av.79 <22
1234 501 344 32.0 L 19 50 7B 80 78 av.79 <22
...
1235 493 325 32.0 L 19 · 50 79 79 77 av.78 <22
1239 499 346 31.5 L 19 50 79 80 80 av.BO <22
I 1240 495 345 31.0 L 19 50 81 80 81 av.81 , <22
* L - npoAOnbHbl� o6pa3e� I Long1tudmal speamen; T - nonepe�HblM o6pa3e� / transverse speamen
** Pe3ynbTaTbl 1-1cnb1TaHM� yMeHbWeHHblX 06pa34oe nepeCYI-ITBHbl Ha nonHopa3MepHb1e/Non-fullsize specimens results convert to fullsize (1Ox10mm)

npo'IMe BMAbl KOHTf)OnA / Other tests


B>!A 1-1cnblraH1-1s / Type of test napaMerpbl / Criteria Pe3ynbT8Tbl KOHTpons /Test results
CnmoU,1HBaHHe / Flattening test Pioes are flattenina tes't. Tov6bl noownH HCnblTaHHe Ha cnmoU,\HBaHHe. YAosnereopHrenbHO / Satisfactory
Pa3AaYa / Flaring test Pioes are flare tested. Tov6bi noownH HCnb1TaHHe Ha oa3na4v. YAosnersop1-1renbHO / Satisfactory
3ar1-16 / Bend test Pioes have been tested on bend. Tov6b1 noownH HCnblTaHHe Ha 3arn6, Y11osnereop1-1renbHO / Satisfactory
cnblT8HMe rH11paenMYeCKHM
t 100% I 2500PSI I 17,2 MPa/ 10 sec Y11osnersop1-1TenbHO / Satisfactory
11asneHl'leM / Hvdrostatic test
Hepa3pywa10U,1M� KOHTponb rena Tpy6bl
MeTOA KOHTpom1/ Method: BHxpeTOKOBblM KOHTPOflb/ Eddy current inspection:
/ Non-dectructive inspection full length YAOBneTBOpl'ITenbHO / Satisfactory
bodv CKB03HOe OTBepCTHe AHaMeTpOM 1,7 MM/ Drilled hole with diameter 1.7 mm
B1-13yanbHb1i.l KOHTponb / Visual
no cTaHAapry/ As per Standard Y11oaneraop1-1renbHO / Satisfactory
insoection
KoHrponb reoMeTpMYeCKI-IX napaMerpos
no craH,!\apry I As per Standard YAOBneTBOPMTenbHO / Satisfactory
/ Dimensional inspection
COCTOAHMe nocTaBKM / Delivery condition
Tpy6bl M3rOTOBneHbl M MCnblTaHbl e COOTBeTCTBMI-I c rpe6oBaHMSMM API Spec SL - 2018/ ASTM A 106/A106M-2019al ASME
SA106/SA106M-2019/ASTM A53/A53M-2020/ ASME SA53/SA53M-2019/ DIN EN 10216-2:2020/ ISO 3183:2019/ ANSI/NACE
06U,11-1e ycnos1-1s / General condition MR0175/ISO 15156-2:2015/ ANSI/NACE MR0103/ISO 1-1 3aKa3a I Pipes were produced and inspected according to requirements of API
Spec SL· 2018/ ASTM A106/A106M-2019al ASME SA106/SA106M-2019/ASTM A53/A53M-2020/ ASME SA53/SA53M-2019/ DIN EN
10216-2:2020/ ISO 3183:2019/ ANSI/NACE MR0175/ISO 15156-2:2015/ ANSI/NACE MR0103/ISO and order's requirements
Tpy6bl np01-13BeAeHbl nyreM ropsYeM 11ecpopMa41-114 M HOpManM30BaHbl npM TeMneparype 880...940 rp9Aycoe, oxnaJKAeHMe Ha B03Ayxe
TepMoo6pa6oTKa / Heat treatment
Pipes produced by Hot Forming process and Normilized at the temperature 880 deo C to 940 deo cooled at air
noKPblTMe / Coatina ToVObl noKPblTbl YePHblM naKoM "Quakercoat 024F "/ Pipes are coated with black varnish " Quakercoat 024F"
<l>acKa (ecnM rpe6yercs) / Bevelled ends
Tpy6b1 ol5pe3aHbl no11 npAMblM yrnoM / Pipes are cut off under a right angle.
if reouired
3aU,11-1ra KoH4os / Protection of pipe
KOH4bl ,py6 OCHaU,1eHbl nnaCTMKOBblMI-I KonnaYKaMH I The ends of pipes are equipped by plastic caps,
ends
CTanb cnoKoi1Has MenK03epHMCTas. Steel is fully Killed and made to fine grain practice
CMCTeMa KaYeCTea COOTBeTCTByer rpe6osaHMSM 111-1peKTMBbl PED 2014/68/EU (appendix 1 exp. 4.3 and 7.5), cornacHO cepr1-1q:>1-1KaTa N2
DGR-0036-QS-W 758/2016/MUC, cpoK Ae�crs1,1s: 1-110nb 2022/ The system of quality conforms to requirements of Directive PED
AononHMTenbHas MHq:>opMa41-1s / 2014168/EU (appendix 1 exp. 4.3 and 7.5) in obedience to a certificate N2 DGR-0036-QS-W 758/2016/MUC, issued by TUV SUD validity
Additional information Juli 2022.
npo"13B0/llolTenb Tpy6 rapaHrnpyer pa6ory y11apa Ha OCHOBe CTaTMCTMYeCKI-IX AaHHblX (27 J min/ KV -20C) pe3ynbTaTOB 1-1cnb1TaHM� Ha
nonHopa3MepHblX 06pa34ax./The manufacturer of pipes guaranties Impact value on the basis of statistical data (27J min/ KV -20C)
considerino full-size sample testina results.
CTpaHa npoHCXO)t(.AeHIII.R. YKpaHHH. Country of ong1n. Ukraine.
' '

Bau.at npe,Q/lo)KeHIIIR no YllyYWeHHto npo.QYK4MIII npocm.A HanpasnRTb. Ha 3/1.a.Qpec / Please send Your proposals for improving the product by e-mail or fax or by phone
info@nstp.interpipe.biz www.interpipe.biz Phone: +380 566-630-133 Fax: +380 566-639-379.
e-mail: info@ae.interpipe.biz. Phone: +97148857411 Fax: +97148857412
3TOT l11HcneK4M0HHb1M cepn1¢>111K8T OTHOa.tTCR TOilbKO K nepe4MCJ1eHH0M B HeM npo,qyK4111111. He.qonyCTHMO BHeceH111e M3MeHeHHM 111IWI ,a.pyroe HenpaeoMepHoe Men cpaKara.
This inspection certificate is only for the listed products. Modification or unauthorized use of the certificate is strictly prohibited. Violations can be considered as fo to prosecution
HHcne•4•0HHbU< cepracpaKaT ccpopMwposaH " nposepeH KOHTponepoM ceprncpaKaropoM nABOEHKO A.C.
nnspection Certificate was dralM'l up and checked by the Certificate Inspector PAVLENKO A.S.
Aara:
n.,..
04.03.2021 noAnMCb MHcneKTopa 3-i< cropoH" :
Signature of 3-rd Part Inspector 1 ... 4 0
//�"----..,..:r
UNIGAZ QATAR |
PREQUALIFICATION

CS Fittings

Brand:TTU/BIS/BOTHWELL

UNIGAZ QATAR
13. SAMPLE WITH MATERIALS, COMPANY
AND COUNTRY DETAILS
NOT APPLICABLE
14. SPARES
Spares List

Material Size Manufacturer COO Model QTY


Description
BALL VALVES 1’’ APOLLO USA 80-105-01 2
Spare part will be provided along with the
Operation manual and will be submitted
separately
15. WARRANTY CERTIFICATE
LETTER OF GUARANTEE

We, Unigaz Qatar, unconditionally guarantee the Design, Engineering, Supply,


Installation, Testing and Commissioning and Complete Hand over Fuel System supplied
at Construction of Terminal Pumping Station at Doha North STW Package 3-C823/3
under sub-contract agreement no. xxxx shall be in compliance with all requirements set
forth in the Contract for 400 days from the Completion Date of the project and shall
be free from errors, defects, failures and bad workmanship (accidental damage or
wanton damage by others excluded).
We undertake, within these 400 days to provide materials free of charge to replace defective
materials as may be instructed by Public Works Authority. Replaced materials shall be
further guaranteed for the days/years from the date of acceptance of the replaced materials
and shall not be less than the warranty period.
We further agree that should we fail to carry out replacement for defected material within
seven (7 days) of being requested to do so, the Public Works Authority may employ others to
carry out the work and may deduct any costs incurred from any monies whatsoever due to us
from the Public Works Authority.

_______________________________
Authorized Signatory

In capacity of: ____________________


Duly authorized to sign for
and on behalf of: ____________________
Name of the contractor: Unigaz Qatar
Address: Al Qamra Holding Group | Bldg. 53, Zone 38, St. 893, Al Difaaf St,
4th Flr. Rm 12. | Al Sadd, Doha Qatar

Telephone: +974 4451 4044


Fax: +974 4451 4041
16. VALID ISO AND OTHER
MANAGEMENT CERTIFICATES (9001,
14001 & 18001)
17. COPY OF VALID CERTIFICATE / APPROVAL OF
THE FIRM (MANUFACTURER / SUPPLIER) FROM
CONCERNED GOVERNMENT DEPARTMENT
18. LIST OF PROJECTS (COMPLETED AND
ONGOING) COPY OF APPROVAL
LIST OF COMPLETED PROJECTS

NAME OF THE NAME OF PROJECT


S.NO CONSULTANT BRIEF SCOPE OF THE WORK
PROJECT THE CLIENT OWNER
3+2 Health centers
Detailed Design, Engineering, Supply,
package 7 Ain Abantia
1 ECG HMC Installation, Testing & Commissioning of
Khaled Health Tempo
Fuel System up to Authority Approval
center- Type B
Gulf Detailed Design, Engineering, Supply,
Al Maha Health Engineering & Installation, Testing & Commissioning of
2 Hyundai HMC
Center ʹHMC Industrial Fuel System for generator and boiler up
Consultancy to Authority Approval

AMERICAN BASE THE US ARMY THE US ARMY Detailed Design, Engineering, Supply,
3 SHEILD-5 AL SEAL CORPS OF CORPS OF Installation, Testing & Commissioning of
PROGRAMMES ENGINEERS ENGINEERS Fuel System up to Authority Approval

PRIVATE Detailed Design, Engineering, Supply,


COAST GUARD DAR AL
4 GET ENGINEERING Installation, Testing & Commissioning of
NAVAL BASE HANDASAH
OFFICE (PEO) Fuel System up to Authority Approval

Detailed Design, Engineering, Supply,


Delivery to Site, Installation, Testing &
5 ISF CAMP -DUHAIL EMEC KEO ISF
Commissioning, Handing Over, Warranty
& Maintenance of Diesel Fuel System

QATAR SUPREME Detailed Design, Engineering, Supply,


CONSPEL
6 FOUNDATION ASTAD EDUCATION Installation, Testing & Commissioning of
QATAR W.L.L
STADIUM COUNCIL Fuel System up to Authority Approval

BOOM Detailed Design, Engineering, Supply,


GENERAL KHATIB & QATAR Delivery to Site, Installation, Testing &
7 QATAR UNIVERSITY
CONTRACTO ALAMI UNIVERSITY Commissioning, Handing Over, Warranty
RS & Maintenance of Diesel Fuel System

Detailed Design, Engineering, Supply,


QATAR UNIVERSITY QATAR Delivery to Site, Installation, Testing &
8 TKYEEF MZP
-SPORTS COMPLEX UNIVERSITY Commissioning, Handing Over, Warranty
& Maintenance of Diesel Fuel System

Detailed Design, Engineering, Supply,


SUPREME SUPREME
DIPLOMAT Delivery to Site, Installation, Testing &
9 EDUCATION KEO EDUCATION
GROUP W.L.L Commissioning, Handing Over, Warranty
COUNCIL COUNCIL
& Maintenance of Diesel Fuel System

Detailed Design, Engineering, Supply,


DOHA PORT Delivery to Site, Installation, Testing &
10 PETROSERV KEO QATAR PORT
REDEVELOPMENT Commissioning, Handing Over, Warranty
& Maintenance of Diesel Fuel System
Detailed Design, Engineering, Supply,
CONSTRUCTION OF
Delivery to Site, Installation, Testing &
11 KAHRAMAA SEG QATAR PROJACS KAHRAMAA
Commissioning, Handing Over, Warranty
TOWERS
& Maintenance of Diesel Fuel System
NAME OF THE NAME OF PROJECT
S.NO CONSULTANT BRIEF SCOPE OF THE WORK
PROJECT THE CLIENT OWNER

ELECECTROM Detailed Design, Engineering, Supply,


AL KHOR EXPRESS ECHANICAL Delivery to Site, Installation, Testing &
12 KEO ASHGHAL
WAY ENGINEERIN Commissioning, Handing Over, Warranty
G CO & Maintenance of Diesel Fuel System

DAPHNE Detailed Design, Engineering, Supply,


JW MARRIOTT HARINSA
13 ECG HOTELS Installation, Testing & Commissioning of
HOTEL TOWER QATAR
COMPANY Fuel System up to Authority Approval

H.E. SHK.
Detailed Design, Engineering, Supply,
FUEL SYSTEM - DAR AL SAOUD BIN
14 SEG QATAR Installation, Testing & Commissioning of
BOULEVARD MALL HANDASAH ABDULLAH AL
Fuel System up to Authority Approval
- THANI

COMMERCIAL MR.
Detailed Design, Engineering, Supply,
BUILDING ABDULLAH BIN
METRIX Delivery to Site, Installation, Testing &
15 (B+G+7P+13F) ON MZP FAHAD
QATAR W.L.L. Commissioning, Handing Over, Warranty
PLOT MARINA GHORAB AL -
& Maintenance of Diesel Fuel System
MIX052 MARRI
Detailed Design, Engineering, Supply,
HALUL REAL
DOHA OASIS MIXED CONSPEL Delivery to Site, Installation, Testing &
16 AECOM INVESTMENT
USE DEVELOPMENT QATAR W.L.L Commissioning, Handing Over, Warranty
COMPANY
& Maintenance of Diesel Fuel System

MUNTAZAH Detailed Design, Engineering, Supply,


COMMERCIAL & BUZWAIR Delivery to Site, Installation, Testing &
17 ZUBLIN MZP
RESIDENTIAL REAL ESTATE Commissioning, Handing Over, Warranty
DIVISION & Maintenance of Diesel Fuel System

Detailed Design, Engineering, Supply,


HOTEL APARTMENT AL MAJED Delivery to Site, Installation, Testing &
18 TAKEEF AEB
AL MANSOURA GROUP Commissioning, Handing Over, Warranty
& Maintenance of Diesel Fuel System
LIST OF SELECTED CURRENT PROJECTS
S.NO PROJECT NAME
DESCRIPTION CONTRACTOR CONSULTANT CLIENT

1) Detailed Design, Engineering, Supply, Delivery to Site,


Seef Lusail Installation, Testing & Commissioning, Handing Over, UCC PARSONS LUSAIL
Warranty & Maintenance of Diesel Fuel System

2) Detailed Design, Engineering, Supply, Delivery to Site, PRIVATE


DESIGN AND BUILD
Installation, Testing & Commissioning, Handing Over, UCC AA AND AECOM ENGINEERING
OF LUSAIL PALACES
Warranty & Maintenance of Diesel Fuel System OFFICE

Construction of
3) Additional Facilities Detailed Design, Engineering, Supply, Delivery to Site,
ROOTS ENERGY & Ashghal - Public
for Community Installation, Testing & Commissioning, Handing Over, ENGINEERING
Erga Qatar
Works Authority
College of Qatar - Warranty & Maintenance of Diesel Fuel System
Boys

LUXURY MIXED
4) Detailed Design, Engineering, Supply, Delivery to Site, TAKYEEF AEB (Arab
USE ARKAZ
DEVELOPMENT AT
Installation, Testing & Commissioning, Handing Over, ELECTROMECHANIC Engineering
INVESTMENT
Warranty & Maintenance of Diesel Fuel System AL WLL Bureau)
LUSAIL

AL MUTAHIDA
5) TOWERS Detailed Design, Engineering, Supply, Delivery to Site, Gulf Engineering & UNITED
Al Seal Contracting &
DEVELOPMENT, Installation, Testing & Commissioning, Handing Over, Trading
Industrial DEVELOPMENT
THE PEARL QATAR Warranty & Maintenance of Diesel Fuel System Consultancy COMPANY.
-THE VIVA BAHRIYA
LIST OF SELECTED ON GOING PROJECTS
S.NO PROJECT NAME
DESCRIPTION CONTRACTOR CONSULTANT CLIENT

6) Detailed Design, Engineering, Supply, Delivery to Site,


Mall of Qatar – Grand
Zone
Installation, Testing & Commissioning, Handing Over, Al Ali Engineering KEO Mall of Qatar
Warranty & Maintenance of Diesel Fuel System

7) FLORESTA Detailed Design, Engineering, Supply, Delivery to Site, UNITED


Samko International KHATIB & ALAMI
GARDEN Installation, Testing & Commissioning, Handing Over, Co. W.L.L COMPANY
DEVELOPMEN
DEVELOPMENT. Warranty & Maintenance of Diesel Fuel System T COMPANY.

CONSTRUCTION
OF GIARDINO MALL
8) AND MARINA Detailed Design, Engineering, Supply, Delivery to Site, ROOTS ENERGY & ARAB UNITED
WORKSHOP Installation, Testing & Commissioning, Handing Over, ENGINEERING ENGINEERING DEVELOPMEN
PACKAGE A, B&C Warranty & Maintenance of Diesel Fuel System SERVICES W.L.L BUREAU T COMPANY
AT THE PEARL
QATAR

FIVE STAR HOTEL Detailed Design, Engineering, Supply, Delivery to Site,


9) CONSTRUCTION
& RESIDENCES@ DAR AL MARSA
MARSA ARABIA -
Installation, Testing & Commissioning, Handing Over, DEVELOPMENT
HANDASAH ARABIA
Warranty & Maintenance of Diesel Fuel System COMPANY
THE PEARL QATAR

QATAR
Detailed Design, Engineering, Supply, Delivery to Site, GENERAL
10) Samko International INSURANCE &
MOZOON TOWERS Installation, Testing & Commissioning, Handing Over, Co. W.L.L.
MZP WLL.
RE
Warranty & Maintenance of Diesel Fuel System INSURANCE
CO.
LIST OF SELECTED CURRENT PROJECTS
S.NO PROJECT NAME
DESCRIPTION CONTRACTOR CONSULTANT CLIENT

11) ISF Sports Facilities Detailed Design, Engineering, Supply, Delivery to Site,
Powermech Dar Al Handasah – Internal Security
and Running Tracks Installation, Testing & Commissioning, Handing Over, Engineering (DAR) Force - (ISF)
– CPC08D Warranty & Maintenance of Diesel Fuel System

12) Detailed Design, Engineering, Supply, Delivery to Site, HH Sheikh


Al Saad Consulting
Dream Hotel Installation, Testing & Commissioning, Handing Over, BK Gulf WLL
Engineering
Mohammad
Warranty & Maintenance of Diesel Fuel System Khalifa Al Thani

13) Detailed Design, Engineering, Supply, Delivery to Site, RADIANT


NE-300 QATAR ARMED
WARE HOUSE.
Installation, Testing & Commissioning, Handing Over, ENGINEERING DAR
FORCE
Warranty & Maintenance of Diesel Fuel System ENTERPRISES LLC

DESIGN & BUILD Detailed Design, Engineering, Supply, Delivery to Site, Anel Mep Lusail Real
14) WORKS FOR State
LUSAIL PLAZA
Installation, Testing & Commissioning, Handing Over, Maintenance and DAR
Development
TOWERS Warranty & Maintenance of Diesel Fuel System Operations Company

QǦBAIRAQ
Proposed Hotel &
15) Detailed Design, Engineering, Supply, Delivery to Site, DEVELOPMEN
Apartment Building Ǧ Structural Electro Dara Engineering
Installation, Testing & Commissioning, Handing Over, T&
The Pearl Qatar (P19 Mechanical W.L.L. Consultants
INVESTMENT
& P19A) Warranty & Maintenance of Diesel Fuel System
CO
19. COPY OF PREVIOUS ASHGHAL APPROVAL