Section 1.0: TASK FOR THE DAY/SHIFT BASED ON THE PTW (Permit Receiver)
(State area, location, site, activity to do, unit no, define if work party is with contractor or organic only)
Are we prepared if there is an emergency? Did my Ensure that the nearby activity does not affect your Were others around you working in a responsible
team understood their role in emergency work. manner and did not add hazards in your work area
situations? Are others around you working responsibly? before leaving the area?
If answered “no” from one of the questions. Discuss these improvements with the Permit Issuer.
Are the tools and equipment to be used in the task
Take a pause, suspend the work and inform the Discuss with the team.
are inspected and color coded?
Permit Issuer as soon as possible.
Topics discussed
and Actions to be
Taken:
Section 3.0: DAILY COMMITMENT TO WORKING SAFELY (Work Party) Use additional sheets as necessary.
The requirements for the safest performance of this job have been explained to us from the scope; individual responsibilities; hazards and its controls; worksite
precautions and the PPEs to wear. Having clearly understood the requirements, we hereby give our unconditional commitment to comply and adhere to them so
we can complete our job in the safest and most efficient manner.
It is also our responsibility to immediately report any incident to our Supervisor and/or to the Control Room.
SIGN ON SIGN OFF
WORK PARTY DESIGNATION
Date and Time Signature Date and Time Signature
9
Section 5.0: COMMENCEMENT OF WORK (Permit Issuer, Permit Receiver)
The permit conditions and safety precautions are to be followed in completing the work.
Section 4.0: WORK PARTY CLEARANCE (Permit Receiver)
As the Permit Receiver and the Supervisor of this Work Party, I declare that the above listed personnel have had their toolbox talk; are aware of the scope of the job;
individual responsibilities; the workplace hazards and its controls; the precautions to be taken and the PPE to wear.