You are on page 1of 20

Format I - Labour Projection

Name of the District: Name of the Mandal:

Grampanchayat: Year:

Total Job Cards in GP: Total Groups in GP:


Avg. days per
Reported Reported Generated Generated Mandays to be Amount to be
Projected HHs HHs to be
Month HHs in HHs in Mandays in 2021- Mandays in provided 2023- alloted 2023-
for 2023-24 provided 2023-
2021-22 2022-23 22 2022-23 24 24
24
Apr-23

May-23

Jun-23

Jul-23

Aug-23

Sep-23

Oct-23

Nov-23

Dec-23

Jan-24

Feb-24

Mar-24

Total
Name of the Field Asst./Senior Mate: Name of the TA: Name of the APO/EC:
Signature: Signature: Signature:
Date: Date: Date:
మ సభ నం

( రంభ మ సభ)

............................ న ………………… …………………. మండలం

……………………….. మ పం య నం మ ం య ణఉ

చటం 2005, 16(1) మ (1), 7 ర మపం య ప

జర న ం ల ,వ ఆ క సంవత ర క స వంద లప మ మ

పం య అవసర న క వస ల కల న త అవసర న ప ల ం త

మపం య అంద గ మ ణఉ పధకం ంద ప ం

అవసర న ల ం ట అ మ త మ సభ ఏ యడ న .

మ సభ ఈ ం షయ చ ంచడ న

1. గత ఆ క సంవత రం ప నప ,ఖ వర .

a. ప నప : అంచ వ: .

b. నప : ఖ : .

2. ల న కరణ (అ యడం)

3. మ వ చర

4. ...................................... ఆ క సంవత ర న అవసర న ప న ,ప

ంచవల న త

a) అవసర న ప న :

b) ంచ వల న ప ల వ( ):

సద ప ల ం ట ఎ. .ఒ./ఇ. . తృత మపం య అ

ఆ స మ , ఉన మ , ండ , , అ
సంద ం మ ం య ణఉ పధక చటం 13 ం 16 వర

గల అం ల అ ణం ప ల త మర మసభ ఆ ద త

సమ ం ట ఆ ంచడ న .

మ పం య సర ం సంతక

మ పం య ర ద సంతకం

మసభ జ న సంతక

4
మ సభ నం

( వ మ సభ)

............................ న ................................... ...................................... మండలం .......................................

మ పం య నం మ సభ ర ం మ ం య ణఉ పధకం

............................ ఆ క సంవత ర న ........................... ప న ల ఆ ంచడ

న .

అం అవసర న ం త య క మ సభ ర ం త

అ మ ం నప ల చ ం , మ అవస ల చ ం టజ న .

ప ల అర సంద ం ట ( ం ఆ ) ................ ప ల .........................

వ గల .............. ప దం ట జ న . ఇంక అవసర న ప ల ం త

................. ం .......................... వర రదర ల అ స ం య

ం ప ల ం టజ న .

ం న ప ల వర

ప శ

వ స ఆ స /ల స అంచ అంచ న
ప వర
సంఖ / నంబ వ ప న సంఖ

నంబ
ప క న ధ మ ప న తన అంద ............... ఆ క

సంవత ర న ఈ పధక 100 లఉ క ంచ అవసర న ప ల

వ త ........................ న మ ంచడ న .ఈ ధ

ం నప ల ఆ ద త ఈ జ న మ సభ నం చ ం ,ఉ

పధక ప ట ంచడ న .

మ పం య సర ం సంతక

మ పం య ర ద సంతకం

మసభ జ న సంతక

4
List of permissible works under MGNREGS
Permissible works before NIC migration NREGA Soft (D 29/D 2 Modules)
Sl.No.
Project Name Work Name New Work Name Work Category Name Sub Category Name (Proposed Name) NRM Agri & Allied
Land Development Construction of stone peripheral bund Works on Individual
1 Stone Bund Constr of stone peripheral bund for Indiv Yes Yes
Project for Individual Category
Land Development
2 Boulder Removal Deleted
Project
Land Development Boundary Plantation of Forestry Trees Works on Individual Boundary Plntation of Forstry Trees for
3 Bund Plantation Yes Yes
Project for Individual Category Individual
Land Development Formation of Ring trenches for Formation of Ring trenches for Works on Individual Construction of Earthen peripheral/farm/field
4 Yes Yes
Project Horticulture Plantation Horticulture Plantation Category bund for individuals
Land Development Desilting and Deepening of Rythuvari Desilting and Deepening of Rythuvari Works on Individual
5 Construction of Farm Ponds for Individuals Yes Yes
Project Kuntalu Kuntalu Category
Land Development Constuction of Level Bench Terrace for Works on Individual
6 Terracing in Hill or Slope areas Const of Level Bench Terrace for Individual Yes Yes
Project Individual Category
Land Development Works on Individual
7 Silt Application I Year Silt Application Levelling/shaping of Fallow land for Individuals Yes Yes
Project Category
Land Development Construction of Irrigation Open Well Works on Individual
8 Digging of new Open Well Constr of Irrigation Open Well for Individuals Yes Yes
Project for Individuals Category
Land Development Construction of Compost Pit for Works on Individual
9 Compost Pit Construction of Compost Pit for Individual Yes Yes
Project Individual Category
Land Development Construction of Farm Ponds for Works on Individual
10 Farm Pond Construction of Farm Ponds for Individuals Yes Yes
Project Individuals Category
Land Development Levelling/shaping of Fallow land for Works on Individual
11 Land Levelling Levelling/shaping of Fallow land for Individuals Yes Yes
Project Individuals Category
Land Development Construction of Earthen peripheral Works on Individual
12 Boundary Trench Constr of Earthen peripheral bund for indiv Yes Yes
Project bund for individuals Category
Land Development SMC Trenches in Existing Horticulture SMC Trenches in Existing Horticulture Works on Individual Construction of Earthen peripheral/farm/field
13 Yes Yes
Project Plantation Plantation Category bund for individuals
Land Development Desilting and deepening of Open Construction of Irrigation Open Well Works on Individual
14 Constr of Irrigation Open Well for Individuals Yes Yes
Project wells - Individual lands for Individuals Category
Land Development Works on Individual
15 Surface Storage Pond Surface Storage Pond Construction of Farm Ponds for Individuals Yes Yes
Project Category
Land Development
16 Deep Ploughing Deleted
Project
Horticulture and Raising of Horticulture Plantation Raising of Horticulture Plantation Works on Individual
17 Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project Apple Bear Apple Bear Category
Horticulture and Raising of Horticulture Plantation Raising of Horticulture Plantation Works on Individual
18 Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project Mango(Dry Land) for PD,DWMA Mango Category

Horticulture and Raising of Horticulture Plantation


19 Deleted
Plantation Project Mango(Dry Land) for PO,ITDA
Permissible works before NIC migration NREGA Soft (D 29/D 2 Modules)
Sl.No.
Project Name Work Name New Work Name Work Category Name Sub Category Name (Proposed Name) NRM Agri & Allied

Horticulture and Raising of Horticulture Plantation


20 Deleted
Plantation Project Mango(MIP) for PD,DWMA

Horticulture and Raising of Horticulture Plantation


21 Deleted
Plantation Project Mango(MIP) for PO,ITDA

Horticulture and Raising of Horticulture Plantation Raising of Horticulture Plantation Works on Individual
22 Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project Guava(Dry Land) for PD,DWMA Guava Category

Horticulture and Raising of Horticulture Plantation


23 Deleted
Plantation Project Guava(Dry Land) for PO,ITDA

Horticulture and Raising of Horticulture Plantation


24 Deleted
Plantation Project Guava(MIP) for PD,DWMA

Horticulture and Raising of Horticulture Plantation Raising of Horticulture Plantation Works on Individual
25 Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project Jamun(Dry Land) for PD,DWMA Jamun Category

Horticulture and Raising of Horticulture Plantation


26 Deleted
Plantation Project Jamun(Dry Land) for PO,ITDA

Horticulture and Raising of Horticulture Plantation


27 Deleted
Plantation Project Jamun Block(Dry Land) for PD,DWMA

Horticulture and Raising of Horticulture Plantation


28 Deleted
Plantation Project Jamun Block(Dry Land) for PO,ITDA

Horticulture and Raising of Horticulture Plantation Oil Raising of Horticulture Plantation Oil Works on Individual
29 Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project Palm(MIP) for PD,DWMA Palm Category

Horticulture and Raising of Horticulture Plantation Oil


30 Deleted
Plantation Project Palm(MIP) for PO,ITDA

Horticulture and Raising of Horticulture Plantation Raising of Horticulture Plantation Works on Individual
31 Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project Sapota(Dry Land) for PD,DWMA Sapota Category

Horticulture and Raising of Horticulture Plantation


32 Deleted
Plantation Project Sapota(Dry Land) for PO,ITDA

Horticulture and Raising of Horticulture Plantation


33 Deleted
Plantation Project Sapota(MIP) for PD,DWMA

Horticulture and Raising of Horticulture Plantation Raising of Horticulture Plantation Works on Individual
34 Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project Sweet Orange(MIP) for PD,DWMA Sweet Orange Category
Permissible works before NIC migration NREGA Soft (D 29/D 2 Modules)
Sl.No.
Project Name Work Name New Work Name Work Category Name Sub Category Name (Proposed Name) NRM Agri & Allied

Horticulture and Raising of Horticulture Plantation


35 Deleted
Plantation Project Sweet Orange(MIP) for PO,ITDA

Horticulture and Raising of Horticulture Plantation Raising of Horticulture Plantation Works on Individual
36 Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project Tamarind (Dry Land) for PD,DWMA Tamarind Category

Horticulture and Raising of Horticulture Plantation Raising of Horticulture Plantation Works on Individual
37 Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project Coconut (Dry Land) for PD,DWMA Coconut Category
Raising of Horticulture Plantation
Horticulture and Raising of Horticulture Plantation Works on Individual
38 Seethaphal Bund(Dry Land) for Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project Seethaphal (Custard apple) Category
PD,DWMA
Raising of Horticulture Plantation
Horticulture and
39 Seethaphal Bund(Dry Land) for Deleted
Plantation Project
PO,ITDA
Horticulture and Raising of Horticulture Plantation Raising of Horticulture Plantation Acid Works on Individual
40 Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project Acid Lime(Dry Land) for PD,DWMA Lime Category

Horticulture and Raising of Horticulture Plantation


41 Deleted
Plantation Project Acid Lime(Dry Land) for PO,ITDA

Horticulture and Raising of Horticulture Plantation


42 Deleted
Plantation Project Acid Lime(MIP) for PD,DWMA

Horticulture and Raising of Horticulture Plantation Raising of Horticulture Plantation Works on Individual
43 Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project Cashew(Dry Land) for PD,DWMA Cashew Category

Horticulture and Raising of Horticulture Plantation


44 Deleted
Plantation Project Cashew(Dry Land) for PO,ITDA

Horticulture and Raising of Horticulture Plantation


45 Deleted
Plantation Project Cashew(MIP) for PD,DWMA

Horticulture and Raising of Horticulture Plantation


46 Deleted
Plantation Project Cashew(MIP) for PO,ITDA

Horticulture and Raising of Horticulture Plantation Raising of Horticulture Plantation Works on Individual
47 Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project Pomegranate(MIP) for PD,DWMA Pomegranate Category
Raising of Horticulture Plantation
Horticulture and
48 Pomegranate(Dry Land) for Deleted
Plantation Project
PD,DWMA
Horticulture and Raising of Horticulture Plantation Raising of Horticulture Plantation Works on Individual
49 Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project TAIWAN GUAVA (Dry Land) TAIWAN GUAVA Category
Permissible works before NIC migration NREGA Soft (D 29/D 2 Modules)
Sl.No.
Project Name Work Name New Work Name Work Category Name Sub Category Name (Proposed Name) NRM Agri & Allied

Horticulture and Raising of Horticulture Plantation


50 Deleted
Plantation Project TAIWAN GUAVA (MIP)
Horticulture and Works on Individual
51 Trench cutting for drip irrigation Trench cutting for drip irrigation Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project Category
Horticulture and Raising of Horticulture Plantation
52 Deleted
Plantation Project Tamarind (Dry Land) for PO,ITDA

Horticulture and Raising of Horticulture Plantation for Raising of Horticulture Plantation for Works on Individual
53 Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project FIG (Anjura) for PD,DWMA FIG (Anjura) Category

Horticulture and Raising of Horticulture Plantation for


54 Deleted
Plantation Project FIG (Anjura) for PO,ITDA

Raising of Horticulture Plantation


Horticulture and
55 Seethaphal (Custard apple) Block Deleted
Plantation Project
Plantation (Dry Land) for PD,DWMA

Raising of Horticulture Plantation


Horticulture and
56 Seethaphal (Custard apple) Block Deleted
Plantation Project
Plantation (Dry Land) for PO, ITDA
Raising of Horticulture Multiple
Horticulture and Raising of Horticulture Multiple Works on Individual
57 Cropping in APCNF GPs under Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project Cropping in APCNF GPs Category
MGNREGS
Horticulture and Raising of Horticulture Plantation Raising of Horticulture Plantation Works on Individual
58 Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project Dragon fruit Dragon fruit Category
Horticulture and Raising of Perennial Rose Garden Works on Individual
59 Raising of Perennial Rose Garden Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project under MGNREGS Category
Horticulture and Raising of Perennial Jasmine Garden Works on Individual
60 Raising of Perennial Jasmine Garden Block Plantation-Hort-Trees in fields-Individuals Yes Yes
Plantation Project under MGNREGS Category
Minor Irrigation Comprehensive Restoration of minor Comprehensive Restoration of minor
61 Drought Proofing Renovtion of Community Ponds for Comm Yes
Restoration Project Irrigation Tank Irrigation Tank
Minor Irrigation Comprehensive Restoration of minor
62 Deleted
Restoration Project Irrigation Tank(MI Dept)
Minor Irrigation Fore shore babool plantation in MI Fore shore babool plantation in MI
63 Drought Proofing Wasteland Block Plantation-Forstry-Community Yes Yes
Restoration Project tanks tanks
Construction of Earthen
Minor Irrigation Construction of Earthen peripheral/farm/field
64 Peripheral trench in MI tanks peripheral/farm/field bund for Drought Proofing Yes Yes
Restoration Project bund for Community
Community
Minor Irrigation Construction of Cattle Ramps in MI Construction of Cattle Ramps in MI
65 Drought Proofing Renovtion of Community Ponds for Comm Yes
Restoration Project Tanks Tanks
Bio-fencing to all Govt institutions (
66 Afforestation Project for those not having pucca Deleted
compound wall )
Permissible works before NIC migration NREGA Soft (D 29/D 2 Modules)
Sl.No.
Project Name Work Name New Work Name Work Category Name Sub Category Name (Proposed Name) NRM Agri & Allied
Wastelands Block Plantation-Farm Forestry -
67 Afforestation Project Greening of Hillocks Greening of Hillocks Drought Proofing Yes Yes
Comm
Raising of GramPanchayat level
68 Afforestation Project Raising of Nursery for Community Drought Proofing Raising of Nursery for Community Yes Yes
Nursery
69 Afforestation Project Village Parks Village Parks Drought Proofing Wasteland Block Plantation-Forstry-Community Yes Yes
Road Side Line Plantation of Forestry Road Line Plantation of Forestry Trees for
70 Afforestation Project Avenue Plantation Drought Proofing Yes Yes
Trees for Community Comm
Raising of Block Plantation in Block Plantation-Farm Forestry in Block Plantation-Farm Forestry in fields for
71 Afforestation Project Drought Proofing Yes Yes
Community Lands fields for Community Comm
Raising of Mulbar Neem(Melia Dubia)
72 Afforestation Project Deleted
in Bund Plantation
73 Afforestation Project Seed Dibbling Seed Dibbling Drought Proofing Wasteland Block Plantation-Forstry-Community Yes Yes
Desilting of Existing Field Channel in
74 Afforestation Project Deleted
Mangrove Areas
Desilting of Existing Feeder Channel
75 Afforestation Project Deleted
in Mangrove Areas
Raising of Teak /Other Spieces Plants Raising of Teak /Other Spieces Plants
76 Afforestation Project Drought Proofing Raising of Nursery for Community Yes Yes
Nursery in 6"xl2" Size Bags by DWMA Nursery in 6"xl2" Size Bags

77 Afforestation Project Preparation of Seed Balls Preparation of Seed Balls Drought Proofing Wasteland Block Plantation-Forstry-Community Yes Yes

78 Afforestation Project Seed Ball Dibbling/Broad casting Seed Ball Dibbling/Broad casting Drought Proofing Wasteland Block Plantation-Forstry-Community Yes Yes
Greening Of Hillocks in Existing
79 Afforestation Project Deleted
Blocks/ New Blocks
Formation of ring/semi lunar Formation of ring/semi lunar trenches Construction of Earthen peripheral/farm/field
80 Afforestation Project Drought Proofing Yes Yes
trenches for community plantation for community plantation bund for Community
Irrigation Drains and
Construction of water courses Canal for
81 Irrigation Channels New Field Channel New Field Channel Irrigation Canals Yes Yes
Community
Project
Irrigation Drains and
82 Irrigation Channels Desilting of Existing Feeder Channel Desilting of Existing Feeder Channel Irrigation Canals Renovation of Feeder Canal for Community Yes Yes
Project
Irrigation Drains and
Desilting of Existing field channel in
83 Irrigation Channels Desilting of Existing field channel Irrigation Canals Renovation of distributary Canal for Community Yes Yes
common area
Project
Irrigation Drains and
Desilting of Existing Irrigation Minor Renovation of Sub-minor canal for
84 Irrigation Channels Irrigation Canals Renovation of Sub-minor canal for community Yes Yes
Drains community
Project
Irrigation Drains and
Desilting of major canals and drains Renovation of minor canal for
85 Irrigation Channels Irrigation Canals Renovation of minor canal for community Yes Yes
with top width more than 10 meters community
Project
Permissible works before NIC migration NREGA Soft (D 29/D 2 Modules)
Sl.No.
Project Name Work Name New Work Name Work Category Name Sub Category Name (Proposed Name) NRM Agri & Allied
Irrigation Drains and
Desilting of minor distributory Renovation of distributary Canal for
86 Irrigation Channels Irrigation Canals Renovation of distributary Canal for Community Yes Yes
channel Community
Project
Rural Connectivity Formation of Approach roads in delta
87 Deleted
Project / Shore areas ( 30 : 70 )
Rural Connectivity Approach Road to Housing Colony
88 Deleted
Project (30:70)
Rural Connectivity Approach road to Housing colony
89 Deleted
Project (50:50)
Rural Connectivity Formation of Road to agriculture
90 Deleted
Project fields
Rural Connectivity Formation of Approach Road ( 50 : 50 Construction of Mitti Murram Roads Construction of Mitti Murram Roads for
91 Rural Connectivity
Project ) for Community Community
Approach Road up to Shore
Rural Connectivity AreaAqua ClusterFisherman
92 Deleted
Project HabitationFish Landing CenterFish
pondFish Drying yard 5050
Construction of Flood/ Diversion Constr of Flood/ Diversion Channel for
93 Flood Control Project Flood Bund Drought Proofing Yes
Channel for Community Community
Public Institutions Govt. building Block Plantation-Farm Gov building Block Plantation-Farm Forestry-
94 Institutional Plantation Drought Proofing Yes Yes
Development Project Forestry-Community Comm
Public Institutions Institutional Water Harvesting Institutional Water Harvesting
95 Drought Proofing Construction of Recharge Pits for Community Yes
Development Project Structure Structure
Public Institutions
96 Levelling of Public Institutions Deleted
Development Project
Public Institutions Construction of Earthen peripheral/farm/field
97 Peripheral Trench in Govt Institutions Peripheral Trench in Govt Institutions Drought Proofing Yes Yes
Development Project bund for Community
Ground Water Recharge
98 Desilting of Drinking Water Tanks Renovtion of Community Ponds Drought Proofing Renovtion of Community Ponds for Comm Yes
Project
Ground Water Recharge Construction of Community Water Construction of Community Water Harvesting
99 Dugout Pond/Percolation Pond Drought Proofing Yes
Project Harvesting Ponds Ponds
Ground Water Recharge Construction of Mini Percolation Tank Construction of Mini Percolation Tank for
100 Mini Percolation Tank Drought Proofing Yes
Project for Community Comm
Ground Water Recharge Improvements and Deepening to Repair & Maint of Gabion Check Dam Repair & Maint of Gabion Check Dam for
101 Drought Proofing Yes Yes
Project existing checkdams for Community Community
Ground Water Recharge Water Conservation and
102 Check Wall Check Wall Constr of Gabion Anicut for Community Yes Yes
Project Water Harvesting
Ground Water Recharge Recharge structure to dried up Bore Construction of Sand filter-borewell Works on Individual
103 Constr of Sand filter-borewellrecharge for Indiv Yes
Project wells - Individual & Community recharge for Individuals Category

Ground Water Recharge Recharge pit for functional bore well - Construction of Sand filter-Borewell Works on Individual Constr of Sand filter-Borewell recharge for
104 Yes
Project Individual & Community recharge for Community Category Comm
Permissible works before NIC migration NREGA Soft (D 29/D 2 Modules)
Sl.No.
Project Name Work Name New Work Name Work Category Name Sub Category Name (Proposed Name) NRM Agri & Allied

Ground Water Recharge Recharge structure for functional


105 Deleted
Project scheme BorewellHP for RWS sources
Ground Water Recharge Desilting & Deepening of Repair & maint of Community Ponds
106 Drought Proofing Repair & maint of Community Ponds for Comm Yes
Project Uracheruvulu/Kuntalu for Community
Ground Water Recharge Construction of Staggered Trench for Construction of Staggered Trench for
107 Staggered Trenches Drought Proofing Yes
Project Community Community
Ground Water Recharge Water Absorption Trench at Foot Construction of Water Absorption Water Conservation and Constr of Water Absorption Trench Trench for
108 Yes
Project Hills Trench Trench for Community Water Harvesting Comm
Ground Water Recharge Desilting and Deepening of Desilting and Deepening of Percolation
109 Drought Proofing Renovtion of Community Ponds for Comm Yes
Project Percolation Tank Tank
Ground Water Recharge Desilting and deepening of Open Repair-maint of parapet/platfrm of Irr
110 Irrigation Canals Rpair-maint of parapet/platfrm of Irr OpenWell Yes Yes
Project wells - Community lands OpenWell
Ground Water Recharge
111 Desilting of Rajaka Tanks Deleted
Project
Ground Water Recharge Water Conservation and Construction of Community Water Harvesting
112 Cattle Ponds in Community Lands Cattle Ponds in Community Lands Yes
Project Water Harvesting Ponds
Ground Water Recharge Rain Water Harvesting Structure in
113 Deleted
Project BC Soils
Ground Water Recharge Water Conservation and Construction of Mini Percolation Tank for
114 Percolation Tank Percolation Tank Yes
Project Water Harvesting Comm
Construction of Anganwadi Multi Unit Constr of Anganwadi Multi Unit Toilets for
115 Rural Sanitaion Project Toilets in Anganwadi Centers Rural Sanitation
Toilets for Community Comm
Constr of Vermi Compost structure for Constr of Vermi Compost structure for
116 Rural Sanitaion Project Solid waste Management Rural Sanitation Yes Yes
Community Community
Repair & Maint of Vermi Compost for Repair & Maint of Vermi Compost for
117 Rural Sanitaion Project SWPC_Additional_Facilities Rural Sanitation Yes Yes
Community Community
Construction of Soak Pit for
118 Rural Sanitaion Project Digging of community soak pit Rural Sanitation Construction of Soak Pit for Community
Community
Constr of NADEP Compost structure Works on Individual Constr of NADEP Compost structure for
119 Rural Sanitaion Project NADEP Compost Pit at SWPC Yes Yes
for Individual Category Individual
Excavation of new drains to drain out
water from waterlogged areas Construction of intrmediate and Link Constr of intrmediate and Link Water Drain-
120 Rural Sanitaion Project Flood Control
connecting to Natural drain(Katcha Water Drain-Community Comm
drains)
Works on Individual
121 LiveStock Related Works Raising of Perinnial Fodder Raising of Perinnial Fodder Dev of Silvipasture Grassslands for Community Yes Yes
Category
Land Development
Water Conservation and Construction of Earthen peripheral/farm/field
122 Project In Community Cattle Proof Trench Cattle Proof Trench Yes Yes
Water Harvesting bund for Community
Lands
Land Development
SMC Trenches in Existing Block SMC Trenches in Existing Block Construction of Earthen peripheral/farm/field
123 Project In Community Drought Proofing Yes Yes
Plantations Plantations bund for Community
Lands
Land Development
Development of fallow lands for Development of fallow lands for
124 Project In Community Land Development Development of Fallow Land for Community Yes Yes
community community
Lands
Permissible works before NIC migration NREGA Soft (D 29/D 2 Modules)
Sl.No.
Project Name Work Name New Work Name Work Category Name Sub Category Name (Proposed Name) NRM Agri & Allied
Fisheries Development Construction of Fisheries Ponds for
125 Fish Ponds Fisheries Construction of Fisheries Ponds for Community Yes Yes
Project Community
Fisheries Development Construction of Fish Drying Yards for Anganwadi/Other Rural Construction of Fish Drying Yards for
126 Construction of Fish Drying Yards Yes
Project Community Infrastructure Community
Approach road up to shore
Fisheries Development area/aqua cluster/fishermen
127 Deleted
Project habitation/fish landing center using
Gravel (30 : 70)
Fisheries Development Excavation of new fish breeding Excavation of new fish breeding ponds
128 Fisheries Construction of Fisheries Ponds for Community Yes Yes
Project ponds in public water bodies in public water bodies
Sericulture Plantation Development of Mulberry bush Development of Mulberry bush Works on Individual
129 Block Plantation-Sericulture in fields-Individuals Yes Yes
Project plantation plantation Category
Sericulture Plantation Construction of Silk Worm Rearing Construction of Silk Worm Rearing Works on Individual
130 Block Plantation-Sericulture in fields-Individuals Yes Yes
Project Shed TYPE-I (Size: 50 X 20 Ft) Shed TYPE-I (Size: 50 X 20 Ft) Category

Sericulture Plantation Construction of Silk Worm Rearing Construction of Silk Worm Rearing Works on Individual
131 Block Plantation-Sericulture in fields-Individuals Yes Yes
Project Shed TYPE - II (Size: 30 X 20 Ft) Shed TYPE - II (Size: 30 X 20 Ft) Category
Sericulture Plantation Development of Mulberry Tree Development of Mulberry Tree Works on Individual
132 Block Plantation-Sericulture in fields-Individuals Yes Yes
Project plantation plantation Category
Unskilled Wages for Rural Houses Unskilled Wages for Rural Houses
Works on Individual
133 Rural Housing Project under Convergence with Housing under Convergence with Housing Constr of State scheme House for Individuals
Category
Department Department
Desilting of water ways of Desilting of water ways of
134 Railways Project bridges/RUBs/Pipe culverts/Box bridges/RUBs/Pipe culverts/Box Irrigation Canals Renovation of minor Canal for Community Yes Yes
culverts culverts
Strengthening/widening of Railways Strengthening/widening of Railways
135 Railways Project Flood Control Construction of Embankment for community
embankment embankment
Trench cutting along Railway Water Conservation and Construction of Earthen peripheral/farm/field
136 Railways Project Trench cutting along Railway boundary Yes Yes
boundary Water Harvesting bund for Community
Recharge structure for dried up bore Construction of Recharge Pits for Water Conservation and
137 Railways Project Construction of Recharge Pits for Community Yes
well Community Water Harvesting
Avenue Plantation (Road Side
138 Railways Project Plantation) along the Railway station Deleted
approach Roads
Raising of Block Plantation in
139 Railways Project Railways Vacant Lands(i.e Deleted
Residential/Mid Section Areas)
Construction of Citizen Information
140 IEC Project Deleted
Board

You might also like