Purpose
Establish and maintain procedure for Tower ladder ~ Static pul test on ladder system as per the applicable
standards.
Scope
‘This procedure is applicable to Tower ladders vz, Wind ladders, Domestic and Commercial Ladders
Responsibiitios
Conducting the tests ~ Quality Supervisors / Quality Head
Aporoval of Test Results - Qualty Head
Terms and Definitions
Ladder —Device incorporating steps or rungs on which a person may ascend or descend (OIN EN 131-1)
ANSIA143
Reference Standards
EN ISO 1412-4: Safety of Machinery, permanent means of access machinery Part 4 ~ Fixed Ladder
DIN EN 131-2: Ladders - Requirements, testing, marking
DIN EN 131-1: Ladders ~ Terminology, types, functional sizes
DIN EN 353-1 and GE specification 2003419 rev C
ANS|-ASE-A143: Fixed ladder safety requirements
ANS! -ASSE 2369.1: Safety requirements for personnel fall arrest systems , subsystems and
components,
Test Equipment Required
Test Fixture and load cel wih hydraulic power pack
‘Typical assembly of connector bracket o ladder rail
Bevel Protractor! Incinometer
Feeler gauge
Torque wrench
Stop watch
Vernier caper / steel rule measuring tape Right angle
Test Frequency
(One in 1000 ladders
Methodology
Before stating the tests, ensure that the measuring gauges to be used have valid calibration and dont have
any erors
Prepared by ahad ‘Approved by:
DateSOon 2017 Dale! 30-Jan 2007
CONTROLLED COPYSTANDARD OPERATING PROCEDURE
TOWER LADDER - STATIC PULL TEST ON LADDER SYSTEM
Doe No: SA.QA-SOP-38 Revision No:01 | Effective dat
‘30an 2017 Page 2ef
82
83
831
832
833
834
835
836
837
838
83g
83.10
8ant
83.12
83.13
Uncertainty of Measurement shall be ensured as below
++ 1 mm or longitudinal measurements;
+ 51mm forthe measurement of the distance between the supports andthe overhanging lath
1° fr the measurement of anges;
+ 1% for static forces and torque.
‘Ladder System - Static pull test (16kN)
Take photos of setup prior to toaing.
(2) 220mm & (1) 840mm ladder sections are to be used for this test. Arrangement should statin contact
wit bottom of the ladder to the floor, and arrangement isto be connected toa back rail stif enough not to
deflect during load application
‘Level ll ladder brackets and check that both maintain equal height and distance between,
Brackets & connectors centered vertically between the two separate ladder segments. Secured using
telnforcement rng hardware on both rungs end rungs of ladders. Ladder bracket heights on both sides fo be
the same height off the groundibase
‘Attach ladder brackets using GE required hardware, and ensure proper torque values ae used.
‘Attach fall arest brackets to reinforced ladder rungs using GE required harcware. Prope torque requied is
‘30Nm/22f bs & back hardware torque 210m
Using all metal components create a ink between load cel fixed down ow to fll atest cable, Ratchet types
‘Come-along & load cell works best to apply & record force. (ensure centre distance between ladder and
oad cell is 100mm)
Record ladder locations against the stationary drop frame or other vertical holding device.
‘ApAly pressure untl either the load cell reads round 16kN/G6OOIbs, o: ladder stats twist and bend. at any
{ime adition foree is applied but readings either don't change or start to drop, ladder test is to stop. Keep
Cable as close to vertical as possible, Looking 1 achieve a downward vertical load, not angular.
Measure and record any movement or twist ofthe ladder & brackets or X brace. Inspect ladder rll for any
‘areas of buckling or material separation
Keep tension on the line and leave sit for approximately 1Ominutes to see if ladder continues to shift or tis
Take photos of setup after load is applied. Also record and any areas of movement or areas of fatigue Aaiure
(material fracturing or rip.
Test must be run withthe use of intemal splice, to see how the results difer.
|Pesesty. 2265 voul_ Approved by (ae? |
([Date:30-Jan 2077 Dale: 30 Jan 2047
CONTROLLED COPY| __ STANDARD OPERATING PROCEDURE ~
ee
TOWER LADDER - STATIC PULL TEST ON LADDE
Doc No: SAGA-SOP 38 [ RevisionNe:01 | Effective dat: 30on
SN
2
=
4
A
A
ge
A
g
5
Sater nga
‘Typical setup for vertical test firture: Sttic Pll
84 Acceptable Limits:
Static pul test on lacier system
Measure and record any movement or twist ofthe ladder and brackets orX brace. Inspect ladder ral for any
areas of bucking or material separation,
keep tension on the lie and leave si for approximately 1Ominutes to see if ladder continues to shift or ts.
85 Reporting of Test Results:
85.1 Report the test results in he Ladder Test Report
852 Take photos of setup ater oad is applied. Also record any areas of movement or areas of fatigue aure
(material racturing orc).
90 Records
94 Ladder Test Report format no SA-QA-FT-08
[Prepay fre) - Approved ys RY |
Date:30Jan 2017 Date: 50 Jan2017 a
CONTROLLED COPY