You are on page 1of 2
wR js. WORK INSTRUCTIONS a WORK INSTRUCTIONS FOR OPERATION OF TECHNOFOUR ee CONDUCTIVITY METER. s Doc No;SAE-CAWO5 Revision No:00 | Etfectve date: 01-De02016 Page tof 2 10 Purpose The purpose of his document i o giv instructions for checking conductivity 20 Scope 30 40 50 Verfcation of machine conion bore perorping tet, setng the machine parameters where applicable, carrying out testing, verification of test results and maintaining machine in good condition after use. This ie applicable to all Aluminium profiles checked by using Technofour Conductivity Meter. Responsibilities QC Supervisor / Chemist QA— In-charges; VP - QA Terms and Definitions None Methodology + Initial Setting ‘¢ Take out the probe case & connect ito the instrument + Tum the OFF-BAT-ON switch io BAT positon. If the pointer rests in green zone proceed to step No. 4 other wise replace the battery, : ‘¢ Turn the OFF-BAT-ON switch to ON position wait for atleast for 20 Minutes, + Keop the reference samples plate near the instrument, Then calibrate the instrument as per the following instructions, + Following procedure (ato fs to be repeated, using LOW VALUE and HIGH VALUE samples altemately tl the LOW SET and _Hiset contols do not need further adjustment (.e. meter reads wihin +/-1 Dvision. of zero for successive readings on LOW VALUE and HIGH VALUE samples) 8) Set cial to read the conductviy of LOW VALUE sample ») Place the probe firmly within the encicied area onthe LOW VALUE sample ©) Adjust the LOWSET contol til meter reading Is zero, ) Set alto read the conductivity of HIGH VALUE sample. ®) Place the probe firmly wih the encircled area on the HIGH VALUE sample. 4) Adjust the HIGH set conto til meter reading is zero * Now repeat above steps. 3 to 5 repetiions are sufficient to vcalbrate the instrument. propery Whenever the conduetvty of a test sample to be reassured the instument is required to be calibrated as per the above procedure. ‘+The following steps are to be followed fr measuring conductivity of part ‘+ The part must have a fat area of atleast 12mm diameter where the probe can be propery placed. + Place the probe firmly on any fat surface (atleast 12mm in diameter ofthe Sample. ED Prepared by: Geers, ‘Approved by: WL . Date: 01-65-2016 Date: 07-De02016 WORK INSTRUCTIONS SA ed Eat 130 CLAUSE:2.5 | WORK INSTRUCTIONS FOR OPERATION OF TEGHNOFOUR Conover wees Bac Oro [Pata ! [ Doc Nosh E-casnnog Revision No: 00 * Rotate the dial stony til meter reads zero. * Te reading below the yelow hate inthe window ls the electical ‘conductivity of the metal is ®IACS * The folowing instuctons are tobe folowed for Switching Of he Instrument ‘¢ Turn the OFF-BAT-ON switch 6 "OFF" position, * Disconnect the probe, pu tin the case and place tine the eather case li, * Garey place the detachable aback or and secure both the latches fim 60 References 84 Quality Assurance Pian (SA.E-QA-QAP) 82 National international Standards, 7.0 Records 7.1 Materia Status Log Book (SA.E-QA-FT-06) 72 Test Cetfcate(SAE-OAFT-12/SAE-OAFT-14) rc gD), Prepared: Lay Approved by: MA ONLY IF ST

You might also like