1. GENERAL...................................................................................................................... 4
Purpose...................................................................................................................................................4
Project Overview & Scope of Works....................................................................................................4
4.CHEMICAL......................................................................................................................... 7
* Primer................................................................................................................................. 7
*ERC........................................................................................................................................ 7
5. SEQUENCE OF OPERATION.......................................................................................... 7
5.2 8. REPLACEMENT OF LADDER.................................................................................................7
6.REFERENCES................................................................................................................... 9
8.Life-Saving Rules............................................................................................................10
9.PTW SYSTEM.................................................................................................................. 10
13.Abbreviations................................................................................................................ 12
[Type here]
Contractor SEAMS
Contact MIC/VTC
SEAMS
Tel. No. Mobile
135 33754873
VHF
VHF-11 33754873
The information and data provided herein shall not be duplicated, disclosed, or
disseminated by the recipient in whole or in part of any purpose whatsoever without
any prior written permission from Seatek.
[Type here]
Purpose
The purpose of the MS is to outline the requirement and responsibilities for works carried
out concrete repair works at berth#4 damaged or deteriorated areas in the cope beams
during the hours of darkness or in the areas where artificial lighting is required.
Environment
*All chemicals shall have MSDS & it must be available at site and properly communicated to
workforce as well.
*First aiders & fire fighters are available for nightshift activities
*Waste Materials shall clearly labelled bins for disposal, The bins shall be emptied through
correct, and as per the Qatar Energy approved -GC16103400 Waste management plan.
* The lighting levels in a workplace should be adequate to ensure that workers can work
without risk to their health from poor or inadequate lighting, does not result in excessive
differences in illuminance within an area or between adjacent areas, managing the health
and safety risks from lighting in the workplace includes:
Planning: Set target for improvement by assessing whether the lighting is suitable and safe
for the work being carrying out
Organizing: if lighting is proving to be problem in the workplace, then they should bring this
to the attention of the performing authority (PA), the Performing authority should also
ensure there are competent electrical technician available to deal with any lighting
problem.
Control: Checking on a regular basis and ensuring the lighting levels & arrangements are
maintained. There should be a system in place for the maintenance, replacement &
disposal lamps & luminaires.
[Type here]
JHA: When assessing lighting in the workplace, OA&PA must consider whether the
arrangements for workplace lighting are satisfactory or might present a risk to workers,
contractors, or visitors to the premises.
4.Marine Vessels
*Standby Emergency Boat (Mooring Boat)
[Type here]
5. SEQUENCE OF OPERATION
*After you gather your tools and ladder, you will first need to mark up where you want
to place the ladder.
*You will need the following in order to install the Exlcusion Zone kit • Marker Pen •
Tape Measure • socket • Hex Key socket • Torque Wrench • Hacksaw or Similar •
Drill with suitable drill bit • Small Spirit Level Step
Step 2 The width of the frame can be adjusted to suit individual site requirements.
Standard width should be 1120mm centres.
[Type here]
Use work boat crane to hold the ladder until installation completed
A. Attach Kee Klamp fittings to upright tube. The clearance distance between the top
and mid rail should not exceed 500mm.
B. Connect 61-8 fittings to the horizontal tubes and connect upright from previous
step as shown in diagram above. Torque all fittings to 39N/m.
C. Attach fitting to ground and wall surfaces using suitable fixings. Following fixing
manufacturers guidance for correct installation.
6.REFERENCES
Below Summary of project References
8.Life-Saving Rules
9.PTW SYSTEM
E – Exact Location
A – Access to Incident scene i.e., provide the best route to the location
13.Abbreviations
PTW - Permit to Work
ITP - Inspection Test Plan
PPE - Personal Protective Equipment
JHA - Job Hazard Analysis
HSE - Health Safety Environment
MSDS- Material Safety Data Sheet
CPW - Consolidated Permit to Work