Testing Inspection Information

Flashover : No Serial No : 0007S106 Waranty Related : No


F&G 3S+1
Date of Inspection : 09/05/2021 Location :PE TMN AMANJAYA NO.3 If yes, already : No
reported in SMB

1) Visual Inspection

Condition
No Parts Remark
Good Damage Missing Of Parts
1 Bushing /
2 SF6 Gas Tank /
3 Pressure Relief Disk /
4 Cable Box /
5 Pressure Gauge /

2) Operational & Mechanism Test

Configuration : 3L+1T

LBS 1 LBS 2 LBS 3 Tx Switch 1 Tx Switch 2 Remarks


Switch "ON"/"OFF" / / / /
Earth "ON"/"OFF" / / / /
Tripping /

3) Electrical Test

Phase to Earth Resistance Phase to Phase Resistance


a) Continuity Test : FAIL R-E 2.2G Ω R-Y 3.6G Ω
Y-E 2.3G Ω Y-B 3.7G Ω
b) Insulation Resistance : FAIL B-E 2.5G Ω B-R 3.7G Ω
Note: All Switch Close (ON), Test Voltage 5kV DC for 1 min

Recommendation: TO REPLACE MRMU FOR SCADA DA

Tested by :

………………………………
Name : SAMRI BIN KASIM
Date : 09/05/2021