PROJECT : AL QALA-ID STREET PARKS

CLIENT : M/S. MODON PROPERTIES PJSC


CONSULTANT : M/S. ICON: INTELLIGENT CONSULT CONSULTANT ENGINEERS
CONTRACTOR : M/S. AL RYUM CONTRACTING & GENERAL TRANSPORT CO. LLC
REFERENCE : AQS-04-00001-00-11-ME-ARC-MI-000001[00]

COMMENTS REPLY
SL# CONSULTANT COMMENTS 11.05.2022 REPLY TO CONSULTANT COMMENTS
Submersible Pumps Set
Comply and attached.
1. Head Loss Calculation to be provided.
Kindly refer index 1
2. Level Control for the Pumps to be provided. Comply with Float switch
Manufacturer Undertaking letter for the suitability of
3. Comply with SS316 Pumps
operation with TSE water to be provided.
Flood Sensors to be provided to shut off the system upon
4. Comply with High level alarm
flood event.
Installation shall be as per approved shop drawings,
5. approved method statement and manufacturer Installation by Contractor
recommendation.
Proposed pumps are from the available stock
which was ordered without factory test report.
However, every pump from Davey factory is tested
Factory Test Certificates, Certificate of Origin and
prior to dispatch. Compliance letter from
6. Manufacturer Warranty (5 Years) shall be available during
manufacturer shall be provided at the time of
product delivery to site.
delivery.
Comply with 5 years of Warranty from the date of
TOC.
7. Protective Coating System for the pumps to be confirmed. Comply as per manufacturer standard
Comply and attached Operation and Maintenance
Operation and Maintenance Manual and End User Training to
8. Manual
be provided.
Kindly refer index 7
Recommended spare part list from the manufacturer to be
9. Comply as per Davey manufacturing
provided without any extra cost.
Final Acceptance subject to satisfactory testing and
10. Noted
commissioning.

Lifeline Trading Technical Submittal 2022


DRAINAGE SUBMERSIBLE PUMP SET
HEAD CALCULATIONS
1 DUTY + 1 STAND BY + CONTROL PANEL+ LIFTING CHAIN
LOCATION: IRRIGATION PUMP ROOM SUMP PIT
PROJECT : AL QALA-ID STREET PARKS
CLIENT : M/S. MODON PROPERTIES PJSC
CONSULTANT : M/S. ICON: INTELLIGENT CONSULT CONSULTANT ENGINEERS
CONTRACTOR : M/S. AL RYUM CONTRACTING & GENERAL TRANSPORT CO. LLC
REFERENCE : AQS-04-00001-00-11-ME-ARC-MI-000001[00]/H
Flow Calculation
Sump Pit Size = 1.2x0.7x0.6 m = 504 L
Considering the Evacuation Time 2½ minutes; So Required Flow
= 504/(2.5x60) = 3.36 L/s
Hence the flow considered as design drawing = 4 L/s
Head Calculation
H = (H1+H2+H3+D.P) SF
Where H Total Mano metric head
H1 Actual Height
H2 Friction loss in Pipe
H3 Friction loss in fittings
D.P Discharge Pressure required @ 0.30 Bar
SF Safety Factor 10%
H1 Calculations
H1 = Vertical Height + Sump pit Depth
H1 = 6+0.6 = 6.6 m
Horizontal Length of the pipe = 48 m
Total Length of the pipe = 6.6+48 = 54.6 m
Pipe Size = 3” uPVC pressure pipe
When 4 L/s Water flows through a 3” uPVC pressure pipe,
Friction loss in 1000 m = 9m
Friction Loss in 54.6 m, H2 = 9x54.6/1000 = 0.49 m
H3 Calculations
uPVC FITTINGS
Diameter 3”
Fittings Elbow Tee
Quantity 3 1
Equivalent Length(cm) 241 188
Equivalent Length(m) 7.23 1.88
Friction loss per unit(m/m) 0.09
Total friction loss(m) 0.0819 m

Total Head H = (H1+H2+H3+DP) SF


H = (6.6+0.49+0.0819+3)1.10= 11.189 m
Head Approx. H = 12 m
So, required Head and Flow = 4 L/s @ 12 m