Professional Documents
Culture Documents
A. SUBSTRUCTURE
Page 1 of 3
GABRI HOMES REAL ESTATE G+1 BLDG
Item
Description Unit Qty Rate Amount
A. SUB-STRUCTURE
1.EXCAVATION & EARTH WORKS
1.01 Site clearing and removing of the top
m2 -
200mm thick soil
1.02
Excavate in ordinary soil for trench depth
m3 -
not exceeding 30cm from reduced level.
1.03
Back Fill around stone masonry, the
desired level with selected borrowed non
m3 -
expansive material and compact in layers
not exceeding 20cm.
1.04
Cart away surplus excavated material to
m3 -
a distance not exceeding 2kms.
Page 3 of 3