You are on page 1of 1

LT panel operation Procedures

 Switching ON ACB
1. Ensure Transformer is in oN condition
2. ACB spring is in charged condition
3. Switch on ACB Manually by pressing the Close push button or handle in LT switch gear
panel
4. Check supply is in all phases at the LT panel of EB incomer
5. Always lock the cubicle after the operation

 Switching off ACB


1. Ensure spring is in charged condition
2. LT panel EB feeders in off condition
3. Switch off ACB Manually using trip push button

You might also like