Pump Shaft Alignment Service Process Report

Description : • Pump Shaft Alignment Service


Location: •CPL Main Sump Pit Area
Pump No: •Pump No-1

*CPL Main Surmp Pit Area Pump No. 1 Reading condition

Rim Aligment Face Aligment Amount of Shims required


0 0.25 3.3mm 3.6mm

0.3 R 0.3 0 A -.0.35 Rear Front


Set Point

3.3mm 3.6mm
0.4 0

Project Team Organize by Mr.Provider Co.,Ltd 1


Room-201,Building 658,
0.4 0 Yadanar bon 8th Street,
Aye Nandar Housing (2),
Mr.Provider Co.,Ltd.(Reg:No. 120430149) No.10/South Ward, Thaketa (11231)
www.mrprovider-mm.com Yangon, MYANMAR.

Description : • Pump Shaft Alignment Service


Location: • Alkali Pump Area
Pump No: •Pump No-2

*Alkali Pump Area Pump No. 2 Reading condition

Rim Aligment Face Aligment Amount of Shims required


+ 0.2 +0.2 1.2mm 1.2mm

0 R + 0.21 0 A +.0.35 Rear Front


Set Point

1.2 mm 1.2mm
- 0.01 + 0.15

Project Team Organize by Mr.Provider Co.,Ltd 2


Room-201,Building 658,
Yadanar bon 8th Street,
Aye Nandar Housing (2),
Mr.Provider Co.,Ltd.(Reg:No. 120430149) No.10/South Ward, Thaketa (11231)
www.mrprovider-mm.com Yangon, MYANMAR.

Description : • Pump Shaft Alignment Service


Location: • HWRT Pump Area
Pump No: •Pump No-2

*HWRT Pump Area Pump No. 2 Reading condition

Rim Aligment Face Aligment Amount of Shims required


0 +0.2 0.2mm 0.2mm

0 R - 0.3 0 A -.0.35 Rear Front


Set Point

0.2 mm 0.2mm
+ 0.2 0

Project Team Organize by Mr.Provider Co.,Ltd 3


Room-201,Building 658,
Yadanar bon 8th Street,
Aye Nandar Housing (2),
Mr.Provider Co.,Ltd.(Reg:No. 120430149) No.10/South Ward, Thaketa (11231)
www.mrprovider-mm.com Yangon, MYANMAR.

We did follow below method for above mention process


1 Visual Line-Up
2 Straightedge/Feeler Gauge
3 Rim and Face
4 Cross Dial
5 Reverse Dial

Straightedges are used to determine the offset between coupling halves. Corrections are made under all
four of the machines feet. traditional Feeler gauges or taper gauges measure the gap between coupling
halves at the bottom and top of the coupling.

uses dial indicators that take shaft-to-shaft readings except that the indicators are in the same plane with
each other. Both the offset and angularity are combined in the alignment calculation. This method
determines the misalignment by taking two rim readings at different points along the shaft.

properly measure the thickness of shims 1 mm and thin or


thicker . These thicknesses are nominal and not necessarily exact.
Insert the pre-cut shims under the foot of the machine until they
touch the bolt. Withdraw slightly.

Project Team Organize by Mr.Provider Co.,Ltd 4


Room-201,Building 658,
Yadanar bon 8th Street,
Aye Nandar Housing (2),
Mr.Provider Co.,Ltd.(Reg:No. 120430149) No.10/South Ward, Thaketa (11231)
www.mrprovider-mm.com Yangon, MYANMAR.

Properly tighting bolt & double nut with spring


Making of horizontal adjustment bolt. washer & flat washer

Prevent Nut & Bolt Self-Loosening by


Screw sealing glue Bolt Fixation by
Mark the tightened fastener and surrounding
LOCTITE 243

*We would like to inform you that Mr.Provider service team is responsible for the above process and
would like to consult with you for further improvement.

We will always strive for your trust


Kind Regards,

Min Thitsar
+959 5167268
(Welcome to call 24/7)

Project Team Organize by Mr.Provider Co.,Ltd 5

You might also like