You are on page 1of 4

JOB: East West Metro project of KMRCL [Contract Package No: EWS-1(R)]

CLIENT: Kolkata Metro Rail Corporation


GCC: MYCEL
CONTRACTOR: Simplex Infrastructures Limited

Form Number: 012/SIL/QAQC/SAF/PIER/001 Revision No: 0 Date:


Structure Identification: Location:

SAFETY CHECKLIST
Sl.
Items Yes No Remarks
No.

1 All workers engaged in Concreting wear gum boot

2 All workers wearing safety helmets

All switch board are properly covered and electrical lines are
3
carried on bamboo poles with insulated wire
Welder and gas cutters are wearing welding helmets and
4
Gloves.
5 All Earthing is done using insulated cables

Emergency medical kit and other emergency facilities are


6
provided at site
All lights are properly covered using insulated wires,
7
Halogen lamps and Hand lamp with wire mesh covering

8 All hot cutting scrape are quenched and remove properly

All oil, fuel installation stock yard are properly protected


9
with temp. fire fighting equipments

10 Safety officer and supervisor s are on constant duty at site

All cranes, Backhoe Loader, Hydra etc. Drivers / Operators


11
have the required certificates
Proper warning sign board / instruction board in Hindi and
12
English should be affixed by the contractor

13 All machine have valid fitness certificates

14 All workers have cotton clothing with company’s monogram

SIL Representative KMRCL/MYCEL Representative


JOB: East West Metro project of KMRCL [Contract Package No: EWS-1(R)]
CLIENT: Kolkata Metro Rail Corporation
GCC: MYCEL
CONTRACTOR: Simplex Infrastructures Limited

Form Number: 012/SIL/QAQC/SUR/PIER/002 Revision No: 0 Date:


Structure Identification: Location:

REFERENCE POINTS FOR CHECKING PIER LOCATION

Center of Pier
marked by Survey

d1

d2

Pegs driven in the ground at d1 & d2 m from center and at right angles to each other , before placing and fixing of pier
starter.

Center of Pier
marked by Survey
D1

D2

Check the distance D1 & D2 while driving. D1 = d1 – ½ dia of pier - thickness of Plate
D2 = d2 – ½ dia of pier - thickness of Plate

Page – 1 of 2

SIL Representative KMRCL/MYCEL Representative


JOB: East West Metro project of KMRCL [Contract Package No: EWS-1(R)]
CLIENT: Kolkata Metro Rail Corporation
GCC: MYCEL
CONTRACTOR: Simplex Infrastructures Limited

Form Number: 012/SIL/QAQC/SUR/PIER/002 Revision No: 0 Date:


Structure Identification: Location:

REFERENCE POINTS FOR CHECKING PIER LOCATION

Difference between
Theoretical Actual Distance and
Dist. Actual Dist.
Dist Theoretical Distance Whether Acceptable or Not
SIL Marking
(iii - ii)
(i) (ii) (iii) (iv) (v)
d1

d2

D1

D2

Representative KMRCL/MYCEL Representative

Page – 2 of 2
JOB: East West Metro project of KMRCL [Contract Package Nos.: EWS-1(R)]
CLIENT: Kolkata Metro Rail Corporation
GCC: MYCEL
CONTRACTOR: Simplex Infrastructures Limited

Form Number: 012/SIL/QAQC/PIER/010 Revision No: 0 Date:


Structure Identification: Location:

POST CONCRETING INSPECTION

A.

Date of Concreting

Date of deshuttering

B.

Sl.
Inspections Findings Remarks/ Corrective measures
No.

01 Size of the Pier

02 Honeycomb

03 Bulge

All the corrective measures, as instructed, have been followed and the Pier is found satisfactory and acceptable.

SIL Representative KMRCL/MYCEL Representative