Professional Documents
Culture Documents
Br. 927-1 Ch.169.140kM
Br. 927-1 Ch.169.140kM
Name of work :-
CONDUCTING GEOTECHNICAL INVESTIGATION (INCLUDING STATION
BUILDINGS), PREPARATION OF ESP OF STATIONS, DETAILED
STRUCTURAL DRAWINGS FOR STATION BUILDINGS, QUARTERS, GAD &
DETAILED DESIGN DRAWINGS OF MAJOR BRIDGES, MINOR BRIDGES,
ROBS & RUBS INCLUDING ITS APPROACHES, ETC. INCLUDING MARKING
OF CENTRE LINE OF PROPOSED ALIGNMENT, FIXING OF BOUNDARY
STONES ON BOTH SIDES OF ALIGNMENT AND AT JUNCTIONS OF ROW,
COUNTING OF TREE AND GIRTH MEASUREMENT, ETC. FROM CHAINAGE
KM 157 (EXCLUDING DIGRAS STATION) TO KM. 285.5 (EXCLUDING
NANDED STATION) IN CONNECTION WITH YAVATMAL-NANDED NEW
B.G. LINE PROJECT IN STATE OF MAHARASHTRA, INDIA
Client :-
Prepared By:
Flood Estimation:
3
50 years design flood discharge (m /s) = Q50 = 0.278 C I A
Where,
C= Runoff coefficient
50 year rainfall intensity (mm/h) lasting for tc hour duration
I=
where tc is the time of concentration
2
A= Catchment area in Km
0.2
Now, C= X (R F)
Value of "X" depends upon the soil type and location as given in Chart No 1
Chart No 1
Sl. No. Description of catchment Value of X
1 Sandy Soil/sandy loam/arid areas 0.249
2 Alluvium / silty loam / coastal areas 0.332
3 0.345
tc = [ L / H ]
= [ 0.412^3 / 42.1799999999999 ]^ 0.345
= 0.11 h
= 7 min
STEP-3:- Calculation of areal reduction factor depending upon catchment
area and duration of rainfall (F) :
Value of F
Catchment area Duration of rainfall
2
km < 30 mins 30 to 60 mins 60 to 100 mins
A < 2.5 0.72 0.81 0.88
2.5≤A≤5 0.71 0.8 0.87
5<A≤13 0.7 0.79 0.86
13<A<25 0.68 0.78 0.85
Note: Rainfall duration shall be equal to the calculated t c for the catchment
F= 0.72
And, For Black cotton/ clayey soil / lightly covered / lightly wooded / plain and barren /
submontane and plateau
X = 0.456
STEP-5:- Calculation of I :
From Fig. 2
The location of this bridge lies in sub-zone 3f of Hydrometerological Subzones of India
From Fig. 4
Thus, for curve corresponding to Zone 3
And,
For T = tc hrs = 0.11 h,
Ratio of 50 yrs tc hrs rainfall / 50 yrs 24 hrs rainfall = 0.075
For T = 1 h,
Ratio of 50 yrs 1 hr rainfall / 50 yrs 24 hrs rainfall = 0.38
Therefore, Ratio of 50 yrs tc hrs rainfall / 50 yrs 1 hr rainfall (K)= [ 0.075/0.38 ] = 0.197
3
Calculation of Regime width for discharge of 1.00 m /s
Pw=1.811 X C X Q^1/2 (As per cl No. 4.5.3 of IRS Substructure foundation code.)
Where, P= Wetted perimeter in meters which can be taken as the effective width of waterway
From the above data and also considering the suitable abutment location and site condition,the proposed
bridge has been fixed as the details given below:
No. of Span = =1
Span Arrangement =2x2M _RCC box
Total Bridge length (dirt wall inner to inner) = 2.700 m
Let,
Width of side wall = 0.350 m
2/3 1/2
Velocity = (1/n)x((B'xd)/(B'+2d)) x (S) = 2.122 m/s
Afflux and Maximum scour level calculations
HFL = 374.292 m ( From Calculated data)
LBL = 385.276 m ( From survey data)
Width of side wall = 0.350 m
Calculation of afflux:
Discharge = 1.0 cumec
Velocity (V) = 2.122 m/s
2
Area (A) = 0.47 m
Total Linear Waterway = 2.7 m
Average Depth = 0.47/2.7 = 0.17 m
Clear Linear Waterway due to obstruction= 2 m
2
Area(a) = 0.34 m
·
CATCHMENT AREA= 35100 Sqm.
20°0'0"N
20°0'0"N
Distance= 412 m.
19°59'50"N
19°59'50"N
Centroid
19°59'40"N
Origin
19°59'40"N
LEGEND
Bridge Location
Centroid
Origin
Catchment Area
Longest Stream
River
Proposed Railway
Elevation in metre
386 - 388
Longest Stream Length- 412 m.
19°59'30"N
388 - 391
19°59'30"N
391 - 395
395 - 400
400 - 406
406 - 411
411 - 414
414 - 419
419 - 422
422 - 426
77°35'30"E 77°35'40"E