Professional Documents
Culture Documents
BLOCK ESTIMATE
ESTIMATE REF: IVPL/WR/TWG/B/1
DATE: 15.04.2023
TANK WAGON FILLING FACILITY AT GSPCL INSIDE THE PLANT BOUNDRAY AREA
NET
GROSS TOT
SI. AMOU TOTAL AL
DESCRIPTION QTY UNIT RATE GST
NO. NT ( (RE
CAPEX) VEX
)
IN
IN IN IN
LAK
LAKHS LAKHS LAKHS
HS
FACILTIES AT EXISTING
PLANT (LPG TANK WAGON
A
LOADING PUMPING
SECTION)
Page 1 of 6
TANK WAGON FILLING FACILITY INSIDE GCPL PLANT
LPG VAPOUR LINE (8) " (A/G) 1000 M 7500 75.00 13.50 88.50
UTITKLITES (NITROGEN/
PORTABLE WATER PIPE
LINE TAPPING FROM
EXISTING PLANT (ASSUME 2000 M 1650 33.00 5.94
DISTANCE FROM TAP OFF
POINT TO GANTRY
MANIFOLD 1KM)
INSTRUMENT AIR PIPE LINE
TAPPING FROM EXISTING
PLANT (ASSUME DISTANCE 1000 M 1800 18.00 3.24
FROM TAP OFF POINT TO
GANTRY MANIFOLD 1KM)
FIRE WATER PIPE LINE (8”)
A/G TAPPING FROM TWO 2000 M 5000 100.00 18.00 118.00
POINTS
COMMUNICATION SYSTEM &
METERING AT BOTH THE LOT LS 1500000 15.00 2.70 17.70
END
SUB. TOTAL 378.50 68.13 386.45
Page 2 of 6
TANK WAGON FILLING FACILITY INSIDE GCPL PLANT
BASIC ENGG,
C STUDIES/INVESTIGATIONS &
PROJECT OFFICE, NOC
SOIL INVEST. & DESIGN
1 RECOMMENDATIONS FOR 1 LS 1000000 10.00 1.80 11.80
FOUNDATIONS
Page 3 of 6
TANK WAGON FILLING FACILITY INSIDE GCPL PLANT
NO
5 LOADING ARMS - TOP 64 300000 192 34.56 226.56
S
NO
6 VALVES - 3" DIA 128 25000 32 5.76 37.76
S
STRUCTURAL CROSS
7 OVERS/ PLATFORMS/ 15 MT 110000 16.5 2.97 19.47
DIRECT ACCESS
SUB TOTAL 364.50 65.61 430.11
FIRE FIGHTING SYSTEM TLF
H
GANTRY
MV SPRAY SYSTEM FOR 1250000
4 1 LS 125 22.50 147.5
TWF GANTRY 0
FIRE EX. & MISC FIRST AID
5 1 LOT 2500000 25 4.50 29.5
FIRE FIGHTING ITEMS
SUB TOTAL 150.00 27.00 177.00
ELECTRICAL WORKS AND
I
EQUIPMENTS AT TWF
POWER & CONTROL
1 1 LOT 5000000 50 9.00 59
CABLES
2 EARTHING SYSTEM 1 LOT 1500000 15 2.70 17.7
3 ELECTRICAL SAFETY ITEMS 1 LOT 1000000 10 1.80 11.8
Page 4 of 6
TANK WAGON FILLING FACILITY INSIDE GCPL PLANT
K MISCELLEANOUS ITEMS
Page 5 of 6
TANK WAGON FILLING FACILITY INSIDE GCPL PLANT
(C)] = (E)
CER @ 0.75% OF PROJECT
COST = (F) (CER:
42.68
CORPORATE SOCAIL
RESPONSIBILITY)
GRAND TOTAL 6029.33 0.00
Rs.
SAY 6000
lakhs
ASSUMPTIONS
6 Sizes of the pipe line & equipment capacity may undergo change after detailing
Plot survey and Geo Tech reports are not available therefore sub structure work, earthing
7
filling /cutting etc. is excluded from the cost.
Page 6 of 6