I&C Da
2
Powermec
I&C Da
2
Powermec
I&C Da
2
Powermec
I&C Da
2
Powermec
I&C Da
CM Unit 3 Field 1 1st vesel vent valve, limit checked after MMD work
Manpower: Pavendan,
Anwar, Shakthi, Sunil, Remarks
Murugan
Night:-Shahid
2
Powermec
I&C Da
Unit 3 ESP 6th field 8th vessel vent valve operation checked,
CM operation ok but open limit indication continously coming, to be
checked
Unit 3 ECO 4th vessel feed valve operation checked, operation ok,
CM But open limit continously coming, to be checked
Manpower: Pavendan,
Anwar, Shakthi, Sunil, Remarks
Murugan
Night:-Shahid