You are on page 1of 29

GENERAL NOTES.

13 - CONCRETE CUBE TEST REPORT SHALL BE KEPT AT


SITE.
1- ALL DIMENSIONS ARE IN FEET AND INCHES.
2- 14 - ANY DEVIATION/CONFLICT FROM ARCHITECTURAL OR
STRUCTURAL DRAWINGS SHOULD BE INFORMED TO THE
3- ALL INTERNAL AND EXTERNAL SIZES ARE FROM BLOCK MASONRY.
CONSULTANT AND ENGINEER BEFORE EXECUTION.
4- ALL THE SIZES OF STRUCTURAL MEMBERS SUCH AS BEAM 15 - EXECUTION WILL BE DONE ACCORDING TO THE
COLUMN / SLAB ETC. SHALL BE FOLLOWED
APPROVED SPECIFICATIONS.
FROM STRUCTURAL DRAWINGS.
16 - PROPERLY TESTED CONSTRUCTION MATERIALS
5- ALL LEVELS SHALL BE READ WITH REFERENCE SHALL BE USED AND REPORTS TO BE KEPT ON
TO THE BENCH MARK. SITE.
6- DEMARCATION OF PLOT SHALL BE DONE BY THE 17 - CONTRACTOR WILL SUBMIT THE SHOP DRAWINGS OF
SURVEYOR AND VERIFIED BY THE ENGINEER. EACH AND EVERY TRADE AND GET APPROVAL
FROM THE CONCERNED CONSULTANT BEFORE
7- CONTRACTOR WILL CONFIRM THE DRAWINGS ARE STARTING THE WORK AT SITE.
ACCORDING TO THE SITE IN WRITING
BEFORE STARTING THE WORK. 18 - CONTRACTOR WILL FENCE THE SITE FOR PROTECTION
OF PUBLIC.
8- CONTRACTOR WILL CONFIRM THE DETAILS ARE
CHECKED THAT FULL FILL THE REQUIREMENTS 19 - COPIES OF PLINTH AND SLAB VERIFICATION SHALL BE
BEFORE START OF WORK. SUBMITTED TO THE CONSULTANT.
9- ALL THE DRAWINGS SHALL BE READ IN CONJUNCTION 20- TAKE OFF POINTS OF ALL THE UTILITIES SHALL BE
WITH STRUCTURE, PLUMBING AND ELECTRICAL ETC. COORDINATED WITH INFRASTRUCTURE DRAWINGS.
10 - ALL BLOCK MASONRY ARE 6" AND 4" THICK UNLESS
OTHERWISE NOTED. 21- ALL THE SIZES & DETAILS OF MEP EQUIPMENTS SHALL BE
11 - ALL LAYOUT WORKS TO BE CHECKED BY THE ENGINEER. CONFIRMED FROM MANUFACTURERS DRAWINGS.

12 - SITE VISIT REPORT SHALL BE RECORDED


& MAINTAINED AT SITE.
SCHEDULE OF FINISHES

Flooring Wall finish


a b
Skirting Ceiling
Riser
c d
a. b.
1- Porcelain tiles 16" x 16". 1- 1/2" thick plaster with plastic emulsion paint.
2- Glazed tiles (matt finish) 12" x 12" 2- Glazed tiles 8" x 12" up to 4'-0" height
3- Glazed Ceramic tiles 8" x 12". (7' ht. on shower wall)&1/2" thick plaster
4- Full length 11" or 12" wide with plastic emulsion paint above Tiles.
botisina marble 3/4" thick. 3- 2'-0" high glazed tiles. 4"x4" above counter
PLOT 5-
6-
Botisina marble 12"x12"x1/2".
National tiles non skid 4"x8".
and 1/2" thick plaster with
emulsion paint above tiles and
7- 2" TH. C.C.(1:2:4)with steel 4- 3/4" thick plaster with weather shield paint.
trowel smooth finish
8- C.C. Chequred Tiles in Ramp

c. d.
1- Porcelain tiles skirting 16" x 4". 1- 1/2" thick plaster with vniyle emulsion paint.
2- Glazed tiles skirting 12" x 4". 2- 1/2" thick plaster with plastic emulsion paint.
3- Botecina section marble 3/8" thick
and 17" long on riser and wall.
4- 4'-0" High glazed ceramic tiles
8"X12"

ROAD

PLOT
UP UP

CLIENT:

PAKISTAN NAVY WELFARE HOUSING SCHEME


LEAD CONSULTANT:
U.G.TANK U.G.TANK
6'x8'x7' 6'x8'x7'
2100.GLS. 2100.GLS. 103, Rufi Trade Centre, SB-29 Block 13-C Main University Road,
Gulshan - e - iqbal Karachi..... Telephone: 021-34811795-6
Website:www.archvisionplus.com Email: archplus@cyber.net.pk

SUB CONSULTANT:

B-3 ROYAL AVENUE, 2ND FLOOR, MAIN UNIVERSITY ROAD,


BLOCK 13-C, GULSHAN-E-IQBAL, KARACHI.
TEL: 021-4968404, 4968953 FAX: 021-4971188

SUB CONSULTANT:

ROAD

COL. LAYOUT PLAN CONSTRUCTION DRAWING

P.N.W.H.S BIN QASIM


180 SQ.YD. BUNGALOW

COLUMN LAYOUT

A-01

P.W.N.H.S AVP/111/18
SCHEDULE OF FINISHES

Flooring Wall finish


a b
Skirting Ceiling
Riser
c d
a. b.
1- Porcelain tiles 16" x 16". 1- 1/2" thick plaster with plastic emulsion paint.
2- Glazed tiles (matt finish) 12" x 12" 2- Glazed tiles 8" x 12" up to 4'-0" height
3- Glazed Ceramic tiles 8" x 12". (7' ht. on shower wall)&1/2" thick plaster
4- Full length 11" or 12" wide with plastic emulsion paint above Tiles.
botisina marble 3/4" thick. 3- 2'-0" high glazed tiles. 4"x4" above counter
5- Botisina marble 12"x12"x1/2". and 1/2" thick plaster with
6- National tiles non skid 4"x8". emulsion paint above tiles and
7- 2" TH. C.C.(1:2:4)with steel 4- 3/4" thick plaster with weather shield paint.

PLOT 8-
trowel smooth finish
C.C. Chequred Tiles in Ramp

OPEN OPEN c. d.
1- Porcelain tiles skirting 16" x 4". 1- 1/2" thick plaster with vniyle emulsion paint.
BATH-2 BATH-2 2- Glazed tiles skirting 12" x 4". 2- 1/2" thick plaster with plastic emulsion paint.
3- Botecina section marble 3/8" thick
and 17" long on riser and wall.
4- 4'-0" High glazed ceramic tiles
CONC. CONC. 8"X12"
BATH-1 BATH-1

W/R

W/R
W/R W/R

OPEN

OPEN
CONC. CONC.

CONC. CONC.

BED BED
BED BED

CONC. CONC. CONC. CONC.


KITCHEN KITCHEN
LOUNGE LOUNGE
ROAD

OPEN

PLOT
UP UP

TRADE -11" TRADE -11"


NOSING-1" CONC. CONC. NOSING-1"
RISER-6 1/2" RISER-6 1/2"
CLIENT:

PARKING BED/DRAWING BED/DRAWING PARKING


CONC. CONC.

PAKISTAN NAVY WELFARE HOUSING SCHEME


CONC. CONC.
LEAD CONSULTANT:

U.G.TANK U.G.TANK
6'x8'x7' 6'x8'x7' 103, Rufi Trade Centre, SB-29 Block 13-C Main University Road,

2100.GLS. 2100.GLS. Gulshan - e - iqbal Karachi..... Telephone: 021-34811795-6


Website:www.archvisionplus.com Email: archplus@cyber.net.pk
BATH-3 BATH-3 SUB CONSULTANT:

B-3 ROYAL AVENUE, 2ND FLOOR, MAIN UNIVERSITY ROAD,


BLOCK 13-C, GULSHAN-E-IQBAL, KARACHI.
TEL: 021-4968404, 4968953 FAX: 021-4971188

SUB CONSULTANT:

GRATING 6"x6" GRATING 6"x6"


ROAD

GROUND FLOOR PLAN CONSTRUCTION DRAWING

P.N.W.H.S BIN QASIM


180 SQ.YD. BUNGALOW

GROUND FLOOR PLAN

A-02

P.W.N.H.S AVP/111/18
SCHEDULE OF FINISHES

Flooring Wall finish


a b
Skirting Ceiling
Riser
c d
a. b.
1- Porcelain tiles 16" x 16". 1- 1/2" thick plaster with plastic emulsion paint.
2- Glazed tiles (matt finish) 12" x 12" 2- Glazed tiles 8" x 12" up to 4'-0" height
3- Glazed Ceramic tiles 8" x 12". (7' ht. on shower wall)&1/2" thick plaster
4- Full length 11" or 12" wide with plastic emulsion paint above Tiles.
botisina marble 3/4" thick. 3- 2'-0" high glazed tiles. 4"x4" above counter
5- Botisina marble 12"x12"x1/2". and 1/2" thick plaster with
6- National tiles non skid 4"x8". emulsion paint above tiles and
7- 2" TH. C.C.(1:2:4)with steel 4- 3/4" thick plaster with weather shield paint.

PLOT 8-
trowel smooth finish
C.C. Chequred Tiles in Ramp

c. d.

OPEN OPEN 1- Porcelain tiles skirting 16" x 4".


2- Glazed tiles skirting 12" x 4".
1- 1/2" thick plaster with vniyle emulsion paint.
2- 1/2" thick plaster with plastic emulsion paint.
3- Botecina section marble 3/8" thick
and 17" long on riser and wall.
4- 4'-0" High glazed ceramic tiles
8"X12"

OPEN

OPEN
ROOF ROOF
2"THICK (avg.)C.C.1:2:4 2"THICK (avg.)C.C.1:2:4
LAID TO SLOPE LAID TO SLOPE
OPEN

OPEN
ROAD

PLOT
CLIENT:

DN DN
PAKISTAN NAVY WELFARE HOUSING SCHEME
LEAD CONSULTANT:

103, Rufi Trade Centre, SB-29 Block 13-C Main University Road,
Gulshan - e - iqbal Karachi..... Telephone: 021-34811795-6
Website:www.archvisionplus.com Email: archplus@cyber.net.pk

SUB CONSULTANT:

B-3 ROYAL AVENUE, 2ND FLOOR, MAIN UNIVERSITY ROAD,


BLOCK 13-C, GULSHAN-E-IQBAL, KARACHI.
TEL: 021-4968404, 4968953 FAX: 021-4971188

SUB CONSULTANT:

ROAD

CONSTRUCTION DRAWING
ROOF PLAN
P.N.W.H.S BIN QASIM
180 SQ.YD. BUNGALOW

ROOF PLAN

A-03

P.W.N.H.S AVP/111/18
Lev: SSL+22'-6" Lev: SSL+22'-6"

GROVE 1/2"x1/2" GROVE 1/2"x1/2"

Lev: SSL+12'-3" Lev: SSL+12'-3"

Lev: SSL+1'-6" Lev: SSL+1'-6"


PLINTH PLINTH

ROAD ROAD

Lev: SSL+22'-6"
CLIENT:

PAKISTAN NAVY WELFARE HOUSING SCHEME


LEAD CONSULTANT:

103, Rufi Trade Centre, SB-29 Block 13-C Main University Road,
Gulshan - e - iqbal Karachi..... Telephone: 021-34811795-6
Website:www.archvisionplus.com Email: archplus@cyber.net.pk

SUB CONSULTANT:

B-3 ROYAL AVENUE, 2ND FLOOR, MAIN UNIVERSITY ROAD,


BLOCK 13-C, GULSHAN-E-IQBAL, KARACHI.
TEL: 021-4968404, 4968953 FAX: 021-4971188

SUB CONSULTANT:

CONSTRUCTION DRAWING

P.N.W.H.S BIN QASIM


180 SQ.YD. BUNGALOW

ELEVATIONS

A-04

P.W.N.H.S AVP/111/18
Lev: SSL+22'-6"

CLIENT:

Lev: SSL+22'-6" Lev: SSL+22'-6"

PAKISTAN NAVY WELFARE HOUSING SCHEME


LEAD CONSULTANT:

103, Rufi Trade Centre, SB-29 Block 13-C Main University Road,
Gulshan - e - iqbal Karachi..... Telephone: 021-34811795-6
Website:www.archvisionplus.com Email: archplus@cyber.net.pk

SUB CONSULTANT:

Lev: SSL+12'-3" Lev: SSL+12'-3"

B-3 ROYAL AVENUE, 2ND FLOOR, MAIN UNIVERSITY ROAD,


BLOCK 13-C, GULSHAN-E-IQBAL, KARACHI.
TEL: 021-4968404, 4968953 FAX: 021-4971188

SUB CONSULTANT:

CONSTRUCTION DRAWING

P.N.W.H.S BIN QASIM


180 SQ.YD. BUNGALOW

SECTION-AA
ELEVATION & SECTION-AA

A-05

P.W.N.H.S AVP/111/18
Lev: SSL+22'-9" Lev: SSL+22'-6"

9" SUNK SLAB Lev: SSL+12'-3"


Lev: SSL+12'-3"

BEAM SIZE
REF.STR.DRG.

Lev: SSL+1'-6"
KIT BED
PLINTH

ROAD

U.G.W TANK
SECTION-BB

CLIENT:
Lev: SSL+22'-6"

PAKISTAN NAVY WELFARE HOUSING SCHEME


LEAD CONSULTANT:

103, Rufi Trade Centre, SB-29 Block 13-C Main University Road,
Gulshan - e - iqbal Karachi..... Telephone: 021-34811795-6
Website:www.archvisionplus.com Email: archplus@cyber.net.pk

9" SUNK SLAB SUB CONSULTANT:


Lev: SSL+12'-3" 9" SUNK SLAB
B-3 ROYAL AVENUE, 2ND FLOOR, MAIN UNIVERSITY ROAD,
BLOCK 13-C, GULSHAN-E-IQBAL, KARACHI.
TEL: 021-4968404, 4968953 FAX: 021-4971188

SUB CONSULTANT:
BEAM SIZE BEAM SIZE
REF.STR.DRG. REF.STR.DRG.

CONSTRUCTION DRAWING

P.N.W.H.S BIN QASIM


180 SQ.YD. BUNGALOW

SECTION-CC SECTION-BB,CC

A-06

P.W.N.H.S AVP/111/18
F.F. LEV. F.F. LEV. F.F. LEV.

FOR EXHAUST

GLAZED TILE
4"X4"
4"X4" 4"X4"
GLAZED TILE GLAZED TILE

F.F. F.F.
LEV.LEV.
F.F. LEV. F.F. LEV.

01 KITCHEN PLAN SCALE:3/8"=1'-0" 02 ELEVATION-E -1 SCALE:3/8"=1'-0" 03 ELEVATION-E -2 SCALE:3/8"=1'-0" 04 ELEVATION-E-3 SCALE:3/8"=1'-0"

5mm. TH.
EXHAUST
FAN
SLIDE SLIDE SLIDE SLIDE SLIDE SLIDE FROSTED GLASS
2"x2" FRAME
ALUMINUM ALUMINUM ALUMINUM ALUMINUM
STYLE STYLE STYLE STYLE 5mm. TH.
FROSTED GLASS

5mm. TH. CLEAR


5mm. TH. CLEAR
5mm. TH. CLEAR

5mm. TH. CLEAR

5mm. TH. CLEAR

5mm. TH. CLEAR

ALUMINUM ALUMINUM ALUMINUM ALUMINUM


FRAME FRAME FRAME FRAME openable

GLASS
GLASS
GLASS

GLASS

GLASS

GLASS

F.F. LEVEL F.F. LEVEL F.F. LEVEL F.F. LEVEL

SLIDING WINDOW ELEVATION -W1 SLIDING WINDOW ELEVATION -W2 KIT.SLIDING WINDOW ELEVATION - W3 ELEVATION - V1
SCALE:- 1 2=1'-0" SCALE:- 1 2=1'-0" SCALE:- 1 2=1'-0" SCALE:- 1 2=1'-0"

CLIENT:
ALUMINUM FLY PROOF
FRAME SHUTTER
ALUMINUM FLY PROOF ALUMINUM FLY PROOF ALUMINUM FLY PROOF SLIDE IN SIDE
FRAME SHUTTER FRAME SHUTTER FRAME SHUTTER
SLIDE IN SIDE SLIDE IN SIDE SLIDE IN SIDE
SLIDE
5mm. TH. CLEAR GLASS OUT SIDE
SLIDE SLIDE SLIDE
5mm. TH. CLEAR GLASS OUT SIDE 5mm. TH. CLEAR GLASS OUT SIDE 5mm. TH. CLEAR GLASS OUT SIDE
SLIDING WINDOW PLAN - V1 PAKISTAN NAVY WELFARE HOUSING SCHEME
SLIDING WINDOW PLAN - W1 SLIDING WINDOW PLAN - W2 KIT.SLIDING WINDOW PLAN - W3 SCALE:- 1 2=1'-0"

SCALE:- 12=1'-0" SCALE:- 1 2=1'-0" SCALE:- 1 2=1'-0"


LEAD CONSULTANT:

MALAYSIAN SKIN COM. PLY MALAYSIAN SKIN COM. PLY MALAYSIAN SKIN COM. PLY
AS PER APPROVED DESIGN AS PER APPROVED DESIGN AS PER APPROVED DESIGN

3'-3" 3'-0" 2'-6" 103, Rufi Trade Centre, SB-29 Block 13-C Main University Road,
6 6
2"

2"

6 Gulshan - e - iqbal Karachi..... Telephone: 021-34811795-6


2"

Website:www.archvisionplus.com Email: archplus@cyber.net.pk

SUB CONSULTANT:

M.S. FRAME
M.S. FRAME
M.S. FRAME
B-3 ROYAL AVENUE, 2ND FLOOR, MAIN UNIVERSITY ROAD,
BLOCK 13-C, GULSHAN-E-IQBAL, KARACHI.
TEL: 021-4968404, 4968953 FAX: 021-4971188

SUB CONSULTANT:
7'-0"

7'-0"

7'-0"

7 7 7

ALUMINUM
FRAME

IN SIDE
3'-4"

3'-4"

3'-4"

5mm. TH. CLEAR GLASS


CONSTRUCTION DRAWING
OUT SIDE
F.F. LEVEL F.F. LEVEL F.F. LEVEL WINDOW PLAN - W4
SCALE:- 1 2=1'-0"

TYPICAL DOOR ELEVATION - D1


SCALE:- 3 4"=1'-0"
TYPICAL DOOR ELEVATION - D2
SCALE:- 3 4"=1'-0"
TYPICAL DOOR ELEVATION - D3
SCALE:- 3 4"=1'-0"
P.N.W.H.S BIN QASIM
180 SQ.YD. BUNGALOW

DETAIL OF KIT. & DOORS WINS.

A-07

P.W.N.H.S AVP/111/18
SCHEDULE OF FINISHES

Flooring Wall finish


a b
Skirting Ceiling
Riser
c d
a. b.
1- Porcelain tiles 16" x 16". 1- 1/2" thick plaster with plastic emulsion paint.
2- Glazed tiles (matt finish) 12" x 12" 2- Glazed tiles 8" x 12" up to 4'-0" height
3- Glazed Ceramic tiles 8" x 12". (7' ht. on shower wall)&1/2" thick plaster
4- Full length 11" or 12" wide with plastic emulsion paint above Tiles.
botisina marble 3/4" thick. 3- 2'-0" high glazed tiles. 4"x4" above counter
5- Botisina marble 12"x12"x1/2". and 1/2" thick plaster with
PLOT 6-
7-
National tiles non skid 4"x8".
2" TH. C.C.(1:2:4)with steel
emulsion paint above tiles and
4- 3/4" thick plaster with weather shield paint.
trowel smooth finish
8- C.C. Chequred Tiles in Ramp

30'-0" 30'-0"

54'-0"

54'-0"
c. d.
1- Porcelain tiles skirting 16" x 4". 1- 1/2" thick plaster with vniyle emulsion paint.
OPEN BATH BATH OPEN 2- Glazed tiles skirting 12" x 4". 2- 1/2" thick plaster with plastic emulsion paint.
3- Botecina section marble 3/8" thick
3 2 5 1 and 17" long on riser and wall.
3 2 a b a b
a b 4- 4'-0" High glazed ceramic tiles
4 1 4 1 8"X12"
c c d
d
BATH BATH

W/R

W/R
3 2 3 2
a b a b
4 1 4 1
c d W/R W/R c d

OPEN

OPEN
BED BED
5 1 5 1
BED a b a b BED
1 1 1 1
5 1 c d c d 5 1
a b a b
1 1 1 1
c d c d

KITCHEN KITCHEN
3 3 LOUNGE LOUNGE 3 3
a b a b
3 1 5 1 3 1
5 1
ROAD

OPEN

OPEN
PLOT

PLOT
c d a b c d
a b
1 1 1 1
c d c d

1 6 6 1
b a a b
2 4 UP UP 4 2
d c c d

1 5 5 1
b a a b
4 4
c c
CLIENT:

BED/DRAWING BED/DRAWING
PARKING 5 1 5 1 PARKING
a b a b
1 1 1 1
c d c d PAKISTAN NAVY WELFARE HOUSING SCHEME

5 1 LEAD CONSULTANT:
5 1
a b a b

103, Rufi Trade Centre, SB-29 Block 13-C Main University Road,
Gulshan - e - iqbal Karachi..... Telephone: 021-34811795-6
Website:www.archvisionplus.com Email: archplus@cyber.net.pk

SUB CONSULTANT:
BATH BATH
3 2 3 2
a b a b B-3 ROYAL AVENUE, 2ND FLOOR, MAIN UNIVERSITY ROAD,
4 1 4 1 BLOCK 13-C, GULSHAN-E-IQBAL, KARACHI.
c d c d TEL: 021-4968404, 4968953 FAX: 021-4971188

SUB CONSULTANT:

ROAD
ROAD
CONSTRUCTION DRAWING
FINISHES LAYOUT PLAN
P.N.W.H.S BIN QASIM
180 SQ.YD. BUNGALOW

FINISHES PLAN
GROUND FLOOR

A-08

P.W.N.H.S AVP/111/18
SCHEDULE OF FINISHES

Flooring Wall finish


a b
Skirting Ceiling
Riser
c d
a. b.
1- Porcelain tiles 16" x 16". 1- 1/2" thick plaster with plastic emulsion paint.
2- Glazed tiles (matt finish) 12" x 12" 2- Glazed tiles 8" x 12" up to 4'-0" height
3- Glazed Ceramic tiles 8" x 12". (7' ht. on shower wall)&1/2" thick plaster
4- Full length 11" or 12" wide with plastic emulsion paint above Tiles.
botisina marble 3/4" thick. 3- 2'-0" high glazed tiles. 4"x4" above counter
5- Botisina marble 12"x12"x1/2". and 1/2" thick plaster with
6- National tiles non skid 4"x8". emulsion paint above tiles and
7- 2" TH. C.C.(1:2:4)with steel 4- 3/4" thick plaster with weather shield paint.
trowel smooth finish
8- C.C. Chequred Tiles in Ramp

PLOT c. d.
1- Porcelain tiles skirting 16" x 4". 1- 1/2" thick plaster with vniyle emulsion paint.
30'-0" 30'-0" 2- Glazed tiles skirting 12" x 4". 2- 1/2" thick plaster with plastic emulsion paint.
3- Botecina section marble 3/8" thick

54'-0"

54'-0"
and 17" long on riser and wall.
OPEN OPEN 4- 4'-0" High glazed ceramic tiles
8"X12"

OPEN

OPEN
ROOF ROOF
2"THICK (avg.)C.C.1:2:4 2"THICK (avg.)C.C.1:2:4
LAID TO SLOPE LAID TO SLOPE
ROAD

PLOT
1 6 1 5 5 1 6 1
b a b a a b a b
OPEN

OPEN
2 4 4 4 4 2
d c c c c d

1 5 5 1 CLIENT:
b a a b
4 4
c c

1 6 1 5 5 1 6 1
b a b a a b a b
2 4 4 4 4 2 PAKISTAN NAVY WELFARE HOUSING SCHEME
d c c c c d
LEAD CONSULTANT:

103, Rufi Trade Centre, SB-29 Block 13-C Main University Road,
Gulshan - e - iqbal Karachi..... Telephone: 021-34811795-6
Website:www.archvisionplus.com Email: archplus@cyber.net.pk

SUB CONSULTANT:

B-3 ROYAL AVENUE, 2ND FLOOR, MAIN UNIVERSITY ROAD,


BLOCK 13-C, GULSHAN-E-IQBAL, KARACHI.
TEL: 021-4968404, 4968953 FAX: 021-4971188

SUB CONSULTANT:

ROAD CONSTRUCTION DRAWING

FINISHES LAYOUT PLAN P.N.W.H.S BIN QASIM


180 SQ.YD. BUNGALOW

FINISHES PLAN
ROOF

A-09

P.W.N.H.S AVP/111/18
SCHEDULE OF FINISHES

Flooring Wall finish


a b
Skirting Ceiling
Riser
c d
a. b.
1- Porcelain tiles 16" x 16". 1- 1/2" thick plaster with plastic emulsion paint.
2- Glazed tiles (matt finish) 12" x 12" 2- Glazed tiles 8" x 12" up to 4'-0" height
3- Glazed Ceramic tiles 8" x 12". (7' ht. on shower wall)&1/2" thick plaster
4- Full length 11" or 12" wide with plastic emulsion paint above Tiles.
botisina marble 3/4" thick. 3- 2'-0" high glazed tiles. 4"x4" above counter
5- Botisina marble 12"x12"x1/2". and 1/2" thick plaster with
6- National tiles non skid 4"x8". emulsion paint above tiles and
7- 2" TH. C.C.(1:2:4)with steel 4- 3/4" thick plaster with weather shield paint.
trowel smooth finish

PLOT 8- C.C. Chequred Tiles in Ramp

c. d.
1- Porcelain tiles skirting 16" x 4". 1- 1/2" thick plaster with vniyle emulsion paint.
30'-0" 30'-0" 2- Glazed tiles skirting 12" x 4". 2- 1/2" thick plaster with plastic emulsion paint.
3- Botecina section marble 3/8" thick

54'-0"

54'-0"
and 17" long on riser and wall.
4- 4'-0" High glazed ceramic tiles
OPEN OPEN 8"X12"
BATH-2 BATH-2

BATH-1 BATH-1

W/R

W/R
W/R W/R

OPEN

OPEN
BED BED
BED BED

KITCHEN KITCHEN
LOUNGE LOUNGE
ROAD

OPEN

OPEN

PLOT
UP UP

CLIENT:

BED/DRAWING BED/DRAWING PAKISTAN NAVY WELFARE HOUSING SCHEME


PARKING PARKING
LEAD CONSULTANT:

103, Rufi Trade Centre, SB-29 Block 13-C Main University Road,
Gulshan - e - iqbal Karachi..... Telephone: 021-34811795-6
Website:www.archvisionplus.com Email: archplus@cyber.net.pk

SUB CONSULTANT:

BATH-3 BATH-3 B-3 ROYAL AVENUE, 2ND FLOOR, MAIN UNIVERSITY ROAD,
BLOCK 13-C, GULSHAN-E-IQBAL, KARACHI.
TEL: 021-4968404, 4968953 FAX: 021-4971188

SUB CONSULTANT:

GRATING 6"x6" ROAD GRATING 6"x6"


CONSTRUCTION DRAWING

FIXTURE LAYOUT PLAN P.N.W.H.S BIN QASIM


180 SQ.YD. BUNGALOW

FIXTURE LAYOUT PLANS

A-10

P.W.N.H.S AVP/111/18
SCHEDULE OF FINISHES

Flooring Wall finish


a b
Skirting Ceiling
Riser
c d
a. b.
1- Porcelain tiles 16" x 16". 1- 1/2" thick plaster with plastic emulsion paint.
2- Glazed tiles (matt finish) 12" x 12" 2- Glazed tiles 8" x 12" up to 4'-0" height
3- Glazed Ceramic tiles 8" x 12". (7' ht. on shower wall)&1/2" thick plaster
4- Full length 11" or 12" wide with plastic emulsion paint above Tiles.
botisina marble 3/4" thick. 3- 2'-0" high glazed tiles. 4"x4" above counter
5- Botisina marble 12"x12"x1/2". and 1/2" thick plaster with
6- National tiles non skid 4"x8". emulsion paint above tiles and
7- 2" TH. C.C.(1:2:4)with steel 4- 3/4" thick plaster with weather shield paint.
PLOT 8-
trowel smooth finish
C.C. Chequred Tiles in Ramp

30'-0" 30'-0" c.
1- Porcelain tiles skirting 16" x 4".
d.
1- 1/2" thick plaster with vniyle emulsion paint.

54'-0"

54'-0"

54'-0"
2- Glazed tiles skirting 12" x 4". 2- 1/2" thick plaster with plastic emulsion paint.
3- Botecina section marble 3/8" thick
OPEN OPEN and 17" long on riser and wall.
4- 4'-0" High glazed ceramic tiles
BATH BATH 8"X12"

BATH BATH

W/R

W/R
W/R W/R

OPEN

OPEN
BED BED
BED BED

KITCHEN KITCHEN
LOUNGE LOUNGE
ROAD

ROAD
OPEN

OPEN

PLOT
UP UP

CLIENT:

BED/DRAWING BED/DRAWING
PARKING PARKING PAKISTAN NAVY WELFARE HOUSING SCHEME
LEAD CONSULTANT:

103, Rufi Trade Centre, SB-29 Block 13-C Main University Road,
Gulshan - e - iqbal Karachi..... Telephone: 021-34811795-6
Website:www.archvisionplus.com Email: archplus@cyber.net.pk

SUB CONSULTANT:

BATH BATH
B-3 ROYAL AVENUE, 2ND FLOOR, MAIN UNIVERSITY ROAD,
BLOCK 13-C, GULSHAN-E-IQBAL, KARACHI.
TEL: 021-4968404, 4968953 FAX: 021-4971188

SUB CONSULTANT:

ROAD
CONSTRUCTION DRAWING

TILE LAYOUT PLAN P.N.W.H.S BIN QASIM


180 SQ.YD. BUNGALOW

TILE LAYOUT PLANS


GROUND FLOOR

A-11

P.W.N.H.S AVP/111/18
SCHEDULE OF FINISHES

Flooring Wall finish


a b
Skirting Ceiling
Riser
c d
a. b.
1- Porcelain tiles 16" x 16". 1- 1/2" thick plaster with plastic emulsion paint.
2- Glazed tiles (matt finish) 12" x 12" 2- Glazed tiles 8" x 12" up to 4'-0" height
3- Glazed Ceramic tiles 8" x 12". (7' ht. on shower wall)&1/2" thick plaster
4- Full length 11" or 12" wide with plastic emulsion paint above Tiles.
botisina marble 3/4" thick. 3- 2'-0" high glazed tiles. 4"x4" above counter
5- Botisina marble 12"x12"x1/2". and 1/2" thick plaster with
6- National tiles non skid 4"x8". emulsion paint above tiles and
7- 2" TH. C.C.(1:2:4)with steel 4- 3/4" thick plaster with weather shield paint.
trowel smooth finish
8- C.C. Chequred Tiles in Ramp

c. d.
1- Porcelain tiles skirting 16" x 4". 1- 1/2" thick plaster with vniyle emulsion paint.
PLOT 2- Glazed tiles skirting 12" x 4".
3- Botecina section marble 3/8" thick
2- 1/2" thick plaster with plastic emulsion paint.

30'-0" 30'-0" and 17" long on riser and wall.


4- 4'-0" High glazed ceramic tiles

54'-0"

54'-0"
8"X12"
OPEN OPEN

OPEN

OPEN
ROOF ROOF
ROAD

PLOT
OPEN

OPEN
CLIENT:

PAKISTAN NAVY WELFARE HOUSING SCHEME


LEAD CONSULTANT:
DN DN

103, Rufi Trade Centre, SB-29 Block 13-C Main University Road,
Gulshan - e - iqbal Karachi..... Telephone: 021-34811795-6
Website:www.archvisionplus.com Email: archplus@cyber.net.pk

SUB CONSULTANT:

B-3 ROYAL AVENUE, 2ND FLOOR, MAIN UNIVERSITY ROAD,


BLOCK 13-C, GULSHAN-E-IQBAL, KARACHI.
TEL: 021-4968404, 4968953 FAX: 021-4971188

SUB CONSULTANT:

ROAD CONSTRUCTION DRAWING

TILE LAYOUT ROOF PLAN P.N.W.H.S BIN QASIM


180 SQ.YD. BUNGALOW

TILE LAYOUT PLANS


ROOF

A-12

P.W.N.H.S AVP/111/18
9" SUNK SLAB 9" SUNK SLAB 9" SUNK SLAB
9" SUNK SLAB

01 PLAN BATH NO. 1 SCALE:3/8"=1'-0" 02 ELEVATION-E -1 SCALE:3/8"=1'-0" 03 ELEVATION-E -2 SCALE:3/8"=1'-0" 04 ELEVATION-E-3 SCALE:3/8"=1'-0" 05 ELEVATION-E-4 SCALE:3/8"=1'-0"

9" SUNK SLAB 9" SUNK SLAB 9" SUNK SLAB 9" SUNK SLAB

CLIENT:

PAKISTAN NAVY WELFARE HOUSING SCHEME


06 PLAN BATH NO. 2 SCALE:3/8"=1'-0" 07 ELEVATION-E -1 SCALE:3/8"=1'-0" 08 ELEVATION-E -2 SCALE:3/8"=1'-0" 09 ELEVATION-E-3 SCALE:3/8"=1'-0" 10 ELEVATION-E-4 SCALE:3/8"=1'-0"
LEAD CONSULTANT:

103, Rufi Trade Centre, SB-29 Block 13-C Main University Road,
Gulshan - e - iqbal Karachi..... Telephone: 021-34811795-6
Website:www.archvisionplus.com Email: archplus@cyber.net.pk

SUB CONSULTANT:
9" SUNK SLAB
9" SUNK SLAB 9" SUNK SLAB 9" SUNK SLAB

B-3 ROYAL AVENUE, 2ND FLOOR, MAIN UNIVERSITY ROAD,


BLOCK 13-C, GULSHAN-E-IQBAL, KARACHI.
TEL: 021-4968404, 4968953 FAX: 021-4971188

SUB CONSULTANT:

CONSTRUCTION DRAWING

P.N.W.H.S BIN QASIM


180 SQ.YD. BUNGALOW

DETAIL OF BATH

A-13

11 PLAN BATH NO. 3 SCALE:3/8"=1'-0"


12 ELEVATION-E -1 SCALE:3/8"=1'-0"
13 ELEVATION-E -2 SCALE:3/8"=1'-0"
14 ELEVATION-E-3 SCALE:3/8"=1'-0"
15 ELEVATION-E-4 SCALE:3/8"=1'-0"
P.W.N.H.S AVP/111/18
A B A B
A B B
- -
- -

- -
A
- -

FULL HANGER
FULL HANGER

OUT SIDE

OUT SIDE
OPEN LOCKER SHOES RACK OPEN
LOCKER SHOES RACK SHELF SHELF

PLAN-1(W/R-1) PLAN-2 (W/R-1)


PLAN-1(W/R-1) PLAN-2 (W/R-1) SCALE:3/4"=1'-0" SCALE:3/4"=1'-0"
SCALE:3/4"=1'-0" SCALE:3/4"=1'-0"

SECTION-A SECTION-B
SCALE:3/4"=1'-0" SCALE:3/4"=1'-0"
SEE DETAIL

SEE DETAIL
LOFT LOFT LOFT LOFT
3"THICK SLAB 3"THICK SLAB 3"THICK SLAB 3"THICK SLAB

CLIENT:

FULL HANGER FULL HANGER

PAKISTAN NAVY WELFARE HOUSING SCHEME


OPEN OPEN LEAD CONSULTANT:
SHELF SHELF

SEE DETAIL SEE DETAIL


SEE DETAIL SEE DETAIL
103, Rufi Trade Centre, SB-29 Block 13-C Main University Road,
Gulshan - e - iqbal Karachi..... Telephone: 021-34811795-6
DRAWER DRAWER Website:www.archvisionplus.com Email: archplus@cyber.net.pk

SUB CONSULTANT:
DRAWER DRAWER

SHOES RACK B-3 ROYAL AVENUE, 2ND FLOOR, MAIN UNIVERSITY ROAD,
SEE DETAIL

SHOES RACK
BLOCK 13-C, GULSHAN-E-IQBAL, KARACHI.

SEE DETAIL
TEL: 021-4968404, 4968953 FAX: 021-4971188

LOCKER LOCKER SUB CONSULTANT:

F.F.LEVEL F.F.LEVEL F.F.LEVEL F.F.LEVEL

ELEVATION (in side) ELEVATION (out side) ELEVATION (in side) ELEVATION (out side)
SCALE:3/4"=1'-0" SCALE:3/4"=1'-0" SCALE:3/4"=1'-0" SCALE:3/4"=1'-0" CONSTRUCTION DRAWING

P.N.W.H.S BIN QASIM


180 SQ.YD. BUNGALOW

DETAIL OF W/R

A-14

P.W.N.H.S AVP/111/18
NOTES:
1- FOUNDATIONS ARE DESIGNED TO SUPPORT ONE FLOOR (GROUND ONLY).
2- FOUNDATION DEPTH SHOULD NOT BE LESS THAN 5 FEET FROM
NATURAL GROUND LEVEL.
3- ALL FOOTINGS ARE CENTERED WITH COLUMN'S CENTER UNLESS
NOTED OTHERWISE.
SCHEDULE OF COLUMNS 4- ALL DIMENSION TO BE COORDINATED WITH ARCHITECTURAL
NO.OF DRAWING.
COLUMNS 5- DIMENSION ARE GIVEN IN FEET AND INCHES UNLESS OTHERWISE
C-1 C-2 C-3 C-4 C-5 NOTED.
STORIES 6- ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH
DETAILS AT 28 DAYS CURING.
FC'= 3000 PSI FOR FOUNDATIONS, BEAMS, SLABS & WALL.
SIZE 6"X18" 6"X21" 6"X24" 6"X12" 12"X12" FC'= 3000 PSI FOR PEDESTALS AND SUPER COLUMNS.
7- ALL REINFORCING STEEL SHALL HAVE A MINIMUM YIELD STRENGTH
MAIN BARS fy=60,000 PSI CONFORMING TO ASTM 615 FOR DEFORMED BARS.
8- CONCRETE COVER OF REINFORCING BARS SHALL NOT BE
RINGS LESS THAN
1.50 inch. FOR PLINTH
1" 18" 1" 1" 21" 1" 1" 24" 1" 1" 12" 1" 1" 12" 1"
2.50 inch. FOR COLUMNS BELOW GROUND LEVEL
VARIES VARIES 6"
3/4 inch. FOR SOLID SLABS

1"

1"

1"

1"

1"
GROUND SHAPE
A 2.50 inch. FOR FOOTING.
FLOOR

1" 6"

1" 6"

1" 6"

1" 6"
9- CAMBER FOR LONG SPAN SHOULD BE CALCULATED IN FORM WORK

B
PB-1 PB-1 PB-1 PB-1 BEFORE ERECTION.

12"
10- FOR EXACT LOCATION OF PLINTH BEAMS SUPPORTING BLOCK
SEE SECTIONAL ELEVATION SEE SECTIONAL ELEVATION WALLS SEE ELECTRICAL AND ARCHITECTURAL DRAWINGS.

1"
TYP.FOUNDATION PLAN OF BOUNDARY WALL BLOCK 11- THE EXACT LOCATION AND DIMENSIONS FOR TRENCHES REFER
SCALE:3/16"=1'-0" MASONERY TO MECHANICAL, ARCHITECTURAL DRAWINGS.
NOTE: INCREASE THE SIZE OF COLUMNS 1" FROM EACH SIDE UPTO PLINTH LEVEL TO INCREASE THE CONCRETE COVER FOR STEEL 12- ALL CONCRETE SHALL BE CORED BY AN APPROVED METHOD.

6'-6"
Y
BELOW GROUND LEVEL AS INDICATED IN DASHED LINES. - WATER PONDING, POLYTHENE/ HESSIAN
CLOTH OR CURING COMPOUND.
13- ALL DAY WORK AND CONSTRUCTION JOINTS IN CONCRETE MENU
COLUMN BARS SHALL BE AT PREDETERMINED. LOCATION AS APPROVED
BY ENGINEER.
MAIN BARS
6'-6"

SEE COLUMN SCHEDULE OF FOOTING


SCHEDULE 0.3xL 0.3xL
0.3xL 0.3xL
RINGS N SIZE OF FOOTING DEPTH REINFORCMENT
SEE SCHEDULE T IO REMARKS
COMPOUND OF COLUMN TA A D LONG WAY
NO
LEVEL +1'-6" B SHORT WAY
VARIES

24"
F-1 3'-6" 15"
24"

5'-0"
4'-0" 4'-0" 4'-0" 4'-0" RINGS
(N.G.LEV.) F-2 4'-0" 5'-0" 15"
C.C 1:4:8
F-3 4'-0" 6'-0" 15"
2'-6"

Y
4" D

C.C 1:4:8 F-3A 4'-6" 6'-6" 15"


SEE FOOTING SCHEDULE ELEVATION OF BOUNDARY WALL (HEIGHT 6'-6") F-4 4'-6" 5'-6" 15"
SEE FOOTING SCHEDULE SCALE:3/16"=1'-0" Y SECTION Y-Y
4" A 4" ST-01 F-5 5'-0" 6'-0" 15"
SCALE:3/8"=1'-0" 1" (Typ.)
F-6 6'-0" 7'-0" 18"

(TYP.)
F-7 2'-6" 2'-6" 9"

54xD
F-8 2'-6" 3'-0" 9" P.LEV.

2'
Varies
N.G.LEV
MAIN BARS
RINGS
3" COVER

OR 6"
5'
12"
(TYP)

D
3" 3'-6" 8' 4'-6" 1' 5' 1' 6'-6" 3" 3" 6'-6" 1' 5' 1' 4'-6" 8' 3'-9" 3'-9" 8' 4'-6" 1' 5' 1' 6'-6" 3" 3"

6"

3"
C.C 1:4:8

SHORT WAY COMPACTED


C-4 EARTH
LONG WAY
C-4 C-4 C-1 C-1 C-4 C-4 C-1 C-1
30'-0" C-1 C-1 C-1
3"

PLOT PLOT PLOT


SECTION OF X-X
C-4 C-4 C-1 C-1 C-1 C-4 C-4 C-1 C-1 C-1 SCALE:1/4"=1'-0"
F-1 C-1 F-1 F-1
54'-0"

F-8 F-8 F-2 F-8 F-8 F-2


3'

C-4
F-8
C-2 C-2 C-2 C-2 C-2 C-2
8'-8"

F-3 F-5 F-5 F-3 F-3 F-5


3'-6"

F-3A F-3A
C-2 C-2 C-2 C-2
SCALE:1/4"=1'-0"

6"
C-4 C-4

F-7 F-7 LONG WAY


1" (Typ.)

SHORT WAY
1" (Typ.)
15'-6"

B
CLIENT:
C-4 C-4

F-7 F-7

6"
6" 6"
A
5'

C-2 C-3 C-3 C-2 C-2 C-3 TYP. PLAN OF FOOTING PAKISTAN NAVY WELFARE HOUSING SCHEME
F-3 F-6 C-2 C-2 F-6 F-3 F-3 F-6 C-2 C-2 SCALE:1/4"=1'-0"

F-3A F-3A LEAD CONSULTANT:


ROAD

PLOT
8'-6"

C-4 C-4
C-1 C-2 C-2 C-1 C-1 C-2 SUB CONSULTANT:
1'-5"

F-7 F-2 F-4 F-4 F-2 F-7 F-2 F-4

UP UP UP
4'

B-3 ROYAL AVENUE, 2ND FLOOR, MAIN UNIVERSITY ROAD,


BLOCK 13-C, GULSHAN-E-IQBAL, KARACHI.
TEL: 021-4968404, 4968953 FAX: 021-4971188
6" 6'-0" 6"
C-2 C-2 C-2 C-2 SUB CONSULTANT:
C-2 C-2 C-2 0.25xL 0.25xL
F-3A F-3A
F-4 F-4 F-4
3'-8"

C-2 C-2 C-2

6"
F-4 F-4 F-4
3'

4'-3"

C-4 C-4
7'-10"

1/2"TH.WATER DRAWING STATUS:


F-7 F-7 PROOF PLASTER
6"

6"

6"

CONSTRUCTION DRAWING

6'-0"
3'-3" 6" 6' 6" 6" 6' 6" 6" 6' 6"
PROJECT:
C-2 C-2 C-2 C-2
C-2 F-3A C-2 C-2 F-3A
8'

8'

8'

P.N.W.H.S

(TYP)

(TYP)
F-5 F-5 F-5

12"

12"
3"
U.G.W.TANK U.G.W.TANK U.G.W.TANK

3"
B (180 SQYD BUNGALOW)
6'X8'X6' 6'X8'X6' 6'X8'X6'
7'-6"

ST-01

6" 10"
6"

6"

6"

SHEET TITLE:
C.C 1:4:8
C-5 C-5 C-5 C-5 C-5 C-5 0.25xL 0.25xL

FOUNDATION LAYOUT PLAN


3"

F-7 F-7 ROAD C-1 C-1 C-1 C-1 F-7 F-7 F-7 F-7 C-1 C-1 C-1
2' 11' F-1 F-2 F-1 11' 2' 2' 11' F-1 F-2
B SECTION OF B-B
CORNER ST-01 SCALE:3/8"=1'-0"
DRAWING NO:
DRAWN BY: YAIII...

CHECKED BY:

SCALE DATE
O.K
ST-01
3/16" = 1'-0" APRIL 2019

PROJECT REF: PROJECT NO: REF. NO.:

P.N.W.H.S AVP/110/18
NOTES:
1- FOUNDATIONS ARE DESIGNED TO SUPPORT ONE FLOOR (GROUND ONLY).
2- FOUNDATION DEPTH SHOULD NOT BE LESS THAN 5 FEET FROM
F H B E E H B E B E H B C D D H NATURAL GROUND LEVEL.
7'-6" 13'-6" 12'-6" 13'-6" 13'-6" 12'-6" 8' 4'-6" 13'-6" 3- ALL FOOTINGS ARE CENTERED WITH COLUMN'S CENTER UNLESS
NOTED OTHERWISE.
4' 4' 4' 4' 4' 3'-9" 4' 4'
4- ALL DIMENSION TO BE COORDINATED WITH ARCHITECTURAL
DRAWING.
5- DIMENSION ARE GIVEN IN FEET AND INCHES UNLESS OTHERWISE
NOTED.
6- ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH
AT 28 DAYS CURING.
FC'= 3000 PSI FOR FOUNDATIONS, BEAMS, SLABS & WALL.
FC'= 3000 PSI FOR PEDESTALS AND SUPER COLUMNS.
4' 4' 4' 4' 4' 4' 4' 4' 7- ALL REINFORCING STEEL SHALL HAVE A MINIMUM YIELD STRENGTH
4' 4' 4' 4' fy=60,000 PSI CONFORMING TO ASTM 615 FOR DEFORMED BARS.
PB-1 (6"X24") PB-2 (6"X24") PB-3 (6"X24") PB-4 (6"X24") PB-5 (6"X24") PB-6 (6"X24") PB-7 (6"X24")
8- CONCRETE COVER OF REINFORCING BARS SHALL NOT BE
SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0"
SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" LESS THAN
1.50 inch. FOR PLINTH
2.50 inch. FOR COLUMNS BELOW GROUND LEVEL
B D D H G H 3 5 6 8 8 2 4 5
3/4 inch. FOR SOLID SLABS
12'-6" 13'-6" 6'-6" 7'-8" 8'-6" 19' 6'-9" 11'-6" 4'
2.50 inch. FOR FOOTING.
4' 4' 4' 6' 6' 3'-6" 4' 9- CAMBER FOR LONG SPAN SHOULD BE CALCULATED IN FORM WORK
BEFORE ERECTION.
10- FOR EXACT LOCATION OF PLINTH BEAMS SUPPORTING BLOCK
WALLS SEE ELECTRICAL AND ARCHITECTURAL DRAWINGS.
11- THE EXACT LOCATION AND DIMENSIONS FOR TRENCHES REFER
TO MECHANICAL, ARCHITECTURAL DRAWINGS.
12- ALL CONCRETE SHALL BE CORED BY AN APPROVED METHOD.
4' 4' - WATER PONDING, POLYTHENE/ HESSIAN
4' 4' 5' CLOTH OR CURING COMPOUND.
PB-9 (6"X24") PB-10 (6"X24") PB-11 (6"X24") PB-12 (6"X24") PB-13 (6"X24") 13- ALL DAY WORK AND CONSTRUCTION JOINTS IN CONCRETE MENU
PB-8 (6"X24")
SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" BARS SHALL BE AT PREDETERMINED. LOCATION AS APPROVED
SCALE 1/4"=1'-0"
BY ENGINEER.

6 8 7 9 1 2 1 2 4 6 7 9
19' 6'-6" 7'-6" 7'-6" 11'-6" 12'-6" 15'-6" 6'-6"
5'-6" 5'-6" 3'-6" 3'-9" 3'-9" 4'-6" 4'-6" 4'-6"

typ

typ
4' 4' 4' 4' 4' 4'-3"
PB-14 (6"X24") PB-15 (6"X24") PB-16 (6"X24") PB-17 (6"X24")
SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0"

6"

6" 6" 6"

24"

24"

24"

24"
24"
4" 4" 4"
4"

4"

4"

4"
1:4:8 1:4:8 1:4:8
3" 3" 3" 3" 3"

4"
3'-6" 8' 4'-6" 1' 5' 1' 6'-6" 6'-6" 1' 5' 1' 4'-6" 8' 3'-9" 3'-9" 8' 4'-6" 1' 5' 1' 6'-6" 1:4:8

1 SECTION 1-1 2 SECTION 2-2 3 SECTION 3-3 4 SECTION 4-4


ST-02 ST-02 ST-02 ST-02
SCALE:1/2"=1'-0" SCALE:1/2"=1'-0" SCALE:1/2"=1'-0" SCALE:1/2"=1'-0"
30'-0" PLOT PLOT PLOT
3"

6"

PB-1 PB-1 PB-1


54'-0"

(6"x24") (6"x24") (6"x24")


3'

(6"x24")

(6"x24")

(6"x24")
PB-2 PB-2 PB-2
PB-15

PB-15

PB-15
6"

6'

(6"x24") (6"x24") (6"x24")


6" 6"
3'-6"

7'
(6"x24")

(6"x24")

(6"x24")
PB-12

PB-12

PB-12
PB-3 PB-3 PB-3
6'

6"

6" 6" (6"x24") (6"x24") (6"x24")


7' 5'-6" 6"
6"
PB-4 PB-4 PB-4 BLOCK
6"

BLOCK MASONARY
(6"x24") (6"x24") (6"x24") 3" FINISH FLOOR 3" FINISH FLOOR
MASONARY TOP BARS
3" 1:3:6 C.C 3" 1:3:6 C.C CLIENT:
TOP BARS (2"TH.D.P.C)
LEV.+2'-0" 6" STONE SOLLING 6" STONE SOLLING
(2"TH.D.P.C)
(6"x24")

(6"x24")

(6"x24")
LEV.+2'-0"
PB-14

PB-14

PB-14
15'-6"

15'

2'-0"
(RINGS) (RINGS)

2'-0"
12'

PAKISTAN NAVY WELFARE HOUSING SCHEME

4"
1:4:8
6" 6" 6" BOTTOM EARTH FILLINGS
13' 12' EARTH FILLINGS
LEAD CONSULTANT:
BARS

2'-0"
BOTTOM COMPACTED
BARS EARTH (SITU)
(1:3:6) 4"
PB-5 PB-5 PB-5 TYP. SEC.OF INTERNAL
6"

4"
6"

PLINTH BEAM COMPACTED


(6"x24") (6"x24") (6"x24") SCALE:3/8"=1'-0" EARTH
6" 25'-6" 6"
TYP. SEC. OF OUTER
ROAD

PLINTH BEAM SUB CONSULTANT:


(6"x24")

(6"x24")

(6"x24")

SCALE:3/8"=1'-0"
PB-11

PB-11

PB-11
8'-6"

PB-17 (6"x24")

PB-17 (6"x24")

PB-17 (6"x24")

PB-17 (6"x24")
8'

12'

B-3 ROYAL AVENUE, 2ND FLOOR, MAIN UNIVERSITY ROAD,


BLOCK 13-C, GULSHAN-E-IQBAL, KARACHI.
TEL: 021-4968404, 4968953 FAX: 021-4971188
PB-6 PB-6 PB-6
SUB CONSULTANT:
6"

6"

(6"x24") (6"x24") (6"x24")


A
4'

ST-02

PB-7 PB-7 PB-7


7'-2"

6"

(6"x24") (6"x24") (6"x24")


3'-8"

PB-8 PB-8 PB-8 BLOCK MASONRY DRAWING STATUS:


6"

(6"x24") (6"x24") (6"x24")


CONSTRUCTION DRAWING
(6"x24")

(6"x24")

(6"x24")
PB-13

PB-13

PB-13
4'-3"

11'

PROJECT:
7'-10"

6"

6"

6"

6" 13' 6"


3'-3" 6" 6' 6" 6" 6' 6" 3'-6" 3'-6" 6" 6' 6"
P.N.W.H.S

6"
PB-9 PB-9 PB-9 GR. FLOOR (180 SQYD BUNGALOW)
TOP BARS
6"

(6"x24") (6"x24") (6"x24")


8'

8'

8'

6" 6" PB-12 SHEET TITLE:


6'
U.G.W.TANK U.G.W.TANK U.G.W.TANK RINGS
(6"x24")

(6"x24")

(6"x24")

PLINTH BEAM FRAMING PLAN,


PB-16

PB-16

PB-16

6'X8'X6' 6'X8'X6' 6'X8'X6'


7'-6"

4'
7'

1:4:8 A SECTION OF A-A


BOTT.
ST-02 SCALE:3/8"=1'-0" BEAM ELEVATION & SECTION
6"

6"

6"

1'
BARS

6"
PB-10 PB-10 PB-10 1:4:8 DRAWING NO:
6"

DRAWN BY: YAIII...


3"

ROAD (6"x24") (6"x24") (6"x24")


6" 8" 8" 8" 6"
CORNER
CHECKED BY:

SCALE DATE
O.K
ST-02
3/16" = 1'-0" APRIL 2019

PROJECT REF: PROJECT NO: REF. NO.:

P.N.W.H.S AVP/110/18
F H B E E H B E B E H B C D D H NOTES:
7'-6" 13'-6" 12'-6" 13'-6" 13'-6" 12'-6" 8' 4'-6" 13'-6"
1-ALL DRAWING SHALL BE COORDINATE WITH ARCHITECTURAL
4' 4' 3'-9" 3'-9" 4' 4' 4' 3'-9" 4' 4' DRAWINGS.
2-THE EXACT LOCATION AND DIMENSIONS FOR OPENINGS,
CONDUITS SLEEVES IN WALLS, GRADE BEAMS, DROP BEAMS
AND SLABS REFER TO MECHANICAL, ELECTRICAL.

3-ALL SLABS ARE 6" THICK UNLESS NOTED


(6"X18") OTHERWISE.

4-ALL TOP DISTRIBUTION STEEL IN SLAB NOT SHOWN IN DRAWING


(6"X36")
SHOULD BE

GB-1 (6"X36") GB-2 (6"X36") GB-3 (6"X36") GB-4 (6"X36") GB-5 (6"X36") GB-6 (6"X36") GB-7 (6"X36")
SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0"
SCALE 1/4"=1'-0"

5-ALL DAYWORK AND CONSTRUCTION JOINTS IN CONCRETE


B D F J G H 3 5 6 8 8 1 2 MEMBERS SHALL BE AT PREDETERMINED LOCATIONS
12'-6" 13'-6" 6'-6" 4'-8" 7'-8" 8'-6" 19' 6'-9" 7'-6" AS APPROVED BY THE ENGINEER.
PC1 4' 4' 5'-6" 5'-6" 6-ALL CONCRETE IS TO BE CURED BY AN APPROVED METHOD-WATER
PONDING, POLYTHENE/HESSIAN SHEET, CURING COMPOUND.

7-CAMBER TO SUSPENDED SLABS AND BEAMS TO BE 1/4" FOR


EVERY 6'-6" OF SPANS, CANTILEVER SHALL BE CAMBERED
1/2" FOR EVERY 8'-0" LENGTH
8-THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE
(6"X36") (6"X36")
6'
(6"X48") (6"X48")
GB-9 (6"X36") GB-10 (6"X36") GB-11 (6"X48"/36") GB-12 (6"X36") GB-16 (6"X36")
GB-8 (6"X/48"/36") SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0"
SCALE 1/4"=1'-0"

2 4 5 6 8 7 9 1 2 4 6 7 9
11'-6" 4' 19' 6'-6" 7'-6" 11'-6" 12'-6" 15'-6" 6'-6"
#3 1 1/2" (40) 4 1/4" (110) 3" (80)
3'-6" PC1 4' 5'-6" 5'-6" 3'-6" 3'-6" 3'-6" 4'-6" 4'-6" 4'-6"
#4 2" (50) 4 1/2" (115) 3" (80)
typ

Dimension A or G
Hook
(6"X18") 6"

Detailing
TOP
(6"X36") BARS
typ
GB-13 (6"X36"/18") GB-14 (6"X36") GB-15 (6"X36") GB-17 (6"X36")
SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0"
6" 6" 6" 6"
DETAIL OF STIRRUP HOOKS
GB-11
6"

36"
B C D B D 3 5 4 5 RINGS
8' 4'-6" 12'-6" 4'-5" 7'-8" 7'-10" 4' Bar size, No D, in (mm)
A or G, ft-in. (mm)
#3 2 1/4 (60) 6 (155)
#4 3 (80) 8(200)

6"
36"

36"

36"

36"
BOTT. #5 3 3/4 (95) 10 (250)
BARS #6 4 1/2 (115) 1-0 (300)
A SECTION OF A-A #7 5 1/4 (135) 1-2 (375)
ST-03 SCALE:1/2"=1'-0"
#8 6 (155) 1-4 (425)
Detailing
Dimension
B-1 (6"X36") B-2 (6"X36") B-3 (6"X36") B-4 (6"X36") 1 SECTION 1-1 2 SECTION 2-2 3 SECTION 3-3 4 SECTION 4-4
ST-03 SCALE:1/2"=1'-0" ST-03 SCALE:1/2"=1'-0" ST-03 SCALE:1/2"=1'-0" ST-03 SCALE:1/2"=1'-0"
SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0" SCALE 1/4"=1'-0"
4"
6"

BLOCK MASONRY

12"
3" 3'-6" 8' 4'-6" 5' 6'-6" 3" 3" 6'-6" 5' 4'-6" 8' 3'-9" 3'-9" 8' 4'-6" 5' 6'-6" 3" 3" TOP
1' 1' 1' 1' 1' 1' SCHEDULE OF SLABS BARS
Typ. detail of end hooks (slabs & beams)
BOTTOM REINFORCEMENT TOP REINFORCEMENT

N
O
TI
TA
30'-0" PLOT PLOT
3"

O
THICK SHORT WAY LONG WAY SHORT WAY LONG WAY B-2

N
6"

36"
GB-1 GB-1 GB-1 RINGS
54'-0"

(6"x36") (6"x36") S-1 6"


3'

(THROUGH) (THROUGH)
GB-2 S-1 K GB-2 GB-2 S-1 K
UN UN
(6"x36")

(6"x36")
9"
GB-15

GB-15
6"

S S S-2 6"
6'

GB-15

S
(6"x36") 9" UN (6"x36") 9"
6" 6" K
3'-6"

K 7' S-1 9" K


SU S-3 6"
UN UN BOTT.
(6"x36")

(6"x36")
S N S
GB-12

GB-12
S-1 GB-3 S-1 K S-1 GB-3 BARS
GB-12

9" S-1 9" S-1


6'

6"

CS-1 6" Y1 SECTION OF Y1-Y1


(6"x36") GB-3 S-1 (6"x36") (MAIN) (DISTRIBUTION)
6" 7' 6" 5'-6" ST-03 SCALE:1/2"=1'-0"

GB-4 GB-4 GB-4


6"

(6"x36") (6"x36") CLIENT:

2" 6" 6" 2"


GB-14

24" TOP TOP


GB-11 (6"x36")

GB-11 (6"x36")
GB-11

BARS BARS
15'-6"

(6"x36")

(6"x36")
18"
GB-14

GB-14
15'

5"
S-2 S-3 S-3 S-2 S-2 S-3
RING RING
12'

6"

6"
B-3 B-4 PAKISTAN NAVY WELFARE HOUSING SCHEME
LEAD CONSULTANT:
6" 13' 6" 12' 6" DETAIL OF PC-1 BOTT. BOTT.
SECTION OF CB-1
SCALE:1/2"=1'-0" BARS BARS
SCALE:1/2"=1'-0" 6" 6"

10'-0"
GB-5 GB-5 GB-5 BLOCK BLOCK
6"

6"

MASONRY MASONRY
(6"x36") (6"x36")
6" 6" 25'-6" 6"
SUB CONSULTANT:
ROAD

PLOT
TOP TOP
A
GB-17 (6"x36")

GB-17 (6"x36")
BARS ROOF BARS
8'-6"

ST-03
8'

S-3 S-3 GB-11


ROOF
CB-1

CB-1

BLOCK B-3 ROYAL AVENUE, 2ND FLOOR, MAIN UNIVERSITY ROAD,


12'

RINGS BLOCK 13-C, GULSHAN-E-IQBAL, KARACHI.


CB-1

MASONRY
GB-17

TEL: 021-4968404, 4968953 FAX: 021-4971188


S-3 GB-13
GB-6 (6"x18") GB-6 (6"x18") SUB CONSULTANT:
GB-6 RINGS
6"

6"

(6"x36") (6"x36")
(6"x18")

(6"x18")

BOTT.
4'

CS-1

BARS
3'-11" 6"
C SECTION OF C-C BOTT.
GB-7 GB-7 GB-7 ST-03 BARS
SCALE:3/8"=1'-0"
6"

SECTION Y-Y
(6"x36") (6"x36") SCALE 1/4" = 1'-0"
10'-8"
CS-1

CS-1
3'-8"

DRAWING STATUS:
(6"x36")

(6"x36")
GB-13
GB-13

GB-13

CONSTRUCTION DRAWING
(6"x48")

(6"x48")

C TOP B C D
S-2 S-2 TOP
11'

ST-03 DN DN DN BARS 8' 4'-6"


PROJECT:
(6"x48") GB-8 (6"x36") (6"x48") GB-8 (6"x36")
1'-4"

PC1 S-2 PC1 PC1


7'-10"

6"

P.N.W.H.S
4"

GB-8 GB-8
6" 6"
5
1'-4" 3' 1'-4" 2'-4" 4'-10" 13' RINGS B1 (6"X36")
4" (180 SQYD BUNGALOW)
ST-03

4'
BLOCK MASONRY
B

7'-10"

GB-9 (6"x36") GB-9 GB-9 (6"x36")


6"

4 SHEET TITLE:

B4 (6"X36")
GB-16 (6"x36")

(6"x36")

B3 (6"X36")
BOTT.

10'-8"
6" 6" CS-1
3'-6"

18"
11'-10" 6' S-1 BARS

3'-8"
CS-1 CS-1 GR. ROOF SLAB FRAMING PLAN,
K
7'-6"

UN

BEAM ELEVATION & SECTION


NK

9"
7'

S-1 S-1
3
S
GB-16
SU
SU

12'
9"
NK

GB-16
9"

BLOCK MASONRY Y
ST-03 DRAWING NO:

3'-9"
GB-10 GB-10 DRAWN BY: YAIII...
GB-10 B2 (6"X36")
6"

PC1
3"

(6"x36") (6"x36")
ROAD CHECKED BY: O.K
ST-03

6"
B SECTION OF B-B SCALE DATE

ST-03
Y1
CORNER ST-03 SCALE:3/8"=1'-0" 3/16" = 1'-0" APRIL 2019

PROJECT REF: PROJECT NO: REF. NO.:


STAIR TOWER SLAB
SCALE 3/16" = 1'-0" P.N.W.H.S AVP/110/18
PLOT
NG NG NG NG NG NG NG NG NG NG NG NG NG NG NG NG NG NG NG NG
NG NG NG NG NG NG NG NG NG NG NG NG NG NG NG NG NG NG NG NG

OPEN OPEN

NG

NG
NG

NG
NG

NG
BATH-2 BATH-2

NG

NG
NG

NG
NG

NG
BATH-1 BATH-1

W/R

W/R
NG

NG
W/R W/R

NG

NG
NG

NG
OPEN

OPEN
NG

NG
NG

NG
NG

NG
NG

NG
BED BED

NG

NG
NG

NG
NG
BED BED

NG
NG

NG
NG

NG
NG

NG
NG

NG
NG

NG
NG

NG
NG

NG
NG

NG
KITCHEN KITCHEN
NG

NG
LOUNGE LOUNGE
NG

NG
OPEN

PLOT
NG

NG
NG

NG
NG NG NG NG NG
NG NG NG NG NG
NG

NG
NG

NG
NG

NG
NG

NG
UP UP
NG

NG
NG

NG
NG

NG
TRADE -11" TRADE -11"
NOSING-1" NOSING-1"
NG

NG
RISER-6 1/2" RISER-6 1/2"
NG

NG
NG

NG
NG

NG
PARKING BED/DRAWING BED/DRAWING PARKING
NG

NG
NG

NG
NG

NG
NG

NG
NG

NG
NG

NG
U.G.TANK U.G.TANK
NG

NG
6'x8'x7' 6'x8'x7'
NG

NG
2100.GLS. 2100.GLS.
BATH-3 BATH-3
NG

NG
NG

NG
NG

NG
NG

NG
NG

NG
GRATING 6"x6" GRATING 6"x6"
ROAD PROPOSED
NATURE GAS LAYOUT
GROUND FLOOR

G-01
PLOT

OPEN OPEN
BATH-2 BATH-2

BATH-1 BATH-1

W/R

W/R
W/R W/R

OPEN

OPEN
BED BED
BED BED

KITCHEN KITCHEN
LOUNGE LOUNGE
OPEN

PLOT
UP UP

TRADE -11" TRADE -11"


NOSING-1" NOSING-1"
RISER-6 1/2" RISER-6 1/2"

PARKING BED/DRAWING BED/DRAWING PARKING

U.G.TANK U.G.TANK
6'x8'x7' 6'x8'x7'
2100.GLS. 2100.GLS.
BATH-3 BATH-3

GRATING 6"x6" GRATING 6"x6"


ROAD

GROUND FLOOR PLAN GROUND FLOOR PLAN PROPOSED


DRAINAGE LAYOUT
GROUND FLOOR
PLAN

P-01
OPEN OPEN

OPEN OPEN

ROOF DECK ROOF DECK

13 13
19 18 17 16 15 14 14 15 16 17 18 19
12 12
11 11
10 10
9 9
8 8
7 7
6 6
5 5
4 4
3 3
2 2
1 1
UP. UP.
M.GATE M.GATE

PROPOSED
DRAINAGE LAYOUT
ROOF

P-02
ROOF PLAN
PLOT

OPEN OPEN
BATH-2 BATH-2

BATH-1 BATH-1

W/R

W/R
W/R W/R

OPEN

OPEN
BED BED
BED BED

KITCHEN KITCHEN
LOUNGE LOUNGE
ROAD

OPEN

PLOT
UP UP

TRADE -11" TRADE -11"


NOSING-1" NOSING-1"
RISER-6 1/2" RISER-6 1/2"

PARKING BED/DRAWING BED/DRAWING PARKING

U.G.TANK U.G.TANK
6'x8'x7' 6'x8'x7'
2100.GLS. 2100.GLS.
BATH-3 BATH-3

GRATING 6"x6" GRATING 6"x6" PROPOSED

ROAD WATER SUPPLY


LAYOUT
GROUND FLOOR

GROUND FLOOR PLAN GROUND FLOOR PLAN WS-01


OPEN OPEN

OPEN OPEN

ROOF DECK ROOF DECK

13 13
19 18 17 16 15 14 14 15 16 17 18 19
12 12
11 11
10 10
9 9
8 8
7 7
6 6
5 5
4 4
3 3
2 2
1 1
UP. UP.
M.GATE M.GATE
PROPOSED
WATER SUPPLY
LAYOUT
ROOF

WS-02
S.NO SYMBOL ITEM DESCRIPTION

1 5A SP ONE WAY GANG SWITCH SCHNEIDER / CLIPSAL / MK WITH BACK BOXES OF 3"x3".

2 5A SP TWO WAY GANG SWITCH SCHNEIDER / CLIPSAL / MK WITH BACK BOXES OF 3"x3".

3 5A SP SWITCH SOCKET OUTLET ON BOARD OF SCHNEIDER / CLIPSAL / MK.

4 5A SP SWITCH SOCKET OUTLET AWAY FROM BOARD OF SCHNEIDER / CLIPSAL / MK.

5 5A SP WEATHER PROOF/WATER TIGHT SHAVER S/S OUTLET WITH BACK BOXES OF 3"x3".

6 20A SP SWITCH SOCKET OUTLET OF SCHNEIDER / CLIPSAL / MK WITH BACK BOXES OF 3"x3".

7 15A SP SWITCH SOCKET OUTLET OF SCHNEIDER / CLIPSAL / MK WITH BACK BOXES OF 3"x3".

8 6 X 12 WATT LED DECORATIVE CHANDELIER.

9 12 WATT LED DECORATIVE CEILING LIGHT FIXTURE SURFACE TYPE.

10 12 WATT LED DOWN LIGHT FIXTURE SURFACE TYPE.

11 18 WATT LED TUBE LIGHT FIXTURE SURFACE TYPE.

12 18 WATT LED WALL TUBE LIGHT FIXTURE SURFACE TYPE.

13 12 WATT LED WALL LIGHT FIXTURE (WEATHER PROOF) SURFACE TYPE.

14 9 WATT LED MIRROR LIGHT FIXTURE SURFACE TYPE.

15 56"/48" SWEEP CEILING FAN

16 24" SWEEP CIRCUMATIC FAN

17 12" SWEEP EXHAUST FAN

18 JUNCTION BOX

19 1.5 TON WALL MOUNTED SPLIT AC INDOOR UNIT

20 SPLIT AC OUTDOOR UNIT CLIENT:


P.N.W.H.S - BIN QASIM
21 RJ 45 TELECOM OUTLET OF SCHNEIDER / CLIPSAL / MK WITH BACK BOXES OF 3"x3".

22 RJ 55 TV OUTLET OF SCHNEIDER / CLIPSAL / MK WITH BACK BOXES OF 3"x3".

23 GATE INTERCOM OF SCHNEIDER / CLIPSAL / MK WITH BACK BOXES OF 3"x3".


PAKISTAN NAVY WELFARE HOUSING SCHEME
24 BELL/BUZZER WITH BACK BOXES OF 3"x3"
LEAD CONSULTANT:

25 BELL PUSH WITH BACK BOXES OF 3"x3"

26 WIFI ROUTER
SUB CONSULTANT:
27 LED PLASMA / LCD
LEGEND, LIST OF DRAWINGS & GENERAL NOTES
28 LIGHTING / POWER DISTRIBUTION BOARD
ELECTRICAL LAYOUT OF GROUND FLOOR
29 TELECOM & CITY CABLE JUNCTION BOX. MEP CONSULTANT:
POWER LAYOUT OF GROUND FLOOR
Ground Level
30 THREE PHASE ENERGY METER
COMMUNICATION LAYOUT OF GROUND FLOOR
31 EARTHING / GROUNDING
ELECTRICAL LAYOUT OF ROOF
500 mm

750 mm

32 CONSTRUCTION DRAWING
DISTRIBUTION BOARD
33

34 REFRIGERANT COPPER PIPES (TYPICAL)


750 mm
P.N.W.H.S - BIN QASIM
180 SQ.YD
125 mm
35
75 mm

3/4 MM DIA UPVC CONDUIT FOR AC DRAIN

450 mm LEGEND, LIST OF DRAWINGS


1000 mm

& GENERAL NOTES


3 MTR

Water level

150 mm

E-01

P.W.N.H.S AVP/110/18
IEMA-2700
PLOT

OPEN OPEN
BATH-2 BATH-2

CONC. CONC.
BATH-1 BATH-1

W/R

W/R
W/R W/R

OPEN

OPEN
CONC. CONC.

CONC. CONC.

BED BED
BED BED

CONC. CONC. CONC. CONC.


KITCHEN KITCHEN
LOUNGE LOUNGE
ROAD

OPEN

CLIENT:
P.N.W.H.S - BIN QASIM
UP UP

TRADE -11" TRADE -11"


NOSING-1" CONC. CONC. NOSING-1" PAKISTAN NAVY WELFARE HOUSING SCHEME
RISER-6 1/2" RISER-6 1/2" LEAD CONSULTANT:

PARKING BED/DRAWING BED/DRAWING PARKING


CONC. CONC. SUB CONSULTANT:

CONC. CONC.
MEP CONSULTANT:
U.G.TANK U.G.TANK
6'x8'x7' 6'x8'x7'
2100.GLS. 2100.GLS.
BATH-3 BATH-3
CONSTRUCTION DRAWING

P.N.W.H.S - BIN QASIM


180 SQ.YD

GRATING 6"x6" GRATING 6"x6"


ROAD ELECTRICAL LAYOUT
OF GROUND FLOOR

GROUND FLOOR PLAN E-02

P.W.N.H.S AVP/110/18
IEMA-2700
PLOT

OPEN OPEN

OPEN

OPEN
ROOF ROOF
2"THICK (avg.)C.C.1:2:4 2"THICK (avg.)C.C.1:2:4
LAID TO SLOPE LAID TO SLOPE
OPEN

OPEN
ROAD

PLOT
CLIENT:
P.N.W.H.S - BIN QASIM

PAKISTAN NAVY WELFARE HOUSING SCHEME


LEAD CONSULTANT:

DN DN
SUB CONSULTANT:

MEP CONSULTANT:

CONSTRUCTION DRAWING

P.N.W.H.S - BIN QASIM


180 SQ.YD

ROAD POWER LAYOUT


OF GROUND FLOOR

ROOF PLAN E-03

P.W.N.H.S AVP/110/18
IEMA-2700
PLOT

OPEN OPEN
BATH-2 BATH-2

CONC. CONC.
BATH-1 BATH-1

W/R

W/R
W/R W/R

OPEN

OPEN
CONC. CONC.

CONC. CONC.

BED BED
BED BED

TV

TV
TV

TV
TV

TV
TV

TV
TV

TV
TV
TV
CONC. CONC. CONC. CONC.

TV

TV
TV
KITCHEN KITCHEN

TV
LOUNGE LOUNGE

TV

TV
TV
TV
ROAD

OPEN

PLOT
TV

TV

TV
TV

TV
TV

TV
TV

TV

TV
TV
TV

TV
CLIENT:

TV
P.N.W.H.S - BIN QASIM
TV

TV
UP TV
TV
UP

TV
TV
TV

TV

TV
TV
TV
TV
TV
TV
TV
TV
TRADE -11" TRADE -11"
TV

TV
TV
TV
TV
TV TV
NOSING-1" TV TV
CONC.
TV

CONC. TV TV
TV
NOSING-1" PAKISTAN NAVY WELFARE HOUSING SCHEME
RISER-6 1/2" RISER-6 1/2"
TV
LEAD CONSULTANT:

PARKING BED/DRAWING BED/DRAWING PARKING


CONC. CONC. SUB CONSULTANT:

CONC. CONC.
MEP CONSULTANT:
U.G.TANK U.G.TANK
6'x8'x7' 6'x8'x7'
2100.GLS. 2100.GLS.
BATH-3 BATH-3
CONSTRUCTION DRAWING

P.N.W.H.S - BIN QASIM


180 SQ.YD

GRATING 6"x6" GRATING 6"x6"


ROAD COMMUNICATION LAYOUT
OF GROUND FLOOR

GROUND FLOOR PLAN E-04

P.W.N.H.S AVP/110/18
IEMA-2700
PLOT

OPEN OPEN
BATH-2 BATH-2

CONC. CONC.
BATH-1 BATH-1

W/R

W/R
A.C OUTER A.C OUTER

W/R W/R

OPEN

OPEN
CONC. CONC.

CONC. CONC.

BED BED
BED BED

CONC. CONC. CONC. CONC.


KITCHEN KITCHEN
LOUNGE LOUNGE
ROAD

OPEN

PLOT
CLIENT:
P.N.W.H.S - BIN QASIM
UP UP

TRADE -11" TRADE -11"


NOSING-1" CONC. CONC. NOSING-1" PAKISTAN NAVY WELFARE HOUSING SCHEME
RISER-6 1/2" RISER-6 1/2" LEAD CONSULTANT:

PARKING BED/DRAWING BED/DRAWING PARKING


CONC. CONC. SUB CONSULTANT:

CONC. CONC.
MEP CONSULTANT:
U.G.TANK U.G.TANK
A.C OUTER A.C OUTER
6'x8'x7' 6'x8'x7'
2100.GLS. 2100.GLS.
BATH-3 BATH-3
CONSTRUCTION DRAWING

P.N.W.H.S - BIN QASIM


180 SQ.YD

GRATING 6"x6" GRATING 6"x6"


ROAD ELECTRICAL LAYOUT
OF ROOF

GROUND FLOOR PLAN E-05

P.W.N.H.S AVP/110/18
IEMA-2700
Keys

CLIENT:
P.N.W.H.S - BIN QASIM

PAKISTAN NAVY WELFARE HOUSING SCHEME


LEAD CONSULTANT:

SUB CONSULTANT:

MEP CONSULTANT:

CONSTRUCTION DRAWING

P.N.W.H.S - BIN QASIM


180 SQ.YD

DISTRIBUTION BOARD

E-06

P.W.N.H.S AVP/110/18
IEMA-2700

You might also like