Salalah LPG Project

Contract No. : SLPG/08/2015


Petrofac Job No. : JI-2033
COMMENT RESOLUTION SHEET
Supplier: PATTERSON PUMP COMPANY (OMQ-800) Package description / PO Number: FIRE WATER PUMPS / SLPG03R0067
Document Title : POWER DISTRIBUTION PANEL DRAWING Contractor Transmittal No. :
Supplier document no: C14 Date: 2-Apr-2018
Petrofac Document No. : SLPG-R-180-0067-B04-005-001-3 Vendor Transmittal No.:
Rev. No.: A Date: 2-Apr-2018

Contractor Response Status


S. No. Page Comments Response
Dated _______ (Open/ Close)

There is no interlocking between the door of the panel


and the isolator or padlocking of the MCB's in OFF
EL01:Vendor to clarify interlocking of the isolator with position. The panel, as you can see from the photo, is
panel door such that the door cannot be opened with provided with an internal cover to protect the operator
1 2 of 3
isolator in ‘ON’ position. Also, clarify padlocking of from the cabling. There is no point to open the panel
MCBs and Switches in OFF position. when there is no power inside. You have to see if the
internal lights are on or off in order to understand the
problem.

2 2 of 3 Indicate tag nos. Indicated.


3 2 of 3 4P? Check and update Updated.
EL03: This is panel anti-condensation heater, not going Yes but it is supplied by circuit breaker line all the other
4 2 of 3 outside. Show accordingly. Also, include this load in loads. The load will be included in the next revision of
Utility list utility list.

External studs will not be used. The enclosure is


stainless steel and we cannot drill holes on the sides. It
EL02: Earth busbar shall be hard-drawn, high-
will loose its IP rating. The enclosure will have internal
conductivity copper.
5 2 of 3 terminal where the earthing cone of the incoming cable
External brass earth stud of this DB shall be internally
will be connected and all the earthing points will be
connected to the earth busbar.
connected there. This includes also the panel and the
door.

6 2 of 3 Delete "0". This revision number Deleted.

C14_SLPG-R-180-0067-B04-005_A z CRS Sheet 1 of 3


Salalah LPG Project
Contract No. : SLPG/08/2015
Petrofac Job No. : JI-2033
COMMENT RESOLUTION SHEET
Supplier: PATTERSON PUMP COMPANY (OMQ-800) Package description / PO Number: FIRE WATER PUMPS / SLPG03R0067
Document Title : POWER DISTRIBUTION PANEL DRAWING Contractor Transmittal No. :
Supplier document no: C14 Date: 2-Apr-2018
Petrofac Document No. : SLPG-R-180-0067-B04-005-001-3 Vendor Transmittal No.:
Rev. No.: A Date: 2-Apr-2018

Contractor Response Status


S. No. Page Comments Response
Dated _______ (Open/ Close)
This is Revision "0" document. Vendor to correct the
7 2 of 3 Revision corrected.
revision no.
Only the incoming power will be indicated on the door.
8 3 of 3 Show all indicating lamps
All the other lights are internally.
Refer comment marked on Name plate drawing, vendor
9 3 of 3 Revised.
to Include this in nameplate drawing
EL05: The DB shall comply with relevant IEC Standard.
10 3 of 3 Indicated.
Indicate the same.
EL06: Description of item-7 mismatches with BOM
11 3 of 3 Description changed.
table. Check and update.

EL04: Earthing arrangement (by vendor):


Metallic enclosure of LV Electrical equipment having
supply cable of less than 35 sq. mm. size shall be
connected to the earthing bus inside skid in 2 points by
25 sq. mm. branch conductor. Metallic enclosure of LV
Electrical equipment having supply cable of 35 sq. mm.
12 3 of 3 See our response in comment S.No 5 above
or above size shall be connected to the earthing bus
inside skid in 2 points by 70 sq. mm. branch conductor.
Earthing studs in the panels shall suit the above
requirement. Earthing cable shall be PVC sheathed,
450/750V grade and colour code will be Yellow/Green
(Yellow base with Green Strip).

C14_SLPG-R-180-0067-B04-005_A z CRS Sheet 2 of 3


Salalah LPG Project
Contract No. : SLPG/08/2015
Petrofac Job No. : JI-2033
COMMENT RESOLUTION SHEET
Supplier: PATTERSON PUMP COMPANY (OMQ-800) Package description / PO Number: FIRE WATER PUMPS / SLPG03R0067
Document Title : POWER DISTRIBUTION PANEL DRAWING Contractor Transmittal No. :
Supplier document no: C14 Date: 2-Apr-2018
Petrofac Document No. : SLPG-R-180-0067-B04-005-001-3 Vendor Transmittal No.:
Rev. No.: A Date: 2-Apr-2018

Contractor Response Status


S. No. Page Comments Response
Dated _______ (Open/ Close)

Open Heaters shall be provided with MCB protection with Not applicable. Heater will be provided with circuit
13 Comment from ELCB (30mA) and thermostat control. Vendor to show breaker and thermostat control as indicated already in
CRS Rev. 0 this in the drawing. the drawing.

Vendor to show typical details of Purchaser's cable


entry into the panel and termination for Purchaser's
Open review. Please refer to photo. All of what you request is already
14 Comment from Terminal blocks, cable terminations, power supply (live) provided. There is a cover which protects all the
CRS Rev. 0 terminals shall be shrouded or provided with fixed terminal blocks, cable terminals, cable entries etc.
transparent covers to provide min IP20 degree of
protection. Vendor to confirm.

Petrofac Sign off Vendor Sign off

Prepared By: Prepared By: MRS. VOULA POULIOU / Doc. Controller

Signature & Date: Signature & Date: 2-Apr-2018

Approved By: Approved By: MR. LAMPROS VELIOTIS / Project Manager

Signature & Date: Signature & Date: 2-Apr-2018

C14_SLPG-R-180-0067-B04-005_A z CRS Sheet 3 of 3


ATTACHMENT #1 TO DOCUMENT :
SLPG-R-180-0067-B04-005-001-3
VENDOR DOCUMENT COVER SHEET
SALALAH LPG PROJECT

Purchase Order Number SLPG03R0067

Purchase Order Description FIRE WATER PUMPS

Vendor Name PATTERSON PUMP COMPANY Vendor's Ref. No. : OMQ-800

Document Description POWER DISTRIBUTION PANEL DRAWING

Equipment Tag Number (s) E&F AREA : P-18001 A/B (DFPs)

Vendor Doc
Vendor Doc. Seq. Number C14 A
Rev.
VENDOR’S ISSUE RECORD

For Approval A 2-Apr-2018 MR. T.SVANAS MR. L. VELIOTIS MR. L. VELIOTIS


For Review 0 8-Mar-2018 MR. T.SVANAS MR. L. VELIOTIS MR. L. VELIOTIS
Purpose Revision Date Prepared Checked Approved

SLPG PROJECT DOCUMENT NUMBER


DOC. CATEGORY

PO Last 4 Digits
Project No.: Area Area & Unit SDRL Sequence Sheet Doc.
Approval discipline of Rev.
JI-2033 Code Code Code Number Number Size
code PO Number

Review
Contract No.:
SLPG/08/2015
SLPG R 180 0067 B04 005 001 3 A
Info

VENDOR DOCUMENT REVIEW

CONTRACTOR APPROVAL
Reviewer Signature Date

CODE 1 Final. Document accepted without comment. Do not resubmit except modified.

Revise & Reissue. Incorporate comments & re-submit. Work may proceed subject to incorporation of
CODE 2
comments indicated.

CODE 3 Rejected. Incorporate comments & Re-issue for review. Work may NOT proceed.

CODE 4 Information only. Incorporate comments if any. Work may proceed

CODE 5 Void/Cancelled. Document has been cancelled/deleted.

CONTRACTORS APPROVAL OF THIS DOCUMENT IS PROVISIONAL ONLY SUBJECT TO APPROVAL FROM SLPG.
Contractor’s review of this document does not relieve Vendor of the responsibility for correctness under the Purchase Order. Permission to proceed does not constitute acceptance of design, detail
and calculations, test methods or materials developed or selected by the Vendor and does not relieve the Vendor from full compliance with the Purchase Order or any other obligations, nor detract
from any of the Contractor’s rights.

The document consists of this front sheet plus 2 pages.