The document outlines various construction tasks including:
1) Securing perimeter fencing, connecting building utilities, and making plumbing connections.
2) Inspecting and making modifications to existing structures like removing brick sections and cutting walls.
3) Budget options for retaining walls, underground attenuation, remediating soil, and muckaway.
4) Specifying plumbing runs for fixtures and manholes.
5) Concrete foundation details including slab design, reinforcement, and footings.
The document outlines various construction tasks including:
1) Securing perimeter fencing, connecting building utilities, and making plumbing connections.
2) Inspecting and making modifications to existing structures like removing brick sections and cutting walls.
3) Budget options for retaining walls, underground attenuation, remediating soil, and muckaway.
4) Specifying plumbing runs for fixtures and manholes.
5) Concrete foundation details including slab design, reinforcement, and footings.
The document outlines various construction tasks including:
1) Securing perimeter fencing, connecting building utilities, and making plumbing connections.
2) Inspecting and making modifications to existing structures like removing brick sections and cutting walls.
3) Budget options for retaining walls, underground attenuation, remediating soil, and muckaway.
4) Specifying plumbing runs for fixtures and manholes.
5) Concrete foundation details including slab design, reinforcement, and footings.
resecure 9 panel temporary fencing perimeter fence to pavement level
building power supply connect water supply connect sewage to connect inspect existing fowl chamber connect onto a toilet extend to rear remove section from west pre existing brick object to inspect * remove section entire brick object section to west budget solutions for retention of brick wall west face budget solution for retention of rear 17 metre wall length though not specfied south intermediate brick wall cut -150 mm street level 17 metres across front wall the same -17 metres across 3 way connector to fowl diverter for shower future recylcing external manholes internal central corridor manholes 19 cubic metre attenuation sub ground budget options remiediate 25 cubic metres to east to create 5.2 metre wide passage way remediate balance 200 cubic metres to west side ( brick waste in the middle) muckaway 10 trucks recycle if possible ,clay 33% , bricks 33%, soil 33% recycle if possible kitchen ring foul pipework south to north decline and outlet points as designed toilet ring foul pipework south to north elevation and outlet points as designed shower ring foul pipework and drainage pipe verticals as designed manhole covers specfied price per manhole conrete slab foundation design with infill reduction where possible slab design to between 200mm to 300 mm thick loadings available slab and reinforcement provision 32.3 m x 1.5 m backfill 17 m x 19 metres x 500 mm =160 cubic metres - reserve the right to changen the amount slab insulation and reinforcement provision damp course perimter wall as per plans rear clayboard 17m x 10 metre to south of site slab pillars 600 x 600 mm x 500 mm to be advised quantity quote price slab pillars 900 mm x 600 mm x 500mm to be advised quantity quote price footings for perimeter brickwork for new build gas , electric water connection and pipe work to entry points cut down the existing perimeter west wall 32 metre to 0.4 metre high and place temp fencing supplied with bolt down stand failure insurance guarantee value in reworks 6 metre cement remediation of brick wall existing surface water drainage around footings perimeter total 90 metres length
please specify your contract time frame
BUILDING CONTROL INSPECTION IS MANDATORY
CONCRETE REDUCTION WHERE POSSIBLE SOIL REMEIDATION REDUCTION WHERE POSSIBLE THE TENDEROR RESERVES RIGHT TO CHANGE QUANITITIES LATER GROUND WORKS CAN BE ADDED AND OPTIONS CAN BE STATED BELOW. labour net materials net no vat exemption material specification
with bolt down stands
metre or cubic metre or length material or size of unit quantity