Professional Documents
Culture Documents
Safety item
Division/Group Issuer, date Quality checked
1542939
Symbols
Task no.
Affected products 0
0,00 hrs
298642 1542939 11
Task number Chassis variant Issuer, date Symbols Real time
Safety Quality control Safety control
1.0 J Voerman / 23-4-2014 sec
298642 1542939 11
Task number Chassis variant Issuer, date Symbols Real time
Safety Quality control Safety control
2.0 J Voerman / 23-4-2014 sec
298642 1542939 11
Task number Chassis variant Issuer, date Symbols
Safety Quality control Safety control
3.0 J Voerman / 23-4-2014 sec
4 Tie up the lines and check that they are not in contact
with anything.
298642 1542939 11
Task number Chassis variant Issuer, date Symbols Real time
Safety Quality control Safety control
4.0 J Voerman / 23-4-2014 sec
2 Check that the propeller shaft does not contact the air
tanks.This can be done by positioning the suspension
in the limit positions.
4 Treat the old holes and the new bolt/nut joints with
transparent Tectyl.