Method Statement

For Structural support shoring work

Date:

Company Name Rohan Builder (I) Pvt. Ltd.


Responsible person (Mdlz) Raghvendra Singh
Responsible person (Contractor) Mr. Parasanna Vijayakumar
Mobile phone 9500809086
Working site Pragati, Mondelez
Starting date
Finishing date (expected)
Finishing date ( actual)

1.PURPOSE

The purpose of this Work Procedure is to provide a controlled system of


operation within project specifications and applicable codes/standards.

2.SCOPE

This Work Procedure shall cover Structural support shoring work and
identify the responsible personnel, sequence of operations and HSE Guidelines.

3.RESPONSIBILITIES

 Project Manager/ Site Engineer to ensure that site supervisor / Foreman


are familiar with work instruction, quality control and safety requirements
for the activity and ensure that these requirements are put into practice.
 The Site Engineer shall be responsible for all the works being carried out.
 Site Supervisor is responsible for the continuous supervision of the work.
 Safety Engineer is responsible to monitor the work and ensure the safety
in the proposed work.

4. Workers Deployment in shoring work


Method Statement
For Structural support shoring work

Date:

Sr. No. Category No. of Person


1 Fitter 2
2 Welder 1
3 Helper 1
4 Eng. + Supervisor 2
5 HSE 1

5-Shoring work Equipment detail


Sr. No. Equipment
1 Hammer 1
2 Welding machine 1
3 Grinding Machine 1

Shoring work preparation Equipment:

Hammer

Welding machine
Method Statement
For Structural support shoring work

Date:

Grinding machine

6- PREPRATION BEFORE WORK START-

1- PTW must be taken before starting the job.


2- Check all available drawings and Instruction documents before starting
Shoring work
3- If any service and power supply is likely to be affected, it must be
Checked & removed prior to commencing work
4- Debris & Mud needs to be removed prior to commissioning work.

5- Placing of all the required material on job location


6- Safe Access must be provided for worker movement.
Method Statement
For Structural support shoring work

Date:

7- Check the other activity and provide safe distance for work and area
should be barricaded.
7- Sequence of the work
 Preparation of ground and estimated location.
 Layout and marking as per instruction.
 Cutting of ISMB/ ISMC as per Required size
 Placing of ISMB/ ISMC material near fixing Location.
 Fixing or Push down of ISMB/ISMC by Hammer or Excavator.
 Fixing of MS plate/ sheet by welding
 Fixing of support

9- SAFETY ASPECTS:
 All Labours involved in the above works will be using all PPEs.
 Proper Barricading shall be provided to the area.
 Proper access must be provided.
 Before the Starting Shoring work of an area, the area will be confirmed
to be free of any service lines/ cables.

 All the machineries proposed to be used in the work shall be checked.

Prepared by- Reviewed by- Approved by-


Method Statement
For Structural support shoring work

Date:

Emergency Preparedness Plan:-

Mr. Brijesh Gangwar – Engineering Lead Mr. Shamshuddin Project safety Lead
Contact No- 8199991134 Contact No- 9852327445

Mr. Raghvendra Singh – Project


Manager Engineering - 7566842911

Mr. Vishal (IPSM) – Safety Emergency Contact Number


Mr. Ashutosh Gupta- 9990045880 - 999
8369848011

Evacuation Plan:-
 All involved in this specific activity shall know the escape route & assembly area.
 Ensure Exits are not to be blocked in any situation.
 First aid reporting procedures are to be planned.
 CPR procedures to be conveyed to the supervision team.