You are on page 1of 58

PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022

ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1 1 PROJEK PEMBANGUNAN CUKAI SENTRAL, ‐0.14 days 755 days RM 47,054,287.47 Mon 23/11/20 Wed 21/2/24 Mon 23/11/20 NA 21.49 22.6 RM 8,763,793.04 RM 8,825,663.71
KEMAMAN, TERENGGANU
2 1.1 START 1 day 0 days RM 0.00 Mon 23/11/20 Mon 23/11/20 Mon 23/11/20 Mon 23/11/20 100 100 RM 0.00 RM 0.00
3 1.2 NON‐PHYSICAL WORKS ‐0.18 days 752.3 days RM 2,333,338.62 Mon 23/11/20 Mon 19/2/24 Mon 23/11/20 NA 76.65 76.72 RM 1,931,205.29 RM 1,931,805.29
4 1.2.1 A1 ‐ PRELIMINARIES ‐0.18 days 752.3 days RM 2,014,298.62 Mon 23/11/20 Mon 19/2/24 Mon 23/11/20 NA 77.05 77.14 RM 1,689,725.39 RM 1,690,325.39
5 1.2.1.1 INITIAL ‐7 days 84 days RM 571,185.07 Wed 2/12/20 Thu 1/4/21 Thu 26/11/20 Tue 23/3/21 100 100 RM 571,185.07 RM 571,185.07
6 1.2.1.1.1 Project Signboard ‐2 days 7 days RM 4,500.00 Mon 14/12/20 Tue 22/12/20 Thu 3/12/20 Sun 20/12/20 100 100 RM 4,500.00 RM 4,500.00
7 1.2.1.1.2 Site Survey and Setting Out ‐34 days 14 days RM 12,000.00 Tue 12/1/21 Sun 31/1/21 Thu 26/11/20 Mon 14/12/20 100 100 RM 12,000.00 RM 12,000.00
8 1.2.1.1.3 Temporary Diversion & Relocation of 0 days 20 days RM 10,000.00 Mon 22/2/21 Tue 23/3/21 Sun 7/2/21 Tue 23/3/21 100 100 RM 10,000.00 RM 10,000.00
Existing Services
9 1.2.1.1.4 Construction Plan (work program) ‐8 days 14 days RM 5,000.00 Wed 23/12/20 Mon 11/1/21 Sun 6/12/20 Wed 30/12/20 100 100 RM 5,000.00 RM 5,000.00
10 1.2.1.1.5 PPE Equipment ‐22 days 7 days RM 9,000.00 Wed 24/3/21 Thu 1/4/21 Mon 15/2/21 Sun 28/2/21 100 100 RM 9,000.00 RM 9,000.00
11 1.2.1.1.6 Fire Extinguishers ‐22 days 7 days RM 1,000.00 Wed 24/3/21 Thu 1/4/21 Mon 15/2/21 Sun 28/2/21 100 100 RM 1,000.00 RM 1,000.00
12 1.2.1.1.7 4 x 4 Vehicles 3nos ‐25 days 14 days RM 200,000.00 Mon 1/2/21 Sun 21/2/21 Tue 8/12/20 Thu 14/1/21 100 100 RM 200,000.00 RM 200,000.00
13 1.2.1.1.8 Performance Bond 0 days 1 day RM 178,000.00 Wed 2/12/20 Wed 2/12/20 Wed 2/12/20 Wed 2/12/20 100 100 RM 178,000.00 RM 178,000.00
14 1.2.1.1.9 CIDB Levy 0 days 1 day RM 60,000.00 Wed 2/12/20 Wed 2/12/20 Wed 2/12/20 Wed 2/12/20 100 100 RM 60,000.00 RM 60,000.00
15 1.2.1.1.1 Insurance of Works 0 days 1 day RM 91,685.07 Wed 2/12/20 Wed 2/12/20 Wed 2/12/20 Wed 2/12/20 100 100 RM 91,685.07 RM 91,685.07
16 1.2.1.2 RECURRING 0 days 601 days RM 1,430,113.55 Mon 23/11/20 Thu 13/7/23 Mon 23/11/20 NA 75.99 75.99 RM 1,118,540.32 RM 1,118,540.32
17 1.2.1.2.1 Contractor's Plant 0 days 586 days RM 250,000.00 Tue 1/12/20 Sun 2/7/23 Tue 1/12/20 NA 78.13 78.13 RM 195,312.50 RM 195,312.50
18 1.2.1.2.1 Contractor's Plant 1 0 days 1 day RM 7,812.50 Tue 1/12/20 Tue 1/12/20 Tue 1/12/20 Tue 1/12/20 100 100 RM 7,812.50 RM 7,812.50
19 1.2.1.2.1 Contractor's Plant 2 0 days 1 day RM 7,812.50 Sun 3/1/21 Sun 3/1/21 Sun 3/1/21 Sun 3/1/21 100 100 RM 7,812.50 RM 7,812.50
20 1.2.1.2.1 Contractor's Plant 3 0 days 1 day RM 7,812.50 Mon 1/2/21 Mon 1/2/21 Mon 1/2/21 Mon 1/2/21 100 100 RM 7,812.50 RM 7,812.50
21 1.2.1.2.1 Contractor's Plant 4 0 days 1 day RM 7,812.50 Mon 1/3/21 Mon 1/3/21 Mon 1/3/21 Mon 1/3/21 100 100 RM 7,812.50 RM 7,812.50
22 1.2.1.2.1 Contractor's Plant 5 0 days 1 day RM 7,812.50 Thu 1/4/21 Thu 1/4/21 Thu 1/4/21 Thu 1/4/21 100 100 RM 7,812.50 RM 7,812.50
23 1.2.1.2.1 Contractor's Plant 6 0 days 1 day RM 7,812.50 Mon 3/5/21 Mon 3/5/21 Mon 3/5/21 Mon 3/5/21 100 100 RM 7,812.50 RM 7,812.50
24 1.2.1.2.1 Contractor's Plant 7 0 days 1 day RM 7,812.50 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 7,812.50 RM 7,812.50
25 1.2.1.2.1 Contractor's Plant 8 0 days 1 day RM 7,812.50 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 7,812.50 RM 7,812.50
26 1.2.1.2.1 Contractor's Plant 9 0 days 1 day RM 7,812.50 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 7,812.50 RM 7,812.50
27 1.2.1.2.1 Contractor's Plant 10 0 days 1 day RM 7,812.50 Wed 1/9/21 Wed 1/9/21 Wed 1/9/21 Wed 1/9/21 100 100 RM 7,812.50 RM 7,812.50
28 1.2.1.2.1 Contractor's Plant 11 0 days 1 day RM 7,812.50 Sun 3/10/21 Sun 3/10/21 Sun 3/10/21 Sun 3/10/21 100 100 RM 7,812.50 RM 7,812.50
29 1.2.1.2.1 Contractor's Plant 12 0 days 1 day RM 7,812.50 Mon 1/11/21 Mon 1/11/21 Mon 1/11/21 Mon 1/11/21 100 100 RM 7,812.50 RM 7,812.50
30 1.2.1.2.1 Contractor's Plant 13 0 days 1 day RM 7,812.50 Wed 1/12/21 Wed 1/12/21 Wed 1/12/21 Wed 1/12/21 100 100 RM 7,812.50 RM 7,812.50
31 1.2.1.2.1 Contractor's Plant 14 0 days 1 day RM 7,812.50 Sun 2/1/22 Sun 2/1/22 Sun 2/1/22 Sun 2/1/22 100 100 RM 7,812.50 RM 7,812.50
32 1.2.1.2.1 Contractor's Plant 15 0 days 1 day RM 7,812.50 Thu 3/2/22 Thu 3/2/22 Thu 3/2/22 Thu 3/2/22 100 100 RM 7,812.50 RM 7,812.50
33 1.2.1.2.1 Contractor's Plant 16 0 days 1 day RM 7,812.50 Tue 1/3/22 Tue 1/3/22 Tue 1/3/22 Tue 1/3/22 100 100 RM 7,812.50 RM 7,812.50
34 1.2.1.2.1 Contractor's Plant 17 0 days 1 day RM 7,812.50 Sun 3/4/22 Sun 3/4/22 Sun 3/4/22 Sun 3/4/22 100 100 RM 7,812.50 RM 7,812.50
35 1.2.1.2.1 Contractor's Plant 18 0 days 1 day RM 7,812.50 Wed 4/5/22 Wed 4/5/22 Wed 4/5/22 Wed 4/5/22 100 100 RM 7,812.50 RM 7,812.50
36 1.2.1.2.1 Contractor's Plant 19 0 days 1 day RM 7,812.50 Wed 1/6/22 Wed 1/6/22 Wed 1/6/22 Wed 1/6/22 100 100 RM 7,812.50 RM 7,812.50
37 1.2.1.2.1 Contractor's Plant 20 0 days 1 day RM 7,812.50 Sun 3/7/22 Sun 3/7/22 Sun 3/7/22 Sun 3/7/22 100 100 RM 7,812.50 RM 7,812.50
38 1.2.1.2.1 Contractor's Plant 21 0 days 1 day RM 7,812.50 Mon 1/8/22 Mon 1/8/22 Mon 1/8/22 Mon 1/8/22 100 100 RM 7,812.50 RM 7,812.50
39 1.2.1.2.1 Contractor's Plant 22 0 days 1 day RM 7,812.50 Thu 1/9/22 Thu 1/9/22 Thu 1/9/22 Thu 1/9/22 100 100 RM 7,812.50 RM 7,812.50
40 1.2.1.2.1 Contractor's Plant 23 0 days 1 day RM 7,812.50 Sun 2/10/22 Sun 2/10/22 Sun 2/10/22 Sun 2/10/22 100 100 RM 7,812.50 RM 7,812.50
41 1.2.1.2.1 Contractor's Plant 24 0 days 1 day RM 7,812.50 Tue 1/11/22 Tue 1/11/22 Tue 1/11/22 Tue 1/11/22 100 100 RM 7,812.50 RM 7,812.50
42 1.2.1.2.1 Contractor's Plant 25 0 days 1 day RM 7,812.50 Thu 1/12/22 Thu 1/12/22 Thu 1/12/22 Thu 1/12/22 100 100 RM 7,812.50 RM 7,812.50
43 1.2.1.2.1 Contractor's Plant 26 0 days 1 day RM 7,812.50 Sun 1/1/23 Sun 1/1/23 NA NA 0 0 RM 0.00 RM 0.00
44 1.2.1.2.1 Contractor's Plant 27 0 days 1 day RM 7,812.50 Wed 1/2/23 Wed 1/2/23 NA NA 0 0 RM 0.00 RM 0.00
45 1.2.1.2.1 Contractor's Plant 28 0 days 1 day RM 7,812.50 Wed 1/3/23 Wed 1/3/23 NA NA 0 0 RM 0.00 RM 0.00
46 1.2.1.2.1 Contractor's Plant 29 0 days 1 day RM 7,812.50 Sun 2/4/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
47 1.2.1.2.1 Contractor's Plant 30 0 days 1 day RM 7,812.50 Tue 2/5/23 Tue 2/5/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
48 1.2.1.2.1 Contractor's Plant 31 0 days 1 day RM 7,812.50 Thu 1/6/23 Thu 1/6/23 NA NA 0 0 RM 0.00 RM 0.00
49 1.2.1.2.1 Contractor's Plant 32 0 days 1 day RM 7,812.50 Sun 2/7/23 Sun 2/7/23 NA NA 0 0 RM 0.00 RM 0.00
50 1.2.1.2.2 Temporary Water & Power Supplies 0 days 564 days RM 100,000.00 Thu 31/12/20 Sun 2/7/23 Thu 31/12/20 NA 77.42 77.42 RM 77,419.33 RM 77,419.33

51 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.80 Thu 31/12/20 Thu 31/12/20 Thu 31/12/20 Thu 31/12/20 100 100 RM 3,225.80 RM 3,225.80
52 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.80 Sun 31/1/21 Sun 31/1/21 Sun 31/1/21 Sun 31/1/21 100 100 RM 3,225.80 RM 3,225.80
53 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.80 Sun 28/2/21 Sun 28/2/21 Sun 28/2/21 Sun 28/2/21 100 100 RM 3,225.80 RM 3,225.80
54 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.80 Wed 31/3/21 Wed 31/3/21 Wed 31/3/21 Wed 31/3/21 100 100 RM 3,225.80 RM 3,225.80
55 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.80 Mon 3/5/21 Mon 3/5/21 Mon 3/5/21 Mon 3/5/21 100 100 RM 3,225.80 RM 3,225.80
56 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.80 Mon 31/5/21 Mon 31/5/21 Mon 31/5/21 Mon 31/5/21 100 100 RM 3,225.80 RM 3,225.80
57 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.80 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 3,225.80 RM 3,225.80
58 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.80 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 3,225.80 RM 3,225.80
59 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.80 Tue 31/8/21 Tue 31/8/21 Tue 31/8/21 Tue 31/8/21 100 100 RM 3,225.80 RM 3,225.80
60 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.80 Thu 30/9/21 Thu 30/9/21 Thu 30/9/21 Thu 30/9/21 100 100 RM 3,225.80 RM 3,225.80
61 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.80 Sun 31/10/21 Sun 31/10/21 Sun 31/10/21 Sun 31/10/21 100 100 RM 3,225.80 RM 3,225.80
62 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Tue 30/11/21 Tue 30/11/21 Tue 30/11/21 Tue 30/11/21 100 100 RM 3,225.81 RM 3,225.81
63 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Sun 2/1/22 Sun 2/1/22 Sun 2/1/22 Sun 2/1/22 100 100 RM 3,225.81 RM 3,225.81
64 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Mon 31/1/22 Mon 31/1/22 Mon 31/1/22 Mon 31/1/22 100 100 RM 3,225.81 RM 3,225.81
65 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Mon 28/2/22 Mon 28/2/22 Mon 28/2/22 Mon 28/2/22 100 100 RM 3,225.81 RM 3,225.81
66 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Thu 31/3/22 Thu 31/3/22 Thu 31/3/22 Thu 31/3/22 100 100 RM 3,225.81 RM 3,225.81
67 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Wed 4/5/22 Wed 4/5/22 Wed 4/5/22 Wed 4/5/22 100 100 RM 3,225.81 RM 3,225.81
68 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Tue 31/5/22 Tue 31/5/22 Tue 31/5/22 Tue 31/5/22 100 100 RM 3,225.81 RM 3,225.81
69 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Thu 30/6/22 Thu 30/6/22 Thu 30/6/22 Thu 30/6/22 100 100 RM 3,225.81 RM 3,225.81
70 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Mon 1/8/22 Mon 1/8/22 Mon 1/8/22 Mon 1/8/22 100 100 RM 3,225.81 RM 3,225.81
71 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Wed 31/8/22 Wed 31/8/22 Wed 31/8/22 Wed 31/8/22 100 100 RM 3,225.81 RM 3,225.81
72 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Sun 2/10/22 Sun 2/10/22 Sun 2/10/22 Sun 2/10/22 100 100 RM 3,225.81 RM 3,225.81
73 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Mon 31/10/22 Mon 31/10/22 Mon 31/10/22 Mon 31/10/22 100 100 RM 3,225.81 RM 3,225.81
74 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Wed 30/11/22 Wed 30/11/22 Wed 30/11/22 Wed 30/11/22 100 100 RM 3,225.81 RM 3,225.81
75 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Sun 1/1/23 Sun 1/1/23 NA NA 0 0 RM 0.00 RM 0.00
76 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Tue 31/1/23 Tue 31/1/23 NA NA 0 0 RM 0.00 RM 0.00
77 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Tue 28/2/23 Tue 28/2/23 NA NA 0 0 RM 0.00 RM 0.00
78 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Sun 2/4/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
79 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Sun 30/4/23 Sun 30/4/23 NA NA 0 0 RM 0.00 RM 0.00
80 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Wed 31/5/23 Wed 31/5/23 NA NA 0 0 RM 0.00 RM 0.00
81 1.2.1.2.2 Temporary Water & Power Supplies0 days 1 day RM 3,225.81 Sun 2/7/23 Sun 2/7/23 NA NA 0 0 RM 0.00 RM 0.00
82 1.2.1.2.3 Site Security 0 days 586 days RM 96,000.00 Tue 1/12/20 Sun 2/7/23 Tue 1/12/20 NA 78.13 78.13 RM 75,000.00 RM 75,000.00
83 1.2.1.2.3 Site Security 1 0 days 1 day RM 3,000.00 Tue 1/12/20 Tue 1/12/20 Tue 1/12/20 Tue 1/12/20 100 100 RM 3,000.00 RM 3,000.00
84 1.2.1.2.3 Site Security 2 0 days 1 day RM 3,000.00 Sun 3/1/21 Sun 3/1/21 Sun 3/1/21 Sun 3/1/21 100 100 RM 3,000.00 RM 3,000.00
85 1.2.1.2.3 Site Security 3 0 days 1 day RM 3,000.00 Mon 1/2/21 Mon 1/2/21 Mon 1/2/21 Mon 1/2/21 100 100 RM 3,000.00 RM 3,000.00
86 1.2.1.2.3 Site Security 4 0 days 1 day RM 3,000.00 Mon 1/3/21 Mon 1/3/21 Mon 1/3/21 Mon 1/3/21 100 100 RM 3,000.00 RM 3,000.00
87 1.2.1.2.3 Site Security 5 0 days 1 day RM 3,000.00 Thu 1/4/21 Thu 1/4/21 Thu 1/4/21 Thu 1/4/21 100 100 RM 3,000.00 RM 3,000.00
88 1.2.1.2.3 Site Security 6 0 days 1 day RM 3,000.00 Mon 3/5/21 Mon 3/5/21 Mon 3/5/21 Mon 3/5/21 100 100 RM 3,000.00 RM 3,000.00
89 1.2.1.2.3 Site Security 7 0 days 1 day RM 3,000.00 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 3,000.00 RM 3,000.00
90 1.2.1.2.3 Site Security 8 0 days 1 day RM 3,000.00 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 3,000.00 RM 3,000.00
91 1.2.1.2.3 Site Security 9 0 days 1 day RM 3,000.00 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 3,000.00 RM 3,000.00
92 1.2.1.2.3 Site Security 10 0 days 1 day RM 3,000.00 Wed 1/9/21 Wed 1/9/21 Wed 1/9/21 Wed 1/9/21 100 100 RM 3,000.00 RM 3,000.00
93 1.2.1.2.3 Site Security 11 0 days 1 day RM 3,000.00 Sun 3/10/21 Sun 3/10/21 Sun 3/10/21 Sun 3/10/21 100 100 RM 3,000.00 RM 3,000.00
94 1.2.1.2.3 Site Security 12 0 days 1 day RM 3,000.00 Mon 1/11/21 Mon 1/11/21 Mon 1/11/21 Mon 1/11/21 100 100 RM 3,000.00 RM 3,000.00
95 1.2.1.2.3 Site Security 13 0 days 1 day RM 3,000.00 Wed 1/12/21 Wed 1/12/21 Wed 1/12/21 Wed 1/12/21 100 100 RM 3,000.00 RM 3,000.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
96 1.2.1.2.3 Site Security 14 0 days 1 day RM 3,000.00 Sun 2/1/22 Sun 2/1/22 Sun 2/1/22 Sun 2/1/22 100 100 RM 3,000.00 RM 3,000.00
97 1.2.1.2.3 Site Security 15 0 days 1 day RM 3,000.00 Thu 3/2/22 Thu 3/2/22 Thu 3/2/22 Thu 3/2/22 100 100 RM 3,000.00 RM 3,000.00
98 1.2.1.2.3 Site Security 16 0 days 1 day RM 3,000.00 Tue 1/3/22 Tue 1/3/22 Tue 1/3/22 Tue 1/3/22 100 100 RM 3,000.00 RM 3,000.00
99 1.2.1.2.3 Site Security 17 0 days 1 day RM 3,000.00 Sun 3/4/22 Sun 3/4/22 Sun 3/4/22 Sun 3/4/22 100 100 RM 3,000.00 RM 3,000.00
100 1.2.1.2.3 Site Security 18 0 days 1 day RM 3,000.00 Wed 4/5/22 Wed 4/5/22 Wed 4/5/22 Wed 4/5/22 100 100 RM 3,000.00 RM 3,000.00
101 1.2.1.2.3 Site Security 19 0 days 1 day RM 3,000.00 Wed 1/6/22 Wed 1/6/22 Wed 1/6/22 Wed 1/6/22 100 100 RM 3,000.00 RM 3,000.00
102 1.2.1.2.3 Site Security 20 0 days 1 day RM 3,000.00 Sun 3/7/22 Sun 3/7/22 Sun 3/7/22 Sun 3/7/22 100 100 RM 3,000.00 RM 3,000.00
103 1.2.1.2.3 Site Security 21 0 days 1 day RM 3,000.00 Mon 1/8/22 Mon 1/8/22 Mon 1/8/22 Mon 1/8/22 100 100 RM 3,000.00 RM 3,000.00
104 1.2.1.2.3 Site Security 22 0 days 1 day RM 3,000.00 Thu 1/9/22 Thu 1/9/22 Thu 1/9/22 Thu 1/9/22 100 100 RM 3,000.00 RM 3,000.00
105 1.2.1.2.3 Site Security 23 0 days 1 day RM 3,000.00 Sun 2/10/22 Sun 2/10/22 Sun 2/10/22 Sun 2/10/22 100 100 RM 3,000.00 RM 3,000.00
106 1.2.1.2.3 Site Security 24 0 days 1 day RM 3,000.00 Tue 1/11/22 Tue 1/11/22 Tue 1/11/22 Tue 1/11/22 100 100 RM 3,000.00 RM 3,000.00
107 1.2.1.2.3 Site Security 25 0 days 1 day RM 3,000.00 Thu 1/12/22 Thu 1/12/22 Thu 1/12/22 Thu 1/12/22 100 100 RM 3,000.00 RM 3,000.00
108 1.2.1.2.3 Site Security 26 0 days 1 day RM 3,000.00 Sun 1/1/23 Sun 1/1/23 NA NA 0 0 RM 0.00 RM 0.00
109 1.2.1.2.3 Site Security 27 0 days 1 day RM 3,000.00 Wed 1/2/23 Wed 1/2/23 NA NA 0 0 RM 0.00 RM 0.00
110 1.2.1.2.3 Site Security 28 0 days 1 day RM 3,000.00 Wed 1/3/23 Wed 1/3/23 NA NA 0 0 RM 0.00 RM 0.00
111 1.2.1.2.3 Site Security 29 0 days 1 day RM 3,000.00 Sun 2/4/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
112 1.2.1.2.3 Site Security 30 0 days 1 day RM 3,000.00 Tue 2/5/23 Tue 2/5/23 NA NA 0 0 RM 0.00 RM 0.00
113 1.2.1.2.3 Site Security 31 0 days 1 day RM 3,000.00 Thu 1/6/23 Thu 1/6/23 NA NA 0 0 RM 0.00 RM 0.00
114 1.2.1.2.3 Site Security 32 0 days 1 day RM 3,000.00 Sun 2/7/23 Sun 2/7/23 NA NA 0 0 RM 0.00 RM 0.00
115 1.2.1.2.4 Temporary Access & Maintenance 0 days 568 days RM 65,000.00 Sun 27/12/20 Sun 2/7/23 Sun 27/12/20 NA 77.42 77.42 RM 50,322.61 RM 50,322.61
Existing Road
116 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.78 Sun 27/12/20 Sun 27/12/20 Sun 27/12/20 Sun 27/12/20 100 100 RM 2,096.78 RM 2,096.78
117 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.78 Wed 27/1/21 Wed 27/1/21 Wed 27/1/21 Wed 27/1/21 100 100 RM 2,096.78 RM 2,096.78
118 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.78 Sun 28/2/21 Sun 28/2/21 Sun 28/2/21 Sun 28/2/21 100 100 RM 2,096.78 RM 2,096.78
119 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.78 Sun 28/3/21 Sun 28/3/21 Sun 28/3/21 Sun 28/3/21 100 100 RM 2,096.78 RM 2,096.78
120 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.78 Tue 27/4/21 Tue 27/4/21 Tue 27/4/21 Tue 27/4/21 100 100 RM 2,096.78 RM 2,096.78
121 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.78 Sun 30/5/21 Sun 30/5/21 Sun 30/5/21 Sun 30/5/21 100 100 RM 2,096.78 RM 2,096.78
122 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.78 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 2,096.78 RM 2,096.78
123 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.78 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 2,096.78 RM 2,096.78
124 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.78 Sun 29/8/21 Sun 29/8/21 Sun 29/8/21 Sun 29/8/21 100 100 RM 2,096.78 RM 2,096.78
125 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.78 Mon 27/9/21 Mon 27/9/21 Mon 27/9/21 Mon 27/9/21 100 100 RM 2,096.78 RM 2,096.78
126 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.78 Wed 27/10/21 Wed 27/10/21 Wed 27/10/21 Wed 27/10/21 100 100 RM 2,096.78 RM 2,096.78
127 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.78 Sun 28/11/21 Sun 28/11/21 Sun 28/11/21 Sun 28/11/21 100 100 RM 2,096.78 RM 2,096.78
128 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.78 Mon 27/12/21 Mon 27/12/21 Mon 27/12/21 Mon 27/12/21 100 100 RM 2,096.78 RM 2,096.78
129 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.77 Thu 27/1/22 Thu 27/1/22 Thu 27/1/22 Thu 27/1/22 100 100 RM 2,096.77 RM 2,096.77
130 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.77 Sun 27/2/22 Sun 27/2/22 Sun 27/2/22 Sun 27/2/22 100 100 RM 2,096.77 RM 2,096.77
131 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.77 Sun 27/3/22 Sun 27/3/22 Sun 27/3/22 Sun 27/3/22 100 100 RM 2,096.77 RM 2,096.77
132 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.77 Wed 27/4/22 Wed 27/4/22 Wed 27/4/22 Wed 27/4/22 100 100 RM 2,096.77 RM 2,096.77
133 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.77 Sun 29/5/22 Sun 29/5/22 Sun 29/5/22 Sun 29/5/22 100 100 RM 2,096.77 RM 2,096.77
134 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.77 Mon 27/6/22 Mon 27/6/22 Mon 27/6/22 Mon 27/6/22 100 100 RM 2,096.77 RM 2,096.77
135 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.77 Wed 27/7/22 Wed 27/7/22 Wed 27/7/22 Wed 27/7/22 100 100 RM 2,096.77 RM 2,096.77
136 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.77 Sun 28/8/22 Sun 28/8/22 Sun 28/8/22 Sun 28/8/22 100 100 RM 2,096.77 RM 2,096.77
137 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.77 Tue 27/9/22 Tue 27/9/22 Tue 27/9/22 Tue 27/9/22 100 100 RM 2,096.77 RM 2,096.77
138 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.77 Thu 27/10/22 Thu 27/10/22 Thu 27/10/22 Thu 27/10/22 100 100 RM 2,096.77 RM 2,096.77
139 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.77 Sun 27/11/22 Sun 27/11/22 Sun 27/11/22 Sun 27/11/22 100 100 RM 2,096.77 RM 2,096.77
140 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.77 Tue 27/12/22 Tue 27/12/22 NA NA 0 0 RM 0.00 RM 0.00
141 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.77 Sun 29/1/23 Sun 29/1/23 NA NA 0 0 RM 0.00 RM 0.00
142 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.77 Mon 27/2/23 Mon 27/2/23 NA NA 0 0 RM 0.00 RM 0.00
143 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.77 Mon 27/3/23 Mon 27/3/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
144 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.77 Thu 27/4/23 Thu 27/4/23 NA NA 0 0 RM 0.00 RM 0.00
145 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.77 Sun 28/5/23 Sun 28/5/23 NA NA 0 0 RM 0.00 RM 0.00
146 1.2.1.2.4 Temporary Access & Maintenance E0 days 1 day RM 2,096.77 Sun 2/7/23 Sun 2/7/23 NA NA 0 0 RM 0.00 RM 0.00
147 1.2.1.2.5 Contractor's Office & Storage 0 days 536 days RM 40,000.00 Tue 23/2/21 Thu 13/7/23 Tue 23/2/21 NA 73.33 73.33 RM 29,333.26 RM 29,333.26
148 1.2.1.2.5 Contractor's Office & Storage 1 0 days 1 day RM 1,333.33 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 1,333.33 RM 1,333.33
149 1.2.1.2.5 Contractor's Office & Storage 2 0 days 1 day RM 1,333.33 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 1,333.33 RM 1,333.33
150 1.2.1.2.5 Contractor's Office & Storage 3 0 days 1 day RM 1,333.33 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 1,333.33 RM 1,333.33
151 1.2.1.2.5 Contractor's Office & Storage 4 0 days 1 day RM 1,333.33 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 1,333.33 RM 1,333.33
152 1.2.1.2.5 Contractor's Office & Storage 5 0 days 1 day RM 1,333.33 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 1,333.33 RM 1,333.33
153 1.2.1.2.5 Contractor's Office & Storage 6 0 days 1 day RM 1,333.33 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 1,333.33 RM 1,333.33
154 1.2.1.2.5 Contractor's Office & Storage 7 0 days 1 day RM 1,333.33 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 1,333.33 RM 1,333.33
155 1.2.1.2.5 Contractor's Office & Storage 8 0 days 1 day RM 1,333.33 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 1,333.33 RM 1,333.33
156 1.2.1.2.5 Contractor's Office & Storage 9 0 days 1 day RM 1,333.33 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 1,333.33 RM 1,333.33
157 1.2.1.2.5 Contractor's Office & Storage 10 0 days 1 day RM 1,333.33 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 1,333.33 RM 1,333.33
158 1.2.1.2.5 Contractor's Office & Storage 11 0 days 1 day RM 1,333.33 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 1,333.33 RM 1,333.33
159 1.2.1.2.5 Contractor's Office & Storage 12 0 days 1 day RM 1,333.33 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 100 100 RM 1,333.33 RM 1,333.33
160 1.2.1.2.5 Contractor's Office & Storage 13 0 days 1 day RM 1,333.33 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 100 100 RM 1,333.33 RM 1,333.33
161 1.2.1.2.5 Contractor's Office & Storage 14 0 days 1 day RM 1,333.33 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 1,333.33 RM 1,333.33
162 1.2.1.2.5 Contractor's Office & Storage 15 0 days 1 day RM 1,333.33 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 100 100 RM 1,333.33 RM 1,333.33
163 1.2.1.2.5 Contractor's Office & Storage 16 0 days 1 day RM 1,333.33 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 100 100 RM 1,333.33 RM 1,333.33
164 1.2.1.2.5 Contractor's Office & Storage 17 0 days 1 day RM 1,333.33 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 1,333.33 RM 1,333.33
165 1.2.1.2.5 Contractor's Office & Storage 18 0 days 1 day RM 1,333.33 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 100 100 RM 1,333.33 RM 1,333.33
166 1.2.1.2.5 Contractor's Office & Storage 19 0 days 1 day RM 1,333.33 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 100 100 RM 1,333.33 RM 1,333.33
167 1.2.1.2.5 Contractor's Office & Storage 20 0 days 1 day RM 1,333.33 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 1,333.33 RM 1,333.33
168 1.2.1.2.5 Contractor's Office & Storage 21 0 days 1 day RM 1,333.33 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 100 100 RM 1,333.33 RM 1,333.33
169 1.2.1.2.5 Contractor's Office & Storage 22 0 days 1 day RM 1,333.33 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 100 100 RM 1,333.33 RM 1,333.33
170 1.2.1.2.5 Contractor's Office & Storage 23 0 days 1 day RM 1,333.33 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
171 1.2.1.2.5 Contractor's Office & Storage 24 0 days 1 day RM 1,333.33 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
172 1.2.1.2.5 Contractor's Office & Storage 25 0 days 1 day RM 1,333.33 Thu 23/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
173 1.2.1.2.5 Contractor's Office & Storage 26 0 days 1 day RM 1,333.33 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
174 1.2.1.2.5 Contractor's Office & Storage 27 0 days 1 day RM 1,333.33 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
175 1.2.1.2.5 Contractor's Office & Storage 28 0 days 1 day RM 1,333.33 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
176 1.2.1.2.5 Contractor's Office & Storage 29 0 days 1 day RM 1,333.33 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
177 1.2.1.2.5 Contractor's Office & Storage 30 0 days 1 day RM 1,333.43 Thu 13/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
178 1.2.1.2.6 Office Accommodation for SO 0 days 138 days RM 100,000.00 Tue 23/2/21 Tue 23/11/21 Tue 23/2/21 Tue 23/11/21 100 100 RM 100,000.00 RM 100,000.00
179 1.2.1.2.6 Office Accommodation for SO 1 0 days 1 day RM 10,000.00 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 10,000.00 RM 10,000.00
180 1.2.1.2.6 Office Accommodation for SO 2 0 days 1 day RM 10,000.00 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 10,000.00 RM 10,000.00
181 1.2.1.2.6 Office Accommodation for SO 3 0 days 1 day RM 10,000.00 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 10,000.00 RM 10,000.00
182 1.2.1.2.6 Office Accommodation for SO 4 0 days 1 day RM 10,000.00 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 10,000.00 RM 10,000.00
183 1.2.1.2.6 Office Accommodation for SO 5 0 days 1 day RM 10,000.00 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 10,000.00 RM 10,000.00
184 1.2.1.2.6 Office Accommodation for SO 6 0 days 1 day RM 10,000.00 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 10,000.00 RM 10,000.00
185 1.2.1.2.6 Office Accommodation for SO 7 0 days 1 day RM 10,000.00 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 10,000.00 RM 10,000.00
186 1.2.1.2.6 Office Accommodation for SO 8 0 days 1 day RM 10,000.00 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 10,000.00 RM 10,000.00
187 1.2.1.2.6 Office Accommodation for SO 9 0 days 1 day RM 10,000.00 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 10,000.00 RM 10,000.00
188 1.2.1.2.6 Office Accommodation for SO 10 0 days 1 day RM 10,000.00 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 10,000.00 RM 10,000.00
189 1.2.1.2.7 Telephone for SO 0 days 536 days RM 16,000.00 Tue 23/2/21 Thu 13/7/23 Tue 23/2/21 NA 73.33 73.33 RM 11,733.26 RM 11,733.26
190 1.2.1.2.7 Telephone for SO 1 0 days 1 day RM 533.33 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 533.33 RM 533.33
191 1.2.1.2.7 Telephone for SO 2 0 days 1 day RM 533.33 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 533.33 RM 533.33
192 1.2.1.2.7 Telephone for SO 3 0 days 1 day RM 533.33 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 533.33 RM 533.33

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
193 1.2.1.2.7 Telephone for SO 4 0 days 1 day RM 533.33 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 533.33 RM 533.33
194 1.2.1.2.7 Telephone for SO 5 0 days 1 day RM 533.33 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 533.33 RM 533.33
195 1.2.1.2.7 Telephone for SO 6 0 days 1 day RM 533.33 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 533.33 RM 533.33
196 1.2.1.2.7 Telephone for SO 7 0 days 1 day RM 533.33 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 533.33 RM 533.33
197 1.2.1.2.7 Telephone for SO 8 0 days 1 day RM 533.33 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 533.33 RM 533.33
198 1.2.1.2.7 Telephone for SO 9 0 days 1 day RM 533.33 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 533.33 RM 533.33
199 1.2.1.2.7 Telephone for SO 10 0 days 1 day RM 533.33 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 533.33 RM 533.33
200 1.2.1.2.7 Telephone for SO 11 0 days 1 day RM 533.33 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 533.33 RM 533.33
201 1.2.1.2.7 Telephone for SO 12 0 days 1 day RM 533.33 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 100 100 RM 533.33 RM 533.33
202 1.2.1.2.7 Telephone for SO 13 0 days 1 day RM 533.33 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 100 100 RM 533.33 RM 533.33
203 1.2.1.2.7 Telephone for SO 14 0 days 1 day RM 533.33 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 533.33 RM 533.33
204 1.2.1.2.7 Telephone for SO 15 0 days 1 day RM 533.33 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 100 100 RM 533.33 RM 533.33
205 1.2.1.2.7 Telephone for SO 16 0 days 1 day RM 533.33 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 100 100 RM 533.33 RM 533.33
206 1.2.1.2.7 Telephone for SO 17 0 days 1 day RM 533.33 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 533.33 RM 533.33
207 1.2.1.2.7 Telephone for SO 18 0 days 1 day RM 533.33 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 100 100 RM 533.33 RM 533.33
208 1.2.1.2.7 Telephone for SO 19 0 days 1 day RM 533.33 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 100 100 RM 533.33 RM 533.33
209 1.2.1.2.7 Telephone for SO 20 0 days 1 day RM 533.33 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 533.33 RM 533.33
210 1.2.1.2.7 Telephone for SO 21 0 days 1 day RM 533.33 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 100 100 RM 533.33 RM 533.33
211 1.2.1.2.7 Telephone for SO 22 0 days 1 day RM 533.33 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 100 100 RM 533.33 RM 533.33
212 1.2.1.2.7 Telephone for SO 23 0 days 1 day RM 533.33 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
213 1.2.1.2.7 Telephone for SO 24 0 days 1 day RM 533.33 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
214 1.2.1.2.7 Telephone for SO 25 0 days 1 day RM 533.33 Thu 23/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
215 1.2.1.2.7 Telephone for SO 26 0 days 1 day RM 533.33 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
216 1.2.1.2.7 Telephone for SO 27 0 days 1 day RM 533.33 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
217 1.2.1.2.7 Telephone for SO 28 0 days 1 day RM 533.33 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
218 1.2.1.2.7 Telephone for SO 29 0 days 1 day RM 533.33 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
219 1.2.1.2.7 Telephone for SO 30 0 days 1 day RM 533.43 Thu 13/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
220 1.2.1.2.8 Survey Instrument & Personnel 0 days 536 days RM 20,000.00 Tue 23/2/21 Thu 13/7/23 Tue 23/2/21 NA 73.33 73.33 RM 14,666.74 RM 14,666.74
221 1.2.1.2.8 Survey Instrument & Personnel 1 0 days 1 day RM 666.67 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 666.67 RM 666.67
222 1.2.1.2.8 Survey Instrument & Personnel 2 0 days 1 day RM 666.67 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 666.67 RM 666.67
223 1.2.1.2.8 Survey Instrument & Personnel 3 0 days 1 day RM 666.67 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 666.67 RM 666.67
224 1.2.1.2.8 Survey Instrument & Personnel 4 0 days 1 day RM 666.67 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 666.67 RM 666.67
225 1.2.1.2.8 Survey Instrument & Personnel 5 0 days 1 day RM 666.67 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 666.67 RM 666.67
226 1.2.1.2.8 Survey Instrument & Personnel 6 0 days 1 day RM 666.67 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 666.67 RM 666.67
227 1.2.1.2.8 Survey Instrument & Personnel 7 0 days 1 day RM 666.67 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 666.67 RM 666.67
228 1.2.1.2.8 Survey Instrument & Personnel 8 0 days 1 day RM 666.67 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 666.67 RM 666.67
229 1.2.1.2.8 Survey Instrument & Personnel 9 0 days 1 day RM 666.67 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 666.67 RM 666.67
230 1.2.1.2.8 Survey Instrument & Personnel 10 0 days 1 day RM 666.67 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 666.67 RM 666.67
231 1.2.1.2.8 Survey Instrument & Personnel 11 0 days 1 day RM 666.67 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 666.67 RM 666.67
232 1.2.1.2.8 Survey Instrument & Personnel 12 0 days 1 day RM 666.67 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 100 100 RM 666.67 RM 666.67
233 1.2.1.2.8 Survey Instrument & Personnel 13 0 days 1 day RM 666.67 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 100 100 RM 666.67 RM 666.67
234 1.2.1.2.8 Survey Instrument & Personnel 14 0 days 1 day RM 666.67 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 666.67 RM 666.67
235 1.2.1.2.8 Survey Instrument & Personnel 15 0 days 1 day RM 666.67 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 100 100 RM 666.67 RM 666.67
236 1.2.1.2.8 Survey Instrument & Personnel 16 0 days 1 day RM 666.67 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 100 100 RM 666.67 RM 666.67
237 1.2.1.2.8 Survey Instrument & Personnel 17 0 days 1 day RM 666.67 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 666.67 RM 666.67
238 1.2.1.2.8 Survey Instrument & Personnel 18 0 days 1 day RM 666.67 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 100 100 RM 666.67 RM 666.67
239 1.2.1.2.8 Survey Instrument & Personnel 19 0 days 1 day RM 666.67 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 100 100 RM 666.67 RM 666.67
240 1.2.1.2.8 Survey Instrument & Personnel 20 0 days 1 day RM 666.67 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 666.67 RM 666.67
241 1.2.1.2.8 Survey Instrument & Personnel 21 0 days 1 day RM 666.67 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 100 100 RM 666.67 RM 666.67

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
242 1.2.1.2.8 Survey Instrument & Personnel 22 0 days 1 day RM 666.67 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 100 100 RM 666.67 RM 666.67
243 1.2.1.2.8 Survey Instrument & Personnel 23 0 days 1 day RM 666.67 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
244 1.2.1.2.8 Survey Instrument & Personnel 24 0 days 1 day RM 666.67 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
245 1.2.1.2.8 Survey Instrument & Personnel 25 0 days 1 day RM 666.67 Thu 23/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
246 1.2.1.2.8 Survey Instrument & Personnel 26 0 days 1 day RM 666.67 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
247 1.2.1.2.8 Survey Instrument & Personnel 27 0 days 1 day RM 666.67 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
248 1.2.1.2.8 Survey Instrument & Personnel 28 0 days 1 day RM 666.67 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
249 1.2.1.2.8 Survey Instrument & Personnel 29 0 days 1 day RM 666.67 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
250 1.2.1.2.8 Survey Instrument & Personnel 30 0 days 1 day RM 666.57 Thu 13/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
251 1.2.1.2.9 Equipment & Facilities 0 days 536 days RM 30,000.00 Tue 23/2/21 Thu 13/7/23 Tue 23/2/21 NA 73.33 73.33 RM 22,000.00 RM 22,000.00
252 1.2.1.2.9 Equipment & Facilities 1 0 days 1 day RM 1,000.00 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 1,000.00 RM 1,000.00
253 1.2.1.2.9 Equipment & Facilities 2 0 days 1 day RM 1,000.00 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 1,000.00 RM 1,000.00
254 1.2.1.2.9 Equipment & Facilities 3 0 days 1 day RM 1,000.00 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 1,000.00 RM 1,000.00
255 1.2.1.2.9 Equipment & Facilities 4 0 days 1 day RM 1,000.00 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 1,000.00 RM 1,000.00
256 1.2.1.2.9 Equipment & Facilities 5 0 days 1 day RM 1,000.00 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 1,000.00 RM 1,000.00
257 1.2.1.2.9 Equipment & Facilities 6 0 days 1 day RM 1,000.00 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 1,000.00 RM 1,000.00
258 1.2.1.2.9 Equipment & Facilities 7 0 days 1 day RM 1,000.00 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 1,000.00 RM 1,000.00
259 1.2.1.2.9 Equipment & Facilities 8 0 days 1 day RM 1,000.00 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 1,000.00 RM 1,000.00
260 1.2.1.2.9 Equipment & Facilities 9 0 days 1 day RM 1,000.00 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 1,000.00 RM 1,000.00
261 1.2.1.2.9 Equipment & Facilities 10 0 days 1 day RM 1,000.00 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 1,000.00 RM 1,000.00
262 1.2.1.2.9 Equipment & Facilities 11 0 days 1 day RM 1,000.00 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 1,000.00 RM 1,000.00
263 1.2.1.2.9 Equipment & Facilities 12 0 days 1 day RM 1,000.00 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 100 100 RM 1,000.00 RM 1,000.00
264 1.2.1.2.9 Equipment & Facilities 13 0 days 1 day RM 1,000.00 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 100 100 RM 1,000.00 RM 1,000.00
265 1.2.1.2.9 Equipment & Facilities 14 0 days 1 day RM 1,000.00 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 1,000.00 RM 1,000.00
266 1.2.1.2.9 Equipment & Facilities 15 0 days 1 day RM 1,000.00 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 100 100 RM 1,000.00 RM 1,000.00
267 1.2.1.2.9 Equipment & Facilities 16 0 days 1 day RM 1,000.00 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 100 100 RM 1,000.00 RM 1,000.00
268 1.2.1.2.9 Equipment & Facilities 17 0 days 1 day RM 1,000.00 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 1,000.00 RM 1,000.00
269 1.2.1.2.9 Equipment & Facilities 18 0 days 1 day RM 1,000.00 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 100 100 RM 1,000.00 RM 1,000.00
270 1.2.1.2.9 Equipment & Facilities 19 0 days 1 day RM 1,000.00 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 100 100 RM 1,000.00 RM 1,000.00
271 1.2.1.2.9 Equipment & Facilities 20 0 days 1 day RM 1,000.00 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 1,000.00 RM 1,000.00
272 1.2.1.2.9 Equipment & Facilities 21 0 days 1 day RM 1,000.00 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 100 100 RM 1,000.00 RM 1,000.00
273 1.2.1.2.9 Equipment & Facilities 22 0 days 1 day RM 1,000.00 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 100 100 RM 1,000.00 RM 1,000.00
274 1.2.1.2.9 Equipment & Facilities 23 0 days 1 day RM 1,000.00 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
275 1.2.1.2.9 Equipment & Facilities 24 0 days 1 day RM 1,000.00 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
276 1.2.1.2.9 Equipment & Facilities 25 0 days 1 day RM 1,000.00 Thu 23/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
277 1.2.1.2.9 Equipment & Facilities 26 0 days 1 day RM 1,000.00 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
278 1.2.1.2.9 Equipment & Facilities 27 0 days 1 day RM 1,000.00 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
279 1.2.1.2.9 Equipment & Facilities 28 0 days 1 day RM 1,000.00 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
280 1.2.1.2.9 Equipment & Facilities 29 0 days 1 day RM 1,000.00 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
281 1.2.1.2.9 Equipment & Facilities 30 0 days 1 day RM 1,000.00 Thu 13/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
282 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups 0 days 557 days RM 15,000.00 Sun 24/1/21 Thu 13/7/23 Sun 24/1/21 NA 74.19 74.19 RM 11,129.04 RM 11,129.04

283 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.88 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 100 100 RM 483.88 RM 483.88
284 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.88 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 483.88 RM 483.88
285 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.88 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 483.88 RM 483.88
286 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 483.87 RM 483.87
287 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 483.87 RM 483.87
288 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 483.87 RM 483.87
289 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 483.87 RM 483.87

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
290 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 483.87 RM 483.87
291 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 483.87 RM 483.87
292 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 483.87 RM 483.87
293 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 483.87 RM 483.87
294 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 483.87 RM 483.87
295 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 100 100 RM 483.87 RM 483.87
296 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 100 100 RM 483.87 RM 483.87
297 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 483.87 RM 483.87
298 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 100 100 RM 483.87 RM 483.87
299 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 100 100 RM 483.87 RM 483.87
300 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 483.87 RM 483.87
301 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 100 100 RM 483.87 RM 483.87
302 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 100 100 RM 483.87 RM 483.87
303 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 483.87 RM 483.87
304 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 100 100 RM 483.87 RM 483.87
305 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 100 100 RM 483.87 RM 483.87
306 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
307 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
308 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Thu 23/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
309 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
310 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
311 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
312 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
313 1.2.1.2.1 Shop Drawing, Samples & Mock‐ups0 days 1 day RM 483.87 Thu 13/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
314 1.2.1.2.1 Progress Photographs & Report 0 days 579 days RM 4,000.00 Wed 23/12/20 Thu 13/7/23 Wed 23/12/20 NA 75 75 RM 3,000.00 RM 3,000.00
315 1.2.1.2.1 Progress Photographs & Report 1 0 days 1 day RM 125.00 Wed 23/12/20 Wed 23/12/20 Wed 23/12/20 Wed 23/12/20 100 100 RM 125.00 RM 125.00
316 1.2.1.2.1 Progress Photographs & Report 2 0 days 1 day RM 125.00 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 100 100 RM 125.00 RM 125.00
317 1.2.1.2.1 Progress Photographs & Report 3 0 days 1 day RM 125.00 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 125.00 RM 125.00
318 1.2.1.2.1 Progress Photographs & Report 4 0 days 1 day RM 125.00 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 125.00 RM 125.00
319 1.2.1.2.1 Progress Photographs & Report 5 0 days 1 day RM 125.00 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 125.00 RM 125.00
320 1.2.1.2.1 Progress Photographs & Report 6 0 days 1 day RM 125.00 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 125.00 RM 125.00
321 1.2.1.2.1 Progress Photographs & Report 7 0 days 1 day RM 125.00 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 125.00 RM 125.00
322 1.2.1.2.1 Progress Photographs & Report 8 0 days 1 day RM 125.00 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 125.00 RM 125.00
323 1.2.1.2.1 Progress Photographs & Report 9 0 days 1 day RM 125.00 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 125.00 RM 125.00
324 1.2.1.2.1 Progress Photographs & Report 10 0 days 1 day RM 125.00 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 125.00 RM 125.00
325 1.2.1.2.1 Progress Photographs & Report 11 0 days 1 day RM 125.00 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 125.00 RM 125.00
326 1.2.1.2.1 Progress Photographs & Report 12 0 days 1 day RM 125.00 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 125.00 RM 125.00
327 1.2.1.2.1 Progress Photographs & Report 13 0 days 1 day RM 125.00 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 125.00 RM 125.00
328 1.2.1.2.1 Progress Photographs & Report 14 0 days 1 day RM 125.00 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 100 100 RM 125.00 RM 125.00
329 1.2.1.2.1 Progress Photographs & Report 15 0 days 1 day RM 125.00 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 100 100 RM 125.00 RM 125.00
330 1.2.1.2.1 Progress Photographs & Report 16 0 days 1 day RM 125.00 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 125.00 RM 125.00
331 1.2.1.2.1 Progress Photographs & Report 17 0 days 1 day RM 125.00 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 100 100 RM 125.00 RM 125.00
332 1.2.1.2.1 Progress Photographs & Report 18 0 days 1 day RM 125.00 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 100 100 RM 125.00 RM 125.00
333 1.2.1.2.1 Progress Photographs & Report 19 0 days 1 day RM 125.00 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 125.00 RM 125.00
334 1.2.1.2.1 Progress Photographs & Report 20 0 days 1 day RM 125.00 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 100 100 RM 125.00 RM 125.00
335 1.2.1.2.1 Progress Photographs & Report 21 0 days 1 day RM 125.00 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 100 100 RM 125.00 RM 125.00
336 1.2.1.2.1 Progress Photographs & Report 22 0 days 1 day RM 125.00 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 125.00 RM 125.00
337 1.2.1.2.1 Progress Photographs & Report 23 0 days 1 day RM 125.00 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 100 100 RM 125.00 RM 125.00
338 1.2.1.2.1 Progress Photographs & Report 24 0 days 1 day RM 125.00 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 100 100 RM 125.00 RM 125.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
339 1.2.1.2.1 Progress Photographs & Report 25 0 days 1 day RM 125.00 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
340 1.2.1.2.1 Progress Photographs & Report 26 0 days 1 day RM 125.00 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
341 1.2.1.2.1 Progress Photographs & Report 27 0 days 1 day RM 125.00 Thu 23/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
342 1.2.1.2.1 Progress Photographs & Report 28 0 days 1 day RM 125.00 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
343 1.2.1.2.1 Progress Photographs & Report 29 0 days 1 day RM 125.00 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
344 1.2.1.2.1 Progress Photographs & Report 30 0 days 1 day RM 125.00 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
345 1.2.1.2.1 Progress Photographs & Report 31 0 days 1 day RM 125.00 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
346 1.2.1.2.1 Progress Photographs & Report 32 0 days 1 day RM 125.00 Thu 13/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
347 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 557 days RM 10,000.00 Sun 24/1/21 Thu 13/7/23 Sun 24/1/21 NA 74.19 74.19 RM 7,419.34 RM 7,419.34
348 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 100 100 RM 322.58 RM 322.58
349 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 322.58 RM 322.58
350 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 322.58 RM 322.58
351 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 322.58 RM 322.58
352 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 322.58 RM 322.58
353 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 322.58 RM 322.58
354 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 322.58 RM 322.58
355 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 322.58 RM 322.58
356 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 322.58 RM 322.58
357 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 322.58 RM 322.58
358 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 322.58 RM 322.58
359 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 322.58 RM 322.58
360 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 100 100 RM 322.58 RM 322.58
361 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 100 100 RM 322.58 RM 322.58
362 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 322.58 RM 322.58
363 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 100 100 RM 322.58 RM 322.58
364 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 100 100 RM 322.58 RM 322.58
365 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 322.58 RM 322.58
366 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 100 100 RM 322.58 RM 322.58
367 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 100 100 RM 322.58 RM 322.58
368 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 322.58 RM 322.58
369 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 100 100 RM 322.58 RM 322.58
370 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 100 100 RM 322.58 RM 322.58
371 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
372 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
373 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Thu 23/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
374 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
375 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
376 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.58 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
377 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.59 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
378 1.2.1.2.1 Material Testing Laboratory & Staff 0 days 1 day RM 322.59 Thu 13/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
379 1.2.1.2.1 Transportation & Services 0 days 543 days RM 100,000.00 Sun 31/1/21 Sun 2/7/23 Sun 31/1/21 NA 76.67 76.67 RM 76,666.69 RM 76,666.69
380 1.2.1.2.1 Services & Maintenances 0 days 543 days RM 100,000.00 Sun 31/1/21 Sun 2/7/23 Sun 31/1/21 NA 76.67 76.67 RM 76,666.69 RM 76,666.69
381 1.2.1.2.1 Services & Maintenances 1 0 days 1 day RM 3,333.34 Sun 31/1/21 Sun 31/1/21 Sun 31/1/21 Sun 31/1/21 100 100 RM 3,333.34 RM 3,333.34
382 1.2.1.2.1 Services & Maintenances 2 0 days 1 day RM 3,333.34 Sun 28/2/21 Sun 28/2/21 Sun 28/2/21 Sun 28/2/21 100 100 RM 3,333.34 RM 3,333.34
383 1.2.1.2.1 Services & Maintenances 3 0 days 1 day RM 3,333.34 Wed 31/3/21 Wed 31/3/21 Wed 31/3/21 Wed 31/3/21 100 100 RM 3,333.34 RM 3,333.34
384 1.2.1.2.1 Services & Maintenances 4 0 days 1 day RM 3,333.34 Mon 3/5/21 Mon 3/5/21 Mon 3/5/21 Mon 3/5/21 100 100 RM 3,333.34 RM 3,333.34
385 1.2.1.2.1 Services & Maintenances 5 0 days 1 day RM 3,333.34 Mon 31/5/21 Mon 31/5/21 Mon 31/5/21 Mon 31/5/21 100 100 RM 3,333.34 RM 3,333.34
386 1.2.1.2.1 Services & Maintenances 6 0 days 1 day RM 3,333.34 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 3,333.34 RM 3,333.34
387 1.2.1.2.1 Services & Maintenances 7 0 days 1 day RM 3,333.34 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 3,333.34 RM 3,333.34

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
388 1.2.1.2.1 Services & Maintenances 8 0 days 1 day RM 3,333.34 Tue 31/8/21 Tue 31/8/21 Tue 31/8/21 Tue 31/8/21 100 100 RM 3,333.34 RM 3,333.34
389 1.2.1.2.1 Services & Maintenances 9 0 days 1 day RM 3,333.34 Thu 30/9/21 Thu 30/9/21 Thu 30/9/21 Thu 30/9/21 100 100 RM 3,333.34 RM 3,333.34
390 1.2.1.2.1 Services & Maintenances 10 0 days 1 day RM 3,333.34 Sun 31/10/21 Sun 31/10/21 Sun 31/10/21 Sun 31/10/21 100 100 RM 3,333.34 RM 3,333.34
391 1.2.1.2.1 Services & Maintenances 11 0 days 1 day RM 3,333.33 Tue 30/11/21 Tue 30/11/21 Tue 30/11/21 Tue 30/11/21 100 100 RM 3,333.33 RM 3,333.33
392 1.2.1.2.1 Services & Maintenances 12 0 days 1 day RM 3,333.33 Sun 2/1/22 Sun 2/1/22 Sun 2/1/22 Sun 2/1/22 100 100 RM 3,333.33 RM 3,333.33
393 1.2.1.2.1 Services & Maintenances 13 0 days 1 day RM 3,333.33 Mon 31/1/22 Mon 31/1/22 Mon 31/1/22 Mon 31/1/22 100 100 RM 3,333.33 RM 3,333.33
394 1.2.1.2.1 Services & Maintenances 14 0 days 1 day RM 3,333.33 Mon 28/2/22 Mon 28/2/22 Mon 28/2/22 Mon 28/2/22 100 100 RM 3,333.33 RM 3,333.33
395 1.2.1.2.1 Services & Maintenances 15 0 days 1 day RM 3,333.33 Thu 31/3/22 Thu 31/3/22 Thu 31/3/22 Thu 31/3/22 100 100 RM 3,333.33 RM 3,333.33
396 1.2.1.2.1 Services & Maintenances 16 0 days 1 day RM 3,333.33 Wed 4/5/22 Wed 4/5/22 Wed 4/5/22 Wed 4/5/22 100 100 RM 3,333.33 RM 3,333.33
397 1.2.1.2.1 Services & Maintenances 17 0 days 1 day RM 3,333.33 Tue 31/5/22 Tue 31/5/22 Tue 31/5/22 Tue 31/5/22 100 100 RM 3,333.33 RM 3,333.33
398 1.2.1.2.1 Services & Maintenances 18 0 days 1 day RM 3,333.33 Thu 30/6/22 Thu 30/6/22 Thu 30/6/22 Thu 30/6/22 100 100 RM 3,333.33 RM 3,333.33
399 1.2.1.2.1 Services & Maintenances 19 0 days 1 day RM 3,333.33 Mon 1/8/22 Mon 1/8/22 Mon 1/8/22 Mon 1/8/22 100 100 RM 3,333.33 RM 3,333.33
400 1.2.1.2.1 Services & Maintenances 20 0 days 1 day RM 3,333.33 Wed 31/8/22 Wed 31/8/22 Wed 31/8/22 Wed 31/8/22 100 100 RM 3,333.33 RM 3,333.33
401 1.2.1.2.1 Services & Maintenances 21 0 days 1 day RM 3,333.33 Sun 2/10/22 Sun 2/10/22 Sun 2/10/22 Sun 2/10/22 100 100 RM 3,333.33 RM 3,333.33
402 1.2.1.2.1 Services & Maintenances 22 0 days 1 day RM 3,333.33 Mon 31/10/22 Mon 31/10/22 Mon 31/10/22 Mon 31/10/22 100 100 RM 3,333.33 RM 3,333.33
403 1.2.1.2.1 Services & Maintenances 23 0 days 1 day RM 3,333.33 Wed 30/11/22 Wed 30/11/22 Wed 30/11/22 Wed 30/11/22 100 100 RM 3,333.33 RM 3,333.33
404 1.2.1.2.1 Services & Maintenances 24 0 days 1 day RM 3,333.33 Sun 1/1/23 Sun 1/1/23 NA NA 0 0 RM 0.00 RM 0.00
405 1.2.1.2.1 Services & Maintenances 25 0 days 1 day RM 3,333.33 Tue 31/1/23 Tue 31/1/23 NA NA 0 0 RM 0.00 RM 0.00
406 1.2.1.2.1 Services & Maintenances 26 0 days 1 day RM 3,333.33 Tue 28/2/23 Tue 28/2/23 NA NA 0 0 RM 0.00 RM 0.00
407 1.2.1.2.1 Services & Maintenances 27 0 days 1 day RM 3,333.33 Sun 2/4/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
408 1.2.1.2.1 Services & Maintenances 28 0 days 1 day RM 3,333.33 Sun 30/4/23 Sun 30/4/23 NA NA 0 0 RM 0.00 RM 0.00
409 1.2.1.2.1 Services & Maintenances 29 0 days 1 day RM 3,333.33 Wed 31/5/23 Wed 31/5/23 NA NA 0 0 RM 0.00 RM 0.00
410 1.2.1.2.1 Services & Maintenances 30 0 days 1 day RM 3,333.33 Sun 2/7/23 Sun 2/7/23 NA NA 0 0 RM 0.00 RM 0.00
411 1.2.1.2.1 Safe Working Area 0 days 579 days RM 22,400.00 Wed 23/12/20 Thu 13/7/23 Wed 23/12/20 NA 75 75 RM 16,800.00 RM 16,800.00
412 1.2.1.2.14 Safe Working Area 1 0 days 1 day RM 700.00 Wed 23/12/20 Wed 23/12/20 Wed 23/12/20 Wed 23/12/20 100 100 RM 700.00 RM 700.00
413 1.2.1.2.14 Safe Working Area 2 0 days 1 day RM 700.00 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 100 100 RM 700.00 RM 700.00
414 1.2.1.2.14 Safe Working Area 3 0 days 1 day RM 700.00 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 700.00 RM 700.00
415 1.2.1.2.14 Safe Working Area 4 0 days 1 day RM 700.00 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 700.00 RM 700.00
416 1.2.1.2.14 Safe Working Area 5 0 days 1 day RM 700.00 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 700.00 RM 700.00
417 1.2.1.2.14 Safe Working Area 6 0 days 1 day RM 700.00 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 700.00 RM 700.00
418 1.2.1.2.14 Safe Working Area 7 0 days 1 day RM 700.00 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 700.00 RM 700.00
419 1.2.1.2.14 Safe Working Area 8 0 days 1 day RM 700.00 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 700.00 RM 700.00
420 1.2.1.2.14 Safe Working Area 9 0 days 1 day RM 700.00 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 700.00 RM 700.00
421 1.2.1.2.14 Safe Working Area 10 0 days 1 day RM 700.00 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 700.00 RM 700.00
422 1.2.1.2.14 Safe Working Area 11 0 days 1 day RM 700.00 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 700.00 RM 700.00
423 1.2.1.2.14 Safe Working Area 12 0 days 1 day RM 700.00 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 700.00 RM 700.00
424 1.2.1.2.14 Safe Working Area 13 0 days 1 day RM 700.00 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 700.00 RM 700.00
425 1.2.1.2.14 Safe Working Area 14 0 days 1 day RM 700.00 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 100 100 RM 700.00 RM 700.00
426 1.2.1.2.14 Safe Working Area 15 0 days 1 day RM 700.00 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 100 100 RM 700.00 RM 700.00
427 1.2.1.2.14 Safe Working Area 16 0 days 1 day RM 700.00 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 700.00 RM 700.00
428 1.2.1.2.14 Safe Working Area 17 0 days 1 day RM 700.00 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 100 100 RM 700.00 RM 700.00
429 1.2.1.2.14 Safe Working Area 18 0 days 1 day RM 700.00 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 100 100 RM 700.00 RM 700.00
430 1.2.1.2.14 Safe Working Area 19 0 days 1 day RM 700.00 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 700.00 RM 700.00
431 1.2.1.2.14 Safe Working Area 20 0 days 1 day RM 700.00 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 100 100 RM 700.00 RM 700.00
432 1.2.1.2.14 Safe Working Area 21 0 days 1 day RM 700.00 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 100 100 RM 700.00 RM 700.00
433 1.2.1.2.14 Safe Working Area 22 0 days 1 day RM 700.00 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 700.00 RM 700.00
434 1.2.1.2.14 Safe Working Area 23 0 days 1 day RM 700.00 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 100 100 RM 700.00 RM 700.00
435 1.2.1.2.14 Safe Working Area 24 0 days 1 day RM 700.00 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 100 100 RM 700.00 RM 700.00
436 1.2.1.2.14 Safe Working Area 25 0 days 1 day RM 700.00 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
437 1.2.1.2.14 Safe Working Area 26 0 days 1 day RM 700.00 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
438 1.2.1.2.14 Safe Working Area 27 0 days 1 day RM 700.00 Thu 23/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
439 1.2.1.2.14 Safe Working Area 28 0 days 1 day RM 700.00 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
440 1.2.1.2.14 Safe Working Area 29 0 days 1 day RM 700.00 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
441 1.2.1.2.14 Safe Working Area 30 0 days 1 day RM 700.00 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
442 1.2.1.2.14 Safe Working Area 31 0 days 1 day RM 700.00 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
443 1.2.1.2.14 Safe Working Area 32 0 days 1 day RM 700.00 Thu 13/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
444 1.2.1.2.1 Safety, Health & Welfare 0 days 579 days RM 10,000.00 Wed 23/12/20 Thu 13/7/23 Wed 23/12/20 NA 75 75 RM 7,500.00 RM 7,500.00
445 1.2.1.2.1 Safety, Health & Welfare 1 0 days 1 day RM 312.50 Wed 23/12/20 Wed 23/12/20 Wed 23/12/20 Wed 23/12/20 100 100 RM 312.50 RM 312.50
446 1.2.1.2.1 Safety, Health & Welfare 2 0 days 1 day RM 312.50 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 100 100 RM 312.50 RM 312.50
447 1.2.1.2.1 Safety, Health & Welfare 3 0 days 1 day RM 312.50 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 312.50 RM 312.50
448 1.2.1.2.1 Safety, Health & Welfare 4 0 days 1 day RM 312.50 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 312.50 RM 312.50
449 1.2.1.2.1 Safety, Health & Welfare 5 0 days 1 day RM 312.50 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 312.50 RM 312.50
450 1.2.1.2.1 Safety, Health & Welfare 6 0 days 1 day RM 312.50 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 312.50 RM 312.50
451 1.2.1.2.1 Safety, Health & Welfare 7 0 days 1 day RM 312.50 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 312.50 RM 312.50
452 1.2.1.2.1 Safety, Health & Welfare 8 0 days 1 day RM 312.50 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 312.50 RM 312.50
453 1.2.1.2.1 Safety, Health & Welfare 9 0 days 1 day RM 312.50 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 312.50 RM 312.50
454 1.2.1.2.1 Safety, Health & Welfare 10 0 days 1 day RM 312.50 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 312.50 RM 312.50
455 1.2.1.2.1 Safety, Health & Welfare 11 0 days 1 day RM 312.50 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 312.50 RM 312.50
456 1.2.1.2.1 Safety, Health & Welfare 12 0 days 1 day RM 312.50 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 312.50 RM 312.50
457 1.2.1.2.1 Safety, Health & Welfare 13 0 days 1 day RM 312.50 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 312.50 RM 312.50
458 1.2.1.2.1 Safety, Health & Welfare 14 0 days 1 day RM 312.50 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 100 100 RM 312.50 RM 312.50
459 1.2.1.2.1 Safety, Health & Welfare 15 0 days 1 day RM 312.50 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 100 100 RM 312.50 RM 312.50
460 1.2.1.2.1 Safety, Health & Welfare 16 0 days 1 day RM 312.50 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 312.50 RM 312.50
461 1.2.1.2.1 Safety, Health & Welfare 17 0 days 1 day RM 312.50 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 100 100 RM 312.50 RM 312.50
462 1.2.1.2.1 Safety, Health & Welfare 18 0 days 1 day RM 312.50 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 100 100 RM 312.50 RM 312.50
463 1.2.1.2.1 Safety, Health & Welfare 19 0 days 1 day RM 312.50 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 312.50 RM 312.50
464 1.2.1.2.1 Safety, Health & Welfare 20 0 days 1 day RM 312.50 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 100 100 RM 312.50 RM 312.50
465 1.2.1.2.1 Safety, Health & Welfare 21 0 days 1 day RM 312.50 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 100 100 RM 312.50 RM 312.50
466 1.2.1.2.1 Safety, Health & Welfare 22 0 days 1 day RM 312.50 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 312.50 RM 312.50
467 1.2.1.2.1 Safety, Health & Welfare 23 0 days 1 day RM 312.50 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 100 100 RM 312.50 RM 312.50
468 1.2.1.2.1 Safety, Health & Welfare 24 0 days 1 day RM 312.50 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 100 100 RM 312.50 RM 312.50
469 1.2.1.2.1 Safety, Health & Welfare 25 0 days 1 day RM 312.50 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
470 1.2.1.2.1 Safety, Health & Welfare 26 0 days 1 day RM 312.50 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
471 1.2.1.2.1 Safety, Health & Welfare 27 0 days 1 day RM 312.50 Thu 23/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
472 1.2.1.2.1 Safety, Health & Welfare 28 0 days 1 day RM 312.50 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
473 1.2.1.2.1 Safety, Health & Welfare 29 0 days 1 day RM 312.50 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
474 1.2.1.2.1 Safety, Health & Welfare 30 0 days 1 day RM 312.50 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
475 1.2.1.2.1 Safety, Health & Welfare 31 0 days 1 day RM 312.50 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
476 1.2.1.2.1 Safety, Health & Welfare 32 0 days 1 day RM 312.50 Thu 13/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
477 1.2.1.2.1 SHO & SSS 0 days 586 days RM 96,000.00 Tue 1/12/20 Sun 2/7/23 Tue 1/12/20 NA 78.13 78.13 RM 75,000.00 RM 75,000.00
478 1.2.1.2.1 SHO & SSS 1 0 days 1 day RM 3,000.00 Tue 1/12/20 Tue 1/12/20 Tue 1/12/20 Tue 1/12/20 100 100 RM 3,000.00 RM 3,000.00
479 1.2.1.2.1 SHO & SSS 2 0 days 1 day RM 3,000.00 Sun 3/1/21 Sun 3/1/21 Sun 3/1/21 Sun 3/1/21 100 100 RM 3,000.00 RM 3,000.00
480 1.2.1.2.1 SHO & SSS 3 0 days 1 day RM 3,000.00 Mon 1/2/21 Mon 1/2/21 Mon 1/2/21 Mon 1/2/21 100 100 RM 3,000.00 RM 3,000.00
481 1.2.1.2.1 SHO & SSS 4 0 days 1 day RM 3,000.00 Mon 1/3/21 Mon 1/3/21 Mon 1/3/21 Mon 1/3/21 100 100 RM 3,000.00 RM 3,000.00
482 1.2.1.2.1 SHO & SSS 5 0 days 1 day RM 3,000.00 Thu 1/4/21 Thu 1/4/21 Thu 1/4/21 Thu 1/4/21 100 100 RM 3,000.00 RM 3,000.00
483 1.2.1.2.1 SHO & SSS 6 0 days 1 day RM 3,000.00 Mon 3/5/21 Mon 3/5/21 Mon 3/5/21 Mon 3/5/21 100 100 RM 3,000.00 RM 3,000.00
484 1.2.1.2.1 SHO & SSS 7 0 days 1 day RM 3,000.00 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 3,000.00 RM 3,000.00
485 1.2.1.2.1 SHO & SSS 8 0 days 1 day RM 3,000.00 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 3,000.00 RM 3,000.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
486 1.2.1.2.1 SHO & SSS 9 0 days 1 day RM 3,000.00 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 3,000.00 RM 3,000.00
487 1.2.1.2.1 SHO & SSS 10 0 days 1 day RM 3,000.00 Wed 1/9/21 Wed 1/9/21 Wed 1/9/21 Wed 1/9/21 100 100 RM 3,000.00 RM 3,000.00
488 1.2.1.2.1 SHO & SSS 11 0 days 1 day RM 3,000.00 Sun 3/10/21 Sun 3/10/21 Sun 3/10/21 Sun 3/10/21 100 100 RM 3,000.00 RM 3,000.00
489 1.2.1.2.1 SHO & SSS 12 0 days 1 day RM 3,000.00 Mon 1/11/21 Mon 1/11/21 Mon 1/11/21 Mon 1/11/21 100 100 RM 3,000.00 RM 3,000.00
490 1.2.1.2.1 SHO & SSS 13 0 days 1 day RM 3,000.00 Wed 1/12/21 Wed 1/12/21 Wed 1/12/21 Wed 1/12/21 100 100 RM 3,000.00 RM 3,000.00
491 1.2.1.2.1 SHO & SSS 14 0 days 1 day RM 3,000.00 Sun 2/1/22 Sun 2/1/22 Sun 2/1/22 Sun 2/1/22 100 100 RM 3,000.00 RM 3,000.00
492 1.2.1.2.1 SHO & SSS 15 0 days 1 day RM 3,000.00 Thu 3/2/22 Thu 3/2/22 Thu 3/2/22 Thu 3/2/22 100 100 RM 3,000.00 RM 3,000.00
493 1.2.1.2.1 SHO & SSS 16 0 days 1 day RM 3,000.00 Tue 1/3/22 Tue 1/3/22 Tue 1/3/22 Tue 1/3/22 100 100 RM 3,000.00 RM 3,000.00
494 1.2.1.2.1 SHO & SSS 17 0 days 1 day RM 3,000.00 Sun 3/4/22 Sun 3/4/22 Sun 3/4/22 Sun 3/4/22 100 100 RM 3,000.00 RM 3,000.00
495 1.2.1.2.1 SHO & SSS 18 0 days 1 day RM 3,000.00 Wed 4/5/22 Wed 4/5/22 Wed 4/5/22 Wed 4/5/22 100 100 RM 3,000.00 RM 3,000.00
496 1.2.1.2.1 SHO & SSS 19 0 days 1 day RM 3,000.00 Wed 1/6/22 Wed 1/6/22 Wed 1/6/22 Wed 1/6/22 100 100 RM 3,000.00 RM 3,000.00
497 1.2.1.2.1 SHO & SSS 20 0 days 1 day RM 3,000.00 Sun 3/7/22 Sun 3/7/22 Sun 3/7/22 Sun 3/7/22 100 100 RM 3,000.00 RM 3,000.00
498 1.2.1.2.1 SHO & SSS 21 0 days 1 day RM 3,000.00 Mon 1/8/22 Mon 1/8/22 Mon 1/8/22 Mon 1/8/22 100 100 RM 3,000.00 RM 3,000.00
499 1.2.1.2.1 SHO & SSS 22 0 days 1 day RM 3,000.00 Thu 1/9/22 Thu 1/9/22 Thu 1/9/22 Thu 1/9/22 100 100 RM 3,000.00 RM 3,000.00
500 1.2.1.2.1 SHO & SSS 23 0 days 1 day RM 3,000.00 Sun 2/10/22 Sun 2/10/22 Sun 2/10/22 Sun 2/10/22 100 100 RM 3,000.00 RM 3,000.00
501 1.2.1.2.1 SHO & SSS 24 0 days 1 day RM 3,000.00 Tue 1/11/22 Tue 1/11/22 Tue 1/11/22 Tue 1/11/22 100 100 RM 3,000.00 RM 3,000.00
502 1.2.1.2.1 SHO & SSS 25 0 days 1 day RM 3,000.00 Thu 1/12/22 Thu 1/12/22 Thu 1/12/22 Thu 1/12/22 100 100 RM 3,000.00 RM 3,000.00
503 1.2.1.2.1 SHO & SSS 26 0 days 1 day RM 3,000.00 Sun 1/1/23 Sun 1/1/23 NA NA 0 0 RM 0.00 RM 0.00
504 1.2.1.2.1 SHO & SSS 27 0 days 1 day RM 3,000.00 Wed 1/2/23 Wed 1/2/23 NA NA 0 0 RM 0.00 RM 0.00
505 1.2.1.2.1 SHO & SSS 28 0 days 1 day RM 3,000.00 Wed 1/3/23 Wed 1/3/23 NA NA 0 0 RM 0.00 RM 0.00
506 1.2.1.2.1 SHO & SSS 29 0 days 1 day RM 3,000.00 Sun 2/4/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
507 1.2.1.2.1 SHO & SSS 30 0 days 1 day RM 3,000.00 Tue 2/5/23 Tue 2/5/23 NA NA 0 0 RM 0.00 RM 0.00
508 1.2.1.2.1 SHO & SSS 31 0 days 1 day RM 3,000.00 Thu 1/6/23 Thu 1/6/23 NA NA 0 0 RM 0.00 RM 0.00
509 1.2.1.2.1 SHO & SSS 32 0 days 1 day RM 3,000.00 Sun 2/7/23 Sun 2/7/23 NA NA 0 0 RM 0.00 RM 0.00
510 1.2.1.2.1 Keeping The Site Tidy 0 days 601 days RM 5,000.00 Mon 23/11/20 Thu 13/7/23 Mon 23/11/20 NA 75.76 75.76 RM 3,787.84 RM 3,787.84
511 1.2.1.2.1 Keeping The Site Tidy 1 0 days 1 day RM 151.51 Mon 23/11/20 Mon 23/11/20 Mon 23/11/20 Mon 23/11/20 100 100 RM 151.51 RM 151.51
512 1.2.1.2.1 Keeping The Site Tidy 2 0 days 1 day RM 151.51 Wed 23/12/20 Wed 23/12/20 Wed 23/12/20 Wed 23/12/20 100 100 RM 151.51 RM 151.51
513 1.2.1.2.1 Keeping The Site Tidy 3 0 days 1 day RM 151.51 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 100 100 RM 151.51 RM 151.51
514 1.2.1.2.1 Keeping The Site Tidy 4 0 days 1 day RM 151.51 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 151.51 RM 151.51
515 1.2.1.2.1 Keeping The Site Tidy 5 0 days 1 day RM 151.51 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 151.51 RM 151.51
516 1.2.1.2.1 Keeping The Site Tidy 6 0 days 1 day RM 151.51 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 151.51 RM 151.51
517 1.2.1.2.1 Keeping The Site Tidy 7 0 days 1 day RM 151.51 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 151.51 RM 151.51
518 1.2.1.2.1 Keeping The Site Tidy 8 0 days 1 day RM 151.51 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 151.51 RM 151.51
519 1.2.1.2.1 Keeping The Site Tidy 9 0 days 1 day RM 151.51 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 151.51 RM 151.51
520 1.2.1.2.1 Keeping The Site Tidy 10 0 days 1 day RM 151.51 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 151.51 RM 151.51
521 1.2.1.2.1 Keeping The Site Tidy 11 0 days 1 day RM 151.51 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 151.51 RM 151.51
522 1.2.1.2.1 Keeping The Site Tidy 12 0 days 1 day RM 151.51 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 151.51 RM 151.51
523 1.2.1.2.1 Keeping The Site Tidy 13 0 days 1 day RM 151.51 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 151.51 RM 151.51
524 1.2.1.2.1 Keeping The Site Tidy 14 0 days 1 day RM 151.51 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 151.51 RM 151.51
525 1.2.1.2.1 Keeping The Site Tidy 15 0 days 1 day RM 151.51 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 100 100 RM 151.51 RM 151.51
526 1.2.1.2.1 Keeping The Site Tidy 16 0 days 1 day RM 151.51 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 100 100 RM 151.51 RM 151.51
527 1.2.1.2.1 Keeping The Site Tidy 17 0 days 1 day RM 151.52 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 151.52 RM 151.52
528 1.2.1.2.1 Keeping The Site Tidy 18 0 days 1 day RM 151.52 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 100 100 RM 151.52 RM 151.52
529 1.2.1.2.1 Keeping The Site Tidy 19 0 days 1 day RM 151.52 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 100 100 RM 151.52 RM 151.52
530 1.2.1.2.1 Keeping The Site Tidy 20 0 days 1 day RM 151.52 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 151.52 RM 151.52
531 1.2.1.2.1 Keeping The Site Tidy 21 0 days 1 day RM 151.52 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 100 100 RM 151.52 RM 151.52
532 1.2.1.2.1 Keeping The Site Tidy 22 0 days 1 day RM 151.52 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 100 100 RM 151.52 RM 151.52
533 1.2.1.2.1 Keeping The Site Tidy 23 0 days 1 day RM 151.52 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 151.52 RM 151.52
534 1.2.1.2.1 Keeping The Site Tidy 24 0 days 1 day RM 151.52 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 100 100 RM 151.52 RM 151.52

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
535 1.2.1.2.1 Keeping The Site Tidy 25 0 days 1 day RM 151.52 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 100 100 RM 151.52 RM 151.52
536 1.2.1.2.1 Keeping The Site Tidy 26 0 days 1 day RM 151.52 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
537 1.2.1.2.1 Keeping The Site Tidy 27 0 days 1 day RM 151.52 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
538 1.2.1.2.1 Keeping The Site Tidy 28 0 days 1 day RM 151.52 Thu 23/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
539 1.2.1.2.1 Keeping The Site Tidy 29 0 days 1 day RM 151.52 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
540 1.2.1.2.1 Keeping The Site Tidy 30 0 days 1 day RM 151.52 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
541 1.2.1.2.1 Keeping The Site Tidy 31 0 days 1 day RM 151.52 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
542 1.2.1.2.1 Keeping The Site Tidy 32 0 days 1 day RM 151.52 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
543 1.2.1.2.1 Keeping The Site Tidy 33 0 days 1 day RM 151.52 Thu 13/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
544 1.2.1.2.1 M & E Coordinator 0 days 601 days RM 174,724.50 Mon 23/11/20 Thu 13/7/23 Mon 23/11/20 NA 75.76 75.76 RM 132,367.06 RM 132,367.06
545 1.2.1.2.1 M & E Coordinator 1 0 days 1 day RM 5,294.69 Mon 23/11/20 Mon 23/11/20 Mon 23/11/20 Mon 23/11/20 100 100 RM 5,294.69 RM 5,294.69
546 1.2.1.2.1 M & E Coordinator 2 0 days 1 day RM 5,294.69 Wed 23/12/20 Wed 23/12/20 Wed 23/12/20 Wed 23/12/20 100 100 RM 5,294.69 RM 5,294.69
547 1.2.1.2.1 M & E Coordinator 3 0 days 1 day RM 5,294.69 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 100 100 RM 5,294.69 RM 5,294.69
548 1.2.1.2.1 M & E Coordinator 4 0 days 1 day RM 5,294.69 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 5,294.69 RM 5,294.69
549 1.2.1.2.1 M & E Coordinator 5 0 days 1 day RM 5,294.69 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 5,294.69 RM 5,294.69
550 1.2.1.2.1 M & E Coordinator 6 0 days 1 day RM 5,294.69 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 5,294.69 RM 5,294.69
551 1.2.1.2.1 M & E Coordinator 7 0 days 1 day RM 5,294.68 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 5,294.68 RM 5,294.68
552 1.2.1.2.1 M & E Coordinator 8 0 days 1 day RM 5,294.68 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 5,294.68 RM 5,294.68
553 1.2.1.2.1 M & E Coordinator 9 0 days 1 day RM 5,294.68 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 5,294.68 RM 5,294.68
554 1.2.1.2.1 M & E Coordinator 10 0 days 1 day RM 5,294.68 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 5,294.68 RM 5,294.68
555 1.2.1.2.1 M & E Coordinator 11 0 days 1 day RM 5,294.68 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 5,294.68 RM 5,294.68
556 1.2.1.2.1 M & E Coordinator 12 0 days 1 day RM 5,294.68 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 5,294.68 RM 5,294.68
557 1.2.1.2.1 M & E Coordinator 13 0 days 1 day RM 5,294.68 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 5,294.68 RM 5,294.68
558 1.2.1.2.1 M & E Coordinator 14 0 days 1 day RM 5,294.68 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 5,294.68 RM 5,294.68
559 1.2.1.2.1 M & E Coordinator 15 0 days 1 day RM 5,294.68 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 100 100 RM 5,294.68 RM 5,294.68
560 1.2.1.2.1 M & E Coordinator 16 0 days 1 day RM 5,294.68 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 100 100 RM 5,294.68 RM 5,294.68
561 1.2.1.2.1 M & E Coordinator 17 0 days 1 day RM 5,294.68 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 5,294.68 RM 5,294.68
562 1.2.1.2.1 M & E Coordinator 18 0 days 1 day RM 5,294.68 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 100 100 RM 5,294.68 RM 5,294.68
563 1.2.1.2.1 M & E Coordinator 19 0 days 1 day RM 5,294.68 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 100 100 RM 5,294.68 RM 5,294.68
564 1.2.1.2.1 M & E Coordinator 20 0 days 1 day RM 5,294.68 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 5,294.68 RM 5,294.68
565 1.2.1.2.1 M & E Coordinator 21 0 days 1 day RM 5,294.68 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 100 100 RM 5,294.68 RM 5,294.68
566 1.2.1.2.1 M & E Coordinator 22 0 days 1 day RM 5,294.68 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 100 100 RM 5,294.68 RM 5,294.68
567 1.2.1.2.1 M & E Coordinator 23 0 days 1 day RM 5,294.68 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 5,294.68 RM 5,294.68
568 1.2.1.2.1 M & E Coordinator 24 0 days 1 day RM 5,294.68 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 100 100 RM 5,294.68 RM 5,294.68
569 1.2.1.2.1 M & E Coordinator 25 0 days 1 day RM 5,294.68 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 100 100 RM 5,294.68 RM 5,294.68
570 1.2.1.2.1 M & E Coordinator 26 0 days 1 day RM 5,294.68 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
571 1.2.1.2.1 M & E Coordinator 27 0 days 1 day RM 5,294.68 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
572 1.2.1.2.1 M & E Coordinator 28 0 days 1 day RM 5,294.68 Thu 23/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
573 1.2.1.2.1 M & E Coordinator 29 0 days 1 day RM 5,294.68 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
574 1.2.1.2.1 M & E Coordinator 30 0 days 1 day RM 5,294.68 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
575 1.2.1.2.1 M & E Coordinator 31 0 days 1 day RM 5,294.68 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
576 1.2.1.2.1 M & E Coordinator 32 0 days 1 day RM 5,294.68 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
577 1.2.1.2.1 M & E Coordinator 33 0 days 1 day RM 5,294.68 Thu 13/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
578 1.2.1.2.1 SOCSO 0 days 601 days RM 5,600.00 Mon 23/11/20 Thu 13/7/23 Mon 23/11/20 NA 75.76 75.76 RM 4,242.48 RM 4,242.48
579 1.2.1.2.1 SOCSO 1 0 days 1 day RM 169.70 Mon 23/11/20 Mon 23/11/20 Mon 23/11/20 Mon 23/11/20 100 100 RM 169.70 RM 169.70
580 1.2.1.2.1 SOCSO 2 0 days 1 day RM 169.70 Wed 23/12/20 Wed 23/12/20 Wed 23/12/20 Wed 23/12/20 100 100 RM 169.70 RM 169.70
581 1.2.1.2.1 SOCSO 3 0 days 1 day RM 169.70 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 100 100 RM 169.70 RM 169.70
582 1.2.1.2.1 SOCSO 4 0 days 1 day RM 169.70 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 169.70 RM 169.70
583 1.2.1.2.1 SOCSO 5 0 days 1 day RM 169.70 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 169.70 RM 169.70

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
584 1.2.1.2.1 SOCSO 6 0 days 1 day RM 169.70 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 169.70 RM 169.70
585 1.2.1.2.1 SOCSO 7 0 days 1 day RM 169.70 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 169.70 RM 169.70
586 1.2.1.2.1 SOCSO 8 0 days 1 day RM 169.70 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 169.70 RM 169.70
587 1.2.1.2.1 SOCSO 9 0 days 1 day RM 169.70 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 169.70 RM 169.70
588 1.2.1.2.1 SOCSO 10 0 days 1 day RM 169.70 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 169.70 RM 169.70
589 1.2.1.2.1 SOCSO 11 0 days 1 day RM 169.70 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 169.70 RM 169.70
590 1.2.1.2.1 SOCSO 12 0 days 1 day RM 169.70 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 169.70 RM 169.70
591 1.2.1.2.1 SOCSO 13 0 days 1 day RM 169.70 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 169.70 RM 169.70
592 1.2.1.2.1 SOCSO 14 0 days 1 day RM 169.70 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 169.70 RM 169.70
593 1.2.1.2.1 SOCSO 15 0 days 1 day RM 169.70 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 100 100 RM 169.70 RM 169.70
594 1.2.1.2.1 SOCSO 16 0 days 1 day RM 169.70 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 100 100 RM 169.70 RM 169.70
595 1.2.1.2.1 SOCSO 17 0 days 1 day RM 169.70 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 169.70 RM 169.70
596 1.2.1.2.1 SOCSO 18 0 days 1 day RM 169.70 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 100 100 RM 169.70 RM 169.70
597 1.2.1.2.1 SOCSO 19 0 days 1 day RM 169.70 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 100 100 RM 169.70 RM 169.70
598 1.2.1.2.1 SOCSO 20 0 days 1 day RM 169.70 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 169.70 RM 169.70
599 1.2.1.2.1 SOCSO 21 0 days 1 day RM 169.70 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 100 100 RM 169.70 RM 169.70
600 1.2.1.2.1 SOCSO 22 0 days 1 day RM 169.70 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 100 100 RM 169.70 RM 169.70
601 1.2.1.2.1 SOCSO 23 0 days 1 day RM 169.70 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 169.70 RM 169.70
602 1.2.1.2.1 SOCSO 24 0 days 1 day RM 169.69 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 100 100 RM 169.69 RM 169.69
603 1.2.1.2.1 SOCSO 25 0 days 1 day RM 169.69 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 100 100 RM 169.69 RM 169.69
604 1.2.1.2.1 SOCSO 26 0 days 1 day RM 169.69 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
605 1.2.1.2.1 SOCSO 27 0 days 1 day RM 169.69 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
606 1.2.1.2.1 SOCSO 28 0 days 1 day RM 169.69 Thu 23/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
607 1.2.1.2.1 SOCSO 29 0 days 1 day RM 169.69 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
608 1.2.1.2.1 SOCSO 30 0 days 1 day RM 169.69 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
609 1.2.1.2.1 SOCSO 31 0 days 1 day RM 169.69 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
610 1.2.1.2.1 SOCSO 32 0 days 1 day RM 169.69 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
611 1.2.1.2.1 SOCSO 33 0 days 1 day RM 169.69 Thu 13/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
612 1.2.1.2.2 Site Agent & Assistants 0 days 601 days RM 270,389.05 Mon 23/11/20 Thu 13/7/23 Mon 23/11/20 NA 75.76 75.76 RM 204,840.17 RM 204,840.17
613 1.2.1.2.2 Site Agent & Assistants 1 0 days 1 day RM 8,193.61 Mon 23/11/20 Mon 23/11/20 Mon 23/11/20 Mon 23/11/20 100 100 RM 8,193.61 RM 8,193.61
614 1.2.1.2.2 Site Agent & Assistants 2 0 days 1 day RM 8,193.61 Wed 23/12/20 Wed 23/12/20 Wed 23/12/20 Wed 23/12/20 100 100 RM 8,193.61 RM 8,193.61
615 1.2.1.2.2 Site Agent & Assistants 3 0 days 1 day RM 8,193.61 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 100 100 RM 8,193.61 RM 8,193.61
616 1.2.1.2.2 Site Agent & Assistants 4 0 days 1 day RM 8,193.60 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 8,193.60 RM 8,193.60
617 1.2.1.2.2 Site Agent & Assistants 5 0 days 1 day RM 8,193.60 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 8,193.60 RM 8,193.60
618 1.2.1.2.2 Site Agent & Assistants 6 0 days 1 day RM 8,193.60 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 8,193.60 RM 8,193.60
619 1.2.1.2.2 Site Agent & Assistants 7 0 days 1 day RM 8,193.60 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 8,193.60 RM 8,193.60
620 1.2.1.2.2 Site Agent & Assistants 8 0 days 1 day RM 8,193.60 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 8,193.60 RM 8,193.60
621 1.2.1.2.2 Site Agent & Assistants 9 0 days 1 day RM 8,193.60 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 8,193.60 RM 8,193.60
622 1.2.1.2.2 Site Agent & Assistants 10 0 days 1 day RM 8,193.60 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 8,193.60 RM 8,193.60
623 1.2.1.2.2 Site Agent & Assistants 11 0 days 1 day RM 8,193.60 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 8,193.60 RM 8,193.60
624 1.2.1.2.2 Site Agent & Assistants 12 0 days 1 day RM 8,193.61 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 8,193.61 RM 8,193.61
625 1.2.1.2.2 Site Agent & Assistants 13 0 days 1 day RM 8,193.61 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 8,193.61 RM 8,193.61
626 1.2.1.2.2 Site Agent & Assistants 14 0 days 1 day RM 8,193.61 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 8,193.61 RM 8,193.61
627 1.2.1.2.2 Site Agent & Assistants 15 0 days 1 day RM 8,193.61 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 100 100 RM 8,193.61 RM 8,193.61
628 1.2.1.2.2 Site Agent & Assistants 16 0 days 1 day RM 8,193.61 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 100 100 RM 8,193.61 RM 8,193.61
629 1.2.1.2.2 Site Agent & Assistants 17 0 days 1 day RM 8,193.61 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 8,193.61 RM 8,193.61
630 1.2.1.2.2 Site Agent & Assistants 18 0 days 1 day RM 8,193.61 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 100 100 RM 8,193.61 RM 8,193.61
631 1.2.1.2.2 Site Agent & Assistants 19 0 days 1 day RM 8,193.61 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 100 100 RM 8,193.61 RM 8,193.61
632 1.2.1.2.2 Site Agent & Assistants 20 0 days 1 day RM 8,193.61 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 8,193.61 RM 8,193.61

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
633 1.2.1.2.2 Site Agent & Assistants 21 0 days 1 day RM 8,193.61 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 100 100 RM 8,193.61 RM 8,193.61
634 1.2.1.2.2 Site Agent & Assistants 22 0 days 1 day RM 8,193.61 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 100 100 RM 8,193.61 RM 8,193.61
635 1.2.1.2.2 Site Agent & Assistants 23 0 days 1 day RM 8,193.61 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 8,193.61 RM 8,193.61
636 1.2.1.2.2 Site Agent & Assistants 24 0 days 1 day RM 8,193.61 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 100 100 RM 8,193.61 RM 8,193.61
637 1.2.1.2.2 Site Agent & Assistants 25 0 days 1 day RM 8,193.61 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 100 100 RM 8,193.61 RM 8,193.61
638 1.2.1.2.2 Site Agent & Assistants 26 0 days 1 day RM 8,193.61 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
639 1.2.1.2.2 Site Agent & Assistants 27 0 days 1 day RM 8,193.61 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
640 1.2.1.2.2 Site Agent & Assistants 28 0 days 1 day RM 8,193.61 Thu 23/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
641 1.2.1.2.2 Site Agent & Assistants 29 0 days 1 day RM 8,193.61 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
642 1.2.1.2.2 Site Agent & Assistants 30 0 days 1 day RM 8,193.61 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
643 1.2.1.2.2 Site Agent & Assistants 31 0 days 1 day RM 8,193.61 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
644 1.2.1.2.2 Site Agent & Assistants 32 0 days 1 day RM 8,193.61 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
645 1.2.1.2.2 Site Agent & Assistants 33 0 days 1 day RM 8,193.61 Thu 13/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
646 1.2.1.3 FINAL ‐0.18 days 743.3 days RM 13,000.00 Sun 6/12/20 Mon 19/2/24 Sun 6/12/20 NA 0 2.8 RM 0.00 RM 600.00
647 1.2.1.3.1 As‐Built Drawings ‐0.18 days 11 days RM 10,000.00 Sun 6/12/20 Mon 19/2/24 Sun 6/12/20 NA 0 6.36 RM 0.00 RM 600.00
648 1.2.1.3.2 Making Good on Completion ‐0.18 days 14 days RM 3,000.00 Tue 30/1/24 Mon 19/2/24 NA NA 0 0 RM 0.00 RM 0.00
649 1.2.2 A2 ‐ ENVIRONMENTAL PROTECTION & 0 days 587 days RM 319,040.00 Sun 13/12/20 Thu 13/7/23 Sun 13/12/20 NA 75.24 75.24 RM 241,479.90 RM 241,479.90
ENHANCEMENT WORKS
650 1.2.2.1 EMP 0 days 14 days RM 27,500.00 Sun 13/12/20 Wed 30/12/20 Sun 13/12/20 Wed 30/12/20 100 100 RM 27,500.00 RM 27,500.00
651 1.2.2.2 Environmental Officer 0 days 557 days RM 147,240.00 Sun 24/1/21 Thu 13/7/23 Sun 24/1/21 NA 74.19 74.19 RM 109,242.64 RM 109,242.64
652 1.2.2.2.1 Environmental Officer 1 0 days 1 day RM 4,749.68 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 100 100 RM 4,749.68 RM 4,749.68
653 1.2.2.2.2 Environmental Officer 2 0 days 1 day RM 4,749.68 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 4,749.68 RM 4,749.68
654 1.2.2.2.3 Environmental Officer 3 0 days 1 day RM 4,749.68 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 4,749.68 RM 4,749.68
655 1.2.2.2.4 Environmental Officer 4 0 days 1 day RM 4,749.68 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 4,749.68 RM 4,749.68
656 1.2.2.2.5 Environmental Officer 5 0 days 1 day RM 4,749.68 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 4,749.68 RM 4,749.68
657 1.2.2.2.6 Environmental Officer 6 0 days 1 day RM 4,749.68 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 4,749.68 RM 4,749.68
658 1.2.2.2.7 Environmental Officer 7 0 days 1 day RM 4,749.68 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 4,749.68 RM 4,749.68
659 1.2.2.2.8 Environmental Officer 8 0 days 1 day RM 4,749.68 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 4,749.68 RM 4,749.68
660 1.2.2.2.9 Environmental Officer 9 0 days 1 day RM 4,749.68 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 4,749.68 RM 4,749.68
661 1.2.2.2.1 Environmental Officer 10 0 days 1 day RM 4,749.68 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 4,749.68 RM 4,749.68
662 1.2.2.2.1 Environmental Officer 11 0 days 1 day RM 4,749.68 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 4,749.68 RM 4,749.68
663 1.2.2.2.1 Environmental Officer 12 0 days 1 day RM 4,749.68 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 4,749.68 RM 4,749.68
664 1.2.2.2.1 Environmental Officer 13 0 days 1 day RM 4,749.68 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 100 100 RM 4,749.68 RM 4,749.68
665 1.2.2.2.14 Environmental Officer 14 0 days 1 day RM 4,749.68 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 100 100 RM 4,749.68 RM 4,749.68
666 1.2.2.2.1 Environmental Officer 15 0 days 1 day RM 4,749.68 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 4,749.68 RM 4,749.68
667 1.2.2.2.1 Environmental Officer 16 0 days 1 day RM 4,749.68 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 100 100 RM 4,749.68 RM 4,749.68
668 1.2.2.2.1 Environmental Officer 17 0 days 1 day RM 4,749.68 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 100 100 RM 4,749.68 RM 4,749.68
669 1.2.2.2.1 Environmental Officer 18 0 days 1 day RM 4,749.68 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 4,749.68 RM 4,749.68
670 1.2.2.2.1 Environmental Officer 19 0 days 1 day RM 4,749.68 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 100 100 RM 4,749.68 RM 4,749.68
671 1.2.2.2.2 Environmental Officer 20 0 days 1 day RM 4,749.68 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 100 100 RM 4,749.68 RM 4,749.68
672 1.2.2.2.2 Environmental Officer 21 0 days 1 day RM 4,749.68 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 4,749.68 RM 4,749.68
673 1.2.2.2.2 Environmental Officer 22 0 days 1 day RM 4,749.68 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 100 100 RM 4,749.68 RM 4,749.68
674 1.2.2.2.2 Environmental Officer 23 0 days 1 day RM 4,749.68 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 100 100 RM 4,749.68 RM 4,749.68
675 1.2.2.2.24 Environmental Officer 24 0 days 1 day RM 4,749.68 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
676 1.2.2.2.2 Environmental Officer 25 0 days 1 day RM 4,749.68 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
677 1.2.2.2.2 Environmental Officer 26 0 days 1 day RM 4,749.68 Thu 23/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
678 1.2.2.2.2 Environmental Officer 27 0 days 1 day RM 4,749.68 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
679 1.2.2.2.2 Environmental Officer 28 0 days 1 day RM 4,749.68 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
680 1.2.2.2.2 Environmental Officer 29 0 days 1 day RM 4,749.68 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
681 1.2.2.2.3 Environmental Officer 30 0 days 1 day RM 4,749.68 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
682 1.2.2.2.3 Environmental Officer 31 0 days 1 day RM 4,749.60 Thu 13/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
683 1.2.2.3 Sampling & In‐Situ Testing 0 days 557 days RM 14,600.00 Sun 24/1/21 Thu 13/7/23 Sun 24/1/21 NA 74.19 74.19 RM 10,832.31 RM 10,832.31
684 1.2.2.3.1 Sampling & In‐Situ Testing 1 0 days 1 day RM 470.97 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 100 100 RM 470.97 RM 470.97
685 1.2.2.3.2 Sampling & In‐Situ Testing 2 0 days 1 day RM 470.97 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 470.97 RM 470.97
686 1.2.2.3.3 Sampling & In‐Situ Testing 3 0 days 1 day RM 470.97 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 470.97 RM 470.97
687 1.2.2.3.4 Sampling & In‐Situ Testing 4 0 days 1 day RM 470.97 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 470.97 RM 470.97
688 1.2.2.3.5 Sampling & In‐Situ Testing 5 0 days 1 day RM 470.97 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 470.97 RM 470.97
689 1.2.2.3.6 Sampling & In‐Situ Testing 6 0 days 1 day RM 470.97 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 470.97 RM 470.97
690 1.2.2.3.7 Sampling & In‐Situ Testing 7 0 days 1 day RM 470.97 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 470.97 RM 470.97
691 1.2.2.3.8 Sampling & In‐Situ Testing 8 0 days 1 day RM 470.97 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 470.97 RM 470.97
692 1.2.2.3.9 Sampling & In‐Situ Testing 9 0 days 1 day RM 470.97 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 470.97 RM 470.97
693 1.2.2.3.1 Sampling & In‐Situ Testing 10 0 days 1 day RM 470.97 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 470.97 RM 470.97
694 1.2.2.3.1 Sampling & In‐Situ Testing 11 0 days 1 day RM 470.97 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 470.97 RM 470.97
695 1.2.2.3.1 Sampling & In‐Situ Testing 12 0 days 1 day RM 470.97 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 470.97 RM 470.97
696 1.2.2.3.1 Sampling & In‐Situ Testing 13 0 days 1 day RM 470.97 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 100 100 RM 470.97 RM 470.97
697 1.2.2.3.14 Sampling & In‐Situ Testing 14 0 days 1 day RM 470.97 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 100 100 RM 470.97 RM 470.97
698 1.2.2.3.1 Sampling & In‐Situ Testing 15 0 days 1 day RM 470.97 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 470.97 RM 470.97
699 1.2.2.3.1 Sampling & In‐Situ Testing 16 0 days 1 day RM 470.97 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 100 100 RM 470.97 RM 470.97
700 1.2.2.3.1 Sampling & In‐Situ Testing 17 0 days 1 day RM 470.97 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 100 100 RM 470.97 RM 470.97
701 1.2.2.3.1 Sampling & In‐Situ Testing 18 0 days 1 day RM 470.97 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 470.97 RM 470.97
702 1.2.2.3.1 Sampling & In‐Situ Testing 19 0 days 1 day RM 470.97 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 100 100 RM 470.97 RM 470.97
703 1.2.2.3.2 Sampling & In‐Situ Testing 20 0 days 1 day RM 470.97 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 100 100 RM 470.97 RM 470.97
704 1.2.2.3.2 Sampling & In‐Situ Testing 21 0 days 1 day RM 470.97 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 470.97 RM 470.97
705 1.2.2.3.2 Sampling & In‐Situ Testing 22 0 days 1 day RM 470.97 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 100 100 RM 470.97 RM 470.97
706 1.2.2.3.2 Sampling & In‐Situ Testing 23 0 days 1 day RM 470.97 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 100 100 RM 470.97 RM 470.97
707 1.2.2.3.24 Sampling & In‐Situ Testing 24 0 days 1 day RM 470.97 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
708 1.2.2.3.2 Sampling & In‐Situ Testing 25 0 days 1 day RM 470.97 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
709 1.2.2.3.2 Sampling & In‐Situ Testing 26 0 days 1 day RM 470.97 Thu 23/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
710 1.2.2.3.2 Sampling & In‐Situ Testing 27 0 days 1 day RM 470.97 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
711 1.2.2.3.2 Sampling & In‐Situ Testing 28 0 days 1 day RM 470.97 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
712 1.2.2.3.2 Sampling & In‐Situ Testing 29 0 days 1 day RM 470.97 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
713 1.2.2.3.3 Sampling & In‐Situ Testing 30 0 days 1 day RM 470.97 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
714 1.2.2.3.3 Sampling & In‐Situ Testing 31 0 days 1 day RM 470.90 Thu 13/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
715 1.2.2.4 Sampling & Laboratory Testing 0 days 557 days RM 16,000.00 Sun 24/1/21 Thu 13/7/23 Sun 24/1/21 NA 74.19 74.19 RM 11,870.99 RM 11,870.99
716 1.2.2.4.1 Sampling & Laboratory Testing 1 0 days 1 day RM 516.13 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 100 100 RM 516.13 RM 516.13
717 1.2.2.4.2 Sampling & Laboratory Testing 2 0 days 1 day RM 516.13 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 516.13 RM 516.13
718 1.2.2.4.3 Sampling & Laboratory Testing 3 0 days 1 day RM 516.13 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 516.13 RM 516.13
719 1.2.2.4.4 Sampling & Laboratory Testing 4 0 days 1 day RM 516.13 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 516.13 RM 516.13
720 1.2.2.4.5 Sampling & Laboratory Testing 5 0 days 1 day RM 516.13 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 516.13 RM 516.13
721 1.2.2.4.6 Sampling & Laboratory Testing 6 0 days 1 day RM 516.13 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 516.13 RM 516.13
722 1.2.2.4.7 Sampling & Laboratory Testing 7 0 days 1 day RM 516.13 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 516.13 RM 516.13
723 1.2.2.4.8 Sampling & Laboratory Testing 8 0 days 1 day RM 516.13 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 516.13 RM 516.13
724 1.2.2.4.9 Sampling & Laboratory Testing 9 0 days 1 day RM 516.13 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 516.13 RM 516.13
725 1.2.2.4.1 Sampling & Laboratory Testing 10 0 days 1 day RM 516.13 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 516.13 RM 516.13
726 1.2.2.4.1 Sampling & Laboratory Testing 11 0 days 1 day RM 516.13 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 516.13 RM 516.13
727 1.2.2.4.1 Sampling & Laboratory Testing 12 0 days 1 day RM 516.13 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 516.13 RM 516.13
728 1.2.2.4.1 Sampling & Laboratory Testing 13 0 days 1 day RM 516.13 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 100 100 RM 516.13 RM 516.13
729 1.2.2.4.14 Sampling & Laboratory Testing 14 0 days 1 day RM 516.13 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 100 100 RM 516.13 RM 516.13

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
730 1.2.2.4.1 Sampling & Laboratory Testing 15 0 days 1 day RM 516.13 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 516.13 RM 516.13
731 1.2.2.4.1 Sampling & Laboratory Testing 16 0 days 1 day RM 516.13 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 100 100 RM 516.13 RM 516.13
732 1.2.2.4.1 Sampling & Laboratory Testing 17 0 days 1 day RM 516.13 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 100 100 RM 516.13 RM 516.13
733 1.2.2.4.1 Sampling & Laboratory Testing 18 0 days 1 day RM 516.13 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 516.13 RM 516.13
734 1.2.2.4.1 Sampling & Laboratory Testing 19 0 days 1 day RM 516.13 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 100 100 RM 516.13 RM 516.13
735 1.2.2.4.2 Sampling & Laboratory Testing 20 0 days 1 day RM 516.13 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 100 100 RM 516.13 RM 516.13
736 1.2.2.4.2 Sampling & Laboratory Testing 21 0 days 1 day RM 516.13 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 516.13 RM 516.13
737 1.2.2.4.2 Sampling & Laboratory Testing 22 0 days 1 day RM 516.13 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 100 100 RM 516.13 RM 516.13
738 1.2.2.4.2 Sampling & Laboratory Testing 23 0 days 1 day RM 516.13 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 100 100 RM 516.13 RM 516.13
739 1.2.2.4.24 Sampling & Laboratory Testing 24 0 days 1 day RM 516.13 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
740 1.2.2.4.2 Sampling & Laboratory Testing 25 0 days 1 day RM 516.13 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
741 1.2.2.4.2 Sampling & Laboratory Testing 26 0 days 1 day RM 516.13 Thu 23/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
742 1.2.2.4.2 Sampling & Laboratory Testing 27 0 days 1 day RM 516.13 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
743 1.2.2.4.2 Sampling & Laboratory Testing 28 0 days 1 day RM 516.13 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
744 1.2.2.4.2 Sampling & Laboratory Testing 29 0 days 1 day RM 516.13 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
745 1.2.2.4.3 Sampling & Laboratory Testing 30 0 days 1 day RM 516.13 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
746 1.2.2.4.3 Sampling & Laboratory Testing 31 0 days 1 day RM 516.10 Thu 13/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
747 1.2.2.5 Conduct Water Quality (Effluent & 0 days 557 days RM 18,000.00 Sun 24/1/21 Thu 13/7/23 Sun 24/1/21 NA 74.19 74.19 RM 13,354.95 RM 13,354.95
Discharge Outlet)
748 1.2.2.5.1 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 100 100 RM 580.65 RM 580.65
749 1.2.2.5.2 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 580.65 RM 580.65
750 1.2.2.5.3 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 580.65 RM 580.65
751 1.2.2.5.4 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 580.65 RM 580.65
752 1.2.2.5.5 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 580.65 RM 580.65
753 1.2.2.5.6 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 580.65 RM 580.65
754 1.2.2.5.7 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 580.65 RM 580.65
755 1.2.2.5.8 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 580.65 RM 580.65
756 1.2.2.5.9 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 580.65 RM 580.65
757 1.2.2.5.1 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 580.65 RM 580.65
758 1.2.2.5.1 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 580.65 RM 580.65
759 1.2.2.5.1 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 580.65 RM 580.65
760 1.2.2.5.1 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 100 100 RM 580.65 RM 580.65
761 1.2.2.5.14 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 100 100 RM 580.65 RM 580.65
762 1.2.2.5.1 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 580.65 RM 580.65
763 1.2.2.5.1 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 100 100 RM 580.65 RM 580.65
764 1.2.2.5.1 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 100 100 RM 580.65 RM 580.65
765 1.2.2.5.1 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 580.65 RM 580.65
766 1.2.2.5.1 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 100 100 RM 580.65 RM 580.65
767 1.2.2.5.2 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 100 100 RM 580.65 RM 580.65
768 1.2.2.5.2 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 580.65 RM 580.65
769 1.2.2.5.2 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 100 100 RM 580.65 RM 580.65
770 1.2.2.5.2 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 100 100 RM 580.65 RM 580.65
771 1.2.2.5.24 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
772 1.2.2.5.2 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
773 1.2.2.5.2 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Thu 23/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
774 1.2.2.5.2 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
775 1.2.2.5.2 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
776 1.2.2.5.2 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
777 1.2.2.5.3 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.65 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
778 1.2.2.5.3 Conduct Water Quality (Effluent & Dis0 days 1 day RM 580.50 Thu 13/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
779 1.2.2.6 Air Quality Control & Monitoring 0 days 507 days RM 17,600.00 Tue 23/3/21 Sun 25/6/23 Tue 23/3/21 NA 70 70 RM 12,320.00 RM 12,320.00
780 1.2.2.6.1 Air Quality Control & Monitoring 1 0 days 1 day RM 1,760.00 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 1,760.00 RM 1,760.00
781 1.2.2.6.2 Air Quality Control & Monitoring 2 0 days 1 day RM 1,760.00 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 1,760.00 RM 1,760.00
782 1.2.2.6.3 Air Quality Control & Monitoring 3 0 days 1 day RM 1,760.00 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 1,760.00 RM 1,760.00
783 1.2.2.6.4 Air Quality Control & Monitoring 4 0 days 1 day RM 1,760.00 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 1,760.00 RM 1,760.00
784 1.2.2.6.5 Air Quality Control & Monitoring 5 0 days 1 day RM 1,760.00 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 1,760.00 RM 1,760.00
785 1.2.2.6.6 Air Quality Control & Monitoring 6 0 days 1 day RM 1,760.00 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 1,760.00 RM 1,760.00
786 1.2.2.6.7 Air Quality Control & Monitoring 7 0 days 1 day RM 1,760.00 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 1,760.00 RM 1,760.00
787 1.2.2.6.8 Air Quality Control & Monitoring 8 0 days 1 day RM 1,760.00 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
788 1.2.2.6.9 Air Quality Control & Monitoring 9 0 days 1 day RM 1,760.00 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
789 1.2.2.6.1 Air Quality Control & Monitoring 10 0 days 1 day RM 1,760.00 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
790 1.2.2.7 Noise Level 0 days 507 days RM 6,500.00 Tue 23/3/21 Sun 25/6/23 Tue 23/3/21 NA 70 70 RM 4,550.00 RM 4,550.00
791 1.2.2.7.1 Noise Level 1 0 days 1 day RM 650.00 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 650.00 RM 650.00
792 1.2.2.7.2 Noise Level 2 0 days 1 day RM 650.00 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 650.00 RM 650.00
793 1.2.2.7.3 Noise Level 3 0 days 1 day RM 650.00 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 650.00 RM 650.00
794 1.2.2.7.4 Noise Level 4 0 days 1 day RM 650.00 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 650.00 RM 650.00
795 1.2.2.7.5 Noise Level 5 0 days 1 day RM 650.00 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 650.00 RM 650.00
796 1.2.2.7.6 Noise Level 6 0 days 1 day RM 650.00 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 650.00 RM 650.00
797 1.2.2.7.7 Noise Level 7 0 days 1 day RM 650.00 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 650.00 RM 650.00
798 1.2.2.7.8 Noise Level 8 0 days 1 day RM 650.00 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
799 1.2.2.7.9 Noise Level 9 0 days 1 day RM 650.00 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
800 1.2.2.7.1 Noise Level 10 0 days 1 day RM 650.00 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
801 1.2.2.8 Vibration 0 days 507 days RM 12,000.00 Tue 23/3/21 Sun 25/6/23 Tue 23/3/21 NA 70 70 RM 8,400.00 RM 8,400.00
802 1.2.2.8.1 Vibration 1 0 days 1 day RM 1,200.00 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 1,200.00 RM 1,200.00
803 1.2.2.8.2 Vibration 2 0 days 1 day RM 1,200.00 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 1,200.00 RM 1,200.00
804 1.2.2.8.3 Vibration 3 0 days 1 day RM 1,200.00 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 1,200.00 RM 1,200.00
805 1.2.2.8.4 Vibration 4 0 days 1 day RM 1,200.00 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 1,200.00 RM 1,200.00
806 1.2.2.8.5 Vibration 5 0 days 1 day RM 1,200.00 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 1,200.00 RM 1,200.00
807 1.2.2.8.6 Vibration 6 0 days 1 day RM 1,200.00 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 1,200.00 RM 1,200.00
808 1.2.2.8.7 Vibration 7 0 days 1 day RM 1,200.00 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 1,200.00 RM 1,200.00
809 1.2.2.8.8 Vibration 8 0 days 1 day RM 1,200.00 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
810 1.2.2.8.9 Vibration 9 0 days 1 day RM 1,200.00 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
811 1.2.2.8.1 Vibration 10 0 days 1 day RM 1,200.00 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
812 1.2.2.9 Environmental Report 0 days 557 days RM 8,800.00 Sun 24/1/21 Thu 13/7/23 Sun 24/1/21 NA 74.19 74.19 RM 6,529.01 RM 6,529.01
813 1.2.2.9.1 Environmental Report 1 0 days 1 day RM 283.87 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 Sun 24/1/21 100 100 RM 283.87 RM 283.87
814 1.2.2.9.2 Environmental Report 2 0 days 1 day RM 283.87 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 Tue 23/2/21 100 100 RM 283.87 RM 283.87
815 1.2.2.9.3 Environmental Report 3 0 days 1 day RM 283.87 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 283.87 RM 283.87
816 1.2.2.9.4 Environmental Report 4 0 days 1 day RM 283.87 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 Sun 25/4/21 100 100 RM 283.87 RM 283.87
817 1.2.2.9.5 Environmental Report 5 0 days 1 day RM 283.87 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 Sun 23/5/21 100 100 RM 283.87 RM 283.87
818 1.2.2.9.6 Environmental Report 6 0 days 1 day RM 283.87 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 283.87 RM 283.87
819 1.2.2.9.7 Environmental Report 7 0 days 1 day RM 283.87 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 283.87 RM 283.87
820 1.2.2.9.8 Environmental Report 8 0 days 1 day RM 283.87 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 Mon 23/8/21 100 100 RM 283.87 RM 283.87
821 1.2.2.9.9 Environmental Report 9 0 days 1 day RM 283.87 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 283.87 RM 283.87
822 1.2.2.9.1 Environmental Report 10 0 days 1 day RM 283.87 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 Sun 24/10/21 100 100 RM 283.87 RM 283.87
823 1.2.2.9.1 Environmental Report 11 0 days 1 day RM 283.87 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 Tue 23/11/21 100 100 RM 283.87 RM 283.87
824 1.2.2.9.1 Environmental Report 12 0 days 1 day RM 283.87 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 283.87 RM 283.87
825 1.2.2.9.1 Environmental Report 13 0 days 1 day RM 283.87 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 Sun 23/1/22 100 100 RM 283.87 RM 283.87
826 1.2.2.9.14 Environmental Report 14 0 days 1 day RM 283.87 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 Wed 23/2/22 100 100 RM 283.87 RM 283.87

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
827 1.2.2.9.1 Environmental Report 15 0 days 1 day RM 283.87 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 283.87 RM 283.87
828 1.2.2.9.1 Environmental Report 16 0 days 1 day RM 283.87 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 Sun 24/4/22 100 100 RM 283.87 RM 283.87
829 1.2.2.9.1 Environmental Report 17 0 days 1 day RM 283.87 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 Mon 23/5/22 100 100 RM 283.87 RM 283.87
830 1.2.2.9.1 Environmental Report 18 0 days 1 day RM 283.87 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 283.87 RM 283.87
831 1.2.2.9.1 Environmental Report 19 0 days 1 day RM 283.87 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 Sun 24/7/22 100 100 RM 283.87 RM 283.87
832 1.2.2.9.2 Environmental Report 20 0 days 1 day RM 283.87 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 Tue 23/8/22 100 100 RM 283.87 RM 283.87
833 1.2.2.9.2 Environmental Report 21 0 days 1 day RM 283.87 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 283.87 RM 283.87
834 1.2.2.9.2 Environmental Report 22 0 days 1 day RM 283.87 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 Sun 23/10/22 100 100 RM 283.87 RM 283.87
835 1.2.2.9.2 Environmental Report 23 0 days 1 day RM 283.87 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 Wed 23/11/22 100 100 RM 283.87 RM 283.87
836 1.2.2.9.24 Environmental Report 24 0 days 1 day RM 283.87 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
837 1.2.2.9.2 Environmental Report 25 0 days 1 day RM 283.87 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
838 1.2.2.9.2 Environmental Report 26 0 days 1 day RM 283.87 Thu 23/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
839 1.2.2.9.2 Environmental Report 27 0 days 1 day RM 283.87 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
840 1.2.2.9.2 Environmental Report 28 0 days 1 day RM 283.87 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
841 1.2.2.9.2 Environmental Report 29 0 days 1 day RM 283.87 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
842 1.2.2.9.3 Environmental Report 30 0 days 1 day RM 283.87 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
843 1.2.2.9.3 Environmental Report 31 0 days 1 day RM 283.90 Thu 13/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
844 1.2.2.10 Environmental Audit 0 days 507 days RM 46,400.00 Tue 23/3/21 Sun 25/6/23 Tue 23/3/21 NA 70 70 RM 32,480.00 RM 32,480.00
845 1.2.2.10. Environmental Audit 1 0 days 1 day RM 4,640.00 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 Tue 23/3/21 100 100 RM 4,640.00 RM 4,640.00
846 1.2.2.10. Environmental Audit 2 0 days 1 day RM 4,640.00 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 Wed 4/8/21 100 100 RM 4,640.00 RM 4,640.00
847 1.2.2.10. Environmental Audit 3 0 days 1 day RM 4,640.00 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 Thu 23/9/21 100 100 RM 4,640.00 RM 4,640.00
848 1.2.2.10.4 Environmental Audit 4 0 days 1 day RM 4,640.00 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 Thu 23/12/21 100 100 RM 4,640.00 RM 4,640.00
849 1.2.2.10. Environmental Audit 5 0 days 1 day RM 4,640.00 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 Wed 23/3/22 100 100 RM 4,640.00 RM 4,640.00
850 1.2.2.10. Environmental Audit 6 0 days 1 day RM 4,640.00 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 Thu 23/6/22 100 100 RM 4,640.00 RM 4,640.00
851 1.2.2.10. Environmental Audit 7 0 days 1 day RM 4,640.00 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 100 100 RM 4,640.00 RM 4,640.00
852 1.2.2.10. Environmental Audit 8 0 days 1 day RM 4,640.00 Mon 26/12/22 Mon 26/12/22 NA NA 0 0 RM 0.00 RM 0.00
853 1.2.2.10. Environmental Audit 9 0 days 1 day RM 4,640.00 Thu 23/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
854 1.2.2.10. Environmental Audit 10 0 days 1 day RM 4,640.00 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
855 1.2.2.11 Training ‐161 days 3 days RM 4,400.00 Mon 8/8/22 Wed 10/8/22 Thu 9/12/21 Thu 9/12/21 100 100 RM 4,400.00 RM 4,400.00
856 1.3 PHYSICAL WORKS ‐1.08 days 739 days RM 44,720,948.85 Sun 13/12/20 Mon 19/2/24 Thu 3/12/20 NA 16.04 17.26 RM 6,832,587.75 RM 6,893,858.42
857 1.3.1 B ‐ PILING WORKS ‐0.18 days 211 days RM 2,557,759.98 Sun 20/3/22 Sun 29/1/23 Thu 10/3/22 NA 76.05 76.85 RM 2,411,752.99 RM 2,415,176.06
858 1.3.1.1 Delivery Piles 112 days 28 days RM 2,148,562.70 Sun 20/3/22 Thu 28/4/22 Thu 10/3/22 Sun 16/10/22 100 100 RM 2,148,562.70 RM 2,148,562.70
859 1.3.1.1.1 Initial Piles (12m) 131 days 9 days RM 790,608.00 Sun 20/3/22 Wed 30/3/22 Thu 10/3/22 Sun 16/10/22 100 100 RM 790,608.00 RM 790,608.00
860 1.3.1.1.2 Extension Piles (12m) 122 days 9 days RM 752,598.00 Thu 31/3/22 Tue 12/4/22 Thu 10/3/22 Sun 16/10/22 100 100 RM 752,598.00 RM 752,598.00
861 1.3.1.1.3 Extension Piles (9m) 112 days 10 days RM 605,356.70 Wed 13/4/22 Thu 28/4/22 Thu 10/3/22 Sun 16/10/22 100 100 RM 605,356.70 RM 605,356.70
862 1.3.1.2 Plant & Equipment 13 days 72 days RM 33,145.00 Mon 18/4/22 Tue 9/8/22 Sat 19/3/22 Sun 28/8/22 100 100 RM 33,145.00 RM 33,145.00
863 1.3.1.2.1 Mobilization ‐21 days 2 days RM 23,145.00 Mon 18/4/22 Wed 20/4/22 Sat 19/3/22 Mon 21/3/22 100 100 RM 23,145.00 RM 23,145.00
864 1.3.1.2.2 Demobilization 13 days 2 days RM 10,000.00 Mon 8/8/22 Tue 9/8/22 Sat 27/8/22 Sun 28/8/22 100 100 RM 10,000.00 RM 10,000.00
865 1.3.1.3 Setting Out Pile Position 12 days 5 days RM 1,000.00 Thu 21/4/22 Thu 28/4/22 Thu 21/4/22 Sun 22/5/22 100 100 RM 1,000.00 RM 1,000.00
866 1.3.1.4 Driven For Test Piles + (7days for friction ‐10.22 days 10 days RM 1,158.00 Tue 12/4/22 Wed 27/4/22 Sun 20/3/22 Mon 11/4/22 100 100 RM 1,158.00 RM 1,158.00
867 1.3.1.5 MLT on Prelim Pile 0 days 9 days RM 42,000.00 Thu 28/4/22 Mon 16/5/22 Sat 16/4/22 Mon 16/5/22 100 100 RM 42,000.00 RM 42,000.00
868 1.3.1.5.1 MLT 1st Point ‐8 days 3 days RM 14,000.00 Thu 28/4/22 Thu 5/5/22 Sat 16/4/22 Tue 19/4/22 100 100 RM 14,000.00 RM 14,000.00
869 1.3.1.5.2 MLT 2nd Point ‐8 days 3 days RM 14,000.00 Sun 8/5/22 Tue 10/5/22 Thu 21/4/22 Sun 24/4/22 100 100 RM 14,000.00 RM 14,000.00
870 1.3.1.5.3 MLT 3rd Point 0 days 3 days RM 14,000.00 Wed 11/5/22 Mon 16/5/22 Wed 11/5/22 Mon 16/5/22 100 100 RM 14,000.00 RM 14,000.00
871 1.3.1.6 Driven For Working Pile ‐0.18 days 153 days RM 348,172.00 Sun 22/5/22 Thu 29/12/22 Sun 22/5/22 NA 86.57 86.64 RM 298,267.35 RM 299,427.92
872 1.3.1.6.1 Market ‐0.18 days 47 days RM 232,114.67 Tue 25/10/22 Thu 29/12/22 Tue 25/10/22 NA 80.85 80.83 RM 182,210.02 RM 183,370.59
873 1.3.1.6.1 Zone A ‐1 day 26 days RM 116,057.34 Tue 25/10/22 Tue 29/11/22 Tue 25/10/22 Mon 28/11/22 100 100 RM 116,057.34 RM 116,057.34
874 1.3.1.6.1 Zone B ‐0.18 days 21 days RM 116,057.33 Wed 30/11/22 Thu 29/12/22 Mon 28/11/22 NA 57.14 58 RM 66,152.68 RM 67,313.25
875 1.3.1.6.2 Terminal (RWH + OSD 1 + OSD 2 + TNB0 days 20 days RM 116,057.33 Wed 8/6/22 Tue 5/7/22 Sun 22/5/22 Tue 5/7/22 100 100 RM 116,057.33 RM 116,057.33

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
876 1.3.1.7 MLT on Working Pile ‐0.18 days 123 days RM 100,000.00 Tue 19/7/22 Wed 11/1/23 Tue 19/7/22 NA 25 25 RM 60,000.00 RM 60,000.00
877 1.3.1.7.1 Stage 1 0 days 0 days? RM 0.00 NA NA Tue 19/7/22 Thu 21/7/22 100 100 RM 60,000.00 RM 60,000.00
878 1.3.1.7.2 Stage 2 ‐0.18 days 9 days RM 40,000.00 Sun 1/1/23 Wed 11/1/23 NA NA 0 0 RM 0.00 RM 0.00
879 1.3.1.8 PDA Test ‐0.18 days 127 days RM 38,610.00 Thu 14/7/22 Thu 12/1/23 Thu 14/7/22 NA 50 50 RM 20,000.00 RM 20,000.00
880 1.3.1.8.1 Stage 1 0 days 0 days? RM 0.00 NA NA Thu 14/7/22 Thu 14/7/22 100 100 RM 20,000.00 RM 20,000.00
881 1.3.1.8.2 Stage 2 ‐0.18 days 1 day RM 18,610.00 Thu 12/1/23 Thu 12/1/23 NA NA 0 0 RM 0.00 RM 0.00
882 1.3.1.9 Pile Integrity Test ‐0.18 days 130 days RM 4,455.00 Thu 7/7/22 Thu 12/1/23 Thu 7/7/22 NA 50 50 RM 2,227.50 RM 2,227.50
883 1.3.1.9.1 Stage 1 0 days 0 days? RM 0.00 NA NA Thu 7/7/22 Thu 7/7/22 100 100 RM 2,227.50 RM 2,227.50
884 1.3.1.9.2 Stage 2 ‐0.18 days 1 day RM 2,227.50 Thu 12/1/23 Thu 12/1/23 NA NA 0 0 RM 0.00 RM 0.00
885 1.3.1.10 Piling Record & As Built ‐0.18 days 20 days RM 1,810.00 Mon 27/6/22 Sun 29/1/23 Mon 27/6/22 NA 10 10 RM 181.00 RM 181.00
886 1.3.1.11 Cut Off Pile To Required Level 0 days 10 days RM 27,150.00 Mon 9/1/23 Tue 24/1/23 Tue 22/11/22 NA 0 9.26 RM 0.00 RM 2,262.50
887 1.3.1.11. Market ‐0.18 days 10 days RM 18,100.00 Mon 9/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
888 1.3.1.11. Zone A ‐0.18 days 7 days RM 9,050.00 Thu 12/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
889 1.3.1.11. Zone B ‐0.18 days 10 days RM 9,050.00 Mon 9/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
890 1.3.1.11. Terminal (RWH + OSD 1 + OSD 2 + 0 days 10 days RM 9,050.00 Mon 9/1/23 Tue 24/1/23 Tue 22/11/22 NA 0 25 RM 0.00 RM 2,262.50
TNB Subs)
891 1.3.1.12 Pile Plug ‐0.18 days 7 days RM 6,033.34 Thu 12/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
892 1.3.1.12. Market ‐0.18 days 7 days RM 6,033.34 Thu 12/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
893 1.3.1.12. Zone A ‐0.18 days 7 days RM 3,016.67 Thu 12/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
894 1.3.1.12. Zone B ‐0.18 days 7 days RM 3,016.67 Thu 12/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
895 1.3.1.13 Terminal (RWH + OSD 1 + OSD 2 + TNB S ‐0.18 days 7 days RM 3,016.66 Wed 20/7/22 Sun 15/1/23 Wed 20/7/22 NA 85 85 RM 2,564.16 RM 2,564.16
896 1.3.1.14 APK No.4 0 days 0 days ‐RM 197,352.72 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 0 100 ‐RM 197,352.72 ‐RM 197,352.72
897 1.3.1.14. Pertukaran Kaedah Cerucuk Dari 0 days 0 days ‐RM 197,352.72 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 Sun 25/9/22 0 100 ‐RM 197,352.72 ‐RM 197,352.72
Hydraulic Drop Hammer ke Injection
Method
898 1.3.2 C1 PASAR ‐0.18 days 285 days RM 13,505,508.95 Thu 1/12/22 Tue 30/1/24 Wed 30/11/22 NA 0.43 0.44 RM 0.00 RM 0.00
899 1.3.2.1 Work Below Lowest Floor Finish ‐0.18 days 60 days RM 1,630,288.30 Wed 25/1/23 Thu 20/4/23 NA NA 0 0 RM 0.00 RM 0.00
900 1.3.2.1.1 Excavate Oversite 350mm Average De‐0.18 days 5 days RM 15,885.00 Wed 25/1/23 Tue 31/1/23 NA NA 0 0 RM 0.00 RM 0.00
901 1.3.2.1.2 Pile Cap ‐0.18 days 24 days RM 268,409.26 Wed 1/2/23 Tue 7/3/23 NA NA 0 0 RM 0.00 RM 0.00
902 1.3.2.1.2 Excavation ‐0.18 days 14 days RM 6,736.00 Wed 1/2/23 Tue 21/2/23 NA NA 0 0 RM 0.00 RM 0.00
903 1.3.2.1.2 Section 1 ‐0.18 days 7 days RM 3,368.00 Wed 1/2/23 Thu 9/2/23 NA NA 0 0 RM 0.00 RM 0.00
904 1.3.2.1.2 Section 2 ‐0.18 days 7 days RM 3,368.00 Sun 12/2/23 Tue 21/2/23 NA NA 0 0 RM 0.00 RM 0.00
905 1.3.2.1.2 Lean Concrete G 20 ‐0.18 days 10 days RM 4,367.60 Sun 5/2/23 Thu 16/2/23 NA NA 0 0 RM 0.00 RM 0.00
906 1.3.2.1.2 Section 1 ‐0.18 days 3 days RM 2,183.80 Sun 5/2/23 Tue 7/2/23 NA NA 0 0 RM 0.00 RM 0.00
907 1.3.2.1.2 Section 2 ‐0.18 days 3 days RM 2,183.80 Tue 14/2/23 Thu 16/2/23 NA NA 0 0 RM 0.00 RM 0.00
908 1.3.2.1.2 Side Formwork ‐0.18 days 14 days RM 33,288.00 Sun 5/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
909 1.3.2.1.2 Section 1 ‐0.18 days 7 days RM 16,644.00 Sun 5/2/23 Mon 13/2/23 NA NA 0 0 RM 0.00 RM 0.00
910 1.3.2.1.2 Section 2 ‐0.18 days 7 days RM 16,644.00 Tue 14/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
911 1.3.2.1.2 Reinforcement Rebar ‐0.18 days 14 days RM 129,982.00 Thu 9/2/23 Wed 1/3/23 NA NA 0 0 RM 0.00 RM 0.00
912 1.3.2.1.2 Section 1 ‐0.18 days 7 days RM 64,991.00 Thu 9/2/23 Mon 20/2/23 NA NA 0 0 RM 0.00 RM 0.00
913 1.3.2.1.2 Section 2 ‐0.18 days 7 days RM 64,991.00 Tue 21/2/23 Wed 1/3/23 NA NA 0 0 RM 0.00 RM 0.00
914 1.3.2.1.2 Concreting G 40 ‐0.18 days 12 days RM 84,378.00 Thu 16/2/23 Mon 6/3/23 NA NA 0 0 RM 0.00 RM 0.00
915 1.3.2.1.2 Section 1 ‐0.18 days 5 days RM 42,189.00 Thu 16/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
916 1.3.2.1.2 Section 2 ‐0.18 days 5 days RM 42,189.00 Tue 28/2/23 Mon 6/3/23 NA NA 0 0 RM 0.00 RM 0.00
917 1.3.2.1.2 Antitermite Treatment ‐0.18 days 10 days RM 9,657.66 Wed 22/2/23 Tue 7/3/23 NA NA 0 0 RM 0.00 RM 0.00
918 1.3.2.1.2 Section 1 ‐0.18 days 3 days RM 4,828.83 Wed 22/2/23 Sun 26/2/23 NA NA 0 0 RM 0.00 RM 0.00
919 1.3.2.1.2 Section 2 ‐0.18 days 3 days RM 4,828.83 Sun 5/3/23 Tue 7/3/23 NA NA 0 0 RM 0.00 RM 0.00
920 1.3.2.1.3 Column Stumps ‐0.18 days 13 days RM 85,696.00 Sun 26/2/23 Tue 14/3/23 NA NA 0 0 RM 0.00 RM 0.00
921 1.3.2.1.3 Side Formwork ‐0.18 days 10 days RM 24,966.00 Sun 26/2/23 Thu 9/3/23 NA NA 0 0 RM 0.00 RM 0.00
922 1.3.2.1.3 Section 1 ‐0.18 days 3 days RM 12,483.00 Sun 26/2/23 Tue 28/2/23 NA NA 0 0 RM 0.00 RM 0.00
WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
923 1.3.2.1.3 Section 2 ‐0.18 days 3 days RM 12,483.00 Tue 7/3/23 Thu 9/3/23 NA NA 0 0 RM 0.00 RM 0.00
924 1.3.2.1.3 Reinforcement Rebar ‐0.18 days 11 days RM 40,290.00 Mon 27/2/23 Mon 13/3/23 NA NA 0 0 RM 0.00 RM 0.00
925 1.3.2.1.3 Section 1 ‐0.18 days 3 days RM 20,145.00 Mon 27/2/23 Wed 1/3/23 NA NA 0 0 RM 0.00 RM 0.00
926 1.3.2.1.3 Section 2 ‐0.18 days 4 days RM 20,145.00 Wed 8/3/23 Mon 13/3/23 NA NA 0 0 RM 0.00 RM 0.00
927 1.3.2.1.3 Concreting G 35 ‐0.18 days 10 days RM 20,440.00 Wed 1/3/23 Tue 14/3/23 NA NA 0 0 RM 0.00 RM 0.00
928 1.3.2.1.3 Section 1 ‐0.18 days 2 days RM 10,220.00 Wed 1/3/23 Thu 2/3/23 NA NA 0 0 RM 0.00 RM 0.00
929 1.3.2.1.3 Section 2 ‐0.18 days 2 days RM 10,220.00 Mon 13/3/23 Tue 14/3/23 NA NA 0 0 RM 0.00 RM 0.00
930 1.3.2.1.4 Ground Beams ‐0.18 days 18 days RM 496,496.08 Sun 5/3/23 Tue 28/3/23 NA NA 0 0 RM 0.00 RM 0.00
931 1.3.2.1.4 Excavation ‐0.18 days 4 days RM 3,048.00 Sun 5/3/23 Wed 8/3/23 NA NA 0 0 RM 0.00 RM 0.00
932 1.3.2.1.4 Section 1 ‐0.18 days 2 days RM 1,524.00 Sun 5/3/23 Mon 6/3/23 NA NA 0 0 RM 0.00 RM 0.00
933 1.3.2.1.4 Section 2 ‐0.18 days 2 days RM 1,524.00 Tue 7/3/23 Wed 8/3/23 NA NA 0 0 RM 0.00 RM 0.00
934 1.3.2.1.4 Lean Concrete G 20 ‐0.18 days 6 days RM 6,051.20 Tue 7/3/23 Tue 14/3/23 NA NA 0 0 RM 0.00 RM 0.00
935 1.3.2.1.4 Section 1 ‐0.18 days 3 days RM 3,025.60 Tue 7/3/23 Thu 9/3/23 NA NA 0 0 RM 0.00 RM 0.00
936 1.3.2.1.4 Section 2 ‐0.18 days 3 days RM 3,025.60 Sun 12/3/23 Tue 14/3/23 NA NA 0 0 RM 0.00 RM 0.00
937 1.3.2.1.4 Side Formwork ‐0.18 days 10 days RM 107,350.00 Wed 8/3/23 Tue 21/3/23 NA NA 0 0 RM 0.00 RM 0.00
938 1.3.2.1.4 Section 1 ‐0.18 days 4 days RM 53,675.00 Wed 8/3/23 Mon 13/3/23 NA NA 0 0 RM 0.00 RM 0.00
939 1.3.2.1.4 Section 2 ‐0.18 days 4 days RM 53,675.00 Thu 16/3/23 Tue 21/3/23 NA NA 0 0 RM 0.00 RM 0.00
940 1.3.2.1.4 Reinforcement Rebar ‐0.18 days 11 days RM 237,109.20 Sun 12/3/23 Sun 26/3/23 NA NA 0 0 RM 0.00 RM 0.00
941 1.3.2.1.4 Section 1 ‐0.18 days 5 days RM 118,554.60 Sun 12/3/23 Thu 16/3/23 NA NA 0 0 RM 0.00 RM 0.00
942 1.3.2.1.4 Section 2 ‐0.18 days 5 days RM 118,554.60 Mon 20/3/23 Sun 26/3/23 NA NA 0 0 RM 0.00 RM 0.00
943 1.3.2.1.4 Concreting G 35 ‐0.18 days 8 days RM 133,280.00 Thu 16/3/23 Mon 27/3/23 NA NA 0 0 RM 0.00 RM 0.00
944 1.3.2.1.4 Section 1 ‐0.18 days 2 days RM 66,640.00 Thu 16/3/23 Sun 19/3/23 NA NA 0 0 RM 0.00 RM 0.00
945 1.3.2.1.4 Section 2 ‐0.18 days 2 days RM 66,640.00 Sun 26/3/23 Mon 27/3/23 NA NA 0 0 RM 0.00 RM 0.00
946 1.3.2.1.4 Antitermite Treatment ‐0.18 days 7 days RM 9,657.68 Mon 20/3/23 Tue 28/3/23 NA NA 0 0 RM 0.00 RM 0.00
947 1.3.2.1.4 Section 1 ‐0.18 days 1 day RM 4,828.84 Mon 20/3/23 Mon 20/3/23 NA NA 0 0 RM 0.00 RM 0.00
948 1.3.2.1.4 Section 2 ‐0.18 days 1 day RM 4,828.84 Tue 28/3/23 Tue 28/3/23 NA NA 0 0 RM 0.00 RM 0.00
949 1.3.2.1.5 Ground Floor Slabs ‐0.18 days 21 days RM 763,801.96 Wed 22/3/23 Thu 20/4/23 NA NA 0 0 RM 0.00 RM 0.00
950 1.3.2.1.5 Hardcore 150mm ‐0.18 days 6 days RM 52,420.50 Wed 22/3/23 Wed 29/3/23 NA NA 0 0 RM 0.00 RM 0.00
951 1.3.2.1.5 Section 1 ‐0.18 days 3 days RM 26,210.25 Wed 22/3/23 Sun 26/3/23 NA NA 0 0 RM 0.00 RM 0.00
952 1.3.2.1.5 Section 2 ‐0.18 days 3 days RM 26,210.25 Mon 27/3/23 Wed 29/3/23 NA NA 0 0 RM 0.00 RM 0.00
953 1.3.2.1.5 Antitermite Treatment ‐0.18 days 1 day RM 9,657.66 Thu 30/3/23 Thu 30/3/23 NA NA 0 0 RM 0.00 RM 0.00
954 1.3.2.1.5 Section 1 ‐0.18 days 1 day RM 4,828.83 Thu 30/3/23 Thu 30/3/23 NA NA 0 0 RM 0.00 RM 0.00
955 1.3.2.1.5 Section 2 ‐0.18 days 1 day RM 4,828.83 Thu 30/3/23 Thu 30/3/23 NA NA 0 0 RM 0.00 RM 0.00
956 1.3.2.1.5 Lean Concrete G 20 ‐0.18 days 2 days RM 64,599.00 Sun 2/4/23 Mon 3/4/23 NA NA 0 0 RM 0.00 RM 0.00
957 1.3.2.1.5 Section 1 ‐0.18 days 2 days RM 32,299.50 Sun 2/4/23 Mon 3/4/23 NA NA 0 0 RM 0.00 RM 0.00
958 1.3.2.1.5 Section 2 ‐0.18 days 2 days RM 32,299.50 Sun 2/4/23 Mon 3/4/23 NA NA 0 0 RM 0.00 RM 0.00
959 1.3.2.1.5 DPM ‐0.18 days 2 days RM 24,357.00 Tue 4/4/23 Wed 5/4/23 NA NA 0 0 RM 0.00 RM 0.00
960 1.3.2.1.5 Section 1 ‐0.18 days 2 days RM 12,178.50 Tue 4/4/23 Wed 5/4/23 NA NA 0 0 RM 0.00 RM 0.00
961 1.3.2.1.5 Section 2 ‐0.18 days 2 days RM 12,178.50 Tue 4/4/23 Wed 5/4/23 NA NA 0 0 RM 0.00 RM 0.00
962 1.3.2.1.5 Reinforcement Rebar ‐0.18 days 10 days RM 334,923.80 Wed 5/4/23 Wed 19/4/23 NA NA 0 0 RM 0.00 RM 0.00
963 1.3.2.1.5 Section 1 ‐0.18 days 5 days RM 167,461.90 Wed 5/4/23 Wed 12/4/23 NA NA 0 0 RM 0.00 RM 0.00
964 1.3.2.1.5 Section 2 ‐0.18 days 5 days RM 167,461.90 Thu 13/4/23 Wed 19/4/23 NA NA 0 0 RM 0.00 RM 0.00
965 1.3.2.1.5 Concreting G 35 & Curing ‐0.18 days 7 days RM 277,844.00 Wed 12/4/23 Thu 20/4/23 NA NA 0 0 RM 0.00 RM 0.00
966 1.3.2.1.5 Section 1 ‐0.18 days 2 days RM 138,922.00 Wed 12/4/23 Thu 13/4/23 NA NA 0 0 RM 0.00 RM 0.00
967 1.3.2.1.5 Section 2 ‐0.18 days 2 days RM 138,922.00 Wed 19/4/23 Thu 20/4/23 NA NA 0 0 RM 0.00 RM 0.00
968 1.3.2.2 Apron, Steps & Perimeter Drain ‐0.07 days 43 days RM 106,665.30 Wed 9/8/23 Tue 10/10/23 NA NA 0 0 RM 0.00 RM 0.00
969 1.3.2.2.1 Excavation 300mm Deep ‐0.07 days 2 days RM 470.00 Wed 9/8/23 Thu 10/8/23 NA NA 0 0 RM 0.00 RM 0.00
970 1.3.2.2.2 Apron ‐0.07 days 16 days RM 16,276.20 Sun 13/8/23 Sun 3/9/23 NA NA 0 0 RM 0.00 RM 0.00
971 1.3.2.2.2 Hardcore 150mm ‐0.07 days 3 days RM 1,168.20 Sun 13/8/23 Tue 15/8/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
972 1.3.2.2.2 Antitermite Treatment ‐0.07 days 1 day RM 413.00 Wed 16/8/23 Wed 16/8/23 NA NA 0 0 RM 0.00 RM 0.00
973 1.3.2.2.2 Formwork ‐0.07 days 3 days RM 1,029.00 Thu 17/8/23 Mon 21/8/23 NA NA 0 0 RM 0.00 RM 0.00
974 1.3.2.2.2 Lean Concrete G 20 ‐0.07 days 2 days RM 1,439.60 Tue 22/8/23 Wed 23/8/23 NA NA 0 0 RM 0.00 RM 0.00
975 1.3.2.2.2 DPM ‐0.07 days 2 days RM 542.80 Thu 24/8/23 Sun 27/8/23 NA NA 0 0 RM 0.00 RM 0.00
976 1.3.2.2.2 Reinforcement Rebar & BRC ‐0.07 days 3 days RM 6,727.60 Mon 28/8/23 Wed 30/8/23 NA NA 0 0 RM 0.00 RM 0.00
977 1.3.2.2.2 Concreting G 35 ‐0.07 days 2 days RM 4,956.00 Thu 31/8/23 Sun 3/9/23 NA NA 0 0 RM 0.00 RM 0.00
978 1.3.2.2.3 Ramp ‐0.07 days 15 days RM 11,479.70 Sun 13/8/23 Thu 31/8/23 NA NA 0 0 RM 0.00 RM 0.00
979 1.3.2.2.3 Hardcore 150mm ‐0.07 days 2 days RM 693.00 Sun 13/8/23 Mon 14/8/23 NA NA 0 0 RM 0.00 RM 0.00
980 1.3.2.2.3 Antitermite Treatment ‐0.07 days 2 days RM 245.00 Tue 15/8/23 Wed 16/8/23 NA NA 0 0 RM 0.00 RM 0.00
981 1.3.2.2.3 Formwork ‐0.07 days 2 days RM 766.50 Thu 17/8/23 Sun 20/8/23 NA NA 0 0 RM 0.00 RM 0.00
982 1.3.2.2.3 Lean Concrete G 20 ‐0.07 days 2 days RM 854.00 Mon 21/8/23 Tue 22/8/23 NA NA 0 0 RM 0.00 RM 0.00
983 1.3.2.2.3 DPM ‐0.07 days 2 days RM 322.00 Wed 23/8/23 Thu 24/8/23 NA NA 0 0 RM 0.00 RM 0.00
984 1.3.2.2.3 Reinforcement Rebar & BRC ‐0.07 days 3 days RM 4,424.40 Sun 27/8/23 Tue 29/8/23 NA NA 0 0 RM 0.00 RM 0.00
985 1.3.2.2.3 Concreting G 35 With Grooved Line ‐0.07 days 2 days RM 4,174.80 Wed 30/8/23 Thu 31/8/23 NA NA 0 0 RM 0.00 RM 0.00
986 1.3.2.2.4 Interlocking Concrete Paver ‐0.07 days 30 days RM 68,034.40 Wed 16/8/23 Thu 28/9/23 NA NA 0 0 RM 0.00 RM 0.00
987 1.3.2.2.4 Crusher Run 150mm ‐0.07 days 5 days RM 4,118.40 Wed 16/8/23 Tue 22/8/23 NA NA 0 0 RM 0.00 RM 0.00
988 1.3.2.2.4 Sand Bedding 50mm ‐0.07 days 5 days RM 880.00 Wed 23/8/23 Tue 29/8/23 NA NA 0 0 RM 0.00 RM 0.00
989 1.3.2.2.4 Paving Block 80mm ‐0.07 days 20 days RM 63,036.00 Wed 30/8/23 Thu 28/9/23 NA NA 0 0 RM 0.00 RM 0.00
990 1.3.2.2.5 Perimeter Drain ‐0.07 days 7 days RM 4,500.00 Wed 30/8/23 Thu 7/9/23 NA NA 0 0 RM 0.00 RM 0.00
991 1.3.2.2.5 Surface Water Drain 300mm ‐0.07 days 5 days RM 540.00 Wed 30/8/23 Tue 5/9/23 NA NA 0 0 RM 0.00 RM 0.00
992 1.3.2.2.5 Mild Steel Grating ‐0.07 days 2 days RM 3,960.00 Wed 6/9/23 Thu 7/9/23 NA NA 0 0 RM 0.00 RM 0.00
993 1.3.2.2.6 Steps ‐0.07 days 8 days RM 5,905.00 Sun 1/10/23 Tue 10/10/23 NA NA 0 0 RM 0.00 RM 0.00
994 1.3.2.2.6 Formwork ‐0.07 days 2 days RM 630.00 Sun 1/10/23 Mon 2/10/23 NA NA 0 0 RM 0.00 RM 0.00
995 1.3.2.2.6 Concreting G 30 ‐0.07 days 1 day RM 532.00 Tue 3/10/23 Tue 3/10/23 NA NA 0 0 RM 0.00 RM 0.00
996 1.3.2.2.6 Tiling ‐0.07 days 5 days RM 4,743.00 Wed 4/10/23 Tue 10/10/23 NA NA 0 0 RM 0.00 RM 0.00
997 1.3.2.3 Lift Shaft ‐0.07 days 114 days RM 74,048.30 Wed 1/2/23 Wed 26/7/23 NA NA 0 0 RM 0.00 RM 0.00
998 1.3.2.3.1 Pile Cap ‐0.18 days 13 days RM 18,599.10 Wed 1/2/23 Mon 20/2/23 NA NA 0 0 RM 0.00 RM 0.00
999 1.3.2.3.1 Excavation ‐0.18 days 3 days RM 232.00 Wed 1/2/23 Sun 5/2/23 NA NA 0 0 RM 0.00 RM 0.00
1000 1.3.2.3.1 Lean Concrete G 20 ‐0.18 days 1 day RM 158.60 Mon 6/2/23 Mon 6/2/23 NA NA 0 0 RM 0.00 RM 0.00
1001 1.3.2.3.1 Side Formwork ‐0.18 days 2 days RM 608.00 Tue 7/2/23 Wed 8/2/23 NA NA 0 0 RM 0.00 RM 0.00
1002 1.3.2.3.1 Reinforcement Rebar ‐0.18 days 3 days RM 11,220.00 Thu 9/2/23 Mon 13/2/23 NA NA 0 0 RM 0.00 RM 0.00
1003 1.3.2.3.1 Concreting G 40 ‐0.18 days 1 day RM 5,880.00 Tue 14/2/23 Tue 14/2/23 NA NA 0 0 RM 0.00 RM 0.00
1004 1.3.2.3.1 Waterproof Membrane ‐0.18 days 1 day RM 500.50 Mon 20/2/23 Mon 20/2/23 NA NA 0 0 RM 0.00 RM 0.00
1005 1.3.2.3.2 Lift Wall ‐0.07 days 51 days RM 52,098.60 Thu 20/4/23 Wed 12/7/23 NA NA 0 0 RM 0.00 RM 0.00
1006 1.3.2.3.2 GF To 1st Floor ‐0.18 days 8 days RM 26,780.80 Thu 20/4/23 Mon 8/5/23 NA NA 0 0 RM 0.00 RM 0.00
1007 1.3.2.3.2 Side Formwork ‐0.18 days 2 days RM 5,415.00 Thu 20/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
1008 1.3.2.3.2 Reinforcement Rebar ‐0.18 days 2 days RM 14,031.80 Thu 27/4/23 Sun 30/4/23 NA NA 0 0 RM 0.00 RM 0.00
1009 1.3.2.3.2 Extra for Door Opening ‐0.18 days 1 day RM 75.00 Tue 2/5/23 Tue 2/5/23 NA NA 0 0 RM 0.00 RM 0.00
1010 1.3.2.3.2 Concreting G 35 ‐0.18 days 1 day RM 5,796.00 Wed 3/5/23 Wed 3/5/23 NA NA 0 0 RM 0.00 RM 0.00
1011 1.3.2.3.2 Waterproof Membrane ‐0.18 days 1 day RM 1,463.00 Mon 8/5/23 Mon 8/5/23 NA NA 0 0 RM 0.00 RM 0.00
1012 1.3.2.3.2 1st Floor To LMR ‐0.07 days 6 days RM 25,317.80 Wed 5/7/23 Wed 12/7/23 NA NA 0 0 RM 0.00 RM 0.00
1013 1.3.2.3.2 Side Formwork ‐0.07 days 2 days RM 5,415.00 Wed 5/7/23 Thu 6/7/23 NA NA 0 0 RM 0.00 RM 0.00
1014 1.3.2.3.2 Reinforcement Rebar ‐0.07 days 2 days RM 14,031.80 Sun 9/7/23 Mon 10/7/23 NA NA 0 0 RM 0.00 RM 0.00
1015 1.3.2.3.2 Extra for Door Opening ‐0.07 days 1 day RM 75.00 Tue 11/7/23 Tue 11/7/23 NA NA 0 0 RM 0.00 RM 0.00
1016 1.3.2.3.2 Concreting G 35 ‐0.07 days 1 day RM 5,796.00 Wed 12/7/23 Wed 12/7/23 NA NA 0 0 RM 0.00 RM 0.00
1017 1.3.2.3.3 Roof Slab ‐0.07 days 4 days RM 3,350.60 Sun 23/7/23 Wed 26/7/23 NA NA 0 0 RM 0.00 RM 0.00
1018 1.3.2.3.3 Soffit Formwork ‐0.07 days 2 days RM 494.00 Sun 23/7/23 Mon 24/7/23 NA NA 0 0 RM 0.00 RM 0.00
1019 1.3.2.3.3 Reinforcement Rebar ‐0.07 days 1 day RM 1,764.60 Tue 25/7/23 Tue 25/7/23 NA NA 0 0 RM 0.00 RM 0.00
1020 1.3.2.3.3 Concreting G 35 ‐0.07 days 1 day RM 1,092.00 Wed 26/7/23 Wed 26/7/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1021 1.3.2.4 Frame ‐0.07 days 167 days RM 2,588,343.34 Thu 1/12/22 Sun 13/8/23 Wed 30/11/22 NA 3.74 3.77 RM 0.00 RM 0.00
1022 1.3.2.4.1 IBS Components ‐0.07 days 167 days RM 1,670,023.00 Thu 1/12/22 Sun 13/8/23 Wed 30/11/22 NA 6.75 6.79 RM 0.00 RM 0.00
1023 1.3.2.4.1 Shop Drawing & Approval ‐0.07 days 27 days RM 0.00 Thu 1/12/22 Mon 9/1/23 Wed 30/11/22 NA 40.74 41 RM 0.00 RM 0.00
1024 1.3.2.4.1 Mould Fabrication ‐0.07 days 21 days RM 0.00 Tue 10/1/23 Thu 9/2/23 NA NA 0 0 RM 0.00 RM 0.00
1025 1.3.2.4.1 Delivery Precast Components to Sit ‐0.07 days 9 days RM 0.00 Sun 12/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
1026 1.3.2.4.1 Fabrication Works for Precast Colum‐0.07 days 45 days RM 0.00 Wed 1/3/23 Wed 10/5/23 NA NA 0 0 RM 0.00 RM 0.00
1027 1.3.2.4.1 Installation IBS ‐0.07 days 75 days RM 1,670,023.00 Mon 17/4/23 Sun 13/8/23 NA NA 0 0 RM 0.00 RM 0.00
1028 1.3.2.4.1 GF To 1st Floor Column ‐0.07 days 15 days RM 291,124.00 Mon 17/4/23 Sun 14/5/23 NA NA 0 0 RM 0.00 RM 0.00
1029 1.3.2.4.1 Section 1 ‐0.07 days 7 days RM 145,562.00 Mon 17/4/23 Sun 30/4/23 NA NA 0 0 RM 0.00 RM 0.00
1030 1.3.2.4.1 Section 2 ‐0.07 days 8 days RM 145,562.00 Tue 2/5/23 Sun 14/5/23 NA NA 0 0 RM 0.00 RM 0.00
1031 1.3.2.4.1 1st Floor Beam ‐0.07 days 16 days RM 600,000.00 Mon 15/5/23 Tue 6/6/23 NA NA 0 0 RM 0.00 RM 0.00
1032 1.3.2.4.1 Section 1 ‐0.07 days 8 days RM 300,000.00 Mon 15/5/23 Wed 24/5/23 NA NA 0 0 RM 0.00 RM 0.00
1033 1.3.2.4.1 Section 2 ‐0.07 days 8 days RM 300,000.00 Thu 25/5/23 Tue 6/6/23 NA NA 0 0 RM 0.00 RM 0.00
1034 1.3.2.4.1 1st Floor To Roof Floor Column ‐0.07 days 14 days RM 277,254.00 Sun 2/7/23 Thu 20/7/23 NA NA 0 0 RM 0.00 RM 0.00

1035 1.3.2.4.1 Section 1 ‐0.07 days 6 days RM 138,627.00 Sun 2/7/23 Sun 9/7/23 NA NA 0 0 RM 0.00 RM 0.00
1036 1.3.2.4.1 Section 2 ‐0.07 days 8 days RM 138,627.00 Mon 10/7/23 Thu 20/7/23 NA NA 0 0 RM 0.00 RM 0.00
1037 1.3.2.4.1 Roof Beam ‐0.07 days 16 days RM 501,645.00 Sun 23/7/23 Sun 13/8/23 NA NA 0 0 RM 0.00 RM 0.00
1038 1.3.2.4.1 Section 1 ‐0.07 days 8 days RM 250,822.50 Sun 23/7/23 Tue 1/8/23 NA NA 0 0 RM 0.00 RM 0.00
1039 1.3.2.4.1 Section 2 ‐0.07 days 8 days RM 250,822.50 Wed 2/8/23 Sun 13/8/23 NA NA 0 0 RM 0.00 RM 0.00
1040 1.3.2.4.2 Steel Portal Frame ‐0.07 days 119 days RM 918,320.34 Mon 30/1/23 Mon 31/7/23 NA NA 0 0 RM 0.00 RM 0.00
1041 1.3.2.4.2 Shop Drawing ‐0.07 days 43 days RM 0.00 Mon 30/1/23 Thu 30/3/23 NA NA 0 0 RM 0.00 RM 0.00
1042 1.3.2.4.2 Shop Drawing Approval ‐0.07 days 6 days RM 0.00 Sun 2/4/23 Mon 10/4/23 NA NA 0 0 RM 0.00 RM 0.00
1043 1.3.2.4.2 Fabrications at Factory ‐0.07 days 12 days RM 10,000.00 Tue 11/4/23 Tue 2/5/23 NA NA 0 0 RM 0.00 RM 0.00
1044 1.3.2.4.2 Installation ‐0.07 days 38 days RM 679,939.54 Wed 3/5/23 Sun 2/7/23 NA NA 0 0 RM 0.00 RM 0.00
1045 1.3.2.4.2 In Situ Concrete ‐0.07 days 63 days RM 228,380.80 Thu 20/4/23 Mon 31/7/23 NA NA 0 0 RM 0.00 RM 0.00
1046 1.3.2.4.2 Stiffeners ‐0.18 days 5 days RM 44,095.00 Thu 20/4/23 Tue 2/5/23 NA NA 0 0 RM 0.00 RM 0.00
1047 1.3.2.4.2 Reinforcement Rebar ‐0.18 days 2 days RM 25,075.00 Thu 20/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
1048 1.3.2.4.2 Formwork ‐0.18 days 2 days RM 14,820.00 Thu 27/4/23 Sun 30/4/23 NA NA 0 0 RM 0.00 RM 0.00
1049 1.3.2.4.2 Concreting G 35 ‐0.18 days 1 day RM 4,200.00 Tue 2/5/23 Tue 2/5/23 NA NA 0 0 RM 0.00 RM 0.00
1050 1.3.2.4.2 Column ‐0.18 days 7 days RM 21,857.00 Tue 2/5/23 Thu 11/5/23 NA NA 0 0 RM 0.00 RM 0.00
1051 1.3.2.4.2 Reinforcement Rebar ‐0.18 days 2 days RM 10,761.00 Tue 2/5/23 Wed 3/5/23 NA NA 0 0 RM 0.00 RM 0.00
1052 1.3.2.4.2 Formwork ‐0.18 days 3 days RM 5,776.00 Sun 7/5/23 Tue 9/5/23 NA NA 0 0 RM 0.00 RM 0.00
1053 1.3.2.4.2 Concreting G 35 ‐0.18 days 2 days RM 5,320.00 Wed 10/5/23 Thu 11/5/23 NA NA 0 0 RM 0.00 RM 0.00
1054 1.3.2.4.2 Suspended Beams ‐0.18 days 10 days RM 66,418.00 Mon 15/5/23 Sun 28/5/23 NA NA 0 0 RM 0.00 RM 0.00
1055 1.3.2.4.2 Formwork ‐0.18 days 4 days RM 15,010.00 Mon 15/5/23 Thu 18/5/23 NA NA 0 0 RM 0.00 RM 0.00
1056 1.3.2.4.2 Reinforcement Rebar ‐0.18 days 4 days RM 27,608.00 Sun 21/5/23 Wed 24/5/23 NA NA 0 0 RM 0.00 RM 0.00
1057 1.3.2.4.2 Concreting G 35 ‐0.18 days 2 days RM 23,800.00 Thu 25/5/23 Sun 28/5/23 NA NA 0 0 RM 0.00 RM 0.00
1058 1.3.2.4.2 Roof Beams ‐0.07 days 7 days RM 96,010.80 Sun 23/7/23 Mon 31/7/23 NA NA 0 0 RM 0.00 RM 0.00
1059 1.3.2.4.2 Formwork ‐0.07 days 4 days RM 21,888.00 Sun 23/7/23 Wed 26/7/23 NA NA 0 0 RM 0.00 RM 0.00
1060 1.3.2.4.2 Reinforcement Rebar ‐0.07 days 4 days RM 43,322.80 Tue 25/7/23 Sun 30/7/23 NA NA 0 0 RM 0.00 RM 0.00
1061 1.3.2.4.2 Concreting G 35 ‐0.07 days 2 days RM 30,800.00 Sun 30/7/23 Mon 31/7/23 NA NA 0 0 RM 0.00 RM 0.00
1062 1.3.2.5 Upper Floor ‐0.07 days 22 days RM 858,116.60 Tue 30/5/23 Tue 4/7/23 NA NA 0 0 RM 0.00 RM 0.00
1063 1.3.2.5.1 Hollowcore Slab ‐0.07 days 17 days RM 772,910.40 Wed 7/6/23 Tue 4/7/23 NA NA 0 0 RM 0.00 RM 0.00
1064 1.3.2.5.1 Section 1 ‐0.07 days 11 days RM 386,455.19 Wed 7/6/23 Wed 21/6/23 NA NA 0 0 RM 0.00 RM 0.00
1065 1.3.2.5.1 Slab ‐0.07 days 7 days RM 322,999.00 Wed 7/6/23 Thu 15/6/23 NA NA 0 0 RM 0.00 RM 0.00
1066 1.3.2.5.1 BRC ‐0.07 days 4 days RM 30,237.86 Thu 15/6/23 Tue 20/6/23 NA NA 0 0 RM 0.00 RM 0.00
1067 1.3.2.5.1 Topping Concrete G 40 + Curing ‐0.07 days 2 days RM 33,218.33 Tue 20/6/23 Wed 21/6/23 NA NA 0 0 RM 0.00 RM 0.00
1068 1.3.2.5.1 Section 2 ‐0.07 days 10 days RM 386,455.21 Sun 18/6/23 Tue 4/7/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1069 1.3.2.5.1 Slab ‐0.07 days 7 days RM 322,999.00 Sun 18/6/23 Mon 26/6/23 NA NA 0 0 RM 0.00 RM 0.00
1070 1.3.2.5.1 BRC ‐0.07 days 4 days RM 30,237.88 Sun 25/6/23 Mon 3/7/23 NA NA 0 0 RM 0.00 RM 0.00
1071 1.3.2.5.1 Topping Concrete G 40 + Curing ‐0.07 days 2 days RM 33,218.33 Mon 3/7/23 Tue 4/7/23 NA NA 0 0 RM 0.00 RM 0.00
1072 1.3.2.5.2 Bondeck Slab ‐0.07 days 8 days RM 38,260.00 Thu 8/6/23 Mon 19/6/23 NA NA 0 0 RM 0.00 RM 0.00
1073 1.3.2.5.2 Installation ‐0.07 days 5 days RM 28,576.00 Thu 8/6/23 Wed 14/6/23 NA NA 0 0 RM 0.00 RM 0.00
1074 1.3.2.5.2 Shear Stud ‐0.07 days 2 days RM 7,500.00 Thu 15/6/23 Sun 18/6/23 NA NA 0 0 RM 0.00 RM 0.00
1075 1.3.2.5.2 Concrete G 35 ‐0.07 days 1 day RM 2,184.00 Mon 19/6/23 Mon 19/6/23 NA NA 0 0 RM 0.00 RM 0.00
1076 1.3.2.5.3 Suspended Floor Slab ‐0.18 days 9 days RM 35,199.00 Tue 30/5/23 Mon 12/6/23 NA NA 0 0 RM 0.00 RM 0.00
1077 1.3.2.5.3 Soffit Formwork ‐0.18 days 4 days RM 6,498.00 Tue 30/5/23 Sun 4/6/23 NA NA 0 0 RM 0.00 RM 0.00
1078 1.3.2.5.3 BRC ‐0.18 days 3 days RM 20,000.00 Tue 6/6/23 Thu 8/6/23 NA NA 0 0 RM 0.00 RM 0.00
1079 1.3.2.5.3 Concreting G 35 ‐0.18 days 2 days RM 8,701.00 Sun 11/6/23 Mon 12/6/23 NA NA 0 0 RM 0.00 RM 0.00
1080 1.3.2.5.4 Suspended Ramp Slab ‐0.18 days 5 days RM 11,747.20 Tue 13/6/23 Mon 19/6/23 NA NA 0 0 RM 0.00 RM 0.00
1081 1.3.2.5.4 Soffit Formwork ‐0.18 days 2 days RM 684.00 Tue 13/6/23 Wed 14/6/23 NA NA 0 0 RM 0.00 RM 0.00
1082 1.3.2.5.4 Reinforcement Rebar ‐0.18 days 2 days RM 4,746.40 Thu 15/6/23 Sun 18/6/23 NA NA 0 0 RM 0.00 RM 0.00
1083 1.3.2.5.4 Concreting G 35 ‐0.18 days 1 day RM 6,316.80 Mon 19/6/23 Mon 19/6/23 NA NA 0 0 RM 0.00 RM 0.00
1084 1.3.2.6 Staircases ‐0.07 days 94 days RM 320,603.80 Tue 20/6/23 Mon 6/11/23 NA NA 0 0 RM 0.00 RM 0.00
1085 1.3.2.6.1 S/case A ‐0.07 days 26 days RM 45,800.52 Tue 20/6/23 Mon 31/7/23 NA NA 0 0 RM 0.00 RM 0.00
1086 1.3.2.6.1 Formwork ‐0.07 days 5 days RM 3,858.40 Tue 20/6/23 Mon 26/6/23 NA NA 0 0 RM 0.00 RM 0.00
1087 1.3.2.6.1 Reinforcement Rebar ‐0.07 days 4 days RM 7,619.40 Sun 2/7/23 Wed 5/7/23 NA NA 0 0 RM 0.00 RM 0.00
1088 1.3.2.6.1 Concreting G 35 ‐0.07 days 1 day RM 8,080.00 Thu 6/7/23 Thu 6/7/23 NA NA 0 0 RM 0.00 RM 0.00
1089 1.3.2.6.1 Plastering ‐0.07 days 3 days RM 1,656.00 Sun 9/7/23 Tue 11/7/23 NA NA 0 0 RM 0.00 RM 0.00
1090 1.3.2.6.1 Painting ‐0.07 days 2 days RM 579.60 Wed 12/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
1091 1.3.2.6.1 Hand Railing ‐0.07 days 3 days RM 14,193.43 Sun 16/7/23 Tue 18/7/23 NA NA 0 0 RM 0.00 RM 0.00
1092 1.3.2.6.1 Tiling ‐0.07 days 5 days RM 9,813.69 Tue 25/7/23 Mon 31/7/23 NA NA 0 0 RM 0.00 RM 0.00
1093 1.3.2.6.2 S/case B (5 nos) ‐0.07 days 89 days RM 229,002.73 Sun 2/7/23 Mon 6/11/23 NA NA 0 0 RM 0.00 RM 0.00
1094 1.3.2.6.2 Formwork ‐0.07 days 20 days RM 19,292.15 Sun 2/7/23 Sun 30/7/23 NA NA 0 0 RM 0.00 RM 0.00
1095 1.3.2.6.2 Reinforcement Rebar ‐0.07 days 20 days RM 38,097.00 Mon 10/7/23 Mon 7/8/23 NA NA 0 0 RM 0.00 RM 0.00
1096 1.3.2.6.2 Concreting G 35 ‐0.07 days 5 days RM 40,400.00 Wed 2/8/23 Tue 8/8/23 NA NA 0 0 RM 0.00 RM 0.00
1097 1.3.2.6.2 Plastering ‐0.07 days 14 days RM 8,280.00 Mon 14/8/23 Thu 31/8/23 NA NA 0 0 RM 0.00 RM 0.00
1098 1.3.2.6.2 Painting ‐0.07 days 10 days RM 2,898.00 Sun 3/9/23 Thu 14/9/23 NA NA 0 0 RM 0.00 RM 0.00
1099 1.3.2.6.2 Hand Railing ‐0.07 days 15 days RM 70,967.15 Mon 18/9/23 Mon 9/10/23 NA NA 0 0 RM 0.00 RM 0.00
1100 1.3.2.6.2 Tiling ‐0.07 days 20 days RM 49,068.43 Tue 10/10/23 Mon 6/11/23 NA NA 0 0 RM 0.00 RM 0.00
1101 1.3.2.6.3 S/case C ‐0.07 days 37 days RM 45,800.55 Mon 31/7/23 Wed 20/9/23 NA NA 0 0 RM 0.00 RM 0.00
1102 1.3.2.6.3 Formwork ‐0.07 days 6 days RM 3,858.43 Mon 31/7/23 Mon 7/8/23 NA NA 0 0 RM 0.00 RM 0.00
1103 1.3.2.6.3 Reinforcement Rebar ‐0.07 days 5 days RM 7,619.40 Sun 6/8/23 Thu 10/8/23 NA NA 0 0 RM 0.00 RM 0.00
1104 1.3.2.6.3 Concreting G 35 ‐0.07 days 1 day RM 8,080.00 Sun 13/8/23 Sun 13/8/23 NA NA 0 0 RM 0.00 RM 0.00
1105 1.3.2.6.3 Plastering ‐0.07 days 3 days RM 1,656.00 Sun 3/9/23 Tue 5/9/23 NA NA 0 0 RM 0.00 RM 0.00
1106 1.3.2.6.3 Painting ‐0.07 days 2 days RM 579.60 Wed 6/9/23 Thu 7/9/23 NA NA 0 0 RM 0.00 RM 0.00
1107 1.3.2.6.3 Hand Railing ‐0.07 days 4 days RM 14,193.43 Sun 10/9/23 Wed 13/9/23 NA NA 0 0 RM 0.00 RM 0.00
1108 1.3.2.6.3 Tiling ‐0.07 days 4 days RM 9,813.69 Thu 14/9/23 Wed 20/9/23 NA NA 0 0 RM 0.00 RM 0.00
1109 1.3.2.7 Roof ‐0.07 days 125 days RM 3,252,298.42 Wed 26/7/23 Mon 22/1/24 NA NA 0 0 RM 0.00 RM 0.00
1110 1.3.2.7.1 Flat Roof ‐0.07 days 17 days RM 153,910.60 Wed 2/8/23 Thu 24/8/23 NA NA 0 0 RM 0.00 RM 0.00
1111 1.3.2.7.1 Section 1 ‐0.07 days 10 days RM 76,955.30 Wed 2/8/23 Tue 15/8/23 NA NA 0 0 RM 0.00 RM 0.00
1112 1.3.2.7.1 Soffit Formwork ‐0.07 days 7 days RM 23,104.00 Wed 2/8/23 Thu 10/8/23 NA NA 0 0 RM 0.00 RM 0.00
1113 1.3.2.7.1 Reinforcement Rebar ‐0.07 days 6 days RM 26,280.30 Mon 7/8/23 Mon 14/8/23 NA NA 0 0 RM 0.00 RM 0.00
1114 1.3.2.7.1 Concreting G 35 + w/proofing ‐0.07 days 2 days RM 27,571.00 Mon 14/8/23 Tue 15/8/23 NA NA 0 0 RM 0.00 RM 0.00
1115 1.3.2.7.1 Section 2 ‐0.07 days 10 days RM 76,955.30 Sun 13/8/23 Thu 24/8/23 NA NA 0 0 RM 0.00 RM 0.00
1116 1.3.2.7.1 Soffit Formwork ‐0.07 days 7 days RM 23,104.00 Sun 13/8/23 Mon 21/8/23 NA NA 0 0 RM 0.00 RM 0.00
1117 1.3.2.7.1 Reinforcement Rebar ‐0.07 days 6 days RM 26,280.30 Wed 16/8/23 Wed 23/8/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1118 1.3.2.7.1 Concreting G 35 + w/proofing ‐0.07 days 2 days RM 27,571.00 Wed 23/8/23 Thu 24/8/23 NA NA 0 0 RM 0.00 RM 0.00
1119 1.3.2.7.2 Steel Roof System ‐0.07 days 43 days RM 1,431,879.07 Wed 26/7/23 Mon 25/9/23 NA NA 0 0 RM 0.00 RM 0.00
1120 1.3.2.7.2 Fabrications ‐0.07 days 20 days RM 100,000.00 Wed 26/7/23 Tue 22/8/23 NA NA 0 0 RM 0.00 RM 0.00
1121 1.3.2.7.2 Installation ‐0.07 days 20 days RM 1,329,404.07 Wed 23/8/23 Wed 20/9/23 NA NA 0 0 RM 0.00 RM 0.00
1122 1.3.2.7.2 Safety Rail ‐0.07 days 3 days RM 2,475.00 Thu 21/9/23 Mon 25/9/23 NA NA 0 0 RM 0.00 RM 0.00
1123 1.3.2.7.3 Roof Finishes ‐0.07 days 103 days RM 1,666,508.75 Sun 27/8/23 Mon 22/1/24 NA NA 0 0 RM 0.00 RM 0.00
1124 1.3.2.7.3 Flat Roof ‐0.07 days 22 days RM 195,396.00 Sun 27/8/23 Tue 26/9/23 NA NA 0 0 RM 0.00 RM 0.00
1125 1.3.2.7.3 2 Layers w/proof membrane ‐0.07 days 7 days RM 155,188.00 Sun 27/8/23 Mon 4/9/23 NA NA 0 0 RM 0.00 RM 0.00
1126 1.3.2.7.3 Cement Render + w/roof compou‐0.07 days 10 days RM 29,208.00 Tue 5/9/23 Tue 19/9/23 NA NA 0 0 RM 0.00 RM 0.00
1127 1.3.2.7.3 Ponding Test ‐0.07 days 3 days RM 11,000.00 Sun 24/9/23 Tue 26/9/23 NA NA 0 0 RM 0.00 RM 0.00
1128 1.3.2.7.3 Metal Deck Roofing ‐0.07 days 33 days RM 683,217.15 Tue 26/9/23 Mon 13/11/23 NA NA 0 0 RM 0.00 RM 0.00
1129 1.3.2.7.3 Aluminium Foil ‐0.07 days 7 days RM 62,229.75 Tue 26/9/23 Thu 5/10/23 NA NA 0 0 RM 0.00 RM 0.00
1130 1.3.2.7.3 Wool Insulation ‐0.07 days 6 days RM 98,257.50 Sun 8/10/23 Sun 15/10/23 NA NA 0 0 RM 0.00 RM 0.00
1131 1.3.2.7.3 Polyethylene Foam ‐0.07 days 6 days RM 70,745.40 Mon 16/10/23 Mon 23/10/23 NA NA 0 0 RM 0.00 RM 0.00
1132 1.3.2.7.3 Metal Deck ‐0.07 days 14 days RM 451,984.50 Tue 24/10/23 Mon 13/11/23 NA NA 0 0 RM 0.00 RM 0.00
1133 1.3.2.7.3 Glass Skylight ‐0.07 days 18 days RM 412,360.00 Tue 14/11/23 Thu 7/12/23 NA NA 0 0 RM 0.00 RM 0.00
1134 1.3.2.7.3 Flashing & Capping + Painting ‐0.07 days 7 days RM 171,257.90 Sun 10/12/23 Mon 18/12/23 NA NA 0 0 RM 0.00 RM 0.00
1135 1.3.2.7.3 Aluminium Zinc Gutter + Painting ‐0.07 days 7 days RM 13,387.00 Tue 19/12/23 Thu 28/12/23 NA NA 0 0 RM 0.00 RM 0.00
1136 1.3.2.7.3 UPVC Gutter ‐0.07 days 7 days RM 68,282.50 Sun 31/12/23 Mon 8/1/24 NA NA 0 0 RM 0.00 RM 0.00
1137 1.3.2.7.3 UPVC Rain Water Down Pipe ‐0.07 days 10 days RM 122,608.20 Tue 9/1/24 Mon 22/1/24 NA NA 0 0 RM 0.00 RM 0.00
1138 1.3.2.8 External Wall ‐0.07 days 174 days RM 524,686.80 Tue 9/5/23 Thu 18/1/24 NA NA 0 0 RM 0.00 RM 0.00
1139 1.3.2.8.1 Half Brick + DPC ‐0.18 days 17 days RM 9,541.30 Tue 9/5/23 Wed 31/5/23 NA NA 0 0 RM 0.00 RM 0.00
1140 1.3.2.8.1 Level 1 ‐0.18 days 10 days RM 4,725.00 Tue 9/5/23 Mon 22/5/23 NA NA 0 0 RM 0.00 RM 0.00
1141 1.3.2.8.1 Level 2 ‐0.18 days 7 days RM 4,816.30 Tue 23/5/23 Wed 31/5/23 NA NA 0 0 RM 0.00 RM 0.00
1142 1.3.2.8.2 AAC Block + DPC ‐0.18 days 34 days RM 175,449.80 Thu 1/6/23 Tue 25/7/23 NA NA 0 0 RM 0.00 RM 0.00
1143 1.3.2.8.2 Level 1 ‐0.18 days 17 days RM 88,400.80 Thu 1/6/23 Mon 26/6/23 NA NA 0 0 RM 0.00 RM 0.00
1144 1.3.2.8.2 Section 1 ‐0.18 days 10 days RM 44,200.40 Thu 1/6/23 Thu 15/6/23 NA NA 0 0 RM 0.00 RM 0.00
1145 1.3.2.8.2 Section 2 ‐0.18 days 7 days RM 44,200.40 Sun 18/6/23 Mon 26/6/23 NA NA 0 0 RM 0.00 RM 0.00
1146 1.3.2.8.2 Level 2 ‐0.18 days 17 days RM 87,049.00 Sun 2/7/23 Tue 25/7/23 NA NA 0 0 RM 0.00 RM 0.00
1147 1.3.2.8.2 Section 1 ‐0.18 days 10 days RM 43,524.50 Sun 2/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
1148 1.3.2.8.2 Section 2 ‐0.18 days 7 days RM 43,524.50 Sun 16/7/23 Tue 25/7/23 NA NA 0 0 RM 0.00 RM 0.00
1149 1.3.2.8.3 Interlocking Brick + DPC ‐0.18 days 34 days RM 48,103.00 Wed 26/7/23 Mon 11/9/23 NA NA 0 0 RM 0.00 RM 0.00
1150 1.3.2.8.3 Level 1 ‐0.18 days 17 days RM 24,051.50 Wed 26/7/23 Thu 17/8/23 NA NA 0 0 RM 0.00 RM 0.00
1151 1.3.2.8.3 Section 1 ‐0.18 days 10 days RM 12,025.75 Wed 26/7/23 Tue 8/8/23 NA NA 0 0 RM 0.00 RM 0.00
1152 1.3.2.8.3 Section 2 ‐0.18 days 7 days RM 12,025.75 Wed 9/8/23 Thu 17/8/23 NA NA 0 0 RM 0.00 RM 0.00
1153 1.3.2.8.3 Level 2 ‐0.18 days 17 days RM 24,051.50 Sun 20/8/23 Mon 11/9/23 NA NA 0 0 RM 0.00 RM 0.00
1154 1.3.2.8.3 Section 1 ‐0.18 days 10 days RM 12,025.75 Sun 20/8/23 Thu 31/8/23 NA NA 0 0 RM 0.00 RM 0.00
1155 1.3.2.8.3 Section 2 ‐0.18 days 7 days RM 12,025.75 Sun 3/9/23 Mon 11/9/23 NA NA 0 0 RM 0.00 RM 0.00
1156 1.3.2.8.4 Facing Brick ‐0.18 days 20 days RM 26,030.00 Tue 12/9/23 Wed 11/10/23 NA NA 0 0 RM 0.00 RM 0.00
1157 1.3.2.8.4 Level 1 ‐0.18 days 10 days RM 13,015.00 Tue 12/9/23 Tue 26/9/23 NA NA 0 0 RM 0.00 RM 0.00
1158 1.3.2.8.4 Section 1 ‐0.18 days 6 days RM 6,507.50 Tue 12/9/23 Wed 20/9/23 NA NA 0 0 RM 0.00 RM 0.00
1159 1.3.2.8.4 Section 2 ‐0.18 days 4 days RM 6,507.50 Thu 21/9/23 Tue 26/9/23 NA NA 0 0 RM 0.00 RM 0.00
1160 1.3.2.8.4 Level 2 ‐0.18 days 10 days RM 13,015.00 Thu 28/9/23 Wed 11/10/23 NA NA 0 0 RM 0.00 RM 0.00
1161 1.3.2.8.4 Section 1 ‐0.18 days 6 days RM 6,507.50 Thu 28/9/23 Thu 5/10/23 NA NA 0 0 RM 0.00 RM 0.00
1162 1.3.2.8.4 Section 2 ‐0.18 days 4 days RM 6,507.50 Sun 8/10/23 Wed 11/10/23 NA NA 0 0 RM 0.00 RM 0.00
1163 1.3.2.8.5 6mm Bonding Tie ‐0.18 days 10 days RM 664.00 Thu 12/10/23 Wed 25/10/23 NA NA 0 0 RM 0.00 RM 0.00
1164 1.3.2.8.5 Level 1 ‐0.18 days 6 days RM 332.00 Thu 12/10/23 Thu 19/10/23 NA NA 0 0 RM 0.00 RM 0.00
1165 1.3.2.8.5 Level 2 ‐0.18 days 4 days RM 332.00 Sun 22/10/23 Wed 25/10/23 NA NA 0 0 RM 0.00 RM 0.00
1166 1.3.2.8.6 100mm x 100mm Concrete Coping ‐0.18 days 10 days RM 2,940.00 Thu 26/10/23 Wed 8/11/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1167 1.3.2.8.6 Level 1 ‐0.18 days 6 days RM 1,470.00 Thu 26/10/23 Thu 2/11/23 NA NA 0 0 RM 0.00 RM 0.00
1168 1.3.2.8.6 Level 2 ‐0.18 days 4 days RM 1,470.00 Sun 5/11/23 Wed 8/11/23 NA NA 0 0 RM 0.00 RM 0.00
1169 1.3.2.8.7 Parapet Wall ‐0.07 days 8 days RM 32,678.20 Wed 16/8/23 Sun 27/8/23 NA NA 0 0 RM 0.00 RM 0.00
1170 1.3.2.8.7 Formwork ‐0.07 days 6 days RM 15,960.00 Wed 16/8/23 Wed 23/8/23 NA NA 0 0 RM 0.00 RM 0.00
1171 1.3.2.8.7 Reinforcement Rebar ‐0.07 days 4 days RM 7,898.20 Mon 21/8/23 Thu 24/8/23 NA NA 0 0 RM 0.00 RM 0.00
1172 1.3.2.8.7 Concreting G 35 ‐0.07 days 3 days RM 8,820.00 Wed 23/8/23 Sun 27/8/23 NA NA 0 0 RM 0.00 RM 0.00
1173 1.3.2.8.8 Façade ‐0.07 days 100 days RM 229,280.50 Mon 28/8/23 Thu 18/1/24 NA NA 0 0 RM 0.00 RM 0.00
1174 1.3.2.8.8 Vent Block ‐0.07 days 12 days RM 14,450.00 Mon 28/8/23 Tue 12/9/23 NA NA 0 0 RM 0.00 RM 0.00
1175 1.3.2.8.8 Section 1 ‐0.07 days 3 days RM 3,612.50 Mon 28/8/23 Wed 30/8/23 NA NA 0 0 RM 0.00 RM 0.00
1176 1.3.2.8.8 Section 2 ‐0.07 days 3 days RM 3,612.50 Thu 31/8/23 Mon 4/9/23 NA NA 0 0 RM 0.00 RM 0.00
1177 1.3.2.8.8 Section 3 ‐0.07 days 3 days RM 3,612.50 Tue 5/9/23 Thu 7/9/23 NA NA 0 0 RM 0.00 RM 0.00
1178 1.3.2.8.8 Section 4 ‐0.07 days 3 days RM 3,612.50 Sun 10/9/23 Tue 12/9/23 NA NA 0 0 RM 0.00 RM 0.00
1179 1.3.2.8.8 Aluminium Louvers ‐0.07 days 12 days RM 30,459.00 Wed 13/9/23 Mon 2/10/23 NA NA 0 0 RM 0.00 RM 0.00
1180 1.3.2.8.8 Section 1 ‐0.07 days 3 days RM 7,614.75 Wed 13/9/23 Mon 18/9/23 NA NA 0 0 RM 0.00 RM 0.00
1181 1.3.2.8.8 Section 2 ‐0.07 days 3 days RM 7,614.75 Tue 19/9/23 Thu 21/9/23 NA NA 0 0 RM 0.00 RM 0.00
1182 1.3.2.8.8 Section 3 ‐0.07 days 3 days RM 7,614.75 Sun 24/9/23 Tue 26/9/23 NA NA 0 0 RM 0.00 RM 0.00
1183 1.3.2.8.8 Section 4 ‐0.07 days 3 days RM 7,614.75 Thu 28/9/23 Mon 2/10/23 NA NA 0 0 RM 0.00 RM 0.00
1184 1.3.2.8.8 Curtain Wall ‐0.07 days 34 days RM 21,560.00 Tue 3/10/23 Mon 20/11/23 NA NA 0 0 RM 0.00 RM 0.00
1185 1.3.2.8.8 Section 1 ‐0.07 days 27 days RM 10,780.00 Tue 3/10/23 Wed 8/11/23 NA NA 0 0 RM 0.00 RM 0.00
1186 1.3.2.8.8 Frame ‐0.07 days 3 days RM 2,500.00 Tue 3/10/23 Thu 5/10/23 NA NA 0 0 RM 0.00 RM 0.00
1187 1.3.2.8.8 Glass ‐0.07 days 7 days RM 8,280.00 Tue 31/10/23 Wed 8/11/23 NA NA 0 0 RM 0.00 RM 0.00
1188 1.3.2.8.8 Section 2 ‐0.07 days 31 days RM 10,780.00 Sun 8/10/23 Mon 20/11/23 NA NA 0 0 RM 0.00 RM 0.00
1189 1.3.2.8.8 Frame ‐0.07 days 3 days RM 2,500.00 Sun 8/10/23 Tue 10/10/23 NA NA 0 0 RM 0.00 RM 0.00
1190 1.3.2.8.8 Glass ‐0.07 days 7 days RM 8,280.00 Thu 9/11/23 Mon 20/11/23 NA NA 0 0 RM 0.00 RM 0.00
1191 1.3.2.8.8 Aluminium Zinc ‐0.07 days 28 days RM 41,591.50 Tue 21/11/23 Sun 31/12/23 NA NA 0 0 RM 0.00 RM 0.00
1192 1.3.2.8.8 Section 1 ‐0.07 days 7 days RM 10,397.86 Tue 21/11/23 Wed 29/11/23 NA NA 0 0 RM 0.00 RM 0.00
1193 1.3.2.8.8 Section 2 ‐0.07 days 7 days RM 10,397.88 Thu 30/11/23 Sun 10/12/23 NA NA 0 0 RM 0.00 RM 0.00
1194 1.3.2.8.8 Section 3 ‐0.07 days 7 days RM 10,397.88 Mon 11/12/23 Tue 19/12/23 NA NA 0 0 RM 0.00 RM 0.00
1195 1.3.2.8.8 Section 4 ‐0.07 days 7 days RM 10,397.88 Wed 20/12/23 Sun 31/12/23 NA NA 0 0 RM 0.00 RM 0.00
1196 1.3.2.8.8 Aluminium Fins ‐0.07 days 28 days RM 121,220.00 Mon 11/12/23 Thu 18/1/24 NA NA 0 0 RM 0.00 RM 0.00
1197 1.3.2.8.8 Section 1 ‐0.07 days 7 days RM 30,305.00 Mon 11/12/23 Tue 19/12/23 NA NA 0 0 RM 0.00 RM 0.00
1198 1.3.2.8.8 Section 2 ‐0.07 days 7 days RM 30,305.00 Wed 20/12/23 Sun 31/12/23 NA NA 0 0 RM 0.00 RM 0.00
1199 1.3.2.8.8 Section 3 ‐0.07 days 7 days RM 30,305.00 Mon 1/1/24 Tue 9/1/24 NA NA 0 0 RM 0.00 RM 0.00
1200 1.3.2.8.8 Section 4 ‐0.07 days 7 days RM 30,305.00 Wed 10/1/24 Thu 18/1/24 NA NA 0 0 RM 0.00 RM 0.00
1201 1.3.2.9 Internal Wall ‐0.18 days 112 days RM 710,226.80 Tue 23/5/23 Sun 5/11/23 NA NA 0 0 RM 0.00 RM 0.00
1202 1.3.2.9.1 Half Brick + DPC ‐0.18 days 17 days RM 13,215.70 Tue 23/5/23 Thu 15/6/23 NA NA 0 0 RM 0.00 RM 0.00
1203 1.3.2.9.1 Level 1 ‐0.18 days 10 days RM 6,607.84 Tue 23/5/23 Tue 6/6/23 NA NA 0 0 RM 0.00 RM 0.00
1204 1.3.2.9.1 Section 1 ‐0.18 days 5 days RM 3,303.91 Tue 23/5/23 Mon 29/5/23 NA NA 0 0 RM 0.00 RM 0.00
1205 1.3.2.9.1 Section 2 ‐0.18 days 5 days RM 3,303.93 Tue 30/5/23 Tue 6/6/23 NA NA 0 0 RM 0.00 RM 0.00
1206 1.3.2.9.1 Level 2 ‐0.18 days 10 days RM 6,607.86 Thu 1/6/23 Thu 15/6/23 NA NA 0 0 RM 0.00 RM 0.00
1207 1.3.2.9.1 Section 1 ‐0.18 days 5 days RM 3,303.93 Thu 1/6/23 Thu 8/6/23 NA NA 0 0 RM 0.00 RM 0.00
1208 1.3.2.9.1 Section 2 ‐0.18 days 5 days RM 3,303.93 Sun 11/6/23 Thu 15/6/23 NA NA 0 0 RM 0.00 RM 0.00
1209 1.3.2.9.2 AAC Block + DPC ‐0.18 days 31 days RM 635,644.50 Sun 2/7/23 Mon 14/8/23 NA NA 0 0 RM 0.00 RM 0.00
1210 1.3.2.9.2 Level 1 ‐0.18 days 14 days RM 317,822.24 Sun 2/7/23 Thu 20/7/23 NA NA 0 0 RM 0.00 RM 0.00
1211 1.3.2.9.2 Section 1 ‐0.18 days 7 days RM 158,911.11 Sun 2/7/23 Mon 10/7/23 NA NA 0 0 RM 0.00 RM 0.00
1212 1.3.2.9.2 Section 2 ‐0.18 days 7 days RM 158,911.13 Tue 11/7/23 Thu 20/7/23 NA NA 0 0 RM 0.00 RM 0.00
1213 1.3.2.9.2 Level 2 ‐0.18 days 14 days RM 317,822.26 Wed 26/7/23 Mon 14/8/23 NA NA 0 0 RM 0.00 RM 0.00
1214 1.3.2.9.2 Section 1 ‐0.18 days 7 days RM 158,911.13 Wed 26/7/23 Thu 3/8/23 NA NA 0 0 RM 0.00 RM 0.00
1215 1.3.2.9.2 Section 2 ‐0.18 days 7 days RM 158,911.13 Sun 6/8/23 Mon 14/8/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1216 1.3.2.9.3 Interlocking Brick + DPC ‐0.18 days 20 days RM 53,023.60 Sun 20/8/23 Thu 14/9/23 NA NA 0 0 RM 0.00 RM 0.00
1217 1.3.2.9.3 Level 1 ‐0.18 days 10 days RM 26,511.80 Sun 20/8/23 Thu 31/8/23 NA NA 0 0 RM 0.00 RM 0.00
1218 1.3.2.9.3 Section 1 ‐0.18 days 5 days RM 13,255.90 Sun 20/8/23 Thu 24/8/23 NA NA 0 0 RM 0.00 RM 0.00
1219 1.3.2.9.3 Section 2 ‐0.18 days 5 days RM 13,255.90 Sun 27/8/23 Thu 31/8/23 NA NA 0 0 RM 0.00 RM 0.00
1220 1.3.2.9.3 Level 2 ‐0.18 days 10 days RM 26,511.80 Sun 3/9/23 Thu 14/9/23 NA NA 0 0 RM 0.00 RM 0.00
1221 1.3.2.9.3 Section 1 ‐0.18 days 5 days RM 13,255.90 Sun 3/9/23 Thu 7/9/23 NA NA 0 0 RM 0.00 RM 0.00
1222 1.3.2.9.3 Section 2 ‐0.18 days 5 days RM 13,255.90 Sun 10/9/23 Thu 14/9/23 NA NA 0 0 RM 0.00 RM 0.00
1223 1.3.2.9.4 6mm Bonding Tie ‐0.18 days 20 days RM 87.00 Mon 18/9/23 Mon 16/10/23 NA NA 0 0 RM 0.00 RM 0.00
1224 1.3.2.9.4 Level 1 ‐0.18 days 10 days RM 43.50 Mon 18/9/23 Mon 2/10/23 NA NA 0 0 RM 0.00 RM 0.00
1225 1.3.2.9.4 Level 2 ‐0.18 days 10 days RM 43.50 Tue 3/10/23 Mon 16/10/23 NA NA 0 0 RM 0.00 RM 0.00
1226 1.3.2.9.5 Phenolic Board ‐0.18 days 14 days RM 8,256.00 Tue 17/10/23 Sun 5/11/23 NA NA 0 0 RM 0.00 RM 0.00
1227 1.3.2.9.5 Level 1 ‐0.18 days 7 days RM 4,128.00 Tue 17/10/23 Wed 25/10/23 NA NA 0 0 RM 0.00 RM 0.00
1228 1.3.2.9.5 Level 2 ‐0.18 days 7 days RM 4,128.00 Thu 26/10/23 Sun 5/11/23 NA NA 0 0 RM 0.00 RM 0.00
1229 1.3.2.10 Windows ‐0.18 days 88 days RM 163,109.50 Thu 1/6/23 Wed 11/10/23 NA NA 0 0 RM 0.00 RM 0.00
1230 1.3.2.10. Concrete Lintol ‐0.18 days 7 days RM 3,580.00 Thu 1/6/23 Mon 12/6/23 NA NA 0 0 RM 0.00 RM 0.00
1231 1.3.2.10. Powder Coated Alu Window Frame ‐0.18 days 40 days RM 102,484.00 Tue 13/6/23 Sun 13/8/23 NA NA 0 0 RM 0.00 RM 0.00
1232 1.3.2.10. Level 1 ‐0.18 days 20 days RM 51,242.00 Tue 13/6/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
1233 1.3.2.10. Section 1 ‐0.18 days 10 days RM 25,621.00 Tue 13/6/23 Mon 26/6/23 NA NA 0 0 RM 0.00 RM 0.00
1234 1.3.2.10. Section 2 ‐0.18 days 10 days RM 25,621.00 Sun 2/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
1235 1.3.2.10. Level 2 ‐0.18 days 20 days RM 51,242.00 Sun 16/7/23 Sun 13/8/23 NA NA 0 0 RM 0.00 RM 0.00
1236 1.3.2.10. Section 1 ‐0.18 days 10 days RM 25,621.00 Sun 16/7/23 Sun 30/7/23 NA NA 0 0 RM 0.00 RM 0.00
1237 1.3.2.10. Section 2 ‐0.18 days 10 days RM 25,621.00 Mon 31/7/23 Sun 13/8/23 NA NA 0 0 RM 0.00 RM 0.00
1238 1.3.2.10. Mild Steel Expanded Metal Window +‐0.18 days 6 days RM 5,164.00 Mon 14/8/23 Mon 21/8/23 NA NA 0 0 RM 0.00 RM 0.00
1239 1.3.2.10. Section 1 ‐0.18 days 3 days RM 2,486.00 Mon 14/8/23 Wed 16/8/23 NA NA 0 0 RM 0.00 RM 0.00
1240 1.3.2.10. Section 2 ‐0.18 days 3 days RM 2,678.00 Thu 17/8/23 Mon 21/8/23 NA NA 0 0 RM 0.00 RM 0.00
1241 1.3.2.10. Clear Float Glass ‐0.18 days 35 days RM 51,881.50 Tue 22/8/23 Wed 11/10/23 NA NA 0 0 RM 0.00 RM 0.00
1242 1.3.2.10.4 Section 1 ‐0.18 days 20 days RM 25,940.75 Tue 22/8/23 Tue 19/9/23 NA NA 0 0 RM 0.00 RM 0.00
1243 1.3.2.10.4 Section 2 ‐0.18 days 15 days RM 25,940.75 Wed 20/9/23 Wed 11/10/23 NA NA 0 0 RM 0.00 RM 0.00
1244 1.3.2.11 Doors ‐0.18 days 141 days RM 543,577.40 Tue 13/6/23 Sun 7/1/24 NA NA 0 0 RM 0.00 RM 0.00
1245 1.3.2.11. Concrete Lintols ‐0.18 days 21 days RM 14,438.00 Tue 13/6/23 Sun 16/7/23 NA NA 0 0 RM 0.00 RM 0.00
1246 1.3.2.11. 110mm x 150mm ‐0.18 days 7 days RM 510.00 Tue 13/6/23 Wed 21/6/23 NA NA 0 0 RM 0.00 RM 0.00
1247 1.3.2.11. 125mm x 150mm ‐0.18 days 7 days RM 13,764.00 Thu 22/6/23 Wed 5/7/23 NA NA 0 0 RM 0.00 RM 0.00
1248 1.3.2.11. 250mm x 150mm ‐0.18 days 7 days RM 164.00 Thu 6/7/23 Sun 16/7/23 NA NA 0 0 RM 0.00 RM 0.00
1249 1.3.2.11. Metal Door Frames ‐0.18 days 38 days RM 11,156.40 Mon 17/7/23 Thu 7/9/23 NA NA 0 0 RM 0.00 RM 0.00
1250 1.3.2.11. Level 1 ‐0.18 days 19 days RM 5,578.20 Mon 17/7/23 Sun 13/8/23 NA NA 0 0 RM 0.00 RM 0.00
1251 1.3.2.11. Frame ‐0.18 days 10 days RM 1,478.50 Mon 17/7/23 Mon 31/7/23 NA NA 0 0 RM 0.00 RM 0.00
1252 1.3.2.11. Flush Door ‐0.18 days 7 days RM 3,375.50 Tue 1/8/23 Wed 9/8/23 NA NA 0 0 RM 0.00 RM 0.00
1253 1.3.2.11. Painting ‐0.18 days 2 days RM 724.20 Thu 10/8/23 Sun 13/8/23 NA NA 0 0 RM 0.00 RM 0.00
1254 1.3.2.11. Level 2 ‐0.18 days 19 days RM 5,578.20 Mon 14/8/23 Thu 7/9/23 NA NA 0 0 RM 0.00 RM 0.00
1255 1.3.2.11. Frame ‐0.18 days 10 days RM 1,478.50 Mon 14/8/23 Sun 27/8/23 NA NA 0 0 RM 0.00 RM 0.00
1256 1.3.2.11. Flush Door ‐0.18 days 7 days RM 3,375.50 Mon 28/8/23 Tue 5/9/23 NA NA 0 0 RM 0.00 RM 0.00
1257 1.3.2.11. Painting ‐0.18 days 2 days RM 724.20 Wed 6/9/23 Thu 7/9/23 NA NA 0 0 RM 0.00 RM 0.00
1258 1.3.2.11. Fire Rated Door ‐0.18 days 2 days RM 3,960.00 Sun 10/9/23 Mon 11/9/23 NA NA 0 0 RM 0.00 RM 0.00
1259 1.3.2.11. Level 1 ‐0.18 days 1 day RM 1,485.00 Sun 10/9/23 Sun 10/9/23 NA NA 0 0 RM 0.00 RM 0.00
1260 1.3.2.11. Level 2 ‐0.18 days 1 day RM 2,475.00 Mon 11/9/23 Mon 11/9/23 NA NA 0 0 RM 0.00 RM 0.00
1261 1.3.2.11. Aluminium Roller Shutter ‐0.18 days 60 days RM 487,975.00 Tue 12/9/23 Thu 7/12/23 NA NA 0 0 RM 0.00 RM 0.00
1262 1.3.2.11. Level 1 ‐0.18 days 30 days RM 243,987.50 Tue 12/9/23 Wed 25/10/23 NA NA 0 0 RM 0.00 RM 0.00
1263 1.3.2.11.4 Section 1 ‐0.18 days 15 days RM 121,993.75 Tue 12/9/23 Wed 4/10/23 NA NA 0 0 RM 0.00 RM 0.00
1264 1.3.2.11.4 Section 2 ‐0.18 days 15 days RM 121,993.75 Thu 5/10/23 Wed 25/10/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1265 1.3.2.11. Level 2 ‐0.18 days 30 days RM 243,987.50 Thu 26/10/23 Thu 7/12/23 NA NA 0 0 RM 0.00 RM 0.00
1266 1.3.2.11.4 Section 1 ‐0.18 days 15 days RM 121,993.75 Thu 26/10/23 Thu 16/11/23 NA NA 0 0 RM 0.00 RM 0.00
1267 1.3.2.11.4 Section 2 ‐0.18 days 15 days RM 121,993.75 Sun 19/11/23 Thu 7/12/23 NA NA 0 0 RM 0.00 RM 0.00
1268 1.3.2.11. Timber Sliding Door ‐0.18 days 10 days RM 1,408.00 Sun 10/12/23 Thu 21/12/23 NA NA 0 0 RM 0.00 RM 0.00
1269 1.3.2.11. Level 1 ‐0.18 days 5 days RM 704.00 Sun 10/12/23 Thu 14/12/23 NA NA 0 0 RM 0.00 RM 0.00
1270 1.3.2.11. Level 2 ‐0.18 days 5 days RM 704.00 Sun 17/12/23 Thu 21/12/23 NA NA 0 0 RM 0.00 RM 0.00
1271 1.3.2.11. Phenolic Door ‐0.18 days 10 days RM 24,640.00 Sun 24/12/23 Sun 7/1/24 NA NA 0 0 RM 0.00 RM 0.00
1272 1.3.2.11. Level 1 ‐0.18 days 5 days RM 12,320.00 Sun 24/12/23 Sun 31/12/23 NA NA 0 0 RM 0.00 RM 0.00
1273 1.3.2.11. Level 2 ‐0.18 days 5 days RM 12,320.00 Mon 1/1/24 Sun 7/1/24 NA NA 0 0 RM 0.00 RM 0.00
1274 1.3.2.12 External Floor Finishes ‐0.18 days 97 days RM 484,804.50 Tue 20/6/23 Thu 9/11/23 NA NA 0 0 RM 0.00 RM 0.00
1275 1.3.2.12. Cement Render ‐0.18 days 10 days RM 1,738.00 Tue 20/6/23 Thu 6/7/23 NA NA 0 0 RM 0.00 RM 0.00
1276 1.3.2.12. Tiling ‐0.18 days 87 days RM 483,066.50 Sun 9/7/23 Thu 9/11/23 NA NA 0 0 RM 0.00 RM 0.00
1277 1.3.2.12. 300mm x 600mm homogenous + Sk‐0.18 days 20 days RM 351,379.50 Sun 9/7/23 Sun 6/8/23 NA NA 0 0 RM 0.00 RM 0.00
1278 1.3.2.12. 300mm x 300mm anti slip homogen‐0.18 days 20 days RM 98,516.00 Mon 7/8/23 Sun 3/9/23 NA NA 0 0 RM 0.00 RM 0.00
1279 1.3.2.12. 300mm x 600mm anti slip homogen‐0.18 days 20 days RM 12,395.00 Mon 4/9/23 Tue 3/10/23 NA NA 0 0 RM 0.00 RM 0.00
1280 1.3.2.12. 300mm x 300mm homogenous tact‐0.18 days 20 days RM 12,236.00 Wed 4/10/23 Tue 31/10/23 NA NA 0 0 RM 0.00 RM 0.00
1281 1.3.2.12. C‐channel Strip ‐0.18 days 7 days RM 8,540.00 Wed 1/11/23 Thu 9/11/23 NA NA 0 0 RM 0.00 RM 0.00
1282 1.3.2.13 Internal Floor Finishes ‐0.18 days 141 days RM 165,007.25 Sun 9/7/23 Sun 28/1/24 NA NA 0 0 RM 0.00 RM 0.00
1283 1.3.2.13. Cement Render ‐0.18 days 40 days RM 42,966.00 Sun 9/7/23 Sun 3/9/23 NA NA 0 0 RM 0.00 RM 0.00
1284 1.3.2.13. Level 1 ‐0.18 days 20 days RM 21,483.00 Sun 9/7/23 Sun 6/8/23 NA NA 0 0 RM 0.00 RM 0.00
1285 1.3.2.13. Level 2 ‐0.18 days 20 days RM 21,483.00 Mon 7/8/23 Sun 3/9/23 NA NA 0 0 RM 0.00 RM 0.00
1286 1.3.2.13. Cement Render + Floor Hardener ‐0.18 days 7 days RM 26,966.00 Mon 4/9/23 Tue 12/9/23 NA NA 0 0 RM 0.00 RM 0.00
1287 1.3.2.13. Tiling ‐0.18 days 94 days RM 95,075.25 Wed 13/9/23 Sun 28/1/24 NA NA 0 0 RM 0.00 RM 0.00
1288 1.3.2.13. 300mm x 300mm Homogenous ‐0.18 days 20 days RM 22,379.00 Wed 13/9/23 Thu 12/10/23 NA NA 0 0 RM 0.00 RM 0.00
1289 1.3.2.13. 300mm x 300mm Non Slip ‐0.18 days 20 days RM 26,878.00 Sun 15/10/23 Thu 9/11/23 NA NA 0 0 RM 0.00 RM 0.00
1290 1.3.2.13. 300mm x 600mm Non Slip ‐0.18 days 20 days RM 17,945.00 Mon 13/11/23 Sun 10/12/23 NA NA 0 0 RM 0.00 RM 0.00
1291 1.3.2.13. 300mm x 300mm glazed ‐0.18 days 20 days RM 3,060.00 Mon 11/12/23 Mon 8/1/24 NA NA 0 0 RM 0.00 RM 0.00
1292 1.3.2.13. Water Proofing ‐0.18 days 14 days RM 24,813.25 Tue 9/1/24 Sun 28/1/24 NA NA 0 0 RM 0.00 RM 0.00
1293 1.3.2.13. Floor Slabs ‐0.18 days 7 days RM 14,476.00 Tue 9/1/24 Wed 17/1/24 NA NA 0 0 RM 0.00 RM 0.00
1294 1.3.2.13. Walls ‐0.18 days 7 days RM 10,337.25 Thu 18/1/24 Sun 28/1/24 NA NA 0 0 RM 0.00 RM 0.00
1295 1.3.2.14 External Ceiling Finishes ‐0.18 days 104 days RM 243,337.00 Mon 7/8/23 Wed 3/1/24 NA NA 0 0 RM 0.00 RM 0.00
1296 1.3.2.14. Skim Coat ‐0.18 days 30 days RM 52,380.00 Mon 7/8/23 Mon 18/9/23 NA NA 0 0 RM 0.00 RM 0.00
1297 1.3.2.14. Level 2 ‐0.18 days 15 days RM 26,190.00 Mon 7/8/23 Sun 27/8/23 NA NA 0 0 RM 0.00 RM 0.00
1298 1.3.2.14. Level 1 ‐0.18 days 15 days RM 26,190.00 Mon 28/8/23 Mon 18/9/23 NA NA 0 0 RM 0.00 RM 0.00
1299 1.3.2.14. Painting ‐0.18 days 14 days RM 30,555.00 Tue 19/9/23 Mon 9/10/23 NA NA 0 0 RM 0.00 RM 0.00
1300 1.3.2.14. Level 2 ‐0.18 days 7 days RM 15,277.50 Tue 19/9/23 Thu 28/9/23 NA NA 0 0 RM 0.00 RM 0.00
1301 1.3.2.14. Level 1 ‐0.18 days 7 days RM 15,277.50 Sun 1/10/23 Mon 9/10/23 NA NA 0 0 RM 0.00 RM 0.00
1302 1.3.2.14. Plasterboard ‐0.18 days 20 days RM 12,172.00 Tue 10/10/23 Mon 6/11/23 NA NA 0 0 RM 0.00 RM 0.00
1303 1.3.2.14. Frames ‐0.18 days 15 days RM 2,000.00 Tue 10/10/23 Mon 30/10/23 NA NA 0 0 RM 0.00 RM 0.00
1304 1.3.2.14. Board ‐0.18 days 5 days RM 10,172.00 Tue 31/10/23 Mon 6/11/23 NA NA 0 0 RM 0.00 RM 0.00
1305 1.3.2.14. Aluminium Strip Ceiling ‐0.18 days 40 days RM 148,230.00 Tue 7/11/23 Wed 3/1/24 NA NA 0 0 RM 0.00 RM 0.00
1306 1.3.2.14.4 Section 1 ‐0.18 days 20 days RM 74,115.00 Tue 7/11/23 Tue 5/12/23 NA NA 0 0 RM 0.00 RM 0.00
1307 1.3.2.14.4 Section 2 ‐0.18 days 20 days RM 74,115.00 Wed 6/12/23 Wed 3/1/24 NA NA 0 0 RM 0.00 RM 0.00
1308 1.3.2.15 Internal Ceiling Finishes ‐0.18 days 55 days RM 494,426.20 Tue 19/9/23 Wed 6/12/23 NA NA 0 0 RM 0.00 RM 0.00
1309 1.3.2.15. Skim Coat ‐0.18 days 9 days RM 1,710.00 Tue 19/9/23 Mon 2/10/23 NA NA 0 0 RM 0.00 RM 0.00
1310 1.3.2.15. Soffit Slab ‐0.18 days 7 days RM 1,080.00 Tue 19/9/23 Thu 28/9/23 NA NA 0 0 RM 0.00 RM 0.00
1311 1.3.2.15. Painting ‐0.18 days 2 days RM 630.00 Sun 1/10/23 Mon 2/10/23 NA NA 0 0 RM 0.00 RM 0.00
1312 1.3.2.15. Plasterboard 1200mm x 600mm ‐0.18 days 35 days RM 47,508.20 Tue 3/10/23 Tue 21/11/23 NA NA 0 0 RM 0.00 RM 0.00
1313 1.3.2.15. Dry Area ‐0.18 days 21 days RM 16,663.00 Tue 3/10/23 Tue 31/10/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1314 1.3.2.15. Level 1 ‐0.18 days 15 days RM 8,331.50 Tue 3/10/23 Mon 23/10/23 NA NA 0 0 RM 0.00 RM 0.00
1315 1.3.2.15. Frame ‐0.18 days 7 days RM 3,000.00 Tue 3/10/23 Wed 11/10/23 NA NA 0 0 RM 0.00 RM 0.00
1316 1.3.2.15. Ceiling Board ‐0.18 days 5 days RM 5,131.50 Thu 12/10/23 Wed 18/10/23 NA NA 0 0 RM 0.00 RM 0.00
1317 1.3.2.15. Access Panel ‐0.18 days 3 days RM 200.00 Thu 19/10/23 Mon 23/10/23 NA NA 0 0 RM 0.00 RM 0.00
1318 1.3.2.15. Level 2 ‐0.18 days 14 days RM 8,331.50 Thu 12/10/23 Tue 31/10/23 NA NA 0 0 RM 0.00 RM 0.00
1319 1.3.2.15. Frame ‐0.18 days 7 days RM 3,000.00 Thu 12/10/23 Sun 22/10/23 NA NA 0 0 RM 0.00 RM 0.00
1320 1.3.2.15. Ceiling Board ‐0.18 days 5 days RM 5,131.50 Mon 23/10/23 Sun 29/10/23 NA NA 0 0 RM 0.00 RM 0.00
1321 1.3.2.15. Access Panel ‐0.18 days 2 days RM 200.00 Mon 30/10/23 Tue 31/10/23 NA NA 0 0 RM 0.00 RM 0.00
1322 1.3.2.15. Wet Area ‐0.18 days 20 days RM 30,845.20 Tue 24/10/23 Tue 21/11/23 NA NA 0 0 RM 0.00 RM 0.00
1323 1.3.2.15. Level 1 ‐0.18 days 14 days RM 15,422.60 Tue 24/10/23 Mon 13/11/23 NA NA 0 0 RM 0.00 RM 0.00
1324 1.3.2.15. Frame ‐0.18 days 7 days RM 5,000.00 Tue 24/10/23 Wed 1/11/23 NA NA 0 0 RM 0.00 RM 0.00
1325 1.3.2.15. Ceiling Board ‐0.18 days 5 days RM 9,922.60 Thu 2/11/23 Wed 8/11/23 NA NA 0 0 RM 0.00 RM 0.00
1326 1.3.2.15. Access Panel ‐0.18 days 2 days RM 500.00 Thu 9/11/23 Mon 13/11/23 NA NA 0 0 RM 0.00 RM 0.00
1327 1.3.2.15. Level 2 ‐0.18 days 14 days RM 15,422.60 Wed 1/11/23 Tue 21/11/23 NA NA 0 0 RM 0.00 RM 0.00
1328 1.3.2.15. Frame ‐0.18 days 7 days RM 5,000.00 Wed 1/11/23 Thu 9/11/23 NA NA 0 0 RM 0.00 RM 0.00
1329 1.3.2.15. Ceiling Board ‐0.18 days 5 days RM 9,922.60 Mon 13/11/23 Sun 19/11/23 NA NA 0 0 RM 0.00 RM 0.00
1330 1.3.2.15. Access Panel ‐0.18 days 2 days RM 500.00 Mon 20/11/23 Tue 21/11/23 NA NA 0 0 RM 0.00 RM 0.00
1331 1.3.2.15. Expanded Metal Ceiling ‐0.18 days 31 days RM 445,208.00 Tue 24/10/23 Wed 6/12/23 NA NA 0 0 RM 0.00 RM 0.00
1332 1.3.2.15. Level 1 ‐0.18 days 25 days RM 222,604.00 Tue 24/10/23 Tue 28/11/23 NA NA 0 0 RM 0.00 RM 0.00
1333 1.3.2.15. Ceiling Panel ‐0.18 days 20 days RM 214,890.00 Tue 24/10/23 Tue 21/11/23 NA NA 0 0 RM 0.00 RM 0.00
1334 1.3.2.15. Painting ‐0.18 days 5 days RM 7,714.00 Wed 22/11/23 Tue 28/11/23 NA NA 0 0 RM 0.00 RM 0.00
1335 1.3.2.15. Level 2 ‐0.18 days 25 days RM 222,604.00 Wed 1/11/23 Wed 6/12/23 NA NA 0 0 RM 0.00 RM 0.00
1336 1.3.2.15. Ceiling Panel ‐0.18 days 20 days RM 214,890.00 Wed 1/11/23 Wed 29/11/23 NA NA 0 0 RM 0.00 RM 0.00
1337 1.3.2.15. Painting ‐0.18 days 5 days RM 7,714.00 Thu 30/11/23 Wed 6/12/23 NA NA 0 0 RM 0.00 RM 0.00
1338 1.3.2.16 External Wall Finishes ‐0.18 days 139 days RM 184,048.00 Sun 9/7/23 Wed 24/1/24 NA NA 0 0 RM 0.00 RM 0.00
1339 1.3.2.16. Plastering (wall, column & beam) ‐0.18 days 25 days RM 13,440.00 Sun 9/7/23 Sun 13/8/23 NA NA 0 0 RM 0.00 RM 0.00
1340 1.3.2.16. Level 3 ‐0.18 days 5 days RM 4,480.00 Sun 9/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
1341 1.3.2.16. Level 2 ‐0.18 days 10 days RM 4,480.00 Sun 16/7/23 Sun 30/7/23 NA NA 0 0 RM 0.00 RM 0.00
1342 1.3.2.16. Level 1 ‐0.18 days 10 days RM 4,480.00 Mon 31/7/23 Sun 13/8/23 NA NA 0 0 RM 0.00 RM 0.00
1343 1.3.2.16. Skim Coat AAC Block ‐0.18 days 37 days RM 52,770.00 Mon 14/8/23 Thu 5/10/23 NA NA 0 0 RM 0.00 RM 0.00
1344 1.3.2.16. Level 3 ‐0.18 days 7 days RM 17,590.00 Mon 14/8/23 Tue 22/8/23 NA NA 0 0 RM 0.00 RM 0.00
1345 1.3.2.16. Level 2 ‐0.18 days 15 days RM 17,590.00 Wed 23/8/23 Tue 12/9/23 NA NA 0 0 RM 0.00 RM 0.00
1346 1.3.2.16. Level 1 ‐0.18 days 15 days RM 17,590.00 Wed 13/9/23 Thu 5/10/23 NA NA 0 0 RM 0.00 RM 0.00
1347 1.3.2.16. Tiling ‐0.18 days 28 days RM 49,500.00 Sun 8/10/23 Wed 15/11/23 NA NA 0 0 RM 0.00 RM 0.00
1348 1.3.2.16. Section 1 ‐0.18 days 14 days RM 24,750.00 Sun 8/10/23 Wed 25/10/23 NA NA 0 0 RM 0.00 RM 0.00
1349 1.3.2.16. Section 2 ‐0.18 days 14 days RM 24,750.00 Thu 26/10/23 Wed 15/11/23 NA NA 0 0 RM 0.00 RM 0.00
1350 1.3.2.16. Painting ‐0.18 days 49 days RM 68,338.00 Thu 16/11/23 Wed 24/1/24 NA NA 0 0 RM 0.00 RM 0.00
1351 1.3.2.16. Walls, Columns & Beams ‐0.18 days 35 days RM 50,280.00 Thu 16/11/23 Thu 4/1/24 NA NA 0 0 RM 0.00 RM 0.00
1352 1.3.2.16.4 Level 3 ‐0.18 days 7 days RM 16,760.00 Thu 16/11/23 Sun 26/11/23 NA NA 0 0 RM 0.00 RM 0.00
1353 1.3.2.16.4 Level 2 ‐0.18 days 14 days RM 16,760.00 Mon 27/11/23 Thu 14/12/23 NA NA 0 0 RM 0.00 RM 0.00
1354 1.3.2.16.4 Level 1 ‐0.18 days 14 days RM 16,760.00 Sun 17/12/23 Thu 4/1/24 NA NA 0 0 RM 0.00 RM 0.00
1355 1.3.2.16.4 Interlocking Brick ‐0.18 days 14 days RM 9,468.00 Sun 7/1/24 Wed 24/1/24 NA NA 0 0 RM 0.00 RM 0.00
1356 1.3.2.16.4 Vent Block ‐0.18 days 14 days RM 1,740.00 Sun 7/1/24 Wed 24/1/24 NA NA 0 0 RM 0.00 RM 0.00
1357 1.3.2.16.4 Clear Lacquer (facing bricks) ‐0.18 days 14 days RM 6,850.00 Sun 7/1/24 Wed 24/1/24 NA NA 0 0 RM 0.00 RM 0.00
1358 1.3.2.17 Internal Wall Finishes ‐0.18 days 158 days RM 133,065.00 Tue 13/6/23 Tue 30/1/24 NA NA 0 0 RM 0.00 RM 0.00
1359 1.3.2.17. Plastering ‐0.18 days 12 days RM 4,416.00 Tue 13/6/23 Mon 3/7/23 NA NA 0 0 RM 0.00 RM 0.00
1360 1.3.2.17. Level 1 ‐0.18 days 7 days RM 2,208.00 Tue 13/6/23 Wed 21/6/23 NA NA 0 0 RM 0.00 RM 0.00
1361 1.3.2.17. Level 2 ‐0.18 days 7 days RM 2,208.00 Tue 20/6/23 Mon 3/7/23 NA NA 0 0 RM 0.00 RM 0.00
1362 1.3.2.17. Skim Coat AAC Block ‐0.18 days 37 days RM 32,715.00 Wed 26/7/23 Thu 14/9/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1363 1.3.2.17. Level 1 ‐0.18 days 20 days RM 16,357.50 Wed 26/7/23 Tue 22/8/23 NA NA 0 0 RM 0.00 RM 0.00
1364 1.3.2.17. Level 2 ‐0.18 days 20 days RM 16,357.50 Sun 20/8/23 Thu 14/9/23 NA NA 0 0 RM 0.00 RM 0.00
1365 1.3.2.17. Tiling ‐0.18 days 40 days RM 58,099.00 Mon 18/9/23 Tue 14/11/23 NA NA 0 0 RM 0.00 RM 0.00
1366 1.3.2.17. 300mm x 600mm ceramic wall tiles ‐0.18 days 10 days RM 5,785.00 Mon 18/9/23 Mon 2/10/23 NA NA 0 0 RM 0.00 RM 0.00
1367 1.3.2.17. 300mm x 300mm glazed ceramic w ‐0.18 days 15 days RM 7,725.00 Tue 3/10/23 Mon 23/10/23 NA NA 0 0 RM 0.00 RM 0.00
1368 1.3.2.17. 300mm x 600mm homogenous ‐0.18 days 15 days RM 44,589.00 Tue 24/10/23 Tue 14/11/23 NA NA 0 0 RM 0.00 RM 0.00
1369 1.3.2.17. Painting ‐0.18 days 54 days RM 37,835.00 Wed 15/11/23 Tue 30/1/24 NA NA 0 0 RM 0.00 RM 0.00
1370 1.3.2.17. Walls, Column & Beams ‐0.18 days 30 days RM 16,611.00 Wed 15/11/23 Wed 27/12/23 NA NA 0 0 RM 0.00 RM 0.00
1371 1.3.2.17.4 Level 1 ‐0.18 days 15 days RM 8,305.50 Wed 15/11/23 Tue 5/12/23 NA NA 0 0 RM 0.00 RM 0.00
1372 1.3.2.17.4 Level 2 ‐0.18 days 15 days RM 8,305.50 Wed 6/12/23 Wed 27/12/23 NA NA 0 0 RM 0.00 RM 0.00
1373 1.3.2.17. Interlocking Brick ‐0.18 days 24 days RM 21,224.00 Thu 28/12/23 Tue 30/1/24 NA NA 0 0 RM 0.00 RM 0.00
1374 1.3.2.17.4 Level 1 ‐0.18 days 12 days RM 10,612.00 Thu 28/12/23 Sun 14/1/24 NA NA 0 0 RM 0.00 RM 0.00
1375 1.3.2.17.4 Level 2 ‐0.18 days 12 days RM 10,612.00 Mon 15/1/24 Tue 30/1/24 NA NA 0 0 RM 0.00 RM 0.00
1376 1.3.2.18 Sanitary Fittings ‐0.18 days 30 days RM 162,491.70 Wed 15/11/23 Wed 27/12/23 NA NA 0 0 RM 0.00 RM 0.00
1377 1.3.2.18. Level 1 ‐0.18 days 15 days RM 81,245.85 Wed 15/11/23 Tue 5/12/23 NA NA 0 0 RM 0.00 RM 0.00
1378 1.3.2.18. Level 2 ‐0.18 days 15 days RM 81,245.85 Wed 6/12/23 Wed 27/12/23 NA NA 0 0 RM 0.00 RM 0.00
1379 1.3.2.19 Fitting & Furnishing ‐0.18 days 14 days RM 44,400.00 Thu 28/12/23 Tue 16/1/24 NA NA 0 0 RM 0.00 RM 0.00
1380 1.3.2.19. Section 1 ‐0.18 days 7 days RM 22,200.00 Thu 28/12/23 Sun 7/1/24 NA NA 0 0 RM 0.00 RM 0.00
1381 1.3.2.19. Section 2 ‐0.18 days 7 days RM 22,200.00 Mon 8/1/24 Tue 16/1/24 NA NA 0 0 RM 0.00 RM 0.00
1382 1.3.2.20 Builders Works for Services ‐0.18 days 91 days RM 397,561.20 Mon 11/9/23 Sun 21/1/24 NA NA 0 0 RM 0.00 RM 0.00
1383 1.3.2.20. Counter Top ‐0.18 days 48 days RM 350,991.80 Mon 11/9/23 Mon 20/11/23 NA NA 0 0 RM 0.00 RM 0.00
1384 1.3.2.20. Formwork ‐0.18 days 7 days RM 34,288.00 Mon 11/9/23 Wed 20/9/23 NA NA 0 0 RM 0.00 RM 0.00
1385 1.3.2.20. Reinforcement Rebar ‐0.18 days 7 days RM 99,947.20 Thu 21/9/23 Mon 2/10/23 NA NA 0 0 RM 0.00 RM 0.00
1386 1.3.2.20. Concreting G 35 ‐0.18 days 3 days RM 42,048.00 Tue 3/10/23 Thu 5/10/23 NA NA 0 0 RM 0.00 RM 0.00
1387 1.3.2.20. Brickwork ‐0.18 days 14 days RM 3,774.00 Sun 8/10/23 Wed 25/10/23 NA NA 0 0 RM 0.00 RM 0.00
1388 1.3.2.20. Toilet Box Up Cover ‐0.18 days 3 days RM 550.00 Thu 26/10/23 Mon 30/10/23 NA NA 0 0 RM 0.00 RM 0.00
1389 1.3.2.20. Tiling ‐0.18 days 14 days RM 170,384.60 Tue 31/10/23 Mon 20/11/23 NA NA 0 0 RM 0.00 RM 0.00
1390 1.3.2.20. Ablution Bench ‐0.18 days 17 days RM 669.40 Tue 21/11/23 Wed 13/12/23 NA NA 0 0 RM 0.00 RM 0.00
1391 1.3.2.20. Brickwork ‐0.18 days 7 days RM 112.50 Tue 21/11/23 Wed 29/11/23 NA NA 0 0 RM 0.00 RM 0.00
1392 1.3.2.20. Concreting G 35 ‐0.18 days 3 days RM 280.00 Thu 30/11/23 Mon 4/12/23 NA NA 0 0 RM 0.00 RM 0.00
1393 1.3.2.20. Tiling ‐0.18 days 7 days RM 276.90 Tue 5/12/23 Wed 13/12/23 NA NA 0 0 RM 0.00 RM 0.00
1394 1.3.2.20. Planter Box ‐0.18 days 20 days RM 20,700.00 Thu 14/12/23 Thu 11/1/24 NA NA 0 0 RM 0.00 RM 0.00
1395 1.3.2.20. RC Box ‐0.18 days 10 days RM 15,000.00 Thu 14/12/23 Thu 28/12/23 NA NA 0 0 RM 0.00 RM 0.00
1396 1.3.2.20. Pebble Wash ‐0.18 days 10 days RM 5,700.00 Sun 31/12/23 Thu 11/1/24 NA NA 0 0 RM 0.00 RM 0.00
1397 1.3.2.20. Wet Market Drainage ‐0.18 days 6 days RM 25,200.00 Sun 14/1/24 Sun 21/1/24 NA NA 0 0 RM 0.00 RM 0.00
1398 1.3.2.20.4 Half Round Channel ‐0.18 days 3 days RM 5,400.00 Sun 14/1/24 Tue 16/1/24 NA NA 0 0 RM 0.00 RM 0.00
1399 1.3.2.20.4 Mild Steel Grating ‐0.18 days 3 days RM 19,800.00 Wed 17/1/24 Sun 21/1/24 NA NA 0 0 RM 0.00 RM 0.00
1400 1.3.2.21 Sundries ‐0.18 days 15 days RM 75,739.00 Thu 14/12/23 Thu 4/1/24 NA NA 0 0 RM 0.00 RM 0.00
1401 1.3.2.21. Handrail & Balustrading ‐0.18 days 15 days RM 75,739.00 Thu 14/12/23 Thu 4/1/24 NA NA 0 0 RM 0.00 RM 0.00
1402 1.3.2.21. 300mm high mild steel railing ‐0.18 days 6 days RM 15,150.00 Thu 14/12/23 Thu 21/12/23 NA NA 0 0 RM 0.00 RM 0.00
1403 1.3.2.21. Section 1 ‐0.18 days 3 days RM 7,575.00 Thu 14/12/23 Mon 18/12/23 NA NA 0 0 RM 0.00 RM 0.00
1404 1.3.2.21. Section 2 ‐0.18 days 3 days RM 7,575.00 Tue 19/12/23 Thu 21/12/23 NA NA 0 0 RM 0.00 RM 0.00
1405 1.3.2.21. 1000mm high mild steel railing ‐0.18 days 6 days RM 47,785.00 Sun 24/12/23 Mon 1/1/24 NA NA 0 0 RM 0.00 RM 0.00
1406 1.3.2.21. Section 1 ‐0.18 days 3 days RM 23,892.50 Sun 24/12/23 Wed 27/12/23 NA NA 0 0 RM 0.00 RM 0.00
1407 1.3.2.21. Section 2 ‐0.18 days 3 days RM 23,892.50 Thu 28/12/23 Mon 1/1/24 NA NA 0 0 RM 0.00 RM 0.00
1408 1.3.2.21. Painting ‐0.18 days 3 days RM 12,804.00 Tue 2/1/24 Thu 4/1/24 NA NA 0 0 RM 0.00 RM 0.00
1409 1.3.2.22 Link Bridge ‐0.18 days 144 days RM 348,664.54 Wed 1/2/23 Wed 6/9/23 NA NA 0 0 RM 0.00 RM 0.00
1410 1.3.2.22. Work Below Lowest Floor Finish ‐0.18 days 90 days RM 206,966.92 Wed 1/2/23 Sun 18/6/23 NA NA 0 0 RM 0.00 RM 0.00
1411 1.3.2.22. Excavate Oversite 350mm Average ‐0.18 days 1 day RM 162.00 Wed 1/2/23 Wed 1/2/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1412 1.3.2.22. Pile Cap ‐0.18 days 15 days RM 5,066.20 Wed 22/2/23 Tue 14/3/23 NA NA 0 0 RM 0.00 RM 0.00
1413 1.3.2.22. Excavations ‐0.18 days 2 days RM 48.00 Wed 22/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
1414 1.3.2.22. lean Concrete G 20 ‐0.18 days 1 day RM 12.20 Sun 26/2/23 Sun 26/2/23 NA NA 0 0 RM 0.00 RM 0.00
1415 1.3.2.22. Side Formwork ‐0.18 days 3 days RM 760.00 Mon 27/2/23 Wed 1/3/23 NA NA 0 0 RM 0.00 RM 0.00
1416 1.3.2.22. Reinforcement Rebar ‐0.18 days 4 days RM 3,264.00 Thu 2/3/23 Tue 7/3/23 NA NA 0 0 RM 0.00 RM 0.00
1417 1.3.2.22. Concreting G 40 ‐0.18 days 1 day RM 882.00 Wed 8/3/23 Wed 8/3/23 NA NA 0 0 RM 0.00 RM 0.00
1418 1.3.2.22. Antitermite Treatment ‐0.18 days 1 day RM 100.00 Tue 14/3/23 Tue 14/3/23 NA NA 0 0 RM 0.00 RM 0.00
1419 1.3.2.22. Column Stumps ‐0.18 days 5 days RM 3,794.80 Wed 15/3/23 Tue 21/3/23 NA NA 0 0 RM 0.00 RM 0.00
1420 1.3.2.22. Side Formwork ‐0.18 days 2 days RM 228.00 Wed 15/3/23 Thu 16/3/23 NA NA 0 0 RM 0.00 RM 0.00
1421 1.3.2.22. Reinforcement Rebar ‐0.18 days 2 days RM 2,726.80 Sun 19/3/23 Mon 20/3/23 NA NA 0 0 RM 0.00 RM 0.00
1422 1.3.2.22. Concreting G 35 ‐0.18 days 1 day RM 840.00 Tue 21/3/23 Tue 21/3/23 NA NA 0 0 RM 0.00 RM 0.00
1423 1.3.2.22. Ground Beams ‐0.18 days 13 days RM 11,552.00 Sun 26/3/23 Wed 12/4/23 NA NA 0 0 RM 0.00 RM 0.00
1424 1.3.2.22. Excavations ‐0.18 days 1 day RM 80.00 Sun 26/3/23 Sun 26/3/23 NA NA 0 0 RM 0.00 RM 0.00
1425 1.3.2.22. Lean Concrete G 20 ‐0.18 days 1 day RM 12.20 Mon 27/3/23 Mon 27/3/23 NA NA 0 0 RM 0.00 RM 0.00
1426 1.3.2.22. Side Formwork ‐0.18 days 4 days RM 2,356.00 Tue 28/3/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
1427 1.3.2.22. Reinforcement Rebar ‐0.18 days 4 days RM 6,483.80 Mon 3/4/23 Thu 6/4/23 NA NA 0 0 RM 0.00 RM 0.00
1428 1.3.2.22. Concreting G 35 ‐0.18 days 2 days RM 2,520.00 Thu 6/4/23 Mon 10/4/23 NA NA 0 0 RM 0.00 RM 0.00
1429 1.3.2.22. Antitermite Treatment ‐0.18 days 1 day RM 100.00 Wed 12/4/23 Wed 12/4/23 NA NA 0 0 RM 0.00 RM 0.00
1430 1.3.2.22. Ground Floor Slabs ‐0.18 days 10 days RM 14,114.50 Sun 16/4/23 Wed 3/5/23 NA NA 0 0 RM 0.00 RM 0.00
1431 1.3.2.22. Hardcore 150mm ‐0.18 days 2 days RM 534.60 Sun 16/4/23 Mon 17/4/23 NA NA 0 0 RM 0.00 RM 0.00
1432 1.3.2.22. Antitermite Treatment ‐0.18 days 1 day RM 206.00 Tue 18/4/23 Tue 18/4/23 NA NA 0 0 RM 0.00 RM 0.00
1433 1.3.2.22. Side Formwork ‐0.18 days 2 days RM 328.50 Wed 19/4/23 Thu 20/4/23 NA NA 0 0 RM 0.00 RM 0.00
1434 1.3.2.22. Lean Concrete G 20 ‐0.18 days 1 day RM 658.80 Tue 25/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
1435 1.3.2.22. DPM ‐0.18 days 1 day RM 248.40 Thu 27/4/23 Thu 27/4/23 NA NA 0 0 RM 0.00 RM 0.00
1436 1.3.2.22. Reinforcement Rebar ‐0.18 days 2 days RM 9,870.20 Sun 30/4/23 Tue 2/5/23 NA NA 0 0 RM 0.00 RM 0.00
1437 1.3.2.22. Concreting G 35 & Curing ‐0.18 days 1 day RM 2,268.00 Wed 3/5/23 Wed 3/5/23 NA NA 0 0 RM 0.00 RM 0.00
1438 1.3.2.22. Steel Frame Structure ‐0.18 days 30 days RM 172,277.42 Sun 7/5/23 Sun 18/6/23 NA NA 0 0 RM 0.00 RM 0.00
1439 1.3.2.22. Fabrications ‐0.18 days 20 days RM 20,000.00 Sun 7/5/23 Thu 1/6/23 NA NA 0 0 RM 0.00 RM 0.00
1440 1.3.2.22. Installations & Painting ‐0.18 days 10 days RM 152,277.42 Sun 4/6/23 Sun 18/6/23 NA NA 0 0 RM 0.00 RM 0.00
1441 1.3.2.22. Upper Floor ‐0.18 days 8 days RM 27,273.45 Mon 19/6/23 Mon 3/7/23 NA NA 0 0 RM 0.00 RM 0.00
1442 1.3.2.22. Bondek Slab ‐0.18 days 8 days RM 27,273.45 Mon 19/6/23 Mon 3/7/23 NA NA 0 0 RM 0.00 RM 0.00
1443 1.3.2.22. Bondek ‐0.18 days 3 days RM 11,040.00 Mon 19/6/23 Wed 21/6/23 NA NA 0 0 RM 0.00 RM 0.00
1444 1.3.2.22. Stud Fixed ‐0.18 days 2 days RM 4,400.00 Thu 22/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
1445 1.3.2.22. Reinforcement Rebar & BRC ‐0.18 days 2 days RM 9,145.45 Mon 26/6/23 Sun 2/7/23 NA NA 0 0 RM 0.00 RM 0.00
1446 1.3.2.22. Concreting G 35 & Curing ‐0.18 days 1 day RM 2,688.00 Mon 3/7/23 Mon 3/7/23 NA NA 0 0 RM 0.00 RM 0.00
1447 1.3.2.22. Roof ‐0.18 days 20 days RM 77,425.67 Tue 4/7/23 Tue 1/8/23 NA NA 0 0 RM 0.00 RM 0.00
1448 1.3.2.22. Frame ‐0.18 days 7 days RM 53,748.15 Tue 4/7/23 Wed 12/7/23 NA NA 0 0 RM 0.00 RM 0.00
1449 1.3.2.22. Fascia Boards ‐0.18 days 3 days RM 120.00 Thu 13/7/23 Mon 17/7/23 NA NA 0 0 RM 0.00 RM 0.00
1450 1.3.2.22. Zinc Gutter ‐0.18 days 3 days RM 1,155.00 Tue 18/7/23 Sun 23/7/23 NA NA 0 0 RM 0.00 RM 0.00
1451 1.3.2.22. UPVC R/water Down Pipes ‐0.18 days 2 days RM 1,484.00 Mon 24/7/23 Tue 25/7/23 NA NA 0 0 RM 0.00 RM 0.00
1452 1.3.2.22. Roof Covering ‐0.18 days 5 days RM 20,918.52 Wed 26/7/23 Tue 1/8/23 NA NA 0 0 RM 0.00 RM 0.00
1453 1.3.2.22. External Floor Finishes ‐0.18 days 7 days RM 5,538.00 Tue 29/8/23 Wed 6/9/23 NA NA 0 0 RM 0.00 RM 0.00
1454 1.3.2.22.4 300mm x 600mm homogenous ‐0.18 days 7 days RM 5,538.00 Tue 29/8/23 Wed 6/9/23 NA NA 0 0 RM 0.00 RM 0.00
1455 1.3.2.22. External Ceiling ‐0.18 days 7 days RM 22,412.50 Wed 9/8/23 Thu 17/8/23 NA NA 0 0 RM 0.00 RM 0.00
1456 1.3.2.22. Aluminium Strip Ceiling ‐0.18 days 7 days RM 22,412.50 Wed 9/8/23 Thu 17/8/23 NA NA 0 0 RM 0.00 RM 0.00
1457 1.3.2.22. Sundries ‐0.18 days 7 days RM 9,048.00 Sun 20/8/23 Mon 28/8/23 NA NA 0 0 RM 0.00 RM 0.00
1458 1.3.2.22. Handrail & Balustrading ‐0.18 days 7 days RM 9,048.00 Sun 20/8/23 Mon 28/8/23 NA NA 0 0 RM 0.00 RM 0.00
1459 1.3.2.22. 1000mm high ms railing ‐0.18 days 5 days RM 7,800.00 Sun 20/8/23 Thu 24/8/23 NA NA 0 0 RM 0.00 RM 0.00
1460 1.3.2.22. Painting ‐0.18 days 2 days RM 1,248.00 Sun 27/8/23 Mon 28/8/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1461 1.3.3 C2 ‐ TERMINAL ‐0.14 days 374 days RM 5,631,108.84 Mon 8/8/22 Sun 11/2/24 Mon 8/8/22 NA 0.77 0.78 RM 8,184.96 RM 8,184.96
1462 1.3.3.1 Work Below Lowest Floor Finish ‐0.18 days 163.1 days RM 752,229.80 Mon 8/8/22 Sun 2/4/23 Mon 8/8/22 NA 4.3 4.3 RM 8,184.96 RM 8,184.96
1463 1.3.3.1.1 Excavate Oversite 350mm Average De‐0.18 days 5 days RM 8,352.00 Mon 8/8/22 Wed 1/2/23 Mon 8/8/22 NA 98 98 RM 8,184.96 RM 8,184.96
1464 1.3.3.1.2 Pile Cap ‐0.18 days 14 days RM 118,477.40 Wed 1/2/23 Wed 22/2/23 NA NA 0 0 RM 0.00 RM 0.00
1465 1.3.3.1.2 Excavation ‐0.18 days 7 days RM 2,944.00 Wed 1/2/23 Sun 12/2/23 NA NA 0 0 RM 0.00 RM 0.00
1466 1.3.3.1.2 Section 1 ‐0.18 days 3 days RM 1,472.00 Wed 1/2/23 Mon 6/2/23 NA NA 0 0 RM 0.00 RM 0.00
1467 1.3.3.1.2 Section 2 ‐0.18 days 4 days RM 1,472.00 Mon 6/2/23 Sun 12/2/23 NA NA 0 0 RM 0.00 RM 0.00
1468 1.3.3.1.2 Lean Concrete G 20 ‐0.18 days 8 days RM 1,915.40 Wed 1/2/23 Mon 13/2/23 NA NA 0 0 RM 0.00 RM 0.00
1469 1.3.3.1.2 Section 1 ‐0.18 days 4 days RM 957.70 Wed 1/2/23 Tue 7/2/23 NA NA 0 0 RM 0.00 RM 0.00
1470 1.3.3.1.2 Section 2 ‐0.18 days 4 days RM 957.70 Tue 7/2/23 Mon 13/2/23 NA NA 0 0 RM 0.00 RM 0.00
1471 1.3.3.1.2 Side Formwork ‐0.18 days 8 days RM 11,932.00 Sun 5/2/23 Wed 15/2/23 NA NA 0 0 RM 0.00 RM 0.00
1472 1.3.3.1.2 Section 1 ‐0.18 days 4 days RM 5,966.00 Sun 5/2/23 Thu 9/2/23 NA NA 0 0 RM 0.00 RM 0.00
1473 1.3.3.1.2 Section 2 ‐0.18 days 4 days RM 5,966.00 Thu 9/2/23 Wed 15/2/23 NA NA 0 0 RM 0.00 RM 0.00
1474 1.3.3.1.2 Reinforcement Rebar ‐0.18 days 8 days RM 61,642.00 Tue 7/2/23 Mon 20/2/23 NA NA 0 0 RM 0.00 RM 0.00
1475 1.3.3.1.2 Section 1 ‐0.18 days 4 days RM 30,821.00 Tue 7/2/23 Mon 13/2/23 NA NA 0 0 RM 0.00 RM 0.00
1476 1.3.3.1.2 Section 2 ‐0.18 days 4 days RM 30,821.00 Mon 13/2/23 Mon 20/2/23 NA NA 0 0 RM 0.00 RM 0.00
1477 1.3.3.1.2 Concreting G 40 ‐0.18 days 7 days RM 37,044.00 Thu 9/2/23 Tue 21/2/23 NA NA 0 0 RM 0.00 RM 0.00
1478 1.3.3.1.2 Section 1 ‐0.18 days 3 days RM 18,522.00 Thu 9/2/23 Tue 14/2/23 NA NA 0 0 RM 0.00 RM 0.00
1479 1.3.3.1.2 Section 2 ‐0.18 days 3 days RM 18,522.00 Wed 15/2/23 Tue 21/2/23 NA NA 0 0 RM 0.00 RM 0.00
1480 1.3.3.1.2 Antitermite Treatment ‐0.18 days 6 days RM 3,000.00 Mon 13/2/23 Wed 22/2/23 NA NA 0 0 RM 0.00 RM 0.00
1481 1.3.3.1.2 Section 1 ‐0.18 days 2 days RM 1,500.00 Mon 13/2/23 Wed 15/2/23 NA NA 0 0 RM 0.00 RM 0.00
1482 1.3.3.1.2 Section 2 ‐0.18 days 2 days RM 1,500.00 Mon 20/2/23 Wed 22/2/23 NA NA 0 0 RM 0.00 RM 0.00
1483 1.3.3.1.3 Column Stumps ‐0.18 days 9 days RM 38,297.40 Tue 14/2/23 Tue 28/2/23 NA NA 0 0 RM 0.00 RM 0.00
1484 1.3.3.1.3 Side Formwork ‐0.18 days 6 days RM 8,056.00 Tue 14/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
1485 1.3.3.1.3 Section 1 ‐0.18 days 2 days RM 4,028.00 Tue 14/2/23 Thu 16/2/23 NA NA 0 0 RM 0.00 RM 0.00
1486 1.3.3.1.3 Section 2 ‐0.18 days 2 days RM 4,028.00 Tue 21/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
1487 1.3.3.1.3 Reinforcement Rebar ‐0.18 days 6 days RM 22,681.40 Thu 16/2/23 Mon 27/2/23 NA NA 0 0 RM 0.00 RM 0.00
1488 1.3.3.1.3 Section 1 ‐0.18 days 2 days RM 11,340.70 Thu 16/2/23 Tue 21/2/23 NA NA 0 0 RM 0.00 RM 0.00
1489 1.3.3.1.3 Section 2 ‐0.18 days 2 days RM 11,340.70 Thu 23/2/23 Mon 27/2/23 NA NA 0 0 RM 0.00 RM 0.00
1490 1.3.3.1.3 Concreting G 35 ‐0.18 days 6 days RM 7,560.00 Mon 20/2/23 Tue 28/2/23 NA NA 0 0 RM 0.00 RM 0.00
1491 1.3.3.1.3 Section 1 ‐0.18 days 2 days RM 3,780.00 Mon 20/2/23 Wed 22/2/23 NA NA 0 0 RM 0.00 RM 0.00
1492 1.3.3.1.3 Section 2 ‐0.18 days 2 days RM 3,780.00 Sun 26/2/23 Tue 28/2/23 NA NA 0 0 RM 0.00 RM 0.00
1493 1.3.3.1.4 Ground Beams ‐0.18 days 14 days RM 239,508.40 Wed 22/2/23 Tue 14/3/23 NA NA 0 0 RM 0.00 RM 0.00
1494 1.3.3.1.4 Excavation ‐0.18 days 4 days RM 1,560.00 Wed 22/2/23 Tue 28/2/23 NA NA 0 0 RM 0.00 RM 0.00
1495 1.3.3.1.4 Section 1 ‐0.18 days 2 days RM 780.00 Wed 22/2/23 Sun 26/2/23 NA NA 0 0 RM 0.00 RM 0.00
1496 1.3.3.1.4 Section 2 ‐0.18 days 2 days RM 780.00 Sun 26/2/23 Tue 28/2/23 NA NA 0 0 RM 0.00 RM 0.00
1497 1.3.3.1.4 Lean Concrete G 20 ‐0.18 days 6 days RM 3,135.40 Thu 23/2/23 Sun 5/3/23 NA NA 0 0 RM 0.00 RM 0.00
1498 1.3.3.1.4 Section 1 ‐0.18 days 2 days RM 1,567.70 Thu 23/2/23 Mon 27/2/23 NA NA 0 0 RM 0.00 RM 0.00
1499 1.3.3.1.4 Section 2 ‐0.18 days 2 days RM 1,567.70 Wed 1/3/23 Sun 5/3/23 NA NA 0 0 RM 0.00 RM 0.00
1500 1.3.3.1.4 Side Formwork ‐0.18 days 7 days RM 61,218.00 Sun 26/2/23 Tue 7/3/23 NA NA 0 0 RM 0.00 RM 0.00
1501 1.3.3.1.4 Section 1 ‐0.18 days 3 days RM 30,609.00 Sun 26/2/23 Wed 1/3/23 NA NA 0 0 RM 0.00 RM 0.00
1502 1.3.3.1.4 Section 2 ‐0.18 days 3 days RM 30,609.00 Thu 2/3/23 Tue 7/3/23 NA NA 0 0 RM 0.00 RM 0.00
1503 1.3.3.1.4 Reinforcement Rebar ‐0.18 days 8 days RM 118,915.00 Mon 27/2/23 Thu 9/3/23 NA NA 0 0 RM 0.00 RM 0.00
1504 1.3.3.1.4 Section 1 ‐0.18 days 4 days RM 59,457.50 Mon 27/2/23 Sun 5/3/23 NA NA 0 0 RM 0.00 RM 0.00
1505 1.3.3.1.4 Section 2 ‐0.18 days 4 days RM 59,457.50 Sun 5/3/23 Thu 9/3/23 NA NA 0 0 RM 0.00 RM 0.00
1506 1.3.3.1.4 Concreting G 35 ‐0.18 days 7 days RM 50,680.00 Thu 2/3/23 Mon 13/3/23 NA NA 0 0 RM 0.00 RM 0.00
1507 1.3.3.1.4 Section 1 ‐0.18 days 3 days RM 25,340.00 Thu 2/3/23 Tue 7/3/23 NA NA 0 0 RM 0.00 RM 0.00
1508 1.3.3.1.4 Section 2 ‐0.18 days 3 days RM 25,340.00 Wed 8/3/23 Mon 13/3/23 NA NA 0 0 RM 0.00 RM 0.00
1509 1.3.3.1.4 Antitermite Treatment ‐0.18 days 5 days RM 4,000.00 Tue 7/3/23 Tue 14/3/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1510 1.3.3.1.4 Section 1 ‐0.18 days 1 day RM 2,000.00 Tue 7/3/23 Wed 8/3/23 NA NA 0 0 RM 0.00 RM 0.00
1511 1.3.3.1.4 Section 2 ‐0.18 days 1 day RM 2,000.00 Mon 13/3/23 Tue 14/3/23 NA NA 0 0 RM 0.00 RM 0.00
1512 1.3.3.1.5 Ground Floor Slabs ‐0.18 days 16 days RM 347,594.60 Thu 9/3/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
1513 1.3.3.1.5 Hardcore 150mm ‐0.18 days 6 days RM 27,561.60 Thu 9/3/23 Sun 19/3/23 NA NA 0 0 RM 0.00 RM 0.00
1514 1.3.3.1.5 Section 1 ‐0.18 days 3 days RM 13,780.80 Thu 9/3/23 Tue 14/3/23 NA NA 0 0 RM 0.00 RM 0.00
1515 1.3.3.1.5 Section 2 ‐0.18 days 3 days RM 13,780.80 Tue 14/3/23 Sun 19/3/23 NA NA 0 0 RM 0.00 RM 0.00
1516 1.3.3.1.5 Antitermite Treatment ‐0.18 days 4 days RM 7,906.50 Tue 14/3/23 Mon 20/3/23 NA NA 0 0 RM 0.00 RM 0.00
1517 1.3.3.1.5 Section 1 ‐0.18 days 1 day RM 3,953.25 Tue 14/3/23 Wed 15/3/23 NA NA 0 0 RM 0.00 RM 0.00
1518 1.3.3.1.5 Section 2 ‐0.18 days 1 day RM 3,953.25 Sun 19/3/23 Mon 20/3/23 NA NA 0 0 RM 0.00 RM 0.00
1519 1.3.3.1.5 Lean Concrete G 20 ‐0.18 days 5 days RM 33,964.80 Wed 15/3/23 Wed 22/3/23 NA NA 0 0 RM 0.00 RM 0.00
1520 1.3.3.1.5 Section 1 ‐0.18 days 2 days RM 16,982.40 Wed 15/3/23 Sun 19/3/23 NA NA 0 0 RM 0.00 RM 0.00
1521 1.3.3.1.5 Section 2 ‐0.18 days 2 days RM 16,982.40 Mon 20/3/23 Wed 22/3/23 NA NA 0 0 RM 0.00 RM 0.00
1522 1.3.3.1.5 DPM ‐0.18 days 2 days RM 12,806.40 Wed 22/3/23 Sun 26/3/23 NA NA 0 0 RM 0.00 RM 0.00
1523 1.3.3.1.5 Section 1 ‐0.18 days 1 day RM 6,403.20 Wed 22/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
1524 1.3.3.1.5 Section 2 ‐0.18 days 1 day RM 6,403.20 Thu 23/3/23 Sun 26/3/23 NA NA 0 0 RM 0.00 RM 0.00
1525 1.3.3.1.5 Reinforcement Rebar ‐0.18 days 5 days RM 130,227.30 Thu 23/3/23 Thu 30/3/23 NA NA 0 0 RM 0.00 RM 0.00
1526 1.3.3.1.5 Section 1 ‐0.18 days 4 days RM 65,113.65 Thu 23/3/23 Wed 29/3/23 NA NA 0 0 RM 0.00 RM 0.00
1527 1.3.3.1.5 Section 2 ‐0.18 days 4 days RM 65,113.65 Sun 26/3/23 Thu 30/3/23 NA NA 0 0 RM 0.00 RM 0.00
1528 1.3.3.1.5 Concreting G 35 & Curing ‐0.18 days 3 days RM 135,128.00 Tue 28/3/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
1529 1.3.3.1.5 Section 1 ‐0.18 days 2 days RM 67,564.00 Tue 28/3/23 Thu 30/3/23 NA NA 0 0 RM 0.00 RM 0.00
1530 1.3.3.1.5 Section 2 ‐0.18 days 2 days RM 67,564.00 Wed 29/3/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
1531 1.3.3.2 Apron, Steps & Perimeter Drain ‐0.14 days 33 days RM 99,316.30 Mon 30/10/23 Thu 14/12/23 NA NA 0 0 RM 0.00 RM 0.00
1532 1.3.3.2.1 Excavation 300mm Deep ‐0.14 days 2 days RM 325.00 Mon 30/10/23 Tue 31/10/23 NA NA 0 0 RM 0.00 RM 0.00
1533 1.3.3.2.2 Apron ‐0.14 days 16 days RM 9,983.40 Wed 1/11/23 Thu 23/11/23 NA NA 0 0 RM 0.00 RM 0.00
1534 1.3.3.2.2 Hardcore 150mm ‐0.14 days 3 days RM 772.20 Wed 1/11/23 Sun 5/11/23 NA NA 0 0 RM 0.00 RM 0.00
1535 1.3.3.2.2 Antitermite Treatment ‐0.14 days 1 day RM 227.50 Mon 6/11/23 Mon 6/11/23 NA NA 0 0 RM 0.00 RM 0.00
1536 1.3.3.2.2 Formwork ‐0.14 days 3 days RM 682.50 Tue 7/11/23 Thu 9/11/23 NA NA 0 0 RM 0.00 RM 0.00
1537 1.3.3.2.2 Lean Concrete G 20 ‐0.14 days 2 days RM 951.60 Mon 13/11/23 Tue 14/11/23 NA NA 0 0 RM 0.00 RM 0.00
1538 1.3.3.2.2 DPM ‐0.14 days 2 days RM 299.00 Wed 15/11/23 Thu 16/11/23 NA NA 0 0 RM 0.00 RM 0.00
1539 1.3.3.2.2 Reinforcement Rebar & BRC ‐0.14 days 3 days RM 3,774.60 Sun 19/11/23 Tue 21/11/23 NA NA 0 0 RM 0.00 RM 0.00
1540 1.3.3.2.2 Concreting G 35 ‐0.14 days 2 days RM 3,276.00 Wed 22/11/23 Thu 23/11/23 NA NA 0 0 RM 0.00 RM 0.00
1541 1.3.3.2.3 Ramp ‐0.14 days 11 days RM 10,931.30 Mon 6/11/23 Tue 21/11/23 NA NA 0 0 RM 0.00 RM 0.00
1542 1.3.3.2.3 Hardcore 150mm ‐0.14 days 2 days RM 514.80 Mon 6/11/23 Tue 7/11/23 NA NA 0 0 RM 0.00 RM 0.00
1543 1.3.3.2.3 Antitermite Treatment ‐0.14 days 1 day RM 227.50 Wed 8/11/23 Wed 8/11/23 NA NA 0 0 RM 0.00 RM 0.00
1544 1.3.3.2.3 Formwork ‐0.14 days 2 days RM 567.00 Thu 9/11/23 Mon 13/11/23 NA NA 0 0 RM 0.00 RM 0.00
1545 1.3.3.2.3 Lean Concrete G 20 ‐0.14 days 1 day RM 634.40 Tue 14/11/23 Tue 14/11/23 NA NA 0 0 RM 0.00 RM 0.00
1546 1.3.3.2.3 DPM ‐0.14 days 1 day RM 299.00 Wed 15/11/23 Wed 15/11/23 NA NA 0 0 RM 0.00 RM 0.00
1547 1.3.3.2.3 Reinforcement Rebar & BRC ‐0.14 days 2 days RM 3,774.60 Thu 16/11/23 Sun 19/11/23 NA NA 0 0 RM 0.00 RM 0.00
1548 1.3.3.2.3 Concreting G 35 With Grooved Line ‐0.14 days 2 days RM 4,914.00 Mon 20/11/23 Tue 21/11/23 NA NA 0 0 RM 0.00 RM 0.00
1549 1.3.3.2.4 Interlocking Concrete Paver ‐0.14 days 29 days RM 72,171.60 Sun 5/11/23 Thu 14/12/23 NA NA 0 0 RM 0.00 RM 0.00
1550 1.3.3.2.4 Crusher Run 150mm ‐0.14 days 5 days RM 10,272.60 Sun 5/11/23 Thu 9/11/23 NA NA 0 0 RM 0.00 RM 0.00
1551 1.3.3.2.4 Sand Bedding 50mm ‐0.14 days 4 days RM 2,195.00 Mon 13/11/23 Thu 16/11/23 NA NA 0 0 RM 0.00 RM 0.00
1552 1.3.3.2.4 Paving Block 80mm ‐0.14 days 20 days RM 59,704.00 Sun 19/11/23 Thu 14/12/23 NA NA 0 0 RM 0.00 RM 0.00
1553 1.3.3.2.5 Steps ‐0.14 days 16 days RM 5,905.00 Wed 22/11/23 Wed 13/12/23 NA NA 0 0 RM 0.00 RM 0.00
1554 1.3.3.2.5 Formwork ‐0.14 days 4 days RM 630.00 Wed 22/11/23 Mon 27/11/23 NA NA 0 0 RM 0.00 RM 0.00
1555 1.3.3.2.5 Concreting G 30 ‐0.14 days 2 days RM 532.00 Tue 28/11/23 Wed 29/11/23 NA NA 0 0 RM 0.00 RM 0.00
1556 1.3.3.2.5 Tiling ‐0.14 days 10 days RM 4,743.00 Thu 30/11/23 Wed 13/12/23 NA NA 0 0 RM 0.00 RM 0.00
1557 1.3.3.3 Lift Shaft ‐0.18 days 41 days RM 116,741.69 Wed 1/2/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
1558 1.3.3.3.1 Pile Cap ‐0.18 days 10 days RM 15,781.00 Wed 1/2/23 Wed 15/2/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1559 1.3.3.3.1 Excavation ‐0.18 days 2 days RM 108.00 Wed 1/2/23 Sun 5/2/23 NA NA 0 0 RM 0.00 RM 0.00
1560 1.3.3.3.1 Lean Concrete G 20 ‐0.18 days 1 day RM 122.00 Sun 5/2/23 Mon 6/2/23 NA NA 0 0 RM 0.00 RM 0.00
1561 1.3.3.3.1 Side Formwork ‐0.18 days 2 days RM 380.00 Mon 6/2/23 Wed 8/2/23 NA NA 0 0 RM 0.00 RM 0.00
1562 1.3.3.3.1 Reinforcement Rebar ‐0.18 days 3 days RM 12,546.00 Wed 8/2/23 Mon 13/2/23 NA NA 0 0 RM 0.00 RM 0.00
1563 1.3.3.3.1 Concreting G 35 ‐0.18 days 1 day RM 2,240.00 Mon 13/2/23 Tue 14/2/23 NA NA 0 0 RM 0.00 RM 0.00
1564 1.3.3.3.1 Waterproof Membrane ‐0.18 days 1 day RM 385.00 Tue 14/2/23 Wed 15/2/23 NA NA 0 0 RM 0.00 RM 0.00
1565 1.3.3.3.2 Lift Wall ‐0.18 days 8 days RM 11,192.10 Mon 20/2/23 Thu 2/3/23 NA NA 0 0 RM 0.00 RM 0.00
1566 1.3.3.3.2 Side Formwork ‐0.18 days 2 days RM 1,444.00 Mon 20/2/23 Wed 22/2/23 NA NA 0 0 RM 0.00 RM 0.00
1567 1.3.3.3.2 Reinforcement Rebar ‐0.18 days 2 days RM 7,952.60 Wed 22/2/23 Sun 26/2/23 NA NA 0 0 RM 0.00 RM 0.00
1568 1.3.3.3.2 Concreting G 35 ‐0.18 days 1 day RM 1,064.00 Sun 26/2/23 Mon 27/2/23 NA NA 0 0 RM 0.00 RM 0.00
1569 1.3.3.3.2 Waterproof Membrane ‐0.18 days 1 day RM 731.50 Wed 1/3/23 Thu 2/3/23 NA NA 0 0 RM 0.00 RM 0.00
1570 1.3.3.3.3 Steel Frame Structure ‐0.18 days 21 days RM 89,768.59 Thu 2/3/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
1571 1.3.3.3.3 Frame ‐0.18 days 14 days RM 65,688.59 Thu 2/3/23 Wed 22/3/23 NA NA 0 0 RM 0.00 RM 0.00
1572 1.3.3.3.3 Curtain Wall ‐0.18 days 7 days RM 24,080.00 Wed 22/3/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
1573 1.3.3.4 Frame ‐0.07 days 138 days RM 821,159.60 Sun 4/12/22 Mon 3/7/23 Thu 1/12/22 NA 3.91 3.96 RM 0.00 RM 0.00
1574 1.3.3.4.1 IBS Components ‐0.14 days 124 days RM 574,392.00 Sun 4/12/22 Thu 8/6/23 Thu 1/12/22 NA 7.58 7.68 RM 0.00 RM 0.00
1575 1.3.3.4.1 Shop Drawing & Approval ‐0.14 days 26 days RM 0.00 Sun 4/12/22 Mon 9/1/23 Thu 1/12/22 NA 38.46 39 RM 0.00 RM 0.00
1576 1.3.3.4.1 Mould Fabrication ‐0.14 days 21 days RM 0.00 Tue 10/1/23 Thu 9/2/23 NA NA 0 0 RM 0.00 RM 0.00
1577 1.3.3.4.1 Delivery Precast Components to Sit ‐0.14 days 9 days RM 0.00 Sun 12/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
1578 1.3.3.4.1 Fabrication Works for Precast Colum‐0.14 days 40 days RM 0.00 Wed 1/3/23 Tue 2/5/23 NA NA 0 0 RM 0.00 RM 0.00
1579 1.3.3.4.1 Installation IBS ‐0.14 days 44 days RM 574,392.00 Thu 30/3/23 Thu 8/6/23 NA NA 0 0 RM 0.00 RM 0.00
1580 1.3.3.4.1 GF To 1st Floor Column ‐0.14 days 10 days RM 100,637.00 Thu 30/3/23 Thu 13/4/23 NA NA 0 0 RM 0.00 RM 0.00
1581 1.3.3.4.1 Section 1 ‐0.14 days 5 days RM 50,318.50 Thu 30/3/23 Wed 5/4/23 NA NA 0 0 RM 0.00 RM 0.00
1582 1.3.3.4.1 Section 2 ‐0.14 days 5 days RM 50,318.50 Thu 6/4/23 Thu 13/4/23 NA NA 0 0 RM 0.00 RM 0.00
1583 1.3.3.4.1 1st Floor Beam ‐0.14 days 10 days RM 213,118.00 Sun 16/4/23 Wed 3/5/23 NA NA 0 0 RM 0.00 RM 0.00
1584 1.3.3.4.1 Section 1 ‐0.14 days 5 days RM 106,559.00 Sun 16/4/23 Thu 20/4/23 NA NA 0 0 RM 0.00 RM 0.00
1585 1.3.3.4.1 Section 2 ‐0.14 days 5 days RM 106,559.00 Tue 25/4/23 Wed 3/5/23 NA NA 0 0 RM 0.00 RM 0.00
1586 1.3.3.4.1 1st Floor To Roof Floor Column ‐0.14 days 8 days RM 100,637.00 Wed 17/5/23 Sun 28/5/23 NA NA 0 0 RM 0.00 RM 0.00

1587 1.3.3.4.1 Section 1 ‐0.14 days 4 days RM 50,318.50 Wed 17/5/23 Mon 22/5/23 NA NA 0 0 RM 0.00 RM 0.00
1588 1.3.3.4.1 Section 2 ‐0.14 days 4 days RM 50,318.50 Tue 23/5/23 Sun 28/5/23 NA NA 0 0 RM 0.00 RM 0.00
1589 1.3.3.4.1 Roof Beam ‐0.14 days 8 days RM 160,000.00 Mon 29/5/23 Thu 8/6/23 NA NA 0 0 RM 0.00 RM 0.00
1590 1.3.3.4.1 Section 1 ‐0.14 days 4 days RM 80,000.00 Mon 29/5/23 Thu 1/6/23 NA NA 0 0 RM 0.00 RM 0.00
1591 1.3.3.4.1 Section 2 ‐0.14 days 4 days RM 80,000.00 Sun 4/6/23 Thu 8/6/23 NA NA 0 0 RM 0.00 RM 0.00
1592 1.3.3.4.2 Steel Portal Frame ‐0.07 days 100 days RM 246,767.60 Mon 30/1/23 Mon 3/7/23 NA NA 0 0 RM 0.00 RM 0.00
1593 1.3.3.4.2 Shop Drawing ‐0.07 days 43 days RM 0.00 Mon 30/1/23 Thu 30/3/23 NA NA 0 0 RM 0.00 RM 0.00
1594 1.3.3.4.2 Shop Drawing Approval ‐0.07 days 5 days RM 0.00 Sun 2/4/23 Thu 6/4/23 NA NA 0 0 RM 0.00 RM 0.00
1595 1.3.3.4.2 Fabrications at Factory ‐0.07 days 13 days RM 9,469.80 Mon 10/4/23 Tue 2/5/23 NA NA 0 0 RM 0.00 RM 0.00
1596 1.3.3.4.2 Installation ‐0.07 days 39 days RM 100,000.00 Wed 3/5/23 Mon 3/7/23 NA NA 0 0 RM 0.00 RM 0.00
1597 1.3.3.4.2 In Situ Concrete ‐0.14 days 38.9 days RM 137,297.80 Sun 2/4/23 Thu 1/6/23 NA NA 0 0 RM 0.00 RM 0.00
1598 1.3.3.4.2 Stiffeners ‐0.18 days 5 days RM 14,713.60 Sun 2/4/23 Mon 10/4/23 NA NA 0 0 RM 0.00 RM 0.00
1599 1.3.3.4.2 Reinforcement Rebar ‐0.18 days 2 days RM 5,623.60 Sun 2/4/23 Tue 4/4/23 NA NA 0 0 RM 0.00 RM 0.00
1600 1.3.3.4.2 Formwork ‐0.18 days 2 days RM 5,814.00 Tue 4/4/23 Thu 6/4/23 NA NA 0 0 RM 0.00 RM 0.00
1601 1.3.3.4.2 Concreting G 35 ‐0.18 days 1 day RM 3,276.00 Thu 6/4/23 Mon 10/4/23 NA NA 0 0 RM 0.00 RM 0.00
1602 1.3.3.4.2 Column ‐0.18 days 5 days RM 11,268.40 Mon 10/4/23 Mon 17/4/23 NA NA 0 0 RM 0.00 RM 0.00
1603 1.3.3.4.2 Reinforcement Rebar ‐0.18 days 2 days RM 4,032.40 Mon 10/4/23 Wed 12/4/23 NA NA 0 0 RM 0.00 RM 0.00
1604 1.3.3.4.2 Formwork ‐0.18 days 2 days RM 3,876.00 Wed 12/4/23 Sun 16/4/23 NA NA 0 0 RM 0.00 RM 0.00
1605 1.3.3.4.2 Concreting G 35 ‐0.18 days 1 day RM 3,360.00 Sun 16/4/23 Mon 17/4/23 NA NA 0 0 RM 0.00 RM 0.00
1606 1.3.3.4.2 Suspended Beams ‐0.18 days 2 days RM 33,563.00 Mon 17/4/23 Wed 19/4/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1607 1.3.3.4.2 Formwork ‐0.18 days 2 days RM 7,980.00 Mon 17/4/23 Wed 19/4/23 NA NA 0 0 RM 0.00 RM 0.00
1608 1.3.3.4.2 Reinforcement Rebar ‐0.18 days 2 days RM 19,703.00 Mon 17/4/23 Wed 19/4/23 NA NA 0 0 RM 0.00 RM 0.00
1609 1.3.3.4.2 Concreting G 35 ‐0.18 days 1 day RM 5,880.00 Tue 18/4/23 Wed 19/4/23 NA NA 0 0 RM 0.00 RM 0.00
1610 1.3.3.4.2 Roof Beams ‐0.14 days 8 days RM 77,752.80 Tue 23/5/23 Thu 1/6/23 NA NA 0 0 RM 0.00 RM 0.00
1611 1.3.3.4.2 Formwork ‐0.14 days 4 days RM 10,450.00 Tue 23/5/23 Sun 28/5/23 NA NA 0 0 RM 0.00 RM 0.00
1612 1.3.3.4.2 Reinforcement Rebar ‐0.14 days 3 days RM 49,102.80 Sun 28/5/23 Tue 30/5/23 NA NA 0 0 RM 0.00 RM 0.00
1613 1.3.3.4.2 Concreting G 35 ‐0.14 days 2 days RM 18,200.00 Wed 31/5/23 Thu 1/6/23 NA NA 0 0 RM 0.00 RM 0.00
1614 1.3.3.5 Upper Floor ‐0.14 days 16.9 days RM 267,394.40 Wed 19/4/23 Thu 18/5/23 NA NA 0 0 RM 0.00 RM 0.00
1615 1.3.3.5.1 Hollowcore Slab ‐0.14 days 10 days RM 233,242.60 Sun 7/5/23 Thu 18/5/23 NA NA 0 0 RM 0.00 RM 0.00
1616 1.3.3.5.1 Section 1 ‐0.14 days 5 days RM 116,621.30 Sun 7/5/23 Thu 11/5/23 NA NA 0 0 RM 0.00 RM 0.00
1617 1.3.3.5.1 Slab ‐0.14 days 4 days RM 96,377.00 Sun 7/5/23 Wed 10/5/23 NA NA 0 0 RM 0.00 RM 0.00
1618 1.3.3.5.1 BRC ‐0.14 days 2 days RM 8,778.30 Wed 10/5/23 Thu 11/5/23 NA NA 0 0 RM 0.00 RM 0.00
1619 1.3.3.5.1 Topping Concrete G 40 + Curing ‐0.14 days 1 day RM 11,466.00 Thu 11/5/23 Thu 11/5/23 NA NA 0 0 RM 0.00 RM 0.00
1620 1.3.3.5.1 Section 2 ‐0.14 days 6 days RM 116,621.30 Thu 11/5/23 Thu 18/5/23 NA NA 0 0 RM 0.00 RM 0.00
1621 1.3.3.5.1 Slab ‐0.14 days 3 days RM 96,377.00 Thu 11/5/23 Mon 15/5/23 NA NA 0 0 RM 0.00 RM 0.00
1622 1.3.3.5.1 BRC ‐0.14 days 2 days RM 8,778.30 Tue 16/5/23 Wed 17/5/23 NA NA 0 0 RM 0.00 RM 0.00
1623 1.3.3.5.1 Topping Concrete G 40 + Curing ‐0.14 days 2 days RM 11,466.00 Wed 17/5/23 Thu 18/5/23 NA NA 0 0 RM 0.00 RM 0.00
1624 1.3.3.5.2 Suspended Floor Slab ‐0.18 days 8 days RM 34,151.80 Wed 19/4/23 Mon 8/5/23 NA NA 0 0 RM 0.00 RM 0.00
1625 1.3.3.5.2 Soffit Formwork ‐0.18 days 4 days RM 10,298.00 Wed 19/4/23 Sun 30/4/23 NA NA 0 0 RM 0.00 RM 0.00
1626 1.3.3.5.2 BRC + Rebar ‐0.18 days 3 days RM 10,665.80 Sun 30/4/23 Sun 7/5/23 NA NA 0 0 RM 0.00 RM 0.00
1627 1.3.3.5.2 Concreting G 35 ‐0.18 days 1 day RM 13,188.00 Sun 7/5/23 Mon 8/5/23 NA NA 0 0 RM 0.00 RM 0.00
1628 1.3.3.6 Staircases ‐0.18 days 132.1 days RM 71,619.60 Sun 21/5/23 Sun 3/12/23 NA NA 0 0 RM 0.00 RM 0.00
1629 1.3.3.6.1 S/case D ‐0.18 days 123.1 days RM 23,873.20 Sun 21/5/23 Mon 20/11/23 NA NA 0 0 RM 0.00 RM 0.00
1630 1.3.3.6.1 Formwork ‐0.14 days 3 days RM 1,118.00 Sun 21/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
1631 1.3.3.6.1 Reinforcement Rebar ‐0.14 days 2 days RM 3,198.27 Wed 24/5/23 Thu 25/5/23 NA NA 0 0 RM 0.00 RM 0.00
1632 1.3.3.6.1 Concreting G 35 ‐0.14 days 1 day RM 1,680.00 Sun 28/5/23 Sun 28/5/23 NA NA 0 0 RM 0.00 RM 0.00
1633 1.3.3.6.1 Plastering ‐0.18 days 2 days RM 661.33 Wed 5/7/23 Sun 9/7/23 NA NA 0 0 RM 0.00 RM 0.00
1634 1.3.3.6.1 Painting ‐0.18 days 2 days RM 200.67 Mon 30/10/23 Wed 1/11/23 NA NA 0 0 RM 0.00 RM 0.00
1635 1.3.3.6.1 Hand Railing ‐0.18 days 5 days RM 14,040.00 Wed 1/11/23 Wed 8/11/23 NA NA 0 0 RM 0.00 RM 0.00
1636 1.3.3.6.1 Tiling ‐0.18 days 7 days RM 2,974.93 Wed 8/11/23 Mon 20/11/23 NA NA 0 0 RM 0.00 RM 0.00
1637 1.3.3.6.2 S/case E ‐0.18 days 122.1 days RM 23,873.20 Wed 24/5/23 Wed 22/11/23 NA NA 0 0 RM 0.00 RM 0.00
1638 1.3.3.6.2 Formwork ‐0.14 days 3 days RM 1,118.00 Wed 24/5/23 Sun 28/5/23 NA NA 0 0 RM 0.00 RM 0.00
1639 1.3.3.6.2 Reinforcement Rebar ‐0.14 days 2 days RM 3,198.27 Mon 29/5/23 Tue 30/5/23 NA NA 0 0 RM 0.00 RM 0.00
1640 1.3.3.6.2 Concreting G 35 ‐0.14 days 1 day RM 1,680.00 Wed 31/5/23 Wed 31/5/23 NA NA 0 0 RM 0.00 RM 0.00
1641 1.3.3.6.2 Plastering ‐0.18 days 2 days RM 661.33 Sun 9/7/23 Tue 11/7/23 NA NA 0 0 RM 0.00 RM 0.00
1642 1.3.3.6.2 Painting ‐0.18 days 2 days RM 200.67 Wed 1/11/23 Sun 5/11/23 NA NA 0 0 RM 0.00 RM 0.00
1643 1.3.3.6.2 Hand Railing ‐0.18 days 5 days RM 14,040.00 Sun 5/11/23 Mon 13/11/23 NA NA 0 0 RM 0.00 RM 0.00
1644 1.3.3.6.2 Tiling ‐0.18 days 7 days RM 2,974.93 Mon 13/11/23 Wed 22/11/23 NA NA 0 0 RM 0.00 RM 0.00
1645 1.3.3.6.3 S/case F ‐0.18 days 126.1 days RM 23,873.20 Mon 29/5/23 Sun 3/12/23 NA NA 0 0 RM 0.00 RM 0.00
1646 1.3.3.6.3 Formwork ‐0.14 days 3 days RM 1,118.00 Mon 29/5/23 Wed 31/5/23 NA NA 0 0 RM 0.00 RM 0.00
1647 1.3.3.6.3 Reinforcement Rebar ‐0.14 days 2 days RM 3,198.27 Thu 1/6/23 Sun 4/6/23 NA NA 0 0 RM 0.00 RM 0.00
1648 1.3.3.6.3 Concreting G 35 ‐0.14 days 1 day RM 1,680.00 Tue 6/6/23 Tue 6/6/23 NA NA 0 0 RM 0.00 RM 0.00
1649 1.3.3.6.3 Plastering ‐0.18 days 2 days RM 661.33 Tue 11/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
1650 1.3.3.6.3 Painting ‐0.18 days 2 days RM 200.67 Sun 5/11/23 Tue 7/11/23 NA NA 0 0 RM 0.00 RM 0.00
1651 1.3.3.6.3 Hand Railing ‐0.18 days 5 days RM 14,040.00 Tue 7/11/23 Wed 15/11/23 NA NA 0 0 RM 0.00 RM 0.00
1652 1.3.3.6.3 Tiling ‐0.18 days 7 days RM 2,974.93 Wed 22/11/23 Sun 3/12/23 NA NA 0 0 RM 0.00 RM 0.00
1653 1.3.3.7 Roof ‐0.14 days 76 days RM 1,622,445.84 Tue 6/6/23 Tue 26/9/23 NA NA 0 0 RM 0.00 RM 0.00
1654 1.3.3.7.1 Flat Roof ‐0.14 days 7 days RM 42,127.20 Tue 6/6/23 Wed 14/6/23 NA NA 0 0 RM 0.00 RM 0.00
1655 1.3.3.7.1 Soffit Formwork ‐0.14 days 5 days RM 12,540.00 Tue 6/6/23 Mon 12/6/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1656 1.3.3.7.1 Reinforcement Rebar ‐0.14 days 3 days RM 15,198.00 Sun 11/6/23 Tue 13/6/23 NA NA 0 0 RM 0.00 RM 0.00
1657 1.3.3.7.1 Concreting G 35 ‐0.14 days 2 days RM 14,389.20 Tue 13/6/23 Wed 14/6/23 NA NA 0 0 RM 0.00 RM 0.00
1658 1.3.3.7.2 Steel Roof System ‐0.14 days 24 days RM 964,066.28 Sun 11/6/23 Mon 17/7/23 NA NA 0 0 RM 0.00 RM 0.00
1659 1.3.3.7.2 Fabrications ‐0.14 days 20 days RM 29,482.28 Thu 15/6/23 Mon 17/7/23 NA NA 0 0 RM 0.00 RM 0.00
1660 1.3.3.7.2 Installation ‐0.14 days 15 days RM 900,000.00 Sun 11/6/23 Tue 4/7/23 NA NA 0 0 RM 0.00 RM 0.00
1661 1.3.3.7.2 Safety Rail ‐0.14 days 2 days RM 1,875.00 Wed 5/7/23 Thu 6/7/23 NA NA 0 0 RM 0.00 RM 0.00
1662 1.3.3.7.2 MS Ledge ‐0.14 days 5 days RM 32,709.00 Sun 9/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
1663 1.3.3.7.3 RooF Finishes ‐0.14 days 51 days RM 616,252.36 Sun 16/7/23 Tue 26/9/23 NA NA 0 0 RM 0.00 RM 0.00
1664 1.3.3.7.3 Flat Roof ‐0.14 days 12 days RM 55,233.00 Sun 16/7/23 Tue 1/8/23 NA NA 0 0 RM 0.00 RM 0.00
1665 1.3.3.7.3 2 Layers w/proof membrane ‐0.14 days 2 days RM 41,833.00 Sun 16/7/23 Mon 17/7/23 NA NA 0 0 RM 0.00 RM 0.00
1666 1.3.3.7.3 Ponding Test ‐0.14 days 3 days RM 3,300.00 Tue 18/7/23 Sun 23/7/23 NA NA 0 0 RM 0.00 RM 0.00
1667 1.3.3.7.3 Cement Render + w/roof compou‐0.14 days 7 days RM 10,100.00 Mon 24/7/23 Tue 1/8/23 NA NA 0 0 RM 0.00 RM 0.00
1668 1.3.3.7.3 Metal Deck Roofing ‐0.14 days 39 days RM 561,019.36 Wed 2/8/23 Tue 26/9/23 NA NA 0 0 RM 0.00 RM 0.00
1669 1.3.3.7.3 Aluminium Foil ‐0.14 days 5 days RM 28,967.40 Wed 2/8/23 Tue 8/8/23 NA NA 0 0 RM 0.00 RM 0.00
1670 1.3.3.7.3 Wool Insulation ‐0.14 days 5 days RM 45,738.00 Wed 9/8/23 Tue 15/8/23 NA NA 0 0 RM 0.00 RM 0.00
1671 1.3.3.7.3 Polyethylene Foam ‐0.14 days 4 days RM 32,931.36 Wed 16/8/23 Mon 21/8/23 NA NA 0 0 RM 0.00 RM 0.00
1672 1.3.3.7.3 G.I Strip ‐0.14 days 3 days RM 37,224.00 Tue 22/8/23 Thu 24/8/23 NA NA 0 0 RM 0.00 RM 0.00
1673 1.3.3.7.3 Metal Deck ‐0.14 days 6 days RM 286,377.60 Sun 27/8/23 Sun 3/9/23 NA NA 0 0 RM 0.00 RM 0.00
1674 1.3.3.7.3 Flashing & Capping + Painting ‐0.14 days 4 days RM 46,308.50 Mon 4/9/23 Thu 7/9/23 NA NA 0 0 RM 0.00 RM 0.00
1675 1.3.3.7.3 Zinc Gutter ‐0.14 days 4 days RM 11,935.00 Sun 10/9/23 Wed 13/9/23 NA NA 0 0 RM 0.00 RM 0.00
1676 1.3.3.7.3 UPVC Gutter ‐0.14 days 4 days RM 22,522.50 Thu 14/9/23 Wed 20/9/23 NA NA 0 0 RM 0.00 RM 0.00
1677 1.3.3.7.3 UPVC Rain Water Down Pipe ‐0.14 days 4 days RM 49,015.00 Thu 21/9/23 Tue 26/9/23 NA NA 0 0 RM 0.00 RM 0.00
1678 1.3.3.8 External Walls ‐0.14 days 178.9 days RM 326,485.20 Mon 8/5/23 Wed 24/1/24 NA NA 0 0 RM 0.00 RM 0.00
1679 1.3.3.8.1 Half Brick + DPC + Facing Brick ‐0.18 days 14 days RM 23,359.50 Mon 8/5/23 Sun 28/5/23 NA NA 0 0 RM 0.00 RM 0.00
1680 1.3.3.8.1 Level 1 ‐0.18 days 7 days RM 11,679.75 Mon 8/5/23 Wed 17/5/23 NA NA 0 0 RM 0.00 RM 0.00
1681 1.3.3.8.1 Level 2 ‐0.18 days 7 days RM 11,679.75 Wed 17/5/23 Sun 28/5/23 NA NA 0 0 RM 0.00 RM 0.00
1682 1.3.3.8.2 AAC Block + DPC ‐0.18 days 30 days RM 140,866.60 Sun 28/5/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
1683 1.3.3.8.2 Level 1 ‐0.18 days 15 days RM 70,433.30 Sun 28/5/23 Mon 19/6/23 NA NA 0 0 RM 0.00 RM 0.00
1684 1.3.3.8.2 Level 2 ‐0.18 days 15 days RM 70,433.30 Mon 19/6/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
1685 1.3.3.8.3 Gypsum Board Partition ‐0.18 days 14 days RM 8,946.00 Thu 13/7/23 Thu 3/8/23 NA NA 0 0 RM 0.00 RM 0.00
1686 1.3.3.8.4 Cem Board Partition ‐0.18 days 14 days RM 14,800.00 Thu 3/8/23 Wed 23/8/23 NA NA 0 0 RM 0.00 RM 0.00
1687 1.3.3.8.5 6mm Bonding Tie ‐0.18 days 7 days RM 645.00 Wed 23/8/23 Sun 3/9/23 NA NA 0 0 RM 0.00 RM 0.00
1688 1.3.3.8.6 75mm x 75mm Concrete Coping ‐0.18 days 7 days RM 8,536.50 Sun 3/9/23 Tue 12/9/23 NA NA 0 0 RM 0.00 RM 0.00
1689 1.3.3.8.7 Parapet Wall ‐0.18 days 6 days RM 7,614.60 Thu 13/7/23 Mon 24/7/23 NA NA 0 0 RM 0.00 RM 0.00
1690 1.3.3.8.7 Formwork ‐0.18 days 4 days RM 3,724.00 Thu 13/7/23 Thu 20/7/23 NA NA 0 0 RM 0.00 RM 0.00
1691 1.3.3.8.7 Reinforcement Rebar ‐0.18 days 2 days RM 1,832.60 Tue 18/7/23 Sun 23/7/23 NA NA 0 0 RM 0.00 RM 0.00
1692 1.3.3.8.7 Concreting G 35 ‐0.18 days 1 day RM 2,058.00 Sun 23/7/23 Mon 24/7/23 NA NA 0 0 RM 0.00 RM 0.00
1693 1.3.3.8.8 Façade ‐0.14 days 134.9 days RM 121,717.00 Thu 13/7/23 Wed 24/1/24 NA NA 0 0 RM 0.00 RM 0.00
1694 1.3.3.8.8 Vent Block ‐0.14 days 20 days RM 11,135.00 Thu 19/10/23 Thu 16/11/23 NA NA 0 0 RM 0.00 RM 0.00
1695 1.3.3.8.8 Section 1 ‐0.14 days 10 days RM 5,567.50 Thu 19/10/23 Wed 1/11/23 NA NA 0 0 RM 0.00 RM 0.00
1696 1.3.3.8.8 Section 2 ‐0.14 days 10 days RM 5,567.50 Thu 2/11/23 Thu 16/11/23 NA NA 0 0 RM 0.00 RM 0.00
1697 1.3.3.8.8 Alluminium Louvers ‐0.14 days 14 days RM 27,450.00 Thu 19/10/23 Tue 7/11/23 NA NA 0 0 RM 0.00 RM 0.00
1698 1.3.3.8.8 Section 1 ‐0.14 days 7 days RM 13,725.00 Thu 19/10/23 Sun 29/10/23 NA NA 0 0 RM 0.00 RM 0.00
1699 1.3.3.8.8 Section 2 ‐0.14 days 7 days RM 13,725.00 Mon 30/10/23 Tue 7/11/23 NA NA 0 0 RM 0.00 RM 0.00
1700 1.3.3.8.8 Curtain Wall ‐0.14 days 107.9 days RM 7,320.00 Thu 13/7/23 Sun 17/12/23 NA NA 0 0 RM 0.00 RM 0.00
1701 1.3.3.8.8 Section 1 ‐0.14 days 104.9 days RM 3,660.00 Thu 13/7/23 Tue 12/12/23 NA NA 0 0 RM 0.00 RM 0.00
1702 1.3.3.8.8 Frame ‐0.18 days 3 days RM 660.00 Thu 13/7/23 Tue 18/7/23 NA NA 0 0 RM 0.00 RM 0.00
1703 1.3.3.8.8 Glass ‐0.14 days 3 days RM 3,000.00 Sun 10/12/23 Tue 12/12/23 NA NA 0 0 RM 0.00 RM 0.00
1704 1.3.3.8.8 Section 2 ‐0.14 days 104.9 days RM 3,660.00 Tue 18/7/23 Sun 17/12/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1705 1.3.3.8.8 Frame ‐0.18 days 3 days RM 660.00 Tue 18/7/23 Mon 24/7/23 NA NA 0 0 RM 0.00 RM 0.00
1706 1.3.3.8.8 Glass ‐0.14 days 3 days RM 3,000.00 Wed 13/12/23 Sun 17/12/23 NA NA 0 0 RM 0.00 RM 0.00
1707 1.3.3.8.8 Aluminium Zinc ‐0.14 days 40 days RM 16,598.00 Mon 20/11/23 Mon 15/1/24 NA NA 0 0 RM 0.00 RM 0.00
1708 1.3.3.8.8 Section 1 ‐0.14 days 20 days RM 8,299.00 Mon 20/11/23 Sun 17/12/23 NA NA 0 0 RM 0.00 RM 0.00
1709 1.3.3.8.8 Section 2 ‐0.14 days 20 days RM 8,299.00 Mon 18/12/23 Mon 15/1/24 NA NA 0 0 RM 0.00 RM 0.00
1710 1.3.3.8.8 Aluminium Fins ‐0.14 days 40 days RM 56,463.00 Mon 20/11/23 Mon 15/1/24 NA NA 0 0 RM 0.00 RM 0.00
1711 1.3.3.8.8 Section 1 ‐0.14 days 20 days RM 28,231.50 Mon 20/11/23 Sun 17/12/23 NA NA 0 0 RM 0.00 RM 0.00
1712 1.3.3.8.8 Section 2 ‐0.14 days 20 days RM 28,231.50 Mon 18/12/23 Mon 15/1/24 NA NA 0 0 RM 0.00 RM 0.00
1713 1.3.3.8.8 Timber Strip ‐0.14 days 7 days RM 2,751.00 Tue 16/1/24 Wed 24/1/24 NA NA 0 0 RM 0.00 RM 0.00
1714 1.3.3.9 Internal Wall ‐0.18 days 52 days RM 96,715.50 Wed 17/5/23 Sun 6/8/23 NA NA 0 0 RM 0.00 RM 0.00
1715 1.3.3.9.1 Half Brick + DPC ‐0.18 days 14 days RM 12,692.90 Wed 17/5/23 Wed 7/6/23 NA NA 0 0 RM 0.00 RM 0.00
1716 1.3.3.9.1 Level 1 ‐0.18 days 7 days RM 6,346.45 Wed 17/5/23 Sun 28/5/23 NA NA 0 0 RM 0.00 RM 0.00
1717 1.3.3.9.1 Level 2 ‐0.18 days 7 days RM 6,346.45 Sun 28/5/23 Wed 7/6/23 NA NA 0 0 RM 0.00 RM 0.00
1718 1.3.3.9.2 AAC Block + DPC ‐0.18 days 28 days RM 73,168.00 Wed 7/6/23 Sun 23/7/23 NA NA 0 0 RM 0.00 RM 0.00
1719 1.3.3.9.2 Level 1 ‐0.18 days 14 days RM 36,584.00 Wed 7/6/23 Sun 2/7/23 NA NA 0 0 RM 0.00 RM 0.00
1720 1.3.3.9.2 Level 2 ‐0.18 days 14 days RM 36,584.00 Sun 2/7/23 Sun 23/7/23 NA NA 0 0 RM 0.00 RM 0.00
1721 1.3.3.9.3 6mm Bonding Tie ‐0.18 days 5 days RM 18.60 Sun 23/7/23 Sun 30/7/23 NA NA 0 0 RM 0.00 RM 0.00
1722 1.3.3.9.4 Phenolic Board ‐0.18 days 5 days RM 10,836.00 Sun 30/7/23 Sun 6/8/23 NA NA 0 0 RM 0.00 RM 0.00
1723 1.3.3.10 Windows ‐0.18 days 74 days RM 176,511.00 Sun 28/5/23 Thu 14/9/23 NA NA 0 0 RM 0.00 RM 0.00
1724 1.3.3.10. Concrete Lintol ‐0.18 days 14 days RM 4,115.00 Sun 28/5/23 Sun 18/6/23 NA NA 0 0 RM 0.00 RM 0.00
1725 1.3.3.10. Level 1 ‐0.18 days 7 days RM 2,057.50 Sun 28/5/23 Wed 7/6/23 NA NA 0 0 RM 0.00 RM 0.00
1726 1.3.3.10. Level 2 ‐0.18 days 7 days RM 2,057.50 Wed 7/6/23 Sun 18/6/23 NA NA 0 0 RM 0.00 RM 0.00
1727 1.3.3.10. Powder Coated Alu Window Frame ‐0.18 days 20 days RM 110,273.00 Sun 18/6/23 Thu 20/7/23 NA NA 0 0 RM 0.00 RM 0.00

1728 1.3.3.10. Level 1 ‐0.18 days 10 days RM 55,136.50 Sun 18/6/23 Wed 5/7/23 NA NA 0 0 RM 0.00 RM 0.00
1729 1.3.3.10. Level 2 ‐0.18 days 10 days RM 55,136.50 Wed 5/7/23 Thu 20/7/23 NA NA 0 0 RM 0.00 RM 0.00
1730 1.3.3.10. Clear Float Glass ‐0.18 days 40 days RM 62,123.00 Thu 20/7/23 Thu 14/9/23 NA NA 0 0 RM 0.00 RM 0.00
1731 1.3.3.10. Section 1 ‐0.18 days 20 days RM 31,061.50 Thu 20/7/23 Thu 17/8/23 NA NA 0 0 RM 0.00 RM 0.00
1732 1.3.3.10. Section 2 ‐0.18 days 20 days RM 31,061.50 Thu 17/8/23 Thu 14/9/23 NA NA 0 0 RM 0.00 RM 0.00
1733 1.3.3.11 Doors ‐0.18 days 102 days RM 215,489.20 Sun 18/6/23 Thu 16/11/23 NA NA 0 0 RM 0.00 RM 0.00
1734 1.3.3.11. Concrete Lintols ‐0.18 days 45 days RM 3,748.00 Sun 18/6/23 Thu 24/8/23 NA NA 0 0 RM 0.00 RM 0.00
1735 1.3.3.11. 110mm x 150mm ‐0.18 days 15 days RM 510.00 Sun 18/6/23 Wed 12/7/23 NA NA 0 0 RM 0.00 RM 0.00
1736 1.3.3.11. 125mm x 150mm ‐0.18 days 15 days RM 2,418.00 Wed 12/7/23 Thu 3/8/23 NA NA 0 0 RM 0.00 RM 0.00
1737 1.3.3.11. 250mm x 150mm ‐0.18 days 15 days RM 820.00 Thu 3/8/23 Thu 24/8/23 NA NA 0 0 RM 0.00 RM 0.00
1738 1.3.3.11. Metal Door Frames ‐0.18 days 31 days RM 21,743.20 Thu 24/8/23 Tue 10/10/23 NA NA 0 0 RM 0.00 RM 0.00
1739 1.3.3.11. Level 1 ‐0.18 days 26 days RM 10,871.60 Thu 24/8/23 Tue 3/10/23 NA NA 0 0 RM 0.00 RM 0.00
1740 1.3.3.11. Frame ‐0.18 days 5 days RM 2,613.00 Thu 24/8/23 Thu 31/8/23 NA NA 0 0 RM 0.00 RM 0.00
1741 1.3.3.11. Flush Door ‐0.18 days 5 days RM 7,091.00 Thu 21/9/23 Sun 1/10/23 NA NA 0 0 RM 0.00 RM 0.00
1742 1.3.3.11. Painting ‐0.18 days 2 days RM 1,167.60 Sun 1/10/23 Tue 3/10/23 NA NA 0 0 RM 0.00 RM 0.00
1743 1.3.3.11. Level 2 ‐0.18 days 26 days RM 10,871.60 Thu 31/8/23 Tue 10/10/23 NA NA 0 0 RM 0.00 RM 0.00
1744 1.3.3.11. Frame ‐0.18 days 5 days RM 2,613.00 Thu 31/8/23 Thu 7/9/23 NA NA 0 0 RM 0.00 RM 0.00
1745 1.3.3.11. Flush Door ‐0.18 days 5 days RM 7,091.00 Sun 1/10/23 Sun 8/10/23 NA NA 0 0 RM 0.00 RM 0.00
1746 1.3.3.11. Painting ‐0.18 days 2 days RM 1,167.60 Sun 8/10/23 Tue 10/10/23 NA NA 0 0 RM 0.00 RM 0.00
1747 1.3.3.11. Fire Rated Door ‐0.18 days 4 days RM 7,480.00 Sun 1/10/23 Thu 5/10/23 NA NA 0 0 RM 0.00 RM 0.00
1748 1.3.3.11. Level 1 ‐0.18 days 2 days RM 3,740.00 Sun 1/10/23 Tue 3/10/23 NA NA 0 0 RM 0.00 RM 0.00
1749 1.3.3.11. Level 2 ‐0.18 days 2 days RM 3,740.00 Tue 3/10/23 Thu 5/10/23 NA NA 0 0 RM 0.00 RM 0.00
1750 1.3.3.11. Aluminium Roller Shutter ‐0.18 days 10 days RM 137,320.00 Thu 5/10/23 Thu 19/10/23 NA NA 0 0 RM 0.00 RM 0.00
1751 1.3.3.11.4 Level 1 ‐0.18 days 5 days RM 68,660.00 Thu 5/10/23 Thu 12/10/23 NA NA 0 0 RM 0.00 RM 0.00
1752 1.3.3.11.4 Level 2 ‐0.18 days 5 days RM 68,660.00 Thu 12/10/23 Thu 19/10/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1753 1.3.3.11. Timber Sliding Door ‐0.18 days 7 days RM 1,408.00 Thu 19/10/23 Mon 30/10/23 NA NA 0 0 RM 0.00 RM 0.00
1754 1.3.3.11. Glass Door ‐0.18 days 7 days RM 19,150.00 Mon 30/10/23 Wed 8/11/23 NA NA 0 0 RM 0.00 RM 0.00
1755 1.3.3.11. Phenolic Door ‐0.18 days 12 days RM 24,640.00 Mon 30/10/23 Thu 16/11/23 NA NA 0 0 RM 0.00 RM 0.00
1756 1.3.3.11. Level 1 ‐0.18 days 6 days RM 12,320.00 Mon 30/10/23 Tue 7/11/23 NA NA 0 0 RM 0.00 RM 0.00
1757 1.3.3.11. Level 2 ‐0.18 days 6 days RM 12,320.00 Tue 7/11/23 Thu 16/11/23 NA NA 0 0 RM 0.00 RM 0.00
1758 1.3.3.12 External Floor Finishes ‐0.18 days 80 days RM 148,679.20 Sun 6/8/23 Wed 29/11/23 NA NA 0 0 RM 0.00 RM 0.00
1759 1.3.3.12. Cement Render ‐0.18 days 14 days RM 12,914.00 Sun 6/8/23 Thu 24/8/23 NA NA 0 0 RM 0.00 RM 0.00
1760 1.3.3.12. Tiling ‐0.18 days 66 days RM 135,765.20 Thu 24/8/23 Wed 29/11/23 NA NA 0 0 RM 0.00 RM 0.00
1761 1.3.3.12. 300mm x 600mm homogenous + S ‐0.18 days 40 days RM 122,437.30 Thu 24/8/23 Mon 23/10/23 NA NA 0 0 RM 0.00 RM 0.00
1762 1.3.3.12. Section 1 ‐0.18 days 20 days RM 61,218.65 Thu 24/8/23 Sun 24/9/23 NA NA 0 0 RM 0.00 RM 0.00
1763 1.3.3.12. Section 2 ‐0.18 days 20 days RM 61,218.65 Sun 24/9/23 Mon 23/10/23 NA NA 0 0 RM 0.00 RM 0.00
1764 1.3.3.12. 300mm x 600mm anti slip homogen‐0.18 days 10 days RM 3,968.90 Tue 24/10/23 Tue 7/11/23 NA NA 0 0 RM 0.00 RM 0.00
1765 1.3.3.12. 300mm x 300mm homogenous tact‐0.18 days 10 days RM 7,315.00 Tue 7/11/23 Wed 22/11/23 NA NA 0 0 RM 0.00 RM 0.00
1766 1.3.3.12. C‐channel Strip ‐0.18 days 5 days RM 2,044.00 Wed 22/11/23 Wed 29/11/23 NA NA 0 0 RM 0.00 RM 0.00
1767 1.3.3.13 Internal Floor Finishes ‐0.18 days 110 days RM 92,339.15 Wed 23/8/23 Tue 30/1/24 NA NA 0 0 RM 0.00 RM 0.00
1768 1.3.3.13. Cement Render ‐0.18 days 10 days RM 8,140.00 Thu 24/8/23 Thu 7/9/23 NA NA 0 0 RM 0.00 RM 0.00
1769 1.3.3.13. Cement Render + Epoxy Paint ‐0.18 days 5 days RM 528.00 Thu 7/9/23 Thu 14/9/23 NA NA 0 0 RM 0.00 RM 0.00
1770 1.3.3.13. Tiling ‐0.18 days 43 days RM 63,092.90 Wed 29/11/23 Tue 30/1/24 NA NA 0 0 RM 0.00 RM 0.00
1771 1.3.3.13. 300mm x 300mm Non Slip ‐0.18 days 20 days RM 39,427.00 Wed 29/11/23 Thu 28/12/23 NA NA 0 0 RM 0.00 RM 0.00
1772 1.3.3.13. 300mm x 600mm Non Slip ‐0.18 days 20 days RM 21,505.90 Thu 28/12/23 Thu 25/1/24 NA NA 0 0 RM 0.00 RM 0.00
1773 1.3.3.13. Epoxy Paint ‐0.18 days 3 days RM 2,160.00 Thu 25/1/24 Tue 30/1/24 NA NA 0 0 RM 0.00 RM 0.00
1774 1.3.3.13. Water Proofing ‐0.18 days 8 days RM 20,578.25 Wed 23/8/23 Mon 4/9/23 NA NA 0 0 RM 0.00 RM 0.00
1775 1.3.3.13. Level 1 ‐0.18 days 4 days RM 10,289.13 Wed 23/8/23 Tue 29/8/23 NA NA 0 0 RM 0.00 RM 0.00
1776 1.3.3.13.4 Floor Slabs ‐0.18 days 2 days RM 2,983.75 Wed 23/8/23 Sun 27/8/23 NA NA 0 0 RM 0.00 RM 0.00
1777 1.3.3.13.4 Walls ‐0.18 days 2 days RM 7,305.38 Sun 27/8/23 Tue 29/8/23 NA NA 0 0 RM 0.00 RM 0.00
1778 1.3.3.13. Level 2 ‐0.18 days 4 days RM 10,289.12 Tue 29/8/23 Mon 4/9/23 NA NA 0 0 RM 0.00 RM 0.00
1779 1.3.3.13.4 Floor Slabs ‐0.18 days 2 days RM 2,983.74 Tue 29/8/23 Thu 31/8/23 NA NA 0 0 RM 0.00 RM 0.00
1780 1.3.3.13.4 Walls ‐0.18 days 2 days RM 7,305.38 Thu 31/8/23 Mon 4/9/23 NA NA 0 0 RM 0.00 RM 0.00
1781 1.3.3.14 External Ceiling Finishes ‐0.14 days 80 days RM 269,500.00 Thu 19/10/23 Sun 11/2/24 NA NA 0 0 RM 0.00 RM 0.00
1782 1.3.3.14. Plasterboard ‐0.14 days 40 days RM 37,125.00 Thu 19/10/23 Thu 14/12/23 NA NA 0 0 RM 0.00 RM 0.00
1783 1.3.3.14. Frames ‐0.14 days 20 days RM 7,125.00 Thu 19/10/23 Thu 16/11/23 NA NA 0 0 RM 0.00 RM 0.00
1784 1.3.3.14. Board ‐0.14 days 20 days RM 30,000.00 Sun 19/11/23 Thu 14/12/23 NA NA 0 0 RM 0.00 RM 0.00
1785 1.3.3.14. Aluminium Strip Ceiling ‐0.14 days 40 days RM 232,375.00 Sun 17/12/23 Sun 11/2/24 NA NA 0 0 RM 0.00 RM 0.00
1786 1.3.3.14. Section 1 ‐0.14 days 20 days RM 116,187.50 Sun 17/12/23 Sun 14/1/24 NA NA 0 0 RM 0.00 RM 0.00
1787 1.3.3.14. Section 2 ‐0.14 days 20 days RM 116,187.50 Mon 15/1/24 Sun 11/2/24 NA NA 0 0 RM 0.00 RM 0.00
1788 1.3.3.15 Internal Ceiling Finishes ‐0.18 days 92 days RM 88,983.10 Wed 12/7/23 Thu 23/11/23 NA NA 0 0 RM 0.00 RM 0.00
1789 1.3.3.15. Skim Coat ‐0.18 days 10 days RM 1,114.00 Thu 3/8/23 Thu 17/8/23 NA NA 0 0 RM 0.00 RM 0.00
1790 1.3.3.15. Soffit Slab ‐0.18 days 7 days RM 876.00 Thu 3/8/23 Mon 14/8/23 NA NA 0 0 RM 0.00 RM 0.00
1791 1.3.3.15. Painting ‐0.18 days 3 days RM 238.00 Mon 14/8/23 Thu 17/8/23 NA NA 0 0 RM 0.00 RM 0.00
1792 1.3.3.15. Plasterboard 1200mm x 600mm ‐0.18 days 92 days RM 86,441.10 Wed 12/7/23 Thu 23/11/23 NA NA 0 0 RM 0.00 RM 0.00
1793 1.3.3.15. Dry Area ‐0.18 days 77 days RM 79,452.50 Thu 3/8/23 Thu 23/11/23 NA NA 0 0 RM 0.00 RM 0.00
1794 1.3.3.15. Section 1 ‐0.18 days 35 days RM 38,746.25 Thu 3/8/23 Sun 24/9/23 NA NA 0 0 RM 0.00 RM 0.00
1795 1.3.3.15. Frame ‐0.18 days 20 days RM 8,746.25 Thu 3/8/23 Thu 31/8/23 NA NA 0 0 RM 0.00 RM 0.00
1796 1.3.3.15. Ceiling Board ‐0.18 days 15 days RM 30,000.00 Thu 31/8/23 Sun 24/9/23 NA NA 0 0 RM 0.00 RM 0.00
1797 1.3.3.15. Section 2 ‐0.18 days 35 days RM 38,746.25 Sun 24/9/23 Tue 14/11/23 NA NA 0 0 RM 0.00 RM 0.00
1798 1.3.3.15. Frame ‐0.18 days 20 days RM 8,746.25 Sun 24/9/23 Mon 23/10/23 NA NA 0 0 RM 0.00 RM 0.00
1799 1.3.3.15. Ceiling Board ‐0.18 days 15 days RM 30,000.00 Mon 23/10/23 Tue 14/11/23 NA NA 0 0 RM 0.00 RM 0.00
1800 1.3.3.15. Access Panel ‐0.18 days 7 days RM 1,960.00 Tue 14/11/23 Thu 23/11/23 NA NA 0 0 RM 0.00 RM 0.00
1801 1.3.3.15. Wet Area ‐0.18 days 26 days RM 6,988.60 Wed 12/7/23 Sun 20/8/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1802 1.3.3.15. Section 1 ‐0.18 days 8 days RM 3,314.30 Wed 12/7/23 Tue 25/7/23 NA NA 0 0 RM 0.00 RM 0.00
1803 1.3.3.15. Frame ‐0.18 days 5 days RM 314.30 Wed 12/7/23 Thu 20/7/23 NA NA 0 0 RM 0.00 RM 0.00
1804 1.3.3.15. Ceiling Board ‐0.18 days 3 days RM 3,000.00 Thu 20/7/23 Tue 25/7/23 NA NA 0 0 RM 0.00 RM 0.00
1805 1.3.3.15. Section 2 ‐0.18 days 11 days RM 3,674.30 Thu 3/8/23 Sun 20/8/23 NA NA 0 0 RM 0.00 RM 0.00
1806 1.3.3.15. Frame ‐0.18 days 5 days RM 314.30 Thu 3/8/23 Thu 10/8/23 NA NA 0 0 RM 0.00 RM 0.00
1807 1.3.3.15. Ceiling Board ‐0.18 days 3 days RM 3,000.00 Thu 10/8/23 Tue 15/8/23 NA NA 0 0 RM 0.00 RM 0.00
1808 1.3.3.15. Access Panel ‐0.18 days 3 days RM 360.00 Tue 15/8/23 Sun 20/8/23 NA NA 0 0 RM 0.00 RM 0.00
1809 1.3.3.15. Spray PU Foam ‐0.18 days 5 days RM 1,428.00 Thu 3/8/23 Thu 10/8/23 NA NA 0 0 RM 0.00 RM 0.00
1810 1.3.3.16 External Wall Finishes ‐0.14 days 62 days RM 84,089.00 Sun 10/9/23 Thu 7/12/23 NA NA 0 0 RM 0.00 RM 0.00
1811 1.3.3.16. Plastering (wall, column & beam) ‐0.14 days 27 days RM 6,740.00 Sun 10/9/23 Wed 18/10/23 NA NA 0 0 RM 0.00 RM 0.00
1812 1.3.3.16. Level 3 ‐0.14 days 7 days RM 740.00 Sun 10/9/23 Tue 19/9/23 NA NA 0 0 RM 0.00 RM 0.00
1813 1.3.3.16. Level 2 ‐0.14 days 10 days RM 3,000.00 Wed 20/9/23 Wed 4/10/23 NA NA 0 0 RM 0.00 RM 0.00
1814 1.3.3.16. Level 1 ‐0.14 days 10 days RM 3,000.00 Thu 5/10/23 Wed 18/10/23 NA NA 0 0 RM 0.00 RM 0.00
1815 1.3.3.16. Skim Coat AAC Block ‐0.14 days 20 days RM 35,340.00 Wed 20/9/23 Wed 18/10/23 NA NA 0 0 RM 0.00 RM 0.00
1816 1.3.3.16. Level 2 ‐0.14 days 10 days RM 17,670.00 Wed 20/9/23 Wed 4/10/23 NA NA 0 0 RM 0.00 RM 0.00
1817 1.3.3.16. Level 1 ‐0.14 days 10 days RM 17,670.00 Thu 5/10/23 Wed 18/10/23 NA NA 0 0 RM 0.00 RM 0.00
1818 1.3.3.16. Painting ‐0.14 days 35 days RM 39,084.00 Thu 19/10/23 Thu 7/12/23 NA NA 0 0 RM 0.00 RM 0.00
1819 1.3.3.16. Walls, Columns & Beams ‐0.14 days 35 days RM 39,084.00 Thu 19/10/23 Thu 7/12/23 NA NA 0 0 RM 0.00 RM 0.00
1820 1.3.3.16. Level 3 ‐0.14 days 7 days RM 9,084.00 Thu 19/10/23 Sun 29/10/23 NA NA 0 0 RM 0.00 RM 0.00
1821 1.3.3.16. Level 2 ‐0.14 days 14 days RM 15,000.00 Mon 30/10/23 Sun 19/11/23 NA NA 0 0 RM 0.00 RM 0.00
1822 1.3.3.16. Level 1 ‐0.14 days 14 days RM 15,000.00 Mon 20/11/23 Thu 7/12/23 NA NA 0 0 RM 0.00 RM 0.00
1823 1.3.3.16.4 Clear Lacquer (facing bricks) ‐0.14 days 14 days RM 2,925.00 Mon 20/11/23 Thu 7/12/23 NA NA 0 0 RM 0.00 RM 0.00
1824 1.3.3.17 Internal Wall Finishes ‐0.18 days 117 days RM 45,846.30 Wed 7/6/23 Tue 28/11/23 NA NA 0 0 RM 0.00 RM 0.00
1825 1.3.3.17. Plastering ‐0.18 days 17 days RM 2,860.00 Wed 7/6/23 Wed 5/7/23 NA NA 0 0 RM 0.00 RM 0.00
1826 1.3.3.17. Level 1 ‐0.18 days 7 days RM 1,430.00 Wed 7/6/23 Sun 18/6/23 NA NA 0 0 RM 0.00 RM 0.00
1827 1.3.3.17. Level 2 ‐0.18 days 10 days RM 1,430.00 Sun 18/6/23 Wed 5/7/23 NA NA 0 0 RM 0.00 RM 0.00
1828 1.3.3.17. Skim Coat AAC Block ‐0.18 days 30 days RM 18,225.00 Sun 18/6/23 Thu 3/8/23 NA NA 0 0 RM 0.00 RM 0.00
1829 1.3.3.17. Level 1 ‐0.18 days 15 days RM 9,112.50 Sun 18/6/23 Wed 12/7/23 NA NA 0 0 RM 0.00 RM 0.00
1830 1.3.3.17. Level 2 ‐0.18 days 15 days RM 9,112.50 Wed 12/7/23 Thu 3/8/23 NA NA 0 0 RM 0.00 RM 0.00
1831 1.3.3.17. Tiling ‐0.18 days 40 days RM 15,255.30 Thu 3/8/23 Mon 2/10/23 NA NA 0 0 RM 0.00 RM 0.00
1832 1.3.3.17. 300mm x 600mm ceramic wall tiles ‐0.18 days 20 days RM 14,240.00 Thu 3/8/23 Thu 31/8/23 NA NA 0 0 RM 0.00 RM 0.00
1833 1.3.3.17. 300mm x 600mm homogenous ‐0.18 days 20 days RM 1,015.30 Thu 31/8/23 Mon 2/10/23 NA NA 0 0 RM 0.00 RM 0.00
1834 1.3.3.17. Painting ‐0.18 days 40 days RM 9,506.00 Mon 2/10/23 Tue 28/11/23 NA NA 0 0 RM 0.00 RM 0.00
1835 1.3.3.17. Walls, Column & Beams ‐0.18 days 40 days RM 9,506.00 Mon 2/10/23 Tue 28/11/23 NA NA 0 0 RM 0.00 RM 0.00
1836 1.3.3.17.4 Level 1 ‐0.18 days 20 days RM 4,753.00 Mon 2/10/23 Mon 30/10/23 NA NA 0 0 RM 0.00 RM 0.00
1837 1.3.3.17.4 Level 2 ‐0.18 days 20 days RM 4,753.00 Mon 30/10/23 Tue 28/11/23 NA NA 0 0 RM 0.00 RM 0.00
1838 1.3.3.18 Sanitary Fittings ‐0.18 days 40 days RM 96,094.96 Thu 31/8/23 Mon 30/10/23 NA NA 0 0 RM 0.00 RM 0.00
1839 1.3.3.18. Section 1 ‐0.18 days 20 days RM 48,047.48 Thu 31/8/23 Mon 2/10/23 NA NA 0 0 RM 0.00 RM 0.00
1840 1.3.3.18. Section 2 ‐0.18 days 20 days RM 48,047.48 Mon 2/10/23 Mon 30/10/23 NA NA 0 0 RM 0.00 RM 0.00
1841 1.3.3.19 Fitting & Furnishing ‐0.18 days 40 days RM 135,520.00 Mon 30/10/23 Wed 27/12/23 NA NA 0 0 RM 0.00 RM 0.00
1842 1.3.3.19. Section 1 ‐0.18 days 20 days RM 67,760.00 Mon 30/10/23 Tue 28/11/23 NA NA 0 0 RM 0.00 RM 0.00
1843 1.3.3.19. Section 2 ‐0.18 days 20 days RM 67,760.00 Tue 28/11/23 Wed 27/12/23 NA NA 0 0 RM 0.00 RM 0.00
1844 1.3.3.20 Builders Works for Services ‐0.18 days 113 days RM 61,806.00 Sun 18/6/23 Sun 3/12/23 NA NA 0 0 RM 0.00 RM 0.00
1845 1.3.3.20. Counter Top ‐0.18 days 44 days RM 22,508.80 Sun 18/6/23 Wed 23/8/23 NA NA 0 0 RM 0.00 RM 0.00
1846 1.3.3.20. Formwork ‐0.18 days 10 days RM 2,597.00 Sun 18/6/23 Wed 5/7/23 NA NA 0 0 RM 0.00 RM 0.00
1847 1.3.3.20. Reinforcement Rebar ‐0.18 days 7 days RM 5,671.20 Wed 5/7/23 Sun 16/7/23 NA NA 0 0 RM 0.00 RM 0.00
1848 1.3.3.20. Concreting G 35 ‐0.18 days 3 days RM 2,156.00 Sun 16/7/23 Thu 20/7/23 NA NA 0 0 RM 0.00 RM 0.00
1849 1.3.3.20. Brickwork ‐0.18 days 5 days RM 825.00 Thu 20/7/23 Thu 27/7/23 NA NA 0 0 RM 0.00 RM 0.00
1850 1.3.3.20. Toilet Box Up Cover ‐0.18 days 5 days RM 550.00 Thu 27/7/23 Thu 3/8/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1851 1.3.3.20. Tiling ‐0.18 days 14 days RM 10,709.60 Thu 3/8/23 Wed 23/8/23 NA NA 0 0 RM 0.00 RM 0.00
1852 1.3.3.20. Ablution Bench ‐0.18 days 7 days RM 676.00 Wed 23/8/23 Sun 3/9/23 NA NA 0 0 RM 0.00 RM 0.00
1853 1.3.3.20. Brickwork ‐0.18 days 2 days RM 111.00 Wed 23/8/23 Sun 27/8/23 NA NA 0 0 RM 0.00 RM 0.00
1854 1.3.3.20. Concreting G 35 ‐0.18 days 2 days RM 280.00 Sun 27/8/23 Tue 29/8/23 NA NA 0 0 RM 0.00 RM 0.00
1855 1.3.3.20. Tiling ‐0.18 days 3 days RM 285.00 Tue 29/8/23 Sun 3/9/23 NA NA 0 0 RM 0.00 RM 0.00
1856 1.3.3.20. Concrete Bench ‐0.18 days 24 days RM 19,621.20 Sun 3/9/23 Mon 9/10/23 NA NA 0 0 RM 0.00 RM 0.00
1857 1.3.3.20. Formwork ‐0.18 days 7 days RM 836.00 Sun 3/9/23 Tue 12/9/23 NA NA 0 0 RM 0.00 RM 0.00
1858 1.3.3.20. Reinforcement Rebar ‐0.18 days 4 days RM 1,795.20 Tue 12/9/23 Tue 19/9/23 NA NA 0 0 RM 0.00 RM 0.00
1859 1.3.3.20. Concreting G 35 ‐0.18 days 3 days RM 3,640.00 Tue 19/9/23 Sun 24/9/23 NA NA 0 0 RM 0.00 RM 0.00
1860 1.3.3.20. Shanghai Pebble Wash ‐0.18 days 10 days RM 13,350.00 Sun 24/9/23 Mon 9/10/23 NA NA 0 0 RM 0.00 RM 0.00
1861 1.3.3.20. Decorotive Reinforced Concrete ‐0.18 days 38 days RM 19,000.00 Mon 9/10/23 Sun 3/12/23 NA NA 0 0 RM 0.00 RM 0.00
Plinth
1862 1.3.3.20.4 Formwork ‐0.18 days 12 days RM 1,000.00 Mon 9/10/23 Wed 25/10/23 NA NA 0 0 RM 0.00 RM 0.00
1863 1.3.3.20.4 Reinforcement Rebar ‐0.18 days 8 days RM 2,000.00 Wed 25/10/23 Mon 6/11/23 NA NA 0 0 RM 0.00 RM 0.00
1864 1.3.3.20.4 Concreting G 35 ‐0.18 days 4 days RM 3,000.00 Mon 6/11/23 Mon 13/11/23 NA NA 0 0 RM 0.00 RM 0.00
1865 1.3.3.20.4 Shanghai Pebble Wash ‐0.18 days 14 days RM 13,000.00 Mon 13/11/23 Sun 3/12/23 NA NA 0 0 RM 0.00 RM 0.00
1866 1.3.3.21 Sundries ‐0.18 days 40 days RM 42,143.00 Sun 3/9/23 Tue 31/10/23 NA NA 0 0 RM 0.00 RM 0.00
1867 1.3.3.21. Handrail & Balustrading ‐0.18 days 35 days RM 38,493.00 Sun 3/9/23 Tue 24/10/23 NA NA 0 0 RM 0.00 RM 0.00
1868 1.3.3.21. 300mm high mild steel railing ‐0.18 days 15 days RM 10,545.00 Sun 3/9/23 Mon 25/9/23 NA NA 0 0 RM 0.00 RM 0.00
1869 1.3.3.21. 1000mm high mild steel railing ‐0.18 days 15 days RM 23,400.00 Mon 25/9/23 Tue 17/10/23 NA NA 0 0 RM 0.00 RM 0.00
1870 1.3.3.21. Painting ‐0.18 days 5 days RM 4,548.00 Tue 17/10/23 Tue 24/10/23 NA NA 0 0 RM 0.00 RM 0.00
1871 1.3.3.21. Stainless Steel Ladder ‐0.18 days 3 days RM 350.00 Tue 24/10/23 Sun 29/10/23 NA NA 0 0 RM 0.00 RM 0.00
1872 1.3.3.21. MS Steel Lifting Cover ‐0.18 days 2 days RM 3,300.00 Sun 29/10/23 Tue 31/10/23 NA NA 0 0 RM 0.00 RM 0.00
1873 1.3.4 C3 ‐ TNB SUBSTATION ‐43.1 days 182.1 days RM 400,821.59 Wed 17/8/22 Tue 16/5/23 Wed 17/8/22 NA 0.35 19.07 RM 34,453.69 RM 44,963.29
1874 1.3.4.1 APK No.6 1 day 0 days RM 33,937.69 Sun 30/10/22 Sun 30/10/22 Sun 30/10/22 Sun 30/10/22 0 100 RM 33,937.69 RM 33,937.69
1875 1.3.4.1.1 Perubahan Rekabentuk TNB 1 day 0 days RM 33,937.69 Sun 30/10/22 Sun 30/10/22 Sun 30/10/22 Sun 30/10/22 0 100 RM 33,937.69 RM 33,937.69
Substation
1876 1.3.4.2 Work Below Lowest Floor Finish ‐50.1 days 151.1 days RM 53,198.60 Wed 17/8/22 Sun 26/3/23 Wed 17/8/22 NA 1.12 46.45 RM 516.00 RM 10,353.60
1877 1.3.4.2.1 Excavate Oversite 350mm Average De62 days 1 day RM 516.00 Wed 17/8/22 Wed 17/8/22 Wed 17/8/22 Tue 15/11/22 100 100 RM 516.00 RM 516.00
1878 1.3.4.2.2 Pile Cap ‐52.1 days 14 days RM 9,621.60 Thu 2/2/23 Thu 23/2/23 Tue 15/11/22 Tue 6/12/22 0 100 RM 0.00 RM 9,621.60
1879 1.3.4.2.2 Excavation ‐56.1 days 8 days RM 333.00 Thu 2/2/23 Tue 14/2/23 Tue 15/11/22 Tue 22/11/22 0 100 RM 0.00 RM 333.00
1880 1.3.4.2.2 Section A ‐49.1 days 1 day RM 166.50 Thu 2/2/23 Sun 5/2/23 Tue 15/11/22 Tue 22/11/22 0 100 RM 0.00 RM 166.50
1881 1.3.4.2.2 Section B ‐57.1 days 1 day RM 166.50 Mon 13/2/23 Tue 14/2/23 Thu 17/11/22 Mon 21/11/22 0 100 RM 0.00 RM 166.50
1882 1.3.4.2.2 Hardcore 150mm ‐56.1 days 8 days RM 158.40 Sun 5/2/23 Wed 15/2/23 Tue 22/11/22 Wed 23/11/22 0 100 RM 0.00 RM 158.40
1883 1.3.4.2.2 Section A ‐49.1 days 1 day RM 79.20 Sun 5/2/23 Mon 6/2/23 Tue 22/11/22 Wed 23/11/22 0 100 RM 0.00 RM 79.20
1884 1.3.4.2.2 Section B ‐56.1 days 1 day RM 79.20 Tue 14/2/23 Wed 15/2/23 Tue 22/11/22 Wed 23/11/22 0 100 RM 0.00 RM 79.20
1885 1.3.4.2.2 Lean Concrete G 20 ‐56.1 days 8 days RM 195.20 Mon 6/2/23 Thu 16/2/23 Thu 24/11/22 Thu 24/11/22 0 100 RM 0.00 RM 195.20
1886 1.3.4.2.2 Section A ‐49.1 days 1 day RM 97.60 Mon 6/2/23 Tue 7/2/23 Thu 24/11/22 Thu 24/11/22 0 100 RM 0.00 RM 97.60
1887 1.3.4.2.2 Section B ‐56.1 days 1 day RM 97.60 Wed 15/2/23 Thu 16/2/23 Thu 24/11/22 Thu 24/11/22 0 100 RM 0.00 RM 97.60
1888 1.3.4.2.2 Side Formwork ‐55.1 days 9 days RM 2,014.00 Tue 7/2/23 Tue 21/2/23 Sat 26/11/22 Tue 29/11/22 0 100 RM 0.00 RM 2,014.00
1889 1.3.4.2.2 Section A ‐49.1 days 2 days RM 1,007.00 Tue 7/2/23 Thu 9/2/23 Sat 26/11/22 Mon 28/11/22 0 100 RM 0.00 RM 1,007.00
1890 1.3.4.2.2 Section B ‐55.1 days 2 days RM 1,007.00 Thu 16/2/23 Tue 21/2/23 Sun 27/11/22 Tue 29/11/22 0 100 RM 0.00 RM 1,007.00
1891 1.3.4.2.2 Reinforcement Rebar ‐55.1 days 10 days RM 3,009.00 Tue 7/2/23 Wed 22/2/23 Tue 29/11/22 Wed 30/11/22 0 100 RM 0.00 RM 3,009.00
1892 1.3.4.2.2 Section A ‐48.1 days 3 days RM 1,504.50 Tue 7/2/23 Sun 12/2/23 Tue 29/11/22 Wed 30/11/22 0 100 RM 0.00 RM 1,504.50
1893 1.3.4.2.2 Section B ‐55.1 days 3 days RM 1,504.50 Thu 16/2/23 Wed 22/2/23 Tue 29/11/22 Wed 30/11/22 0 100 RM 0.00 RM 1,504.50
1894 1.3.4.2.2 Concreting G 35 ‐52.1 days 8 days RM 3,640.00 Thu 9/2/23 Wed 22/2/23 Thu 1/12/22 Mon 5/12/22 0 100 RM 0.00 RM 3,640.00
1895 1.3.4.2.2 Section A ‐47.1 days 1 day RM 1,820.00 Thu 9/2/23 Sun 12/2/23 Thu 1/12/22 Thu 1/12/22 0 100 RM 0.00 RM 1,820.00
1896 1.3.4.2.2 Section B ‐52.1 days 1 day RM 1,820.00 Tue 21/2/23 Wed 22/2/23 Thu 1/12/22 Mon 5/12/22 0 100 RM 0.00 RM 1,820.00
1897 1.3.4.2.2 Antitermite Treatment ‐52.1 days 8 days RM 272.00 Sun 12/2/23 Thu 23/2/23 Tue 6/12/22 Tue 6/12/22 0 100 RM 0.00 RM 272.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1898 1.3.4.2.2 Section A ‐45.1 days 1 day RM 136.00 Sun 12/2/23 Mon 13/2/23 Tue 6/12/22 Tue 6/12/22 0 100 RM 0.00 RM 136.00
1899 1.3.4.2.2 Section B ‐52.1 days 1 day RM 136.00 Wed 22/2/23 Thu 23/2/23 Tue 6/12/22 Tue 6/12/22 0 100 RM 0.00 RM 136.00
1900 1.3.4.2.3 Column Stumps ‐45.1 days 11 days RM 2,629.20 Mon 13/2/23 Wed 1/3/23 NA NA 0 0 RM 0.00 RM 0.00
1901 1.3.4.2.3 Side Formwork ‐45.1 days 8 days RM 988.00 Mon 13/2/23 Sun 26/2/23 NA NA 0 0 RM 0.00 RM 0.00
1902 1.3.4.2.3 Section A ‐38.1 days 1 day RM 494.00 Mon 13/2/23 Tue 14/2/23 NA NA 0 0 RM 0.00 RM 0.00
1903 1.3.4.2.3 Section B ‐45.1 days 1 day RM 494.00 Thu 23/2/23 Sun 26/2/23 NA NA 0 0 RM 0.00 RM 0.00
1904 1.3.4.2.3 Reinforcement Rebar ‐45.1 days 9 days RM 1,081.20 Tue 14/2/23 Tue 28/2/23 NA NA 0 0 RM 0.00 RM 0.00
1905 1.3.4.2.3 Section A ‐38.1 days 2 days RM 540.60 Tue 14/2/23 Thu 16/2/23 NA NA 0 0 RM 0.00 RM 0.00
1906 1.3.4.2.3 Section B ‐45.1 days 2 days RM 540.60 Sun 26/2/23 Tue 28/2/23 NA NA 0 0 RM 0.00 RM 0.00
1907 1.3.4.2.3 Concreting G 35 ‐45.1 days 8 days RM 560.00 Thu 16/2/23 Wed 1/3/23 NA NA 0 0 RM 0.00 RM 0.00
1908 1.3.4.2.3 Section A ‐38.1 days 1 day RM 280.00 Thu 16/2/23 Mon 20/2/23 NA NA 0 0 RM 0.00 RM 0.00
1909 1.3.4.2.3 Section B ‐45.1 days 1 day RM 280.00 Tue 28/2/23 Wed 1/3/23 NA NA 0 0 RM 0.00 RM 0.00
1910 1.3.4.2.4 Ground Beams ‐50.1 days 13 days RM 24,343.40 Mon 20/2/23 Thu 9/3/23 Wed 16/11/22 NA 0 39.13 RM 0.00 RM 216.00
1911 1.3.4.2.4 Excavation ‐67.1 days 8 days RM 216.00 Mon 20/2/23 Thu 2/3/23 Wed 16/11/22 Tue 22/11/22 0 100 RM 0.00 RM 216.00
1912 1.3.4.2.4 Section A ‐60.1 days 1 day RM 108.00 Mon 20/2/23 Tue 21/2/23 Wed 16/11/22 Tue 22/11/22 0 100 RM 0.00 RM 108.00
1913 1.3.4.2.4 Section B ‐68.1 days 1 day RM 108.00 Wed 1/3/23 Thu 2/3/23 Wed 16/11/22 Mon 21/11/22 0 100 RM 0.00 RM 108.00
1914 1.3.4.2.4 Lean Concrete G 20 ‐50.1 days 8 days RM 366.00 Tue 21/2/23 Sun 5/3/23 NA NA 0 0 RM 0.00 RM 0.00
1915 1.3.4.2.4 Section A ‐43.1 days 1 day RM 183.00 Tue 21/2/23 Wed 22/2/23 NA NA 0 0 RM 0.00 RM 0.00
1916 1.3.4.2.4 Section B ‐50.1 days 1 day RM 183.00 Thu 2/3/23 Sun 5/3/23 NA NA 0 0 RM 0.00 RM 0.00
1917 1.3.4.2.4 Side Formwork ‐50.1 days 9 days RM 7,714.00 Wed 22/2/23 Tue 7/3/23 NA NA 0 0 RM 0.00 RM 0.00
1918 1.3.4.2.4 Section A ‐43.1 days 2 days RM 3,857.00 Wed 22/2/23 Sun 26/2/23 NA NA 0 0 RM 0.00 RM 0.00
1919 1.3.4.2.4 Section B ‐50.1 days 2 days RM 3,857.00 Sun 5/3/23 Tue 7/3/23 NA NA 0 0 RM 0.00 RM 0.00
1920 1.3.4.2.4 Reinforcement Rebar ‐50.1 days 9 days RM 8,367.40 Wed 22/2/23 Tue 7/3/23 NA NA 0 0 RM 0.00 RM 0.00
1921 1.3.4.2.4 Section A ‐43.1 days 2 days RM 4,183.70 Wed 22/2/23 Sun 26/2/23 NA NA 0 0 RM 0.00 RM 0.00
1922 1.3.4.2.4 Section B ‐50.1 days 2 days RM 4,183.70 Sun 5/3/23 Tue 7/3/23 NA NA 0 0 RM 0.00 RM 0.00
1923 1.3.4.2.4 Concreting G 35 ‐50.1 days 8 days RM 7,280.00 Thu 23/2/23 Tue 7/3/23 NA NA 0 0 RM 0.00 RM 0.00
1924 1.3.4.2.4 Section A ‐43.1 days 1 day RM 3,640.00 Thu 23/2/23 Sun 26/2/23 NA NA 0 0 RM 0.00 RM 0.00
1925 1.3.4.2.4 Section B ‐50.1 days 1 day RM 3,640.00 Mon 6/3/23 Tue 7/3/23 NA NA 0 0 RM 0.00 RM 0.00
1926 1.3.4.2.4 Antitermite Treatment ‐50.1 days 8 days RM 400.00 Mon 27/2/23 Thu 9/3/23 NA NA 0 0 RM 0.00 RM 0.00
1927 1.3.4.2.4 Section A ‐43.1 days 1 day RM 200.00 Mon 27/2/23 Tue 28/2/23 NA NA 0 0 RM 0.00 RM 0.00
1928 1.3.4.2.4 Section B ‐50.1 days 1 day RM 200.00 Wed 8/3/23 Thu 9/3/23 NA NA 0 0 RM 0.00 RM 0.00
1929 1.3.4.2.5 Ground Floor Slabs ‐50.1 days 14 days RM 15,479.80 Tue 28/2/23 Mon 20/3/23 NA NA 0 0 RM 0.00 RM 0.00
1930 1.3.4.2.5 Hardcore 150mm ‐50.1 days 8 days RM 1,346.40 Tue 28/2/23 Sun 12/3/23 NA NA 0 0 RM 0.00 RM 0.00
1931 1.3.4.2.5 Section A ‐43.1 days 1 day RM 673.20 Tue 28/2/23 Wed 1/3/23 NA NA 0 0 RM 0.00 RM 0.00
1932 1.3.4.2.5 Section B ‐50.1 days 1 day RM 673.20 Thu 9/3/23 Sun 12/3/23 NA NA 0 0 RM 0.00 RM 0.00
1933 1.3.4.2.5 Antitermite Treatment ‐50.1 days 8 days RM 700.00 Wed 1/3/23 Mon 13/3/23 NA NA 0 0 RM 0.00 RM 0.00
1934 1.3.4.2.5 Section A ‐43.1 days 1 day RM 350.00 Wed 1/3/23 Thu 2/3/23 NA NA 0 0 RM 0.00 RM 0.00
1935 1.3.4.2.5 Section B ‐50.1 days 1 day RM 350.00 Sun 12/3/23 Mon 13/3/23 NA NA 0 0 RM 0.00 RM 0.00
1936 1.3.4.2.5 Lean Concrete G 20 ‐50.1 days 8 days RM 1,659.20 Thu 2/3/23 Tue 14/3/23 NA NA 0 0 RM 0.00 RM 0.00
1937 1.3.4.2.5 Section A ‐43.1 days 1 day RM 829.60 Thu 2/3/23 Sun 5/3/23 NA NA 0 0 RM 0.00 RM 0.00
1938 1.3.4.2.5 Section B ‐50.1 days 1 day RM 829.60 Mon 13/3/23 Tue 14/3/23 NA NA 0 0 RM 0.00 RM 0.00
1939 1.3.4.2.5 DPM ‐50.1 days 8 days RM 625.60 Sun 5/3/23 Wed 15/3/23 NA NA 0 0 RM 0.00 RM 0.00
1940 1.3.4.2.5 Section A ‐43.1 days 1 day RM 312.80 Sun 5/3/23 Mon 6/3/23 NA NA 0 0 RM 0.00 RM 0.00
1941 1.3.4.2.5 Section B ‐50.1 days 1 day RM 312.80 Tue 14/3/23 Wed 15/3/23 NA NA 0 0 RM 0.00 RM 0.00
1942 1.3.4.2.5 Reinforcement Rebar ‐50.1 days 9 days RM 5,436.60 Mon 6/3/23 Sun 19/3/23 NA NA 0 0 RM 0.00 RM 0.00
1943 1.3.4.2.5 Section A ‐43.1 days 2 days RM 2,718.30 Mon 6/3/23 Wed 8/3/23 NA NA 0 0 RM 0.00 RM 0.00
1944 1.3.4.2.5 Section B ‐50.1 days 2 days RM 2,718.30 Wed 15/3/23 Sun 19/3/23 NA NA 0 0 RM 0.00 RM 0.00
1945 1.3.4.2.5 Concreting G 35 & Curing ‐50.1 days 8 days RM 5,712.00 Wed 8/3/23 Mon 20/3/23 NA NA 0 0 RM 0.00 RM 0.00
1946 1.3.4.2.5 Section A ‐43.1 days 1 day RM 2,856.00 Wed 8/3/23 Thu 9/3/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1947 1.3.4.2.5 Section B ‐50.1 days 1 day RM 2,856.00 Sun 19/3/23 Mon 20/3/23 NA NA 0 0 RM 0.00 RM 0.00
1948 1.3.4.2.6 Based Plinth ‐50.1 days 4 days RM 608.60 Mon 20/3/23 Sun 26/3/23 NA NA 0 0 RM 0.00 RM 0.00
1949 1.3.4.2.6 Side Formwork ‐50.1 days 1 day RM 70.00 Mon 20/3/23 Tue 21/3/23 NA NA 0 0 RM 0.00 RM 0.00
1950 1.3.4.2.6 Reinforcement Rebar ‐50.1 days 2 days RM 370.60 Tue 21/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
1951 1.3.4.2.6 Concreting G 35 ‐50.1 days 1 day RM 168.00 Thu 23/3/23 Sun 26/3/23 NA NA 0 0 RM 0.00 RM 0.00
1952 1.3.4.3 Sundries ‐43.1 days 53 days RM 63,948.00 Tue 21/2/23 Mon 15/5/23 Wed 16/11/22 NA 0 16.67 RM 0.00 RM 672.00
1953 1.3.4.3.1 Incoming Cable Trench ‐43.1 days 53 days RM 63,948.00 Tue 21/2/23 Mon 15/5/23 Wed 16/11/22 NA 0 16.67 RM 0.00 RM 672.00
1954 1.3.4.3.1 Trench Slabs ‐51.1 days 12 days RM 26,609.80 Tue 21/2/23 Thu 9/3/23 Wed 16/11/22 NA 0 33.33 RM 0.00 RM 672.00
1955 1.3.4.3.1 Excavate Not Exceed 1.50m ‐68.1 days 8 days RM 672.00 Tue 21/2/23 Sun 5/3/23 Wed 16/11/22 Tue 22/11/22 0 100 RM 0.00 RM 672.00
1956 1.3.4.3.1 Section A ‐61.1 days 1 day RM 336.00 Tue 21/2/23 Wed 22/2/23 Wed 16/11/22 Tue 22/11/22 0 100 RM 0.00 RM 336.00
1957 1.3.4.3.1 Section B ‐68.1 days 1 day RM 336.00 Thu 2/3/23 Sun 5/3/23 Wed 16/11/22 Tue 22/11/22 0 100 RM 0.00 RM 336.00
1958 1.3.4.3.1 Hardcore 150mm ‐51.1 days 8 days RM 594.00 Wed 22/2/23 Mon 6/3/23 NA NA 0 0 RM 0.00 RM 0.00
1959 1.3.4.3.1 Section A ‐44.1 days 1 day RM 297.00 Wed 22/2/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
1960 1.3.4.3.1 Section B ‐51.1 days 1 day RM 297.00 Sun 5/3/23 Mon 6/3/23 NA NA 0 0 RM 0.00 RM 0.00
1961 1.3.4.3.1 Lean Concrete G 20 ‐51.1 days 8 days RM 732.00 Thu 23/2/23 Tue 7/3/23 NA NA 0 0 RM 0.00 RM 0.00
1962 1.3.4.3.1 Section A ‐44.1 days 1 day RM 366.00 Thu 23/2/23 Sun 26/2/23 NA NA 0 0 RM 0.00 RM 0.00
1963 1.3.4.3.1 Section B ‐51.1 days 1 day RM 366.00 Mon 6/3/23 Tue 7/3/23 NA NA 0 0 RM 0.00 RM 0.00
1964 1.3.4.3.1 Side Formwork ‐51.1 days 8 days RM 14,972.00 Sun 26/2/23 Wed 8/3/23 NA NA 0 0 RM 0.00 RM 0.00
1965 1.3.4.3.1 Section A ‐44.1 days 1 day RM 7,486.00 Sun 26/2/23 Mon 27/2/23 NA NA 0 0 RM 0.00 RM 0.00
1966 1.3.4.3.1 Section B ‐51.1 days 1 day RM 7,486.00 Tue 7/3/23 Wed 8/3/23 NA NA 0 0 RM 0.00 RM 0.00
1967 1.3.4.3.1 Reinforcement Rebar ‐51.1 days 9 days RM 6,279.80 Sun 26/2/23 Thu 9/3/23 NA NA 0 0 RM 0.00 RM 0.00
1968 1.3.4.3.1 Section A ‐44.1 days 2 days RM 3,139.90 Sun 26/2/23 Tue 28/2/23 NA NA 0 0 RM 0.00 RM 0.00
1969 1.3.4.3.1 Section B ‐51.1 days 2 days RM 3,139.90 Tue 7/3/23 Thu 9/3/23 NA NA 0 0 RM 0.00 RM 0.00
1970 1.3.4.3.1 Concreting G 35 & Curing ‐51.1 days 8 days RM 3,360.00 Mon 27/2/23 Thu 9/3/23 NA NA 0 0 RM 0.00 RM 0.00
1971 1.3.4.3.1 Section A ‐44.1 days 1 day RM 1,680.00 Mon 27/2/23 Tue 28/2/23 NA NA 0 0 RM 0.00 RM 0.00
1972 1.3.4.3.1 Section B ‐51.1 days 1 day RM 1,680.00 Wed 8/3/23 Thu 9/3/23 NA NA 0 0 RM 0.00 RM 0.00
1973 1.3.4.3.1 Trench Walls ‐51.1 days 9 days RM 25,004.20 Tue 28/2/23 Mon 13/3/23 NA NA 0 0 RM 0.00 RM 0.00
1974 1.3.4.3.1 Reinforcement Rebar ‐51.1 days 9 days RM 13,916.20 Tue 28/2/23 Mon 13/3/23 NA NA 0 0 RM 0.00 RM 0.00
1975 1.3.4.3.1 Section A ‐44.1 days 2 days RM 6,958.10 Tue 28/2/23 Thu 2/3/23 NA NA 0 0 RM 0.00 RM 0.00
1976 1.3.4.3.1 Section B ‐51.1 days 2 days RM 6,958.10 Thu 9/3/23 Mon 13/3/23 NA NA 0 0 RM 0.00 RM 0.00
1977 1.3.4.3.1 Concreting G 35 ‐51.1 days 8 days RM 11,088.00 Wed 1/3/23 Mon 13/3/23 NA NA 0 0 RM 0.00 RM 0.00
1978 1.3.4.3.1 Section A ‐44.1 days 1 day RM 5,544.00 Wed 1/3/23 Thu 2/3/23 NA NA 0 0 RM 0.00 RM 0.00
1979 1.3.4.3.1 Section B ‐51.1 days 1 day RM 5,544.00 Sun 12/3/23 Mon 13/3/23 NA NA 0 0 RM 0.00 RM 0.00
1980 1.3.4.3.1 River Sand ‐50.1 days 8 days RM 300.00 Sun 12/3/23 Wed 22/3/23 NA NA 0 0 RM 0.00 RM 0.00
1981 1.3.4.3.1 Section A ‐43.1 days 1 day RM 150.00 Sun 12/3/23 Mon 13/3/23 NA NA 0 0 RM 0.00 RM 0.00
1982 1.3.4.3.1 Section B ‐50.1 days 1 day RM 150.00 Tue 21/3/23 Wed 22/3/23 NA NA 0 0 RM 0.00 RM 0.00
1983 1.3.4.3.1 100mm Precast Concrete Cover ‐50.1 days 8 days RM 6,534.00 Mon 13/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
1984 1.3.4.3.1 Section A ‐43.1 days 1 day RM 3,267.00 Mon 13/3/23 Tue 14/3/23 NA NA 0 0 RM 0.00 RM 0.00
1985 1.3.4.3.1 Section B ‐50.1 days 1 day RM 3,267.00 Wed 22/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
1986 1.3.4.3.1 Bollard ‐50.1 days 6 days RM 4,000.00 Thu 23/3/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
1987 1.3.4.3.1 Section A ‐50.1 days 3 days RM 2,000.00 Thu 23/3/23 Tue 28/3/23 NA NA 0 0 RM 0.00 RM 0.00
1988 1.3.4.3.1 Section B ‐50.1 days 3 days RM 2,000.00 Tue 28/3/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
1989 1.3.4.3.1 Signage ‐43.1 days 2 days RM 1,500.00 Thu 11/5/23 Mon 15/5/23 NA NA 0 0 RM 0.00 RM 0.00
1990 1.3.4.4 Apron & Ramp ‐50.1 days 9 days RM 3,450.10 Mon 20/3/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
1991 1.3.4.4.1 Excavation 300mm Deep ‐50.1 days 1 day RM 65.00 Mon 20/3/23 Tue 21/3/23 NA NA 0 0 RM 0.00 RM 0.00
1992 1.3.4.4.2 Hardcore 150mm ‐50.1 days 1 day RM 257.40 Tue 21/3/23 Wed 22/3/23 NA NA 0 0 RM 0.00 RM 0.00
1993 1.3.4.4.3 Antitermite Treatment ‐50.1 days 1 day RM 91.00 Wed 22/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
1994 1.3.4.4.4 Side Formwork ‐50.1 days 1 day RM 39.90 Thu 23/3/23 Sun 26/3/23 NA NA 0 0 RM 0.00 RM 0.00
1995 1.3.4.4.5 Reinforcement Rebar & BRC ‐50.1 days 3 days RM 1,499.80 Sun 26/3/23 Wed 29/3/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
1996 1.3.4.4.6 12mm Bituminous Sealant ‐50.1 days 1 day RM 405.00 Wed 29/3/23 Thu 30/3/23 NA NA 0 0 RM 0.00 RM 0.00
1997 1.3.4.4.7 Concreting G 35 ‐50.1 days 1 day RM 1,092.00 Thu 30/3/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
1998 1.3.4.5 Frame ‐50.1 days 15 days RM 39,710.80 Thu 9/3/23 Thu 30/3/23 NA NA 0 0 RM 0.00 RM 0.00
1999 1.3.4.5.1 Column ‐50.1 days 11 days RM 7,592.80 Thu 9/3/23 Sun 26/3/23 NA NA 0 0 RM 0.00 RM 0.00
2000 1.3.4.5.1 Reinforcement Rebar ‐50.1 days 9 days RM 3,100.80 Thu 9/3/23 Wed 22/3/23 NA NA 0 0 RM 0.00 RM 0.00
2001 1.3.4.5.1 Section A ‐43.1 days 2 days RM 1,550.40 Thu 9/3/23 Mon 13/3/23 NA NA 0 0 RM 0.00 RM 0.00
2002 1.3.4.5.1 Section B ‐50.1 days 2 days RM 1,550.40 Mon 20/3/23 Wed 22/3/23 NA NA 0 0 RM 0.00 RM 0.00
2003 1.3.4.5.1 Side Formwork ‐50.1 days 8 days RM 2,812.00 Mon 13/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
2004 1.3.4.5.1 Section A ‐43.1 days 1 day RM 1,406.00 Mon 13/3/23 Tue 14/3/23 NA NA 0 0 RM 0.00 RM 0.00
2005 1.3.4.5.1 Section B ‐50.1 days 1 day RM 1,406.00 Wed 22/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
2006 1.3.4.5.1 Concreting G 35 ‐50.1 days 8 days RM 1,680.00 Tue 14/3/23 Sun 26/3/23 NA NA 0 0 RM 0.00 RM 0.00
2007 1.3.4.5.1 Section A ‐43.1 days 1 day RM 840.00 Tue 14/3/23 Wed 15/3/23 NA NA 0 0 RM 0.00 RM 0.00
2008 1.3.4.5.1 Section B ‐50.1 days 1 day RM 840.00 Thu 23/3/23 Sun 26/3/23 NA NA 0 0 RM 0.00 RM 0.00
2009 1.3.4.5.2 Roof Beams ‐50.1 days 11 days RM 28,774.80 Wed 15/3/23 Thu 30/3/23 NA NA 0 0 RM 0.00 RM 0.00
2010 1.3.4.5.2 Sides & Soffit Formwork ‐50.1 days 8 days RM 8,550.00 Wed 15/3/23 Mon 27/3/23 NA NA 0 0 RM 0.00 RM 0.00
2011 1.3.4.5.2 Section A ‐43.1 days 1 day RM 4,275.00 Wed 15/3/23 Thu 16/3/23 NA NA 0 0 RM 0.00 RM 0.00
2012 1.3.4.5.2 Section B ‐50.1 days 1 day RM 4,275.00 Sun 26/3/23 Mon 27/3/23 NA NA 0 0 RM 0.00 RM 0.00
2013 1.3.4.5.2 Reinforcement Rebar ‐50.1 days 9 days RM 13,504.80 Thu 16/3/23 Wed 29/3/23 NA NA 0 0 RM 0.00 RM 0.00
2014 1.3.4.5.2 Section A ‐43.1 days 2 days RM 6,752.40 Thu 16/3/23 Mon 20/3/23 NA NA 0 0 RM 0.00 RM 0.00
2015 1.3.4.5.2 Section B ‐50.1 days 2 days RM 6,752.40 Mon 27/3/23 Wed 29/3/23 NA NA 0 0 RM 0.00 RM 0.00
2016 1.3.4.5.2 Concreting G 35 ‐50.1 days 8 days RM 6,720.00 Mon 20/3/23 Thu 30/3/23 NA NA 0 0 RM 0.00 RM 0.00
2017 1.3.4.5.2 Section A ‐43.1 days 1 day RM 3,360.00 Mon 20/3/23 Tue 21/3/23 NA NA 0 0 RM 0.00 RM 0.00
2018 1.3.4.5.2 Section B ‐50.1 days 1 day RM 3,360.00 Wed 29/3/23 Thu 30/3/23 NA NA 0 0 RM 0.00 RM 0.00
2019 1.3.4.5.3 Stiffeners ‐43.1 days 4 days RM 3,343.20 Mon 13/3/23 Sun 19/3/23 NA NA 0 0 RM 0.00 RM 0.00
2020 1.3.4.5.3 Side Formwork ‐43.1 days 1 day RM 1,558.00 Mon 13/3/23 Tue 14/3/23 NA NA 0 0 RM 0.00 RM 0.00
2021 1.3.4.5.3 Reinforcement Rebar ‐43.1 days 2 days RM 945.20 Tue 14/3/23 Thu 16/3/23 NA NA 0 0 RM 0.00 RM 0.00
2022 1.3.4.5.3 Concreting G 35 ‐43.1 days 1 day RM 840.00 Thu 16/3/23 Sun 19/3/23 NA NA 0 0 RM 0.00 RM 0.00
2023 1.3.4.6 Roof ‐45.1 days 16 days RM 103,913.60 Wed 22/3/23 Sun 16/4/23 NA NA 0 0 RM 0.00 RM 0.00
2024 1.3.4.6.1 Roof Construction ‐50.1 days 14 days RM 48,709.60 Wed 22/3/23 Wed 12/4/23 NA NA 0 0 RM 0.00 RM 0.00
2025 1.3.4.6.1 Roof & Gutter Slabs ‐50.1 days 10 days RM 38,068.20 Wed 22/3/23 Wed 5/4/23 NA NA 0 0 RM 0.00 RM 0.00
2026 1.3.4.6.1 Soffit Formwork ‐50.1 days 8 days RM 9,728.00 Wed 22/3/23 Mon 3/4/23 NA NA 0 0 RM 0.00 RM 0.00
2027 1.3.4.6.1 Section A ‐43.1 days 1 day RM 4,864.00 Wed 22/3/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
2028 1.3.4.6.1 Section B ‐50.1 days 1 day RM 4,864.00 Sun 2/4/23 Mon 3/4/23 NA NA 0 0 RM 0.00 RM 0.00
2029 1.3.4.6.1 Reinforcement Rebar + BRC ‐50.1 days 9 days RM 17,210.20 Wed 22/3/23 Tue 4/4/23 NA NA 0 0 RM 0.00 RM 0.00
2030 1.3.4.6.1 Section A ‐43.1 days 2 days RM 8,605.10 Wed 22/3/23 Sun 26/3/23 NA NA 0 0 RM 0.00 RM 0.00
2031 1.3.4.6.1 Section B ‐50.1 days 2 days RM 8,605.10 Sun 2/4/23 Tue 4/4/23 NA NA 0 0 RM 0.00 RM 0.00
2032 1.3.4.6.1 Concreting G 35 ‐50.1 days 8 days RM 11,130.00 Sun 26/3/23 Wed 5/4/23 NA NA 0 0 RM 0.00 RM 0.00
2033 1.3.4.6.1 Section A ‐43.1 days 1 day RM 5,565.00 Sun 26/3/23 Mon 27/3/23 NA NA 0 0 RM 0.00 RM 0.00
2034 1.3.4.6.1 Section B ‐50.1 days 1 day RM 5,565.00 Tue 4/4/23 Wed 5/4/23 NA NA 0 0 RM 0.00 RM 0.00
2035 1.3.4.6.1 Gutter Walls ‐50.1 days 11 days RM 10,641.40 Mon 27/3/23 Wed 12/4/23 NA NA 0 0 RM 0.00 RM 0.00
2036 1.3.4.6.1 Side Formwork ‐50.1 days 8 days RM 2,888.00 Mon 27/3/23 Thu 6/4/23 NA NA 0 0 RM 0.00 RM 0.00
2037 1.3.4.6.1 Section A ‐43.1 days 1 day RM 1,444.00 Mon 27/3/23 Tue 28/3/23 NA NA 0 0 RM 0.00 RM 0.00
2038 1.3.4.6.1 Section B ‐50.1 days 1 day RM 1,444.00 Wed 5/4/23 Thu 6/4/23 NA NA 0 0 RM 0.00 RM 0.00
2039 1.3.4.6.1 Reinforcement Rebar ‐50.1 days 9 days RM 6,157.40 Tue 28/3/23 Tue 11/4/23 NA NA 0 0 RM 0.00 RM 0.00
2040 1.3.4.6.1 Section A ‐43.1 days 2 days RM 3,078.70 Tue 28/3/23 Thu 30/3/23 NA NA 0 0 RM 0.00 RM 0.00
2041 1.3.4.6.1 Section B ‐50.1 days 2 days RM 3,078.70 Thu 6/4/23 Tue 11/4/23 NA NA 0 0 RM 0.00 RM 0.00
2042 1.3.4.6.1 Concreting G 35 ‐50.1 days 8 days RM 1,596.00 Thu 30/3/23 Wed 12/4/23 NA NA 0 0 RM 0.00 RM 0.00
2043 1.3.4.6.1 Section A ‐43.1 days 1 day RM 798.00 Thu 30/3/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
2044 1.3.4.6.1 Section B ‐50.1 days 1 day RM 798.00 Tue 11/4/23 Wed 12/4/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
2045 1.3.4.6.2 Roof Finishes ‐45.1 days 8 days RM 55,204.00 Mon 3/4/23 Sun 16/4/23 NA NA 0 0 RM 0.00 RM 0.00
2046 1.3.4.6.2 Plastering ‐43.1 days 2 days RM 2,116.00 Tue 4/4/23 Thu 6/4/23 NA NA 0 0 RM 0.00 RM 0.00
2047 1.3.4.6.2 Section A ‐43.1 days 1 day RM 1,058.00 Tue 4/4/23 Wed 5/4/23 NA NA 0 0 RM 0.00 RM 0.00
2048 1.3.4.6.2 Section B ‐43.1 days 1 day RM 1,058.00 Wed 5/4/23 Thu 6/4/23 NA NA 0 0 RM 0.00 RM 0.00
2049 1.3.4.6.2 Apply Waterproof Membrane ‐50.1 days 8 days RM 37,235.00 Mon 3/4/23 Sun 16/4/23 NA NA 0 0 RM 0.00 RM 0.00
2050 1.3.4.6.2 Section A ‐43.1 days 1 day RM 18,617.50 Mon 3/4/23 Tue 4/4/23 NA NA 0 0 RM 0.00 RM 0.00
2051 1.3.4.6.2 Section B ‐50.1 days 1 day RM 18,617.50 Thu 13/4/23 Sun 16/4/23 NA NA 0 0 RM 0.00 RM 0.00
2052 1.3.4.6.2 Rendering ‐43.1 days 2 days RM 10,290.00 Tue 4/4/23 Thu 6/4/23 NA NA 0 0 RM 0.00 RM 0.00
2053 1.3.4.6.2 Section A ‐43.1 days 1 day RM 5,145.00 Tue 4/4/23 Wed 5/4/23 NA NA 0 0 RM 0.00 RM 0.00
2054 1.3.4.6.2 Section B ‐43.1 days 1 day RM 5,145.00 Wed 5/4/23 Thu 6/4/23 NA NA 0 0 RM 0.00 RM 0.00
2055 1.3.4.6.2 Ponding Test ‐43.1 days 1 day RM 3,850.00 Thu 6/4/23 Mon 10/4/23 NA NA 0 0 RM 0.00 RM 0.00
2056 1.3.4.6.2 UPVC Rainwater Down Pipes ‐43.1 days 2 days RM 609.00 Thu 6/4/23 Tue 11/4/23 NA NA 0 0 RM 0.00 RM 0.00
2057 1.3.4.6.2 Section A ‐43.1 days 1 day RM 304.50 Thu 6/4/23 Mon 10/4/23 NA NA 0 0 RM 0.00 RM 0.00
2058 1.3.4.6.2 Section B ‐43.1 days 1 day RM 304.50 Mon 10/4/23 Tue 11/4/23 NA NA 0 0 RM 0.00 RM 0.00
2059 1.3.4.6.2 Painting Gutters ‐43.1 days 2 days RM 1,104.00 Mon 10/4/23 Wed 12/4/23 NA NA 0 0 RM 0.00 RM 0.00
2060 1.3.4.6.2 Section A ‐43.1 days 1 day RM 552.00 Mon 10/4/23 Tue 11/4/23 NA NA 0 0 RM 0.00 RM 0.00
2061 1.3.4.6.2 Section B ‐43.1 days 1 day RM 552.00 Tue 11/4/23 Wed 12/4/23 NA NA 0 0 RM 0.00 RM 0.00
2062 1.3.4.7 External Walls ‐43.1 days 10 days RM 24,517.00 Tue 28/3/23 Wed 12/4/23 NA NA 0 0 RM 0.00 RM 0.00
2063 1.3.4.7.1 Clay Bricks & Vent Block ‐43.1 days 10 days RM 24,517.00 Tue 28/3/23 Wed 12/4/23 NA NA 0 0 RM 0.00 RM 0.00
2064 1.3.4.7.1 Section A ‐43.1 days 5 days RM 12,258.50 Tue 28/3/23 Tue 4/4/23 NA NA 0 0 RM 0.00 RM 0.00
2065 1.3.4.7.1 Section B ‐43.1 days 5 days RM 12,258.50 Tue 4/4/23 Wed 12/4/23 NA NA 0 0 RM 0.00 RM 0.00
2066 1.3.4.8 Internal Walls ‐43.1 days 10 days RM 8,244.80 Wed 12/4/23 Tue 2/5/23 NA NA 0 0 RM 0.00 RM 0.00
2067 1.3.4.8.1 Clay Bricks ‐43.1 days 10 days RM 8,244.80 Wed 12/4/23 Tue 2/5/23 NA NA 0 0 RM 0.00 RM 0.00
2068 1.3.4.8.1 Section A ‐43.1 days 5 days RM 4,122.40 Wed 12/4/23 Wed 19/4/23 NA NA 0 0 RM 0.00 RM 0.00
2069 1.3.4.8.1 Section B ‐43.1 days 5 days RM 4,122.40 Wed 19/4/23 Tue 2/5/23 NA NA 0 0 RM 0.00 RM 0.00
2070 1.3.4.9 Doors ‐43.1 days 15 days RM 27,442.00 Mon 27/3/23 Tue 18/4/23 NA NA 0 0 RM 0.00 RM 0.00
2071 1.3.4.9.1 125 x 200mm Thick Lintols ‐43.1 days 6 days RM 490.00 Mon 27/3/23 Tue 4/4/23 NA NA 0 0 RM 0.00 RM 0.00
2072 1.3.4.9.1 Section A ‐43.1 days 1 day RM 245.00 Mon 27/3/23 Tue 28/3/23 NA NA 0 0 RM 0.00 RM 0.00
2073 1.3.4.9.1 Section B ‐43.1 days 1 day RM 245.00 Mon 3/4/23 Tue 4/4/23 NA NA 0 0 RM 0.00 RM 0.00
2074 1.3.4.9.2 Composite Door ‐43.1 days 1 day RM 11,518.00 Thu 6/4/23 Mon 10/4/23 NA NA 0 0 RM 0.00 RM 0.00
2075 1.3.4.9.3 Acustic Door ‐43.1 days 1 day RM 14,030.00 Sun 16/4/23 Mon 17/4/23 NA NA 0 0 RM 0.00 RM 0.00
2076 1.3.4.9.4 Painting ‐43.1 days 1 day RM 1,404.00 Mon 17/4/23 Tue 18/4/23 NA NA 0 0 RM 0.00 RM 0.00
2077 1.3.4.10 Internal Floor Finishes ‐43.1 days 10 days RM 11,600.00 Sun 30/4/23 Tue 16/5/23 NA NA 0 0 RM 0.00 RM 0.00
2078 1.3.4.10. Rendering ‐43.1 days 3 days RM 3,190.00 Sun 30/4/23 Sun 7/5/23 NA NA 0 0 RM 0.00 RM 0.00
2079 1.3.4.10. Epoxy Paint ‐43.1 days 1 day RM 8,410.00 Mon 15/5/23 Tue 16/5/23 NA NA 0 0 RM 0.00 RM 0.00
2080 1.3.4.11 External Ceiling Finishes ‐43.1 days 12 days RM 1,501.00 Sun 16/4/23 Tue 9/5/23 NA NA 0 0 RM 0.00 RM 0.00
2081 1.3.4.11. Skim Plastering ‐43.1 days 2 days RM 948.00 Sun 16/4/23 Tue 18/4/23 NA NA 0 0 RM 0.00 RM 0.00
2082 1.3.4.11. Painting ‐43.1 days 2 days RM 553.00 Sun 7/5/23 Tue 9/5/23 NA NA 0 0 RM 0.00 RM 0.00
2083 1.3.4.12 Internal Ceiling Finishes ‐43.1 days 7 days RM 3,268.00 Tue 25/4/23 Tue 9/5/23 NA NA 0 0 RM 0.00 RM 0.00
2084 1.3.4.12. Skim Plastering ‐43.1 days 2 days RM 2,064.00 Tue 25/4/23 Sun 30/4/23 NA NA 0 0 RM 0.00 RM 0.00
2085 1.3.4.12. Painting ‐43.1 days 2 days RM 1,204.00 Sun 7/5/23 Tue 9/5/23 NA NA 0 0 RM 0.00 RM 0.00
2086 1.3.4.13 External Wall Finishes ‐43.1 days 21 days RM 10,640.00 Tue 4/4/23 Thu 11/5/23 NA NA 0 0 RM 0.00 RM 0.00
2087 1.3.4.13. Plastering ‐43.1 days 7 days RM 6,020.00 Tue 4/4/23 Sun 16/4/23 NA NA 0 0 RM 0.00 RM 0.00
2088 1.3.4.13. Section A ‐43.1 days 2 days RM 3,010.00 Tue 4/4/23 Thu 6/4/23 NA NA 0 0 RM 0.00 RM 0.00
2089 1.3.4.13. Section B ‐43.1 days 2 days RM 3,010.00 Wed 12/4/23 Sun 16/4/23 NA NA 0 0 RM 0.00 RM 0.00
2090 1.3.4.13. Painting ‐43.1 days 2 days RM 4,620.00 Tue 9/5/23 Thu 11/5/23 NA NA 0 0 RM 0.00 RM 0.00
2091 1.3.4.13. Section A ‐43.1 days 1 day RM 2,310.00 Tue 9/5/23 Wed 10/5/23 NA NA 0 0 RM 0.00 RM 0.00
2092 1.3.4.13. Section B ‐43.1 days 1 day RM 2,310.00 Wed 10/5/23 Thu 11/5/23 NA NA 0 0 RM 0.00 RM 0.00
2093 1.3.4.14 Internal Wall Finishes ‐43.1 days 13 days RM 15,450.00 Wed 19/4/23 Mon 15/5/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
2094 1.3.4.14. Plastering ‐43.1 days 7 days RM 11,845.00 Wed 19/4/23 Sun 7/5/23 NA NA 0 0 RM 0.00 RM 0.00
2095 1.3.4.14. Section A ‐43.1 days 2 days RM 5,922.50 Wed 19/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
2096 1.3.4.14. Section B ‐43.1 days 2 days RM 5,922.50 Tue 2/5/23 Sun 7/5/23 NA NA 0 0 RM 0.00 RM 0.00
2097 1.3.4.14. Painting ‐43.1 days 4 days RM 3,605.00 Tue 9/5/23 Mon 15/5/23 NA NA 0 0 RM 0.00 RM 0.00
2098 1.3.4.14. Section A ‐43.1 days 2 days RM 1,802.50 Tue 9/5/23 Thu 11/5/23 NA NA 0 0 RM 0.00 RM 0.00
2099 1.3.4.14. Section B ‐43.1 days 2 days RM 1,802.50 Thu 11/5/23 Mon 15/5/23 NA NA 0 0 RM 0.00 RM 0.00
2100 1.3.5 D ‐ EXTERNAL WORKS ‐0.18 days 723.1 days RM 10,582,934.03 Sun 13/12/20 Mon 29/1/24 Thu 3/12/20 NA 57.12 57.2 RM 4,353,972.11 RM 4,353,972.11
2101 1.3.5.1 Demolition & Relocation 0 days 202 days RM 0.00 Sun 10/1/21 Mon 10/1/22 Sun 10/1/21 Mon 10/1/22 100 100 RM 0.00 RM 0.00
2102 1.3.5.1.1 Demolish existing Building 0 days 7 days RM 10,800.00 Sun 10/1/21 Mon 18/1/21 Sun 10/1/21 Mon 18/1/21 100 100 RM 10,800.00 RM 10,800.00
2103 1.3.5.1.2 Relocate existing high mast lighting 0 days 14 days RM 20,000.00 Tue 19/1/21 Sun 7/2/21 Tue 19/1/21 Sun 7/2/21 100 100 RM 20,000.00 RM 20,000.00
2104 1.3.5.1.3 PHK No.1 0 days 0 days ‐RM 30,800.00 Mon 10/1/22 Mon 10/1/22 Mon 10/1/22 Mon 10/1/22 0 100 ‐RM 30,800.00 ‐RM 30,800.00
2105 1.3.5.1.3 Demolition & Relocation 0 days 0 days ‐RM 30,800.00 Mon 10/1/22 Mon 10/1/22 Mon 10/1/22 Mon 10/1/22 0 100 ‐RM 30,800.00 ‐RM 30,800.00
2106 1.3.5.2 Site Preparation & Earthworks 34 days 382 days RM 4,433,267.61 Sun 13/12/20 Wed 7/9/22 Thu 3/12/20 Thu 27/10/22 100 100 RM 4,433,267.61 RM 4,433,267.61
2107 1.3.5.2.1 Site Clearing 1 day 20 days RM 16,500.00 Sun 13/12/20 Thu 7/1/21 Thu 3/12/20 Sun 10/1/21 100 100 RM 16,500.00 RM 16,500.00
2108 1.3.5.2.2 Prefabricated Vertical & Horizontal ‐13 days 108 days RM 2,439,237.50 Sun 10/1/21 Wed 25/8/21 Wed 30/12/20 Thu 5/8/21 100 100 RM 2,439,237.50 RM 2,439,237.50
Drain
2109 1.3.5.2.2 Mobilization 0 days 3 days RM 10,000.00 Sun 10/1/21 Tue 12/1/21 Mon 11/1/21 Tue 12/1/21 100 100 RM 10,000.00 RM 10,000.00
2110 1.3.5.2.2 Demobilization ‐5 days 2 days RM 10,000.00 Wed 10/3/21 Sun 14/3/21 Tue 2/3/21 Wed 3/3/21 100 100 RM 10,000.00 RM 10,000.00
2111 1.3.5.2.2 Non woven Geotextile ‐1 day 46 days RM 669,168.00 Wed 13/1/21 Mon 22/3/21 Wed 30/12/20 Sun 21/3/21 100 100 RM 669,168.00 RM 669,168.00
2112 1.3.5.2.2 1st Layer 0 days 5 days RM 334,584.00 Wed 13/1/21 Tue 19/1/21 Wed 30/12/20 Tue 19/1/21 100 100 RM 334,584.00 RM 334,584.00
2113 1.3.5.2.2 2nd Layer ‐1 day 5 days RM 334,584.00 Tue 16/3/21 Mon 22/3/21 Thu 25/2/21 Sun 21/3/21 100 100 RM 334,584.00 RM 334,584.00
2114 1.3.5.2.2 Vertical Drain ‐1 day 25 days RM 594,355.50 Wed 27/1/21 Wed 3/3/21 Sun 17/1/21 Tue 2/3/21 100 100 RM 594,355.50 RM 594,355.50
2115 1.3.5.2.2 Section A ‐8 days 20 days RM 297,177.75 Wed 27/1/21 Wed 24/2/21 Sun 17/1/21 Thu 11/2/21 100 100 RM 297,177.75 RM 297,177.75
2116 1.3.5.2.2 Section B ‐1 day 20 days RM 297,177.75 Wed 3/2/21 Wed 3/3/21 Wed 3/2/21 Tue 2/3/21 100 100 RM 297,177.75 RM 297,177.75
2117 1.3.5.2.2 Horizontal Drain ‐3 days 8 days RM 30,000.00 Thu 25/2/21 Tue 9/3/21 Wed 10/2/21 Wed 3/3/21 100 100 RM 30,000.00 RM 30,000.00
2118 1.3.5.2.2 Section A ‐10 days 3 days RM 15,000.00 Thu 25/2/21 Mon 1/3/21 Wed 10/2/21 Mon 15/2/21 100 100 RM 15,000.00 RM 15,000.00
2119 1.3.5.2.2 Section B ‐3 days 3 days RM 15,000.00 Sun 7/3/21 Tue 9/3/21 Wed 3/3/21 Wed 3/3/21 100 100 RM 15,000.00 RM 15,000.00
2120 1.3.5.2.2 Sand Blanket 19 days 38 days RM 702,660.00 Wed 20/1/21 Wed 17/3/21 Wed 30/12/20 Tue 13/4/21 100 100 RM 702,660.00 RM 702,660.00
2121 1.3.5.2.2 Section A 24 days 33 days RM 351,330.00 Wed 20/1/21 Tue 9/3/21 Wed 30/12/20 Tue 13/4/21 100 100 RM 351,330.00 RM 351,330.00
2122 1.3.5.2.2 1st Layer 0 days 5 days RM 175,665.00 Wed 20/1/21 Tue 26/1/21 Wed 30/12/20 Tue 26/1/21 100 100 RM 175,665.00 RM 175,665.00
2123 1.3.5.2.2 2nd Layer 24 days 5 days RM 175,665.00 Tue 2/3/21 Tue 9/3/21 Sun 14/2/21 Tue 13/4/21 100 100 RM 175,665.00 RM 175,665.00
2124 1.3.5.2.2 Section B ‐3 days 33 days RM 351,330.00 Wed 27/1/21 Wed 17/3/21 Tue 26/1/21 Sun 14/3/21 100 100 RM 351,330.00 RM 351,330.00
2125 1.3.5.2.2 1st Layer 0 days 5 days RM 175,665.00 Wed 27/1/21 Tue 2/2/21 Tue 26/1/21 Tue 2/2/21 100 100 RM 175,665.00 RM 175,665.00
2126 1.3.5.2.2 2nd Layer ‐3 days 5 days RM 175,665.00 Wed 10/3/21 Wed 17/3/21 Sun 7/3/21 Sun 14/3/21 100 100 RM 175,665.00 RM 175,665.00
2127 1.3.5.2.2 Earth Filling (surcharge) ‐13 days 20 days RM 423,054.00 Sun 23/5/21 Wed 25/8/21 Thu 6/5/21 Thu 5/8/21 100 100 RM 423,054.00 RM 423,054.00
2128 1.3.5.2.2 Section A ‐5 days 10 days RM 211,527.00 Sun 23/5/21 Wed 11/8/21 Thu 6/5/21 Thu 29/7/21 100 100 RM 211,527.00 RM 211,527.00
2129 1.3.5.2.2 Section B ‐13 days 10 days RM 211,527.00 Thu 12/8/21 Wed 25/8/21 Tue 1/6/21 Thu 5/8/21 100 100 RM 211,527.00 RM 211,527.00
2130 1.3.5.2.3 Instrumentation ‐19 days 245 days RM 186,848.00 Wed 27/1/21 Thu 31/3/22 Wed 27/1/21 Sun 6/3/22 100 100 RM 186,848.00 RM 186,848.00
2131 1.3.5.2.3 Surface Marker 8 days 3 days RM 4,000.00 Thu 20/5/21 Mon 24/5/21 Wed 11/8/21 Wed 11/8/21 100 100 RM 4,000.00 RM 4,000.00
2132 1.3.5.2.3 Settlement Plate 0 days 7 days RM 4,550.00 Wed 27/1/21 Thu 4/2/21 Wed 27/1/21 Thu 4/2/21 100 100 RM 4,550.00 RM 4,550.00
2133 1.3.5.2.3 Magnetic Extensometer 0 days 7 days RM 25,500.00 Wed 27/1/21 Thu 4/2/21 Wed 27/1/21 Thu 4/2/21 100 100 RM 25,500.00 RM 25,500.00
2134 1.3.5.2.3 Vibrating Wire Piezometer 0 days 7 days RM 39,000.00 Wed 27/1/21 Thu 4/2/21 Wed 27/1/21 Thu 4/2/21 100 100 RM 39,000.00 RM 39,000.00
2135 1.3.5.2.3 Inclinometer 3 days 7 days RM 44,000.00 Wed 27/1/21 Thu 4/2/21 Wed 27/1/21 Tue 9/2/21 100 100 RM 44,000.00 RM 44,000.00
2136 1.3.5.2.3 Monitoring Instrument (Rest ‐19 days 150 days RM 69,798.00 Thu 26/8/21 Thu 31/3/22 Sun 8/8/21 Sun 6/3/22 100 100 RM 69,798.00 RM 69,798.00
Period)
2137 1.3.5.2.3 Base Reading for Surface Marker ‐11 days 10 days RM 0.00 Thu 26/8/21 Wed 8/9/21 Sun 8/8/21 Tue 24/8/21 100 100 RM 0.00 RM 0.00
2138 1.3.5.2.3 Monitoring Instrument 1 ‐12 days 10 days RM 0.00 Thu 9/9/21 Thu 23/9/21 Wed 25/8/21 Mon 6/9/21 100 100 RM 0.00 RM 0.00
2139 1.3.5.2.3 Monitoring Instrument 2 ‐13 days 10 days RM 0.00 Sun 26/9/21 Thu 7/10/21 Tue 7/9/21 Mon 20/9/21 100 100 RM 0.00 RM 0.00
2140 1.3.5.2.3 Monitoring Instrument 3 ‐13 days 10 days RM 0.00 Sun 10/10/21 Sun 24/10/21 Wed 22/9/21 Mon 4/10/21 100 100 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
2141 1.3.5.2.3 Monitoring Instrument 4 ‐14 days 10 days RM 0.00 Mon 25/10/21 Mon 8/11/21 Wed 6/10/21 Sun 17/10/21 100 100 RM 0.00 RM 0.00
2142 1.3.5.2.3 Monitoring Instrument 5 ‐22 days 10 days RM 0.00 Tue 9/11/21 Mon 22/11/21 Wed 20/10/21 Wed 20/10/21 100 100 RM 0.00 RM 0.00
2143 1.3.5.2.3 Monitoring Instrument 6 ‐15 days 10 days RM 0.00 Tue 23/11/21 Mon 6/12/21 Wed 3/11/21 Mon 15/11/21 100 100 RM 0.00 RM 0.00
2144 1.3.5.2.3 Monitoring Instrument 7 ‐14 days 10 days RM 0.00 Tue 7/12/21 Mon 20/12/21 Wed 17/11/21 Tue 30/11/21 100 100 RM 0.00 RM 0.00
2145 1.3.5.2.3 Monitoring Instrument 8 ‐14 days 10 days RM 0.00 Tue 21/12/21 Tue 4/1/22 Wed 1/12/21 Tue 14/12/21 100 100 RM 0.00 RM 0.00
2146 1.3.5.2.3 Monitoring Instrument 9 ‐23 days 10 days RM 0.00 Wed 5/1/22 Tue 18/1/22 Wed 15/12/21 Wed 15/12/21 100 100 RM 0.00 RM 0.00
2147 1.3.5.2.3 Monitoring Instrument 10 ‐15 days 10 days RM 0.00 Wed 19/1/22 Thu 3/2/22 Wed 29/12/21 Tue 11/1/22 100 100 RM 0.00 RM 0.00
2148 1.3.5.2.3 Monitoring Instrument 11 ‐15 days 10 days RM 0.00 Sun 6/2/22 Thu 17/2/22 Wed 12/1/22 Tue 25/1/22 100 100 RM 0.00 RM 0.00
2149 1.3.5.2.3 Monitoring Instrument 12 ‐17 days 10 days RM 0.00 Sun 20/2/22 Thu 3/3/22 Wed 26/1/22 Tue 8/2/22 100 100 RM 0.00 RM 0.00
2150 1.3.5.2.3 Monitoring Instrument 13 ‐17 days 10 days RM 0.00 Sun 6/3/22 Thu 17/3/22 Wed 9/2/22 Tue 22/2/22 100 100 RM 0.00 RM 0.00
2151 1.3.5.2.3 Monitoring Instrument 14 ‐19 days 10 days RM 0.00 Sun 20/3/22 Thu 31/3/22 Wed 23/2/22 Sun 6/3/22 100 100 RM 0.00 RM 0.00
2152 1.3.5.2.3 APK No.1 0 days 0 days RM 39,998.00 Mon 10/1/22 Mon 10/1/22 Mon 10/1/22 Mon 10/1/22 0 100 RM 39,998.00 RM 39,998.00
2153 1.3.5.2.3 Monitoring Instrument 0 days 0 days RM 39,998.00 Mon 10/1/22 Mon 10/1/22 Mon 10/1/22 Mon 10/1/22 0 100 RM 39,998.00 RM 39,998.00
2154 1.3.5.2.3 APK No.2 0 days 0 days RM 29,800.00 Mon 10/1/22 Mon 10/1/22 Mon 10/1/22 Mon 10/1/22 0 100 RM 29,800.00 RM 29,800.00
2155 1.3.5.2.3 Close Turfing 0 days 0 days RM 29,800.00 Mon 10/1/22 Mon 10/1/22 Mon 10/1/22 Mon 10/1/22 0 100 RM 29,800.00 RM 29,800.00
2156 1.3.5.2.4 Temporary Sheet Pile ‐37 days 45 days RM 245,505.00 Tue 12/1/21 Thu 18/3/21 Wed 13/1/21 Thu 21/1/21 100 100 RM 245,505.00 RM 245,505.00
2157 1.3.5.2.4 Section A ‐12 days 15 days RM 81,835.00 Tue 12/1/21 Mon 1/2/21 Wed 13/1/21 Thu 14/1/21 100 100 RM 81,835.00 RM 81,835.00
2158 1.3.5.2.4 Section B ‐25 days 15 days RM 81,835.00 Tue 2/2/21 Tue 23/2/21 Sat 16/1/21 Mon 18/1/21 100 100 RM 81,835.00 RM 81,835.00
2159 1.3.5.2.4 Section C ‐37 days 15 days RM 81,835.00 Wed 24/2/21 Thu 18/3/21 Mon 18/1/21 Thu 21/1/21 100 100 RM 81,835.00 RM 81,835.00
2160 1.3.5.2.5 Remove Sheet Pile 0 days 7 days RM 0.00 Tue 29/3/22 Wed 6/4/22 Thu 31/3/22 Wed 6/4/22 100 100 RM 0.00 RM 0.00
2161 1.3.5.2.6 Earthworks 6 days 87 days RM 751,580.00 Sun 10/1/21 Wed 19/5/21 Sun 10/1/21 Thu 29/7/21 100 100 RM 751,580.00 RM 751,580.00
2162 1.3.5.2.6 Excavate & move excavated to fillin‐1 day 3 days RM 1,700.00 Sun 10/1/21 Tue 12/1/21 Sun 10/1/21 Mon 11/1/21 100 100 RM 1,700.00 RM 1,700.00
2163 1.3.5.2.6 Imported earth filling 6 days 40 days RM 749,880.00 Sun 21/3/21 Wed 19/5/21 Sat 27/2/21 Thu 29/7/21 100 100 RM 749,880.00 RM 749,880.00
2164 1.3.5.2.6 Section A 26 days 20 days RM 374,940.00 Sun 21/3/21 Thu 15/4/21 Sat 27/2/21 Sun 25/7/21 100 100 RM 374,940.00 RM 374,940.00
2165 1.3.5.2.6 Section B 6 days 20 days RM 374,940.00 Sun 18/4/21 Wed 19/5/21 Thu 15/4/21 Thu 29/7/21 100 100 RM 374,940.00 RM 374,940.00
2166 1.3.5.2.7 Keystone Retaining Wall ‐28 days 86 days RM 473,902.00 Wed 4/5/22 Wed 7/9/22 Mon 18/4/22 Thu 28/7/22 100 100 RM 473,902.00 RM 473,902.00
2167 1.3.5.2.7 Wall not exceeding 2.5m high ‐28 days 80 days RM 370,942.00 Wed 4/5/22 Tue 30/8/22 Mon 18/4/22 Wed 20/7/22 100 100 RM 370,942.00 RM 370,942.00
2168 1.3.5.2.7 Section A 10 days 20 days RM 92,735.50 Wed 4/5/22 Wed 1/6/22 Wed 4/5/22 Thu 16/6/22 100 100 RM 92,735.50 RM 92,735.50
2169 1.3.5.2.7 Section B ‐2 days 20 days RM 92,735.50 Thu 2/6/22 Thu 30/6/22 Wed 4/5/22 Tue 28/6/22 100 100 RM 92,735.50 RM 92,735.50
2170 1.3.5.2.7 Section C ‐20 days 20 days RM 92,735.50 Sun 3/7/22 Tue 2/8/22 Mon 18/4/22 Thu 30/6/22 100 100 RM 92,735.50 RM 92,735.50
2171 1.3.5.2.7 Section D ‐28 days 20 days RM 92,735.50 Wed 3/8/22 Tue 30/8/22 Sun 3/7/22 Wed 20/7/22 100 100 RM 92,735.50 RM 92,735.50
2172 1.3.5.2.7 Imported granular filling ‐28 days 80 days RM 102,960.00 Thu 12/5/22 Wed 7/9/22 Thu 12/5/22 Thu 28/7/22 100 100 RM 102,960.00 RM 102,960.00
2173 1.3.5.2.7 Section A 27 days 20 days RM 25,740.00 Thu 12/5/22 Sun 12/6/22 Thu 12/5/22 Sat 23/7/22 100 100 RM 25,740.00 RM 25,740.00
2174 1.3.5.2.7 Section B 8 days 20 days RM 25,740.00 Mon 13/6/22 Tue 12/7/22 Mon 13/6/22 Sun 24/7/22 100 100 RM 25,740.00 RM 25,740.00
2175 1.3.5.2.7 Section C ‐11 days 20 days RM 25,740.00 Wed 13/7/22 Wed 10/8/22 Sun 26/6/22 Mon 25/7/22 100 100 RM 25,740.00 RM 25,740.00
2176 1.3.5.2.7 Section D ‐28 days 20 days RM 25,740.00 Thu 11/8/22 Wed 7/9/22 Sat 2/7/22 Thu 28/7/22 100 100 RM 25,740.00 RM 25,740.00
2177 1.3.5.2.8 Temporary Works 34 days 330 days RM 189,000.00 Wed 24/2/21 Wed 7/9/22 Thu 29/4/21 Thu 27/10/22 100 100 RM 189,000.00 RM 189,000.00
2178 1.3.5.2.8 Hoarding Section 1 344 days 20 days RM 63,000.00 Wed 24/2/21 Thu 25/3/21 Thu 29/4/21 Thu 27/10/22 100 100 RM 63,000.00 RM 63,000.00
2179 1.3.5.2.8 Hoarding Section 2 92 days 20 days RM 63,000.00 Sun 28/3/21 Thu 22/4/21 Wed 6/10/21 Tue 16/11/21 100 100 RM 63,000.00 RM 63,000.00
2180 1.3.5.2.8 Hoarding Section 3 28 days 60 days RM 63,000.00 Mon 13/6/22 Wed 7/9/22 Fri 7/10/22 Tue 18/10/22 100 100 RM 63,000.00 RM 63,000.00
2181 1.3.5.2.8 Section A & B 65 days 20 days RM 31,500.00 Mon 13/6/22 Tue 12/7/22 Fri 7/10/22 Sat 15/10/22 100 100 RM 31,500.00 RM 31,500.00
2182 1.3.5.2.8 Section C & D 28 days 20 days RM 31,500.00 Thu 11/8/22 Wed 7/9/22 Mon 10/10/22 Tue 18/10/22 100 100 RM 31,500.00 RM 31,500.00
2183 1.3.5.2.9 Silt Traps 44 days 28 days RM 34,000.00 Thu 31/3/22 Tue 17/5/22 Tue 22/3/22 Thu 21/7/22 100 100 RM 34,000.00 RM 34,000.00
2184 1.3.5.2.9 Size 3.6m x 2.0m x 1.8m 26 days 14 days RM 18,000.00 Thu 31/3/22 Wed 20/4/22 Tue 22/3/22 Thu 2/6/22 100 100 RM 18,000.00 RM 18,000.00
2185 1.3.5.2.9 Size 3.3m x 2.0m x 1.8m 44 days 14 days RM 16,000.00 Thu 21/4/22 Tue 17/5/22 Thu 21/4/22 Thu 21/7/22 100 100 RM 16,000.00 RM 16,000.00
2186 1.3.5.2.1 Temporary Pipe Culvert 37 days 7 days RM 5,750.00 Wed 18/5/22 Thu 26/5/22 Thu 17/12/20 Sat 23/7/22 100 100 RM 5,750.00 RM 5,750.00
2187 1.3.5.2.1 Wash Through ‐227 days 7 days RM 24,460.11 Sun 29/5/22 Tue 7/6/22 Wed 14/4/21 Thu 22/4/21 100 100 RM 24,460.11 RM 24,460.11
2188 1.3.5.2.1 Temporary Access Road ‐251 days 15 days RM 51,390.00 Wed 18/5/22 Wed 8/6/22 Mon 8/3/21 Mon 22/3/21 100 100 RM 51,390.00 RM 51,390.00
2189 1.3.5.2.1 Earth Drain 69 days 14 days RM 9,815.00 Wed 18/5/22 Tue 7/6/22 Wed 18/5/22 Thu 15/9/22 100 100 RM 9,815.00 RM 9,815.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
2190 1.3.5.2.14 Silt Fence ‐18 days 7 days RM 5,280.00 Wed 8/6/22 Thu 16/6/22 Sun 14/3/21 Sun 22/5/22 100 100 RM 5,280.00 RM 5,280.00
2191 1.3.5.3 Roads & Hardstanding ‐0.18 days 102 days RM 2,244,911.00 Sun 3/9/23 Mon 29/1/24 NA NA 0 0 RM 0.00 RM 0.00
2192 1.3.5.3.1 Road Works ‐0.18 days 88 days RM 1,788,099.00 Sun 3/9/23 Tue 9/1/24 NA NA 0 0 RM 0.00 RM 0.00
2193 1.3.5.3.1 Excavate to Reduce Level ‐0.18 days 10 days RM 88,911.00 Sun 3/9/23 Mon 18/9/23 NA NA 0 0 RM 0.00 RM 0.00
2194 1.3.5.3.1 Section 1 ‐0.18 days 5 days RM 44,455.50 Sun 3/9/23 Sun 10/9/23 NA NA 0 0 RM 0.00 RM 0.00
2195 1.3.5.3.1 Section 2 ‐0.18 days 5 days RM 44,455.50 Sun 10/9/23 Mon 18/9/23 NA NA 0 0 RM 0.00 RM 0.00
2196 1.3.5.3.1 Subgrade ‐0.18 days 14 days RM 39,516.00 Mon 18/9/23 Mon 9/10/23 NA NA 0 0 RM 0.00 RM 0.00
2197 1.3.5.3.1 Section 1 ‐0.18 days 7 days RM 19,758.00 Mon 18/9/23 Thu 28/9/23 NA NA 0 0 RM 0.00 RM 0.00
2198 1.3.5.3.1 Section 2 ‐0.18 days 7 days RM 19,758.00 Thu 28/9/23 Mon 9/10/23 NA NA 0 0 RM 0.00 RM 0.00
2199 1.3.5.3.1 150mm Sub base ‐0.18 days 20 days RM 124,475.40 Mon 9/10/23 Mon 6/11/23 NA NA 0 0 RM 0.00 RM 0.00
2200 1.3.5.3.1 Section 1 ‐0.18 days 10 days RM 62,237.70 Mon 9/10/23 Mon 23/10/23 NA NA 0 0 RM 0.00 RM 0.00
2201 1.3.5.3.1 Section 2 ‐0.18 days 10 days RM 62,237.70 Mon 23/10/23 Mon 6/11/23 NA NA 0 0 RM 0.00 RM 0.00
2202 1.3.5.3.1 250mm Road Base ‐0.18 days 24 days RM 478,143.60 Mon 6/11/23 Mon 11/12/23 NA NA 0 0 RM 0.00 RM 0.00
2203 1.3.5.3.1 Section 1 ‐0.18 days 12 days RM 239,071.80 Mon 6/11/23 Thu 23/11/23 NA NA 0 0 RM 0.00 RM 0.00
2204 1.3.5.3.1 Section 2 ‐0.18 days 12 days RM 239,071.80 Thu 23/11/23 Mon 11/12/23 NA NA 0 0 RM 0.00 RM 0.00
2205 1.3.5.3.1 65mm binder course ‐0.18 days 10 days RM 588,788.40 Mon 11/12/23 Tue 26/12/23 NA NA 0 0 RM 0.00 RM 0.00
2206 1.3.5.3.1 Section 1 ‐0.18 days 5 days RM 294,394.20 Mon 11/12/23 Mon 18/12/23 NA NA 0 0 RM 0.00 RM 0.00
2207 1.3.5.3.1 Section 2 ‐0.18 days 5 days RM 294,394.20 Mon 18/12/23 Tue 26/12/23 NA NA 0 0 RM 0.00 RM 0.00
2208 1.3.5.3.1 50mm wearing course ‐0.18 days 10 days RM 468,264.60 Tue 26/12/23 Tue 9/1/24 NA NA 0 0 RM 0.00 RM 0.00
2209 1.3.5.3.1 Section 1 ‐0.18 days 5 days RM 234,132.30 Tue 26/12/23 Tue 2/1/24 NA NA 0 0 RM 0.00 RM 0.00
2210 1.3.5.3.1 Section 2 ‐0.18 days 5 days RM 234,132.30 Tue 2/1/24 Tue 9/1/24 NA NA 0 0 RM 0.00 RM 0.00
2211 1.3.5.3.2 In Situ Concrete Kerb ‐0.18 days 30 days RM 275,010.00 Sun 19/11/23 Mon 1/1/24 NA NA 0 0 RM 0.00 RM 0.00
2212 1.3.5.3.2 Section 1 ‐0.18 days 15 days RM 137,505.00 Sun 19/11/23 Sun 10/12/23 NA NA 0 0 RM 0.00 RM 0.00
2213 1.3.5.3.2 Section 2 ‐0.18 days 15 days RM 137,505.00 Sun 10/12/23 Mon 1/1/24 NA NA 0 0 RM 0.00 RM 0.00
2214 1.3.5.3.3 Scupper Drain ‐0.18 days 7 days RM 16,440.00 Mon 1/1/24 Wed 10/1/24 NA NA 0 0 RM 0.00 RM 0.00
2215 1.3.5.3.4 Road Marking ‐0.18 days 10 days RM 68,127.00 Sun 14/1/24 Sun 28/1/24 NA NA 0 0 RM 0.00 RM 0.00
2216 1.3.5.3.4 Section 1 ‐0.18 days 5 days RM 34,063.50 Sun 14/1/24 Sun 21/1/24 NA NA 0 0 RM 0.00 RM 0.00
2217 1.3.5.3.4 Section 2 ‐0.18 days 5 days RM 34,063.50 Sun 21/1/24 Sun 28/1/24 NA NA 0 0 RM 0.00 RM 0.00
2218 1.3.5.3.5 Road Signages ‐0.18 days 7 days RM 18,900.00 Tue 9/1/24 Thu 18/1/24 NA NA 0 0 RM 0.00 RM 0.00
2219 1.3.5.3.6 Guard Rail ‐0.18 days 10 days RM 35,045.00 Tue 9/1/24 Tue 23/1/24 NA NA 0 0 RM 0.00 RM 0.00
2220 1.3.5.3.7 Road Hump ‐0.18 days 3 days RM 9,000.00 Tue 9/1/24 Sun 14/1/24 NA NA 0 0 RM 0.00 RM 0.00
2221 1.3.5.3.8 RC Entrance Slab ‐0.18 days 5 days RM 5,590.00 Mon 11/12/23 Mon 18/12/23 NA NA 0 0 RM 0.00 RM 0.00
2222 1.3.5.3.9 Rubber Vehicle Stopper ‐0.18 days 14 days RM 28,700.00 Tue 9/1/24 Mon 29/1/24 NA NA 0 0 RM 0.00 RM 0.00
2223 1.3.5.3.9 150mm x 500 x 90mm ‐0.18 days 14 days RM 27,580.00 Tue 9/1/24 Mon 29/1/24 NA NA 0 0 RM 0.00 RM 0.00
2224 1.3.5.3.9 150mm x 550 x 150mm ‐0.18 days 4 days RM 1,120.00 Tue 9/1/24 Mon 15/1/24 NA NA 0 0 RM 0.00 RM 0.00
2225 1.3.5.4 Water Reticulation Works ‐0.18 days 403 days RM 415,157.72 Mon 10/1/22 Wed 6/9/23 Mon 10/1/22 NA 0 1.41 RM 19,550.00 RM 19,550.00
2226 1.3.5.4.1 APK No.3 0 days 0 days RM 19,550.00 Mon 10/1/22 Mon 10/1/22 Mon 10/1/22 Mon 10/1/22 0 100 RM 19,550.00 RM 19,550.00
2227 1.3.5.4.1 Topographical Survey & 0 days 0 days RM 19,550.00 Mon 10/1/22 Mon 10/1/22 Mon 10/1/22 Mon 10/1/22 0 100 RM 19,550.00 RM 19,550.00
Underground Utilities Mapping
2228 1.3.5.4.2 Excavation ‐0.18 days 14 days RM 5,848.50 Thu 25/5/23 Wed 14/6/23 NA NA 0 0 RM 0.00 RM 0.00
2229 1.3.5.4.3 Pipe Bedding ‐0.18 days 20 days RM 16,632.00 Thu 15/6/23 Mon 17/7/23 NA NA 0 0 RM 0.00 RM 0.00
2230 1.3.5.4.4 Pipework ‐0.18 days 20 days RM 263,109.00 Tue 18/7/23 Tue 15/8/23 NA NA 0 0 RM 0.00 RM 0.00
2231 1.3.5.4.5 Pipe Crossing Over Culvert & Main dra‐0.18 days 3 days RM 30,500.00 Wed 16/8/23 Sun 20/8/23 NA NA 0 0 RM 0.00 RM 0.00
2232 1.3.5.4.6 Bulk meter ‐0.18 days 5 days RM 16,000.00 Mon 21/8/23 Sun 27/8/23 NA NA 0 0 RM 0.00 RM 0.00
2233 1.3.5.4.7 Connection to Internal Pipe ‐0.18 days 3 days RM 3,000.00 Mon 28/8/23 Wed 30/8/23 NA NA 0 0 RM 0.00 RM 0.00
2234 1.3.5.4.8 Connection to Reticulation System ‐0.18 days 3 days RM 50,518.22 Thu 31/8/23 Mon 4/9/23 NA NA 0 0 RM 0.00 RM 0.00
2235 1.3.5.4.9 Testing ‐0.18 days 2 days RM 10,000.00 Tue 5/9/23 Wed 6/9/23 NA NA 0 0 RM 0.00 RM 0.00
2236 1.3.5.5 Surface Water Drainage ‐43.1 days 88 days RM 880,013.60 Mon 15/5/23 Sun 24/9/23 NA NA 0 0 RM 0.00 RM 0.00
2237 1.3.5.5.1 Surface Drain ‐43.1 days 60 days RM 614,540.00 Mon 15/5/23 Mon 14/8/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
2238 1.3.5.5.1 Section 1 ‐43.1 days 20 days RM 204,846.67 Mon 15/5/23 Tue 13/6/23 NA NA 0 0 RM 0.00 RM 0.00
2239 1.3.5.5.1 Section 2 ‐43.1 days 20 days RM 204,846.67 Tue 13/6/23 Sun 16/7/23 NA NA 0 0 RM 0.00 RM 0.00
2240 1.3.5.5.1 Section 3 ‐43.1 days 20 days RM 204,846.66 Sun 16/7/23 Mon 14/8/23 NA NA 0 0 RM 0.00 RM 0.00
2241 1.3.5.5.2 Cascade Drain ‐43.1 days 7 days RM 1,950.00 Mon 14/8/23 Wed 23/8/23 NA NA 0 0 RM 0.00 RM 0.00
2242 1.3.5.5.3 Scupper Drain ‐43.1 days 7 days RM 2,325.00 Wed 23/8/23 Sun 3/9/23 NA NA 0 0 RM 0.00 RM 0.00
2243 1.3.5.5.4 RC Sumps ‐43.1 days 60 days RM 185,500.00 Tue 13/6/23 Mon 11/9/23 NA NA 0 0 RM 0.00 RM 0.00
2244 1.3.5.5.4 1200mm x 1200mm ‐43.1 days 60 days RM 185,500.00 Tue 13/6/23 Mon 11/9/23 NA NA 0 0 RM 0.00 RM 0.00
2245 1.3.5.5.4 Section 1 ‐43.1 days 20 days RM 61,833.34 Tue 13/6/23 Sun 16/7/23 NA NA 0 0 RM 0.00 RM 0.00
2246 1.3.5.5.4 Section 2 ‐43.1 days 20 days RM 61,833.33 Sun 16/7/23 Mon 14/8/23 NA NA 0 0 RM 0.00 RM 0.00
2247 1.3.5.5.4 Section 3 ‐43.1 days 20 days RM 61,833.33 Mon 14/8/23 Mon 11/9/23 NA NA 0 0 RM 0.00 RM 0.00
2248 1.3.5.5.5 RC Culvert ‐43.1 days 30 days RM 50,540.00 Sun 2/7/23 Mon 14/8/23 NA NA 0 0 RM 0.00 RM 0.00
2249 1.3.5.5.5 600mm ‐ 750mm deep ‐43.1 days 10 days RM 17,550.00 Sun 2/7/23 Sun 16/7/23 NA NA 0 0 RM 0.00 RM 0.00
2250 1.3.5.5.5 750mm ‐ 900mm deep ‐43.1 days 10 days RM 29,240.00 Sun 16/7/23 Mon 31/7/23 NA NA 0 0 RM 0.00 RM 0.00
2251 1.3.5.5.5 2400mm ‐ 2500mm deep ‐43.1 days 10 days RM 3,750.00 Mon 31/7/23 Mon 14/8/23 NA NA 0 0 RM 0.00 RM 0.00
2252 1.3.5.5.6 GI Trash Screen ‐43.1 days 14 days RM 3,000.00 Mon 14/8/23 Sun 3/9/23 NA NA 0 0 RM 0.00 RM 0.00
2253 1.3.5.5.7 Excavation ‐43.1 days 5 days RM 162.00 Sun 3/9/23 Sun 10/9/23 NA NA 0 0 RM 0.00 RM 0.00
2254 1.3.5.5.7 Trench 1200mm wide ‐43.1 days 3 days RM 84.00 Sun 3/9/23 Wed 6/9/23 NA NA 0 0 RM 0.00 RM 0.00
2255 1.3.5.5.7 Trench 650mm wide ‐43.1 days 2 days RM 78.00 Wed 6/9/23 Sun 10/9/23 NA NA 0 0 RM 0.00 RM 0.00
2256 1.3.5.5.8 Pipe Bedding ‐43.1 days 5 days RM 436.60 Wed 6/9/23 Wed 13/9/23 NA NA 0 0 RM 0.00 RM 0.00
2257 1.3.5.5.8 For 950mm wide x 650mm thick ‐43.1 days 3 days RM 312.00 Wed 6/9/23 Mon 11/9/23 NA NA 0 0 RM 0.00 RM 0.00
2258 1.3.5.5.8 For 650mm wide x 650mm thick ‐43.1 days 3 days RM 124.60 Sun 10/9/23 Wed 13/9/23 NA NA 0 0 RM 0.00 RM 0.00
2259 1.3.5.5.9 Pipework (ductile iron) ‐43.1 days 4 days RM 9,560.00 Wed 13/9/23 Wed 20/9/23 NA NA 0 0 RM 0.00 RM 0.00
2260 1.3.5.5.9 600mm dia pipes ‐43.1 days 2 days RM 4,760.00 Wed 13/9/23 Mon 18/9/23 NA NA 0 0 RM 0.00 RM 0.00
2261 1.3.5.5.9 250mm dia pipes ‐43.1 days 2 days RM 4,800.00 Mon 18/9/23 Wed 20/9/23 NA NA 0 0 RM 0.00 RM 0.00
2262 1.3.5.5.1 Connection to Existing Drain ‐43.1 days 2 days RM 12,000.00 Wed 20/9/23 Sun 24/9/23 NA NA 0 0 RM 0.00 RM 0.00
2263 1.3.5.6 Detention Pond & Rainwater ‐0.18 days 257 days RM 1,026,113.10 Thu 6/10/22 Sun 29/10/23 Thu 6/10/22 NA 0 0.8 ‐RM 98,845.50 ‐RM 98,845.50
Harvesting
2264 1.3.5.6.1 APK No.5 0 days 0 days ‐RM 98,845.50 Thu 6/10/22 Thu 6/10/22 Thu 6/10/22 Thu 6/10/22 0 100 ‐RM 98,845.50 ‐RM 98,845.50
2265 1.3.5.6.1 Perubahan Rekabentuk Detention 0 days 0 days ‐RM 98,845.50 Thu 6/10/22 Thu 6/10/22 Thu 6/10/22 Thu 6/10/22 0 100 ‐RM 98,845.50 ‐RM 98,845.50
Pond & Rainwater Harvesting Tank

2266 1.3.5.6.2 DP1 & RwHT ‐0.18 days 71 days RM 763,998.60 Tue 18/7/23 Sun 29/10/23 NA NA 0 0 RM 0.00 RM 0.00
2267 1.3.5.6.2 Excavate not exceed 3.0m deep ‐0.18 days 2 days RM 24,650.00 Tue 18/7/23 Thu 20/7/23 NA NA 0 0 RM 0.00 RM 0.00
2268 1.3.5.6.2 Pile Caps ‐0.18 days 17 days RM 43,739.20 Sun 23/7/23 Mon 14/8/23 NA NA 0 0 RM 0.00 RM 0.00
2269 1.3.5.6.2 Excavation not exceed 1.5m ‐0.18 days 3 days RM 632.00 Sun 23/7/23 Tue 25/7/23 NA NA 0 0 RM 0.00 RM 0.00
2270 1.3.5.6.2 Lean Concrete G 20 ‐0.18 days 3 days RM 807.80 Wed 26/7/23 Sun 30/7/23 NA NA 0 0 RM 0.00 RM 0.00
2271 1.3.5.6.2 Formwork ‐0.18 days 4 days RM 6,032.00 Mon 31/7/23 Thu 3/8/23 NA NA 0 0 RM 0.00 RM 0.00
2272 1.3.5.6.2 Reinforcement Rebar ‐0.18 days 4 days RM 21,147.40 Sun 6/8/23 Wed 9/8/23 NA NA 0 0 RM 0.00 RM 0.00
2273 1.3.5.6.2 Concreting G 35 ‐0.18 days 3 days RM 15,120.00 Thu 10/8/23 Mon 14/8/23 NA NA 0 0 RM 0.00 RM 0.00
2274 1.3.5.6.2 Bed ‐0.18 days 10 days RM 175,079.80 Tue 15/8/23 Mon 28/8/23 NA NA 0 0 RM 0.00 RM 0.00
2275 1.3.5.6.2 Lean Concrete G 20 ‐0.18 days 2 days RM 10,615.60 Tue 15/8/23 Wed 16/8/23 NA NA 0 0 RM 0.00 RM 0.00
2276 1.3.5.6.2 Reinforcement Rebar ‐0.18 days 5 days RM 93,832.20 Thu 17/8/23 Wed 23/8/23 NA NA 0 0 RM 0.00 RM 0.00
2277 1.3.5.6.2 Concreting G 35 ‐0.18 days 3 days RM 70,632.00 Thu 24/8/23 Mon 28/8/23 NA NA 0 0 RM 0.00 RM 0.00
2278 1.3.5.6.2 Column & Wall ‐0.18 days 11 days RM 216,928.60 Tue 29/8/23 Tue 12/9/23 NA NA 0 0 RM 0.00 RM 0.00
2279 1.3.5.6.2 Formwork ‐0.18 days 3 days RM 42,624.00 Tue 29/8/23 Thu 31/8/23 NA NA 0 0 RM 0.00 RM 0.00
2280 1.3.5.6.2 Reinforcement Rebar ‐0.18 days 5 days RM 138,624.60 Sun 3/9/23 Thu 7/9/23 NA NA 0 0 RM 0.00 RM 0.00
2281 1.3.5.6.2 Concreting G 35 ‐0.18 days 3 days RM 35,680.00 Sun 10/9/23 Tue 12/9/23 NA NA 0 0 RM 0.00 RM 0.00
2282 1.3.5.6.2 Upper Beam ‐0.18 days 11 days RM 89,948.80 Wed 13/9/23 Sun 1/10/23 NA NA 0 0 RM 0.00 RM 0.00
2283 1.3.5.6.2 Formwork ‐0.18 days 4 days RM 13,066.00 Wed 13/9/23 Tue 19/9/23 NA NA 0 0 RM 0.00 RM 0.00
2284 1.3.5.6.2 Reinforcement Rebar ‐0.18 days 4 days RM 52,762.80 Wed 20/9/23 Mon 25/9/23 NA NA 0 0 RM 0.00 RM 0.00
WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
2285 1.3.5.6.2 Concreting G 35 ‐0.18 days 3 days RM 24,120.00 Tue 26/9/23 Sun 1/10/23 NA NA 0 0 RM 0.00 RM 0.00
2286 1.3.5.6.2 Upper Slab ‐0.18 days 12 days RM 178,526.20 Mon 2/10/23 Tue 17/10/23 NA NA 0 0 RM 0.00 RM 0.00
2287 1.3.5.6.2 Formwork ‐0.18 days 4 days RM 20,998.00 Mon 2/10/23 Thu 5/10/23 NA NA 0 0 RM 0.00 RM 0.00
2288 1.3.5.6.2 Reinforcement Rebar ‐0.18 days 5 days RM 90,508.20 Sun 8/10/23 Thu 12/10/23 NA NA 0 0 RM 0.00 RM 0.00
2289 1.3.5.6.2 Concreting G 35 ‐0.18 days 3 days RM 67,020.00 Sun 15/10/23 Tue 17/10/23 NA NA 0 0 RM 0.00 RM 0.00
2290 1.3.5.6.2 Opening ‐0.18 days 1 day RM 600.00 Wed 18/10/23 Wed 18/10/23 NA NA 0 0 RM 0.00 RM 0.00
2291 1.3.5.6.2 Construction Joint ‐0.18 days 1 day RM 7,350.00 Thu 19/10/23 Thu 19/10/23 NA NA 0 0 RM 0.00 RM 0.00
2292 1.3.5.6.2 Waterstop ‐0.18 days 1 day RM 9,494.00 Sun 22/10/23 Sun 22/10/23 NA NA 0 0 RM 0.00 RM 0.00
2293 1.3.5.6.2 Waterproofing to concrete wall ‐0.18 days 1 day RM 14,382.00 Mon 23/10/23 Mon 23/10/23 NA NA 0 0 RM 0.00 RM 0.00
2294 1.3.5.6.2 Precast Concrete Slab ‐0.18 days 2 days RM 2,050.00 Tue 24/10/23 Wed 25/10/23 NA NA 0 0 RM 0.00 RM 0.00
2295 1.3.5.6.2 3000mm x 7750mm ‐0.18 days 1 day RM 650.00 Tue 24/10/23 Tue 24/10/23 NA NA 0 0 RM 0.00 RM 0.00
2296 1.3.5.6.2 1000mm x 1000mm ‐0.18 days 1 day RM 1,400.00 Wed 25/10/23 Wed 25/10/23 NA NA 0 0 RM 0.00 RM 0.00
2297 1.3.5.6.2 Connection Drainage System ‐0.18 days 2 days RM 1,250.00 Thu 26/10/23 Sun 29/10/23 NA NA 0 0 RM 0.00 RM 0.00
2298 1.3.5.6.3 DP2 ‐0.18 days 44 days RM 360,960.00 Sun 23/7/23 Thu 21/9/23 NA NA 0 0 RM 0.00 RM 0.00
2299 1.3.5.6.3 Excavate not exceed 3.0m deep ‐0.18 days 2 days RM 10,000.00 Sun 23/7/23 Mon 24/7/23 NA NA 0 0 RM 0.00 RM 0.00
2300 1.3.5.6.3 Pile Caps ‐0.18 days 9 days RM 21,800.00 Tue 25/7/23 Sun 6/8/23 NA NA 0 0 RM 0.00 RM 0.00
2301 1.3.5.6.3 Excavation not exceed 1.5m ‐0.18 days 2 days RM 400.00 Tue 25/7/23 Wed 26/7/23 NA NA 0 0 RM 0.00 RM 0.00
2302 1.3.5.6.3 Lean Concrete G 20 ‐0.18 days 2 days RM 400.00 Thu 27/7/23 Sun 30/7/23 NA NA 0 0 RM 0.00 RM 0.00
2303 1.3.5.6.3 Formwork ‐0.18 days 3 days RM 4,000.00 Sun 30/7/23 Tue 1/8/23 NA NA 0 0 RM 0.00 RM 0.00
2304 1.3.5.6.3 Reinforcement Rebar ‐0.18 days 3 days RM 10,000.00 Tue 1/8/23 Thu 3/8/23 NA NA 0 0 RM 0.00 RM 0.00
2305 1.3.5.6.3 Concreting G 35 ‐0.18 days 2 days RM 7,000.00 Thu 3/8/23 Sun 6/8/23 NA NA 0 0 RM 0.00 RM 0.00
2306 1.3.5.6.3 Bed ‐0.18 days 7 days RM 79,000.00 Mon 7/8/23 Tue 15/8/23 NA NA 0 0 RM 0.00 RM 0.00
2307 1.3.5.6.3 Lean Concrete G 20 ‐0.18 days 1 day RM 4,000.00 Mon 7/8/23 Mon 7/8/23 NA NA 0 0 RM 0.00 RM 0.00
2308 1.3.5.6.3 Reinforcement Rebar ‐0.18 days 4 days RM 45,000.00 Tue 8/8/23 Sun 13/8/23 NA NA 0 0 RM 0.00 RM 0.00
2309 1.3.5.6.3 Concreting G 35 ‐0.18 days 2 days RM 30,000.00 Mon 14/8/23 Tue 15/8/23 NA NA 0 0 RM 0.00 RM 0.00
2310 1.3.5.6.3 Column & Wall ‐0.18 days 7 days RM 95,000.00 Wed 16/8/23 Thu 24/8/23 NA NA 0 0 RM 0.00 RM 0.00
2311 1.3.5.6.3 Formwork ‐0.18 days 3 days RM 20,000.00 Wed 16/8/23 Sun 20/8/23 NA NA 0 0 RM 0.00 RM 0.00
2312 1.3.5.6.3 Reinforcement Rebar ‐0.18 days 3 days RM 60,000.00 Sun 20/8/23 Tue 22/8/23 NA NA 0 0 RM 0.00 RM 0.00
2313 1.3.5.6.3 Concreting G 35 ‐0.18 days 2 days RM 15,000.00 Wed 23/8/23 Thu 24/8/23 NA NA 0 0 RM 0.00 RM 0.00
2314 1.3.5.6.3 Upper Beam ‐0.18 days 7 days RM 52,000.00 Sun 27/8/23 Mon 4/9/23 NA NA 0 0 RM 0.00 RM 0.00
2315 1.3.5.6.3 Formwork ‐0.18 days 3 days RM 10,000.00 Sun 27/8/23 Tue 29/8/23 NA NA 0 0 RM 0.00 RM 0.00
2316 1.3.5.6.3 Reinforcement Rebar ‐0.18 days 3 days RM 30,000.00 Tue 29/8/23 Thu 31/8/23 NA NA 0 0 RM 0.00 RM 0.00
2317 1.3.5.6.3 Concreting G 35 ‐0.18 days 2 days RM 12,000.00 Sun 3/9/23 Mon 4/9/23 NA NA 0 0 RM 0.00 RM 0.00
2318 1.3.5.6.3 Upper Slab ‐0.18 days 7 days RM 86,000.00 Tue 5/9/23 Wed 13/9/23 NA NA 0 0 RM 0.00 RM 0.00
2319 1.3.5.6.3 Formwork ‐0.18 days 3 days RM 14,000.00 Tue 5/9/23 Thu 7/9/23 NA NA 0 0 RM 0.00 RM 0.00
2320 1.3.5.6.3 Reinforcement Rebar ‐0.18 days 3 days RM 42,000.00 Thu 7/9/23 Mon 11/9/23 NA NA 0 0 RM 0.00 RM 0.00
2321 1.3.5.6.3 Concreting G 35 ‐0.18 days 2 days RM 30,000.00 Tue 12/9/23 Wed 13/9/23 NA NA 0 0 RM 0.00 RM 0.00
2322 1.3.5.6.3 Opening ‐0.18 days 1 day RM 300.00 Thu 7/9/23 Thu 7/9/23 NA NA 0 0 RM 0.00 RM 0.00
2323 1.3.5.6.3 Construction Joint ‐0.18 days 1 day RM 4,200.00 Wed 23/8/23 Wed 23/8/23 NA NA 0 0 RM 0.00 RM 0.00
2324 1.3.5.6.3 Waterstop ‐0.18 days 1 day RM 4,300.00 Wed 23/8/23 Wed 23/8/23 NA NA 0 0 RM 0.00 RM 0.00
2325 1.3.5.6.3 Waterproofing to concrete wall ‐0.18 days 1 day RM 6,500.00 Thu 14/9/23 Thu 14/9/23 NA NA 0 0 RM 0.00 RM 0.00
2326 1.3.5.6.3 Precast Concrete Slab ‐0.18 days 2 days RM 1,110.00 Mon 18/9/23 Tue 19/9/23 NA NA 0 0 RM 0.00 RM 0.00
2327 1.3.5.6.3 3000mm x 7750mm ‐0.18 days 1 day RM 350.00 Mon 18/9/23 Mon 18/9/23 NA NA 0 0 RM 0.00 RM 0.00
2328 1.3.5.6.3 1000mm x 1000mm ‐0.18 days 1 day RM 760.00 Tue 19/9/23 Tue 19/9/23 NA NA 0 0 RM 0.00 RM 0.00
2329 1.3.5.6.3 Connection Drainage System ‐0.18 days 2 days RM 750.00 Wed 20/9/23 Thu 21/9/23 NA NA 0 0 RM 0.00 RM 0.00
2330 1.3.5.7 Sewerage Works ‐0.18 days 64 days RM 266,743.50 Thu 26/1/23 Wed 3/5/23 NA NA 0 0 RM 0.00 RM 0.00
2331 1.3.5.7.1 Sewer Pipe ‐0.18 days 26 days RM 209,243.50 Thu 26/1/23 Sun 5/3/23 NA NA 0 0 RM 0.00 RM 0.00
2332 1.3.5.7.1 Zone A ‐0.18 days 16 days RM 69,747.84 Thu 26/1/23 Thu 16/2/23 NA NA 0 0 RM 0.00 RM 0.00
2333 1.3.5.7.1 Excavations ‐0.18 days 7 days RM 2,139.50 Thu 26/1/23 Sun 5/2/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
2334 1.3.5.7.1 Laid Ductile Iron Pipes ‐0.18 days 5 days RM 65,473.34 Mon 6/2/23 Sun 12/2/23 NA NA 0 0 RM 0.00 RM 0.00
2335 1.3.5.7.1 Pipe Backfilling ‐0.18 days 4 days RM 2,135.00 Mon 13/2/23 Thu 16/2/23 NA NA 0 0 RM 0.00 RM 0.00
2336 1.3.5.7.1 Zone B ‐0.18 days 19 days RM 69,747.83 Mon 6/2/23 Sun 5/3/23 NA NA 0 0 RM 0.00 RM 0.00
2337 1.3.5.7.1 Excavations ‐0.18 days 7 days RM 2,139.50 Mon 6/2/23 Tue 14/2/23 NA NA 0 0 RM 0.00 RM 0.00
2338 1.3.5.7.1 Laid Ductile Iron Pipes ‐0.18 days 7 days RM 65,473.33 Wed 15/2/23 Sun 26/2/23 NA NA 0 0 RM 0.00 RM 0.00
2339 1.3.5.7.1 Pipe Backfilling ‐0.18 days 5 days RM 2,135.00 Mon 27/2/23 Sun 5/3/23 NA NA 0 0 RM 0.00 RM 0.00
2340 1.3.5.7.1 Zone C ‐0.18 days 12 days RM 69,747.83 Wed 15/2/23 Sun 5/3/23 NA NA 0 0 RM 0.00 RM 0.00
2341 1.3.5.7.1 Excavations ‐0.18 days 5 days RM 2,139.50 Wed 15/2/23 Wed 22/2/23 NA NA 0 0 RM 0.00 RM 0.00
2342 1.3.5.7.1 Laid Ductile Iron Pipes ‐0.18 days 4 days RM 65,473.33 Thu 23/2/23 Tue 28/2/23 NA NA 0 0 RM 0.00 RM 0.00
2343 1.3.5.7.1 Pipe Backfilling ‐0.18 days 3 days RM 2,135.00 Wed 1/3/23 Sun 5/3/23 NA NA 0 0 RM 0.00 RM 0.00
2344 1.3.5.7.2 Precast Manhole ‐0.18 days 30 days RM 35,100.00 Mon 6/3/23 Mon 17/4/23 NA NA 0 0 RM 0.00 RM 0.00
2345 1.3.5.7.2 Zone A (3nos) ‐0.18 days 10 days RM 12,600.00 Mon 6/3/23 Sun 19/3/23 NA NA 0 0 RM 0.00 RM 0.00
2346 1.3.5.7.2 Zone B (3nos) ‐0.18 days 10 days RM 13,500.00 Mon 20/3/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
2347 1.3.5.7.2 Zone C (2nos) ‐0.18 days 10 days RM 9,000.00 Mon 3/4/23 Mon 17/4/23 NA NA 0 0 RM 0.00 RM 0.00
2348 1.3.5.7.3 RC Chamber ‐0.18 days 5 days RM 2,400.00 Tue 18/4/23 Thu 27/4/23 NA NA 0 0 RM 0.00 RM 0.00
2349 1.3.5.7.4 Connection to STP ‐0.18 days 2 days RM 10,000.00 Sun 30/4/23 Tue 2/5/23 NA NA 0 0 RM 0.00 RM 0.00
2350 1.3.5.7.5 CCTV Testing ‐0.18 days 1 day RM 10,000.00 Wed 3/5/23 Wed 3/5/23 NA NA 0 0 RM 0.00 RM 0.00
2351 1.3.5.8 Sewerage Treatment Plant ‐0.18 days 537 days RM 558,700.00 Wed 7/4/21 Sun 27/8/23 Thu 22/4/21 NA 27.84 27.73 RM 0.00 RM 0.00
2352 1.3.5.8.1 Design Stage 11 days 14 days RM 0.00 Wed 7/4/21 Tue 27/4/21 Thu 22/4/21 Mon 17/5/21 100 100 RM 0.00 RM 0.00
2353 1.3.5.8.2 Submission 19 days 20 days RM 0.00 Wed 28/4/21 Wed 4/8/21 Wed 23/6/21 Wed 1/9/21 100 100 RM 0.00 RM 0.00
2354 1.3.5.8.3 Approval 21.8 days 20 days RM 0.00 Thu 11/11/21 Wed 16/11/22 Thu 11/11/21 NA 100 99 RM 0.00 RM 0.00
2355 1.3.5.8.4 C & S Work ‐0.18 days 40 days RM 157,142.80 Thu 26/1/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
2356 1.3.5.8.4 Foundation ‐0.18 days 20 days RM 78,571.40 Thu 26/1/23 Thu 23/2/23 NA NA 0 0 RM 0.00 RM 0.00
2357 1.3.5.8.4 Structure ‐0.18 days 20 days RM 78,571.40 Sun 26/2/23 Thu 23/3/23 NA NA 0 0 RM 0.00 RM 0.00
2358 1.3.5.8.5 M & E Works ‐0.18 days 40 days RM 165,842.80 Sun 26/3/23 Sun 28/5/23 NA NA 0 0 RM 0.00 RM 0.00
2359 1.3.5.8.5 System ‐0.18 days 20 days RM 78,571.40 Sun 26/3/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
2360 1.3.5.8.5 Installation Pump ‐0.18 days 20 days RM 87,271.40 Thu 27/4/23 Sun 28/5/23 NA NA 0 0 RM 0.00 RM 0.00
2361 1.3.5.8.6 External Works ‐0.18 days 60 days RM 235,714.40 Mon 29/5/23 Sun 27/8/23 NA NA 0 0 RM 0.00 RM 0.00
2362 1.3.5.8.6 Pavement Works ‐0.18 days 20 days RM 78,571.40 Mon 29/5/23 Mon 26/6/23 NA NA 0 0 RM 0.00 RM 0.00
2363 1.3.5.8.6 Drainage ‐0.18 days 20 days RM 78,571.40 Sun 2/7/23 Sun 30/7/23 NA NA 0 0 RM 0.00 RM 0.00
2364 1.3.5.8.6 Fencing & Gate ‐0.18 days 20 days RM 78,571.60 Mon 31/7/23 Sun 27/8/23 NA NA 0 0 RM 0.00 RM 0.00
2365 1.3.5.9 Effluent Treatment Plant & System 12.66 days 459.34 days RM 735,000.00 Thu 22/4/21 Thu 18/5/23 Thu 22/4/21 NA 40.3 40.23 RM 0.00 RM 0.00
2366 1.3.5.9.1 Design Stage 0.86 days 14 days RM 0.00 Thu 22/4/21 Wed 16/11/22 Thu 22/4/21 Wed 16/11/22 100 100 RM 0.00 RM 0.00
2367 1.3.5.9.2 Submission 0.66 days 20 days RM 0.00 Tue 18/5/21 Wed 16/11/22 Tue 18/5/21 Wed 16/11/22 100 100 RM 0.00 RM 0.00
2368 1.3.5.9.3 Approval 12.66 days 20 days RM 0.00 Thu 14/7/22 Wed 30/11/22 Thu 14/7/22 NA 100 95 RM 0.00 RM 0.00
2369 1.3.5.9.4 C & S Work 12.66 days 40 days RM 350,000.00 Sun 15/1/23 Wed 15/3/23 NA NA 0 0 RM 0.00 RM 0.00
2370 1.3.5.9.4 Foundation 12.66 days 20 days RM 175,000.00 Sun 15/1/23 Tue 14/2/23 NA NA 0 0 RM 0.00 RM 0.00
2371 1.3.5.9.4 Structure 12.66 days 20 days RM 175,000.00 Tue 14/2/23 Wed 15/3/23 NA NA 0 0 RM 0.00 RM 0.00
2372 1.3.5.9.5 M & E Works 12.66 days 40 days RM 385,000.00 Wed 15/3/23 Thu 18/5/23 NA NA 0 0 RM 0.00 RM 0.00
2373 1.3.5.9.5 System 12.66 days 20 days RM 175,000.00 Wed 15/3/23 Thu 13/4/23 NA NA 0 0 RM 0.00 RM 0.00
2374 1.3.5.9.5 Installation Pump 12.66 days 20 days RM 210,000.00 Thu 13/4/23 Thu 18/5/23 NA NA 0 0 RM 0.00 RM 0.00
2375 1.3.5.10 Suction Tank Plinths ‐0.18 days 17 days RM 23,027.50 Thu 30/3/23 Sun 30/4/23 NA NA 0 0 RM 0.00 RM 0.00
2376 1.3.5.10. Excavate 300mm average deep ‐0.18 days 1 day RM 147.00 Thu 30/3/23 Sun 2/4/23 NA NA 0 0 RM 0.00 RM 0.00
2377 1.3.5.10. Base ‐0.18 days 10 days RM 17,683.90 Sun 2/4/23 Mon 17/4/23 NA NA 0 0 RM 0.00 RM 0.00
2378 1.3.5.10. Excavate for base ‐0.18 days 1 day RM 144.00 Sun 2/4/23 Mon 3/4/23 NA NA 0 0 RM 0.00 RM 0.00
2379 1.3.5.10. Hardcore ‐0.18 days 1 day RM 485.10 Mon 3/4/23 Tue 4/4/23 NA NA 0 0 RM 0.00 RM 0.00
2380 1.3.5.10. Lean Concrete G 20 ‐0.18 days 1 day RM 597.80 Tue 4/4/23 Wed 5/4/23 NA NA 0 0 RM 0.00 RM 0.00
2381 1.3.5.10. Formwork ‐0.18 days 3 days RM 494.00 Wed 5/4/23 Tue 11/4/23 NA NA 0 0 RM 0.00 RM 0.00
2382 1.3.5.10. Reinforcement Rebar ‐0.18 days 3 days RM 11,203.00 Tue 11/4/23 Sun 16/4/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
2383 1.3.5.10. Concreting G 35 ‐0.18 days 1 day RM 4,760.00 Sun 16/4/23 Mon 17/4/23 NA NA 0 0 RM 0.00 RM 0.00
2384 1.3.5.10. Plinths ‐0.18 days 6 days RM 5,196.60 Mon 17/4/23 Sun 30/4/23 NA NA 0 0 RM 0.00 RM 0.00
2385 1.3.5.10. Formwork ‐0.18 days 2 days RM 2,014.00 Mon 17/4/23 Wed 19/4/23 NA NA 0 0 RM 0.00 RM 0.00
2386 1.3.5.10. Reinforcement Rebar ‐0.18 days 2 days RM 2,342.60 Wed 19/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
2387 1.3.5.10. Concreting G 35 ‐0.18 days 2 days RM 840.00 Tue 25/4/23 Sun 30/4/23 NA NA 0 0 RM 0.00 RM 0.00
2388 1.3.6 E ‐ M&E WORKS RELATED TO BUILDERS ‐0.18 days 127 days RM 1,762,416.00 Mon 27/3/23 Sun 8/10/23 NA NA 0 0 RM 0.00 RM 0.00
2389 1.3.6.1 Internal Cold Water Plumbing ‐0.18 days 89 days RM 457,930.00 Sun 7/5/23 Wed 13/9/23 NA NA 0 0 RM 0.00 RM 0.00
2390 1.3.6.1.1 Cold Water Piping ‐0.18 days 49 days RM 198,385.00 Sun 7/5/23 Tue 18/7/23 NA NA 0 0 RM 0.00 RM 0.00
2391 1.3.6.1.1 Stainless Steel Pipe ‐0.18 days 42 days RM 84,700.00 Sun 7/5/23 Sun 9/7/23 NA NA 0 0 RM 0.00 RM 0.00
2392 1.3.6.1.1 Pasar ‐0.18 days 21 days RM 49,999.99 Sun 7/5/23 Sun 4/6/23 NA NA 0 0 RM 0.00 RM 0.00
2393 1.3.6.1.1 Level 1 ‐0.18 days 7 days RM 16,666.65 Sun 7/5/23 Mon 15/5/23 NA NA 0 0 RM 0.00 RM 0.00
2394 1.3.6.1.1 Level 2 ‐0.18 days 7 days RM 16,666.67 Tue 16/5/23 Wed 24/5/23 NA NA 0 0 RM 0.00 RM 0.00
2395 1.3.6.1.1 Level 3 ‐0.18 days 7 days RM 16,666.67 Thu 25/5/23 Sun 4/6/23 NA NA 0 0 RM 0.00 RM 0.00
2396 1.3.6.1.1 Terminal ‐0.18 days 21 days RM 34,700.01 Tue 6/6/23 Sun 9/7/23 NA NA 0 0 RM 0.00 RM 0.00
2397 1.3.6.1.1 Level 1 ‐0.18 days 7 days RM 11,566.67 Tue 6/6/23 Wed 14/6/23 NA NA 0 0 RM 0.00 RM 0.00
2398 1.3.6.1.1 Level 2 ‐0.18 days 7 days RM 11,566.67 Thu 15/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
2399 1.3.6.1.1 Level 3 ‐0.18 days 7 days RM 11,566.67 Mon 26/6/23 Sun 9/7/23 NA NA 0 0 RM 0.00 RM 0.00
2400 1.3.6.1.1 PPR Pipe ‐0.18 days 28 days RM 113,685.00 Tue 6/6/23 Tue 18/7/23 NA NA 0 0 RM 0.00 RM 0.00
2401 1.3.6.1.1 Pasar ‐0.18 days 14 days RM 56,842.50 Tue 6/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
2402 1.3.6.1.1 Level 1 ‐0.18 days 7 days RM 28,421.25 Tue 6/6/23 Wed 14/6/23 NA NA 0 0 RM 0.00 RM 0.00
2403 1.3.6.1.1 Level 2 ‐0.18 days 7 days RM 28,421.25 Thu 15/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
2404 1.3.6.1.1 Terminal ‐0.18 days 14 days RM 56,842.50 Mon 26/6/23 Tue 18/7/23 NA NA 0 0 RM 0.00 RM 0.00
2405 1.3.6.1.1 Level 1 ‐0.18 days 7 days RM 28,421.25 Mon 26/6/23 Sun 9/7/23 NA NA 0 0 RM 0.00 RM 0.00
2406 1.3.6.1.1 Level 2 ‐0.18 days 7 days RM 28,421.25 Mon 10/7/23 Tue 18/7/23 NA NA 0 0 RM 0.00 RM 0.00
2407 1.3.6.1.2 Suction Tank ‐0.18 days 7 days RM 71,500.00 Thu 20/7/23 Sun 30/7/23 NA NA 0 0 RM 0.00 RM 0.00
2408 1.3.6.1.3 Storage Tank ‐0.18 days 21 days RM 157,300.00 Mon 31/7/23 Mon 28/8/23 NA NA 0 0 RM 0.00 RM 0.00
2409 1.3.6.1.3 Terminal (FRP Tank) ‐0.18 days 7 days RM 33,000.00 Mon 31/7/23 Tue 8/8/23 NA NA 0 0 RM 0.00 RM 0.00
2410 1.3.6.1.3 Pasar & Ruang Niaga ‐0.18 days 14 days RM 124,300.00 Wed 9/8/23 Mon 28/8/23 NA NA 0 0 RM 0.00 RM 0.00
2411 1.3.6.1.3 FRP Tank A ‐0.18 days 7 days RM 81,400.00 Wed 9/8/23 Thu 17/8/23 NA NA 0 0 RM 0.00 RM 0.00
2412 1.3.6.1.3 FRP Tank B ‐0.18 days 7 days RM 42,900.00 Sun 20/8/23 Mon 28/8/23 NA NA 0 0 RM 0.00 RM 0.00
2413 1.3.6.1.4 Water Meter ‐0.18 days 5 days RM 30,305.00 Tue 29/8/23 Mon 4/9/23 NA NA 0 0 RM 0.00 RM 0.00
2414 1.3.6.1.5 Water Tap ‐0.18 days 7 days RM 440.00 Tue 5/9/23 Wed 13/9/23 NA NA 0 0 RM 0.00 RM 0.00
2415 1.3.6.2 Internal Sanitary Plumbing ‐0.18 days 109 days RM 839,597.00 Mon 27/3/23 Sun 10/9/23 NA NA 0 0 RM 0.00 RM 0.00
2416 1.3.6.2.1 Excavation ‐0.18 days 5 days RM 19,800.00 Mon 3/4/23 Mon 10/4/23 NA NA 0 0 RM 0.00 RM 0.00
2417 1.3.6.2.2 Waste Pipe ‐0.18 days 5 days RM 6,050.00 Tue 11/4/23 Mon 17/4/23 NA NA 0 0 RM 0.00 RM 0.00
2418 1.3.6.2.3 Inspection Chamber ‐0.18 days 40 days RM 29,260.00 Mon 15/5/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
2419 1.3.6.2.3 Pasar ‐0.18 days 20 days RM 17,260.00 Mon 15/5/23 Mon 12/6/23 NA NA 0 0 RM 0.00 RM 0.00
2420 1.3.6.2.3 Terminal ‐0.18 days 20 days RM 12,000.00 Tue 13/6/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
2421 1.3.6.2.4 Sanitary Piping ‐0.18 days 60 days RM 61,677.00 Tue 13/6/23 Sun 10/9/23 NA NA 0 0 RM 0.00 RM 0.00
2422 1.3.6.2.4 Pasar ‐0.18 days 40 days RM 30,839.00 Tue 13/6/23 Sun 13/8/23 NA NA 0 0 RM 0.00 RM 0.00
2423 1.3.6.2.4 Level 1 ‐0.18 days 20 days RM 15,419.00 Tue 13/6/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
2424 1.3.6.2.4 Level 2 ‐0.18 days 20 days RM 15,420.00 Sun 16/7/23 Sun 13/8/23 NA NA 0 0 RM 0.00 RM 0.00
2425 1.3.6.2.4 Terminal ‐0.18 days 40 days RM 30,838.00 Sun 16/7/23 Sun 10/9/23 NA NA 0 0 RM 0.00 RM 0.00
2426 1.3.6.2.4 Level 1 ‐0.18 days 20 days RM 15,419.00 Sun 16/7/23 Sun 13/8/23 NA NA 0 0 RM 0.00 RM 0.00
2427 1.3.6.2.4 Level 2 ‐0.18 days 20 days RM 15,419.00 Mon 14/8/23 Sun 10/9/23 NA NA 0 0 RM 0.00 RM 0.00
2428 1.3.6.2.5 Pre Treatment Sump (Pasar) ‐0.18 days 13 days RM 257,730.00 Mon 27/3/23 Thu 13/4/23 NA NA 0 0 RM 0.00 RM 0.00
2429 1.3.6.2.5 Section 1 ‐0.18 days 10 days RM 128,865.00 Mon 27/3/23 Mon 10/4/23 NA NA 0 0 RM 0.00 RM 0.00
2430 1.3.6.2.5 Section 2 ‐0.18 days 10 days RM 128,865.00 Thu 30/3/23 Thu 13/4/23 NA NA 0 0 RM 0.00 RM 0.00
2431 1.3.6.2.6 Gully Trap ‐0.18 days 20 days RM 3,080.00 Tue 13/6/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
2432 1.3.6.2.6 Section 1 ‐0.18 days 10 days RM 1,540.00 Tue 13/6/23 Mon 26/6/23 NA NA 0 0 RM 0.00 RM 0.00
2433 1.3.6.2.6 Section 2 ‐0.18 days 10 days RM 1,540.00 Sun 2/7/23 Thu 13/7/23 NA NA 0 0 RM 0.00 RM 0.00
2434 1.3.6.2.7 Grease Trap ‐0.18 days 34 days RM 462,000.00 Sun 16/7/23 Thu 31/8/23 NA NA 0 0 RM 0.00 RM 0.00
2435 1.3.6.2.7 Section 1 ‐0.18 days 20 days RM 231,000.00 Sun 16/7/23 Sun 13/8/23 NA NA 0 0 RM 0.00 RM 0.00
2436 1.3.6.2.7 Section 2 ‐0.18 days 14 days RM 231,000.00 Mon 14/8/23 Thu 31/8/23 NA NA 0 0 RM 0.00 RM 0.00
2437 1.3.6.3 Rainwater Harvesting ‐0.18 days 24 days RM 220,770.00 Sun 3/9/23 Sun 8/10/23 NA NA 0 0 RM 0.00 RM 0.00
2438 1.3.6.3.1 Pumping System ‐0.18 days 10 days RM 9,240.00 Sun 3/9/23 Thu 14/9/23 NA NA 0 0 RM 0.00 RM 0.00
2439 1.3.6.3.2 Filtering System ‐0.18 days 7 days RM 202,180.00 Mon 18/9/23 Tue 26/9/23 NA NA 0 0 RM 0.00 RM 0.00
2440 1.3.6.3.3 Piping System ‐0.18 days 7 days RM 9,350.00 Thu 28/9/23 Sun 8/10/23 NA NA 0 0 RM 0.00 RM 0.00
2441 1.3.6.4 External Infrastructure LV Works ‐0.18 days 34 days RM 225,295.00 Mon 3/4/23 Sun 28/5/23 NA NA 0 0 RM 0.00 RM 0.00
2442 1.3.6.4.1 Underground Ducting Works ‐0.18 days 34 days RM 225,295.00 Mon 3/4/23 Sun 28/5/23 NA NA 0 0 RM 0.00 RM 0.00
2443 1.3.6.4.1 Lay HDPE Pipe ‐0.18 days 20 days RM 188,925.00 Mon 3/4/23 Mon 8/5/23 NA NA 0 0 RM 0.00 RM 0.00
2444 1.3.6.4.1 Section 1 ‐0.18 days 10 days RM 94,462.50 Mon 3/4/23 Mon 17/4/23 NA NA 0 0 RM 0.00 RM 0.00
2445 1.3.6.4.1 Section 2 ‐0.18 days 10 days RM 94,462.50 Tue 18/4/23 Mon 8/5/23 NA NA 0 0 RM 0.00 RM 0.00
2446 1.3.6.4.1 Electrical Manhole ‐0.18 days 7 days RM 32,560.00 Tue 9/5/23 Wed 17/5/23 NA NA 0 0 RM 0.00 RM 0.00
2447 1.3.6.4.1 Electrical Pit ‐0.18 days 5 days RM 2,310.00 Thu 18/5/23 Wed 24/5/23 NA NA 0 0 RM 0.00 RM 0.00
2448 1.3.6.4.1 Liason With Authority ‐0.18 days 2 days RM 1,500.00 Thu 25/5/23 Sun 28/5/23 NA NA 0 0 RM 0.00 RM 0.00
2449 1.3.6.5 External Telecommunication Works ‐0.18 days 28 days RM 18,824.00 Tue 18/4/23 Thu 1/6/23 NA NA 0 0 RM 0.00 RM 0.00
2450 1.3.6.5.1 Manhole ‐0.18 days 28 days RM 18,824.00 Tue 18/4/23 Thu 1/6/23 NA NA 0 0 RM 0.00 RM 0.00
2451 1.3.6.5.1 JRC7 ‐0.18 days 2 days RM 1,760.00 Tue 18/4/23 Wed 19/4/23 NA NA 0 0 RM 0.00 RM 0.00
2452 1.3.6.5.1 JC9 ‐0.18 days 2 days RM 2,750.00 Thu 20/4/23 Tue 25/4/23 NA NA 0 0 RM 0.00 RM 0.00
2453 1.3.6.5.1 Ducting Works ‐0.18 days 10 days RM 11,814.00 Tue 9/5/23 Mon 22/5/23 NA NA 0 0 RM 0.00 RM 0.00
2454 1.3.6.5.1 Liason With Authority ‐0.18 days 1 day RM 1,000.00 Tue 23/5/23 Tue 23/5/23 NA NA 0 0 RM 0.00 RM 0.00
2455 1.3.6.5.1 Testing & Commisioning ‐0.18 days 7 days RM 1,500.00 Wed 24/5/23 Thu 1/6/23 NA NA 0 0 RM 0.00 RM 0.00
2456 1.3.7 F ‐ PRIME COST SUM ‐2 days 300 days RM 8,699,399.46 Wed 30/11/22 Mon 19/2/24 Sun 3/7/22 NA 0.78 4.83 RM 24,224.00 RM 71,562.00
2457 1.3.7.1 Electrical Services 0 days 298 days RM 3,970,566.00 Wed 30/11/22 Thu 15/2/24 Sun 3/7/22 NA 2.55 4.8 RM 24,224.00 RM 27,002.00
2458 1.3.7.1.1 Preliminaries 0 days 298 days RM 104,010.70 Wed 30/11/22 Thu 15/2/24 Sun 3/7/22 NA 6.59 12.11 RM 24,224.00 RM 27,002.00
2459 1.3.7.1.1 Insurance of Sub‐Contract Work ‐101 days 3 days RM 3,334.00 Wed 30/11/22 Sun 4/12/22 Sun 3/7/22 Thu 7/7/22 100 100 RM 3,334.00 RM 3,334.00

2460 1.3.7.1.1 Insurance Against Personal Injuries ‐105 days 3 days RM 6,667.00 Mon 5/12/22 Wed 7/12/22 Sun 3/7/22 Wed 6/7/22 100 100 RM 6,667.00 RM 6,667.00
and Property
2461 1.3.7.1.1 Performance Bond ‐107 days 3 days RM 7,556.00 Thu 8/12/22 Mon 12/12/22 Sun 3/7/22 Thu 7/7/22 100 100 RM 7,556.00 RM 7,556.00
2462 1.3.7.1.1 Employee's Social Security Act ‐111 days 3 days RM 6,667.00 Tue 13/12/22 Thu 15/12/22 Sun 3/7/22 Wed 6/7/22 100 100 RM 6,667.00 RM 6,667.00
1969
2463 1.3.7.1.1 Sub‐Contract Work Programme ‐113 days 3 days RM 2,778.00 Sun 18/12/22 Tue 20/12/22 Sun 3/7/22 Thu 7/7/22 0 100 RM 0.00 RM 2,778.00
2464 1.3.7.1.1 Clearing and Cleaning of Site ‐3 days 20 days RM 5,977.70 Wed 21/12/22 Wed 18/1/23 NA NA 0 0 RM 0.00 RM 0.00
2465 1.3.7.1.1 Competent Persons ‐3 days 1 day RM 10,000.00 Thu 19/1/23 Thu 19/1/23 NA NA 0 0 RM 0.00 RM 0.00
2466 1.3.7.1.1 Resources For Site Safety ‐3 days 1 day RM 18,010.00 Tue 24/1/23 Tue 24/1/23 NA NA 0 0 RM 0.00 RM 0.00
2467 1.3.7.1.1 Submission of Shop / Working Draw‐3 days 5 days RM 5,000.00 Wed 25/1/23 Tue 31/1/23 NA NA 0 0 RM 0.00 RM 0.00
2468 1.3.7.1.1 Coordination of Work (IBS) ‐3 days 20 days RM 2,778.00 Wed 1/2/23 Wed 1/3/23 NA NA 0 0 RM 0.00 RM 0.00
2469 1.3.7.1.1 Electrical Protection Schemes (Calib‐3 days 20 days RM 3,334.00 Thu 2/3/23 Wed 29/3/23 NA NA 0 0 RM 0.00 RM 0.00
2470 1.3.7.1.1 Equipment Inventory List ‐3 days 20 days RM 4,445.00 Thu 30/3/23 Wed 3/5/23 NA NA 0 0 RM 0.00 RM 0.00
2471 1.3.7.1.1 Sub‐Contract Document ‐3 days 20 days RM 4,445.00 Sun 7/5/23 Thu 1/6/23 NA NA 0 0 RM 0.00 RM 0.00
2472 1.3.7.1.1 Material and Workmanship ‐3 days 1 day RM 1,112.00 Sun 4/6/23 Sun 4/6/23 NA NA 0 0 RM 0.00 RM 0.00
2473 1.3.7.1.1 Inspection, Testing and Commission‐0.14 days 1 day RM 2,223.00 Wed 7/2/24 Wed 7/2/24 NA NA 0 0 RM 0.00 RM 0.00
2474 1.3.7.1.1 Application To and Testing By The A‐3 days 20 days RM 3,334.00 Tue 6/6/23 Thu 6/7/23 NA NA 0 0 RM 0.00 RM 0.00
2475 1.3.7.1.1 Documentation Upon Completion ‐0.14 days 20 days RM 7,460.00 Sun 21/1/24 Thu 15/2/24 NA NA 0 0 RM 0.00 RM 0.00
2476 1.3.7.1.1 Protection of Existing Services 0 days 162 days RM 6,112.00 Sun 25/6/23 Thu 15/2/24 NA NA 0 0 RM 0.00 RM 0.00
2477 1.3.7.1.1 Protection of Existing Services 1 0 days 1 day RM 679.00 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
2478 1.3.7.1.1 Protection of Existing Services 2 0 days 1 day RM 679.00 Sun 23/7/23 Sun 23/7/23 NA NA 0 0 RM 0.00 RM 0.00
WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
2479 1.3.7.1.1 Protection of Existing Services 3 0 days 1 day RM 679.00 Wed 23/8/23 Wed 23/8/23 NA NA 0 0 RM 0.00 RM 0.00
2480 1.3.7.1.1 Protection of Existing Services 4 0 days 1 day RM 679.00 Sun 24/9/23 Sun 24/9/23 NA NA 0 0 RM 0.00 RM 0.00
2481 1.3.7.1.1 Protection of Existing Services 5 0 days 1 day RM 679.00 Mon 23/10/23 Mon 23/10/23 NA NA 0 0 RM 0.00 RM 0.00
2482 1.3.7.1.1 Protection of Existing Services 6 0 days 1 day RM 679.00 Thu 23/11/23 Thu 23/11/23 NA NA 0 0 RM 0.00 RM 0.00
2483 1.3.7.1.1 Protection of Existing Services 7 0 days 1 day RM 679.00 Sun 24/12/23 Sun 24/12/23 NA NA 0 0 RM 0.00 RM 0.00
2484 1.3.7.1.1 Protection of Existing Services 8 0 days 1 day RM 679.00 Tue 23/1/24 Tue 23/1/24 NA NA 0 0 RM 0.00 RM 0.00
2485 1.3.7.1.1 Protection of Existing Services 9 0 days 1 day RM 680.00 Thu 15/2/24 Thu 15/2/24 NA NA 0 0 RM 0.00 RM 0.00
2486 1.3.7.1.1 Progress Reports and Photographs 0 days 162 days RM 2,778.00 Sun 25/6/23 Thu 15/2/24 NA NA 0 0 RM 0.00 RM 0.00
2487 1.3.7.1.1 Progress Reports and Photograph0 days 1 day RM 308.00 Sun 25/6/23 Sun 25/6/23 NA NA 0 0 RM 0.00 RM 0.00
2488 1.3.7.1.1 Progress Reports and Photograph0 days 1 day RM 308.00 Sun 23/7/23 Sun 23/7/23 NA NA 0 0 RM 0.00 RM 0.00
2489 1.3.7.1.1 Progress Reports and Photograph0 days 1 day RM 308.00 Wed 23/8/23 Wed 23/8/23 NA NA 0 0 RM 0.00 RM 0.00
2490 1.3.7.1.1 Progress Reports and Photograph0 days 1 day RM 308.00 Sun 24/9/23 Sun 24/9/23 NA NA 0 0 RM 0.00 RM 0.00
2491 1.3.7.1.1 Progress Reports and Photograph0 days 1 day RM 308.00 Mon 23/10/23 Mon 23/10/23 NA NA 0 0 RM 0.00 RM 0.00
2492 1.3.7.1.1 Progress Reports and Photograph0 days 1 day RM 308.00 Thu 23/11/23 Thu 23/11/23 NA NA 0 0 RM 0.00 RM 0.00
2493 1.3.7.1.1 Progress Reports and Photograph0 days 1 day RM 308.00 Sun 24/12/23 Sun 24/12/23 NA NA 0 0 RM 0.00 RM 0.00
2494 1.3.7.1.1 Progress Reports and Photograph0 days 1 day RM 308.00 Tue 23/1/24 Tue 23/1/24 NA NA 0 0 RM 0.00 RM 0.00
2495 1.3.7.1.1 Progress Reports and Photograph0 days 1 day RM 314.00 Thu 15/2/24 Thu 15/2/24 NA NA 0 0 RM 0.00 RM 0.00
2496 1.3.7.1.2 TNB Room ‐3 days 48 days RM 961,862.00 Tue 6/6/23 Wed 16/8/23 NA NA 0 0 RM 0.00 RM 0.00
2497 1.3.7.1.2 Main Switchboard (MSB) Installatio ‐3 days 1 day RM 157,847.00 Tue 15/8/23 Tue 15/8/23 NA NA 0 0 RM 0.00 RM 0.00
2498 1.3.7.1.2 Essential LV Board (EMSB) Installati ‐3 days 1 day RM 46,713.00 Wed 16/8/23 Wed 16/8/23 NA NA 0 0 RM 0.00 RM 0.00
2499 1.3.7.1.2 Distribution Board ‐3 days 2 days RM 2,614.00 Wed 14/6/23 Thu 15/6/23 NA NA 0 0 RM 0.00 RM 0.00
2500 1.3.7.1.2 DB‐TNB ‐3 days 1 day RM 1,395.00 Wed 14/6/23 Wed 14/6/23 NA NA 0 0 RM 0.00 RM 0.00
2501 1.3.7.1.2 DB‐MSB ‐3 days 1 day RM 1,219.00 Thu 15/6/23 Thu 15/6/23 NA NA 0 0 RM 0.00 RM 0.00
2502 1.3.7.1.2 FEEDER PILLAR AND ACCESSORIES F‐3 days 2 days RM 6,668.00 Sun 18/6/23 Mon 19/6/23 NA NA 0 0 RM 0.00 RM 0.00
2503 1.3.7.1.2 Conduit & Trunking Installation ‐3 days 3 days RM 2,572.00 Tue 6/6/23 Thu 8/6/23 NA NA 0 0 RM 0.00 RM 0.00
2504 1.3.7.1.2 Wiring Works ‐3 days 3 days RM 2,572.00 Sun 11/6/23 Tue 13/6/23 NA NA 0 0 RM 0.00 RM 0.00
2505 1.3.7.1.2 Socket Fitting Installation ‐3 days 4 days RM 2,572.00 Wed 14/6/23 Mon 19/6/23 NA NA 0 0 RM 0.00 RM 0.00
2506 1.3.7.1.2 Submains Cabling & Ducting ‐3 days 3 days RM 670,879.00 Tue 20/6/23 Thu 22/6/23 NA NA 0 0 RM 0.00 RM 0.00
2507 1.3.7.1.2 Light Fitting Installation ‐3 days 4 days RM 3,662.00 Sun 25/6/23 Mon 3/7/23 NA NA 0 0 RM 0.00 RM 0.00
2508 1.3.7.1.2 STP Feeder Pillar Installation ‐3 days 2 days RM 9,334.00 Tue 4/7/23 Wed 5/7/23 NA NA 0 0 RM 0.00 RM 0.00
2509 1.3.7.1.2 STP Meter Kiosk Installation ‐3 days 2 days RM 21,654.00 Thu 6/7/23 Sun 9/7/23 NA NA 0 0 RM 0.00 RM 0.00
2510 1.3.7.1.2 Submission and approval to TNB ‐3 days 14 days RM 8,001.00 Mon 10/7/23 Sun 30/7/23 NA NA 0 0 RM 0.00 RM 0.00
2511 1.3.7.1.2 Room accessories ‐3 days 5 days RM 5,334.00 Mon 31/7/23 Sun 6/8/23 NA NA 0 0 RM 0.00 RM 0.00
2512 1.3.7.1.2 Earthing accessories installation ‐3 days 4 days RM 16,640.00 Mon 7/8/23 Thu 10/8/23 NA NA 0 0 RM 0.00 RM 0.00
2513 1.3.7.1.2 TNB Metering Kisok and Accessorie ‐3 days 2 days RM 4,800.00 Sun 13/8/23 Mon 14/8/23 NA NA 0 0 RM 0.00 RM 0.00
2514 1.3.7.1.3 LV Terminal Bus ‐0.14 days 50 days RM 678,013.00 Thu 28/9/23 Thu 7/12/23 NA NA 0 0 RM 0.00 RM 0.00
2515 1.3.7.1.3 Ground Floor ‐0.14 days 22 days RM 279,670.00 Thu 28/9/23 Sun 29/10/23 NA NA 0 0 RM 0.00 RM 0.00
2516 1.3.7.1.3 Conduit & Trunking Installation ‐0.14 days 5 days RM 10,000.00 Thu 28/9/23 Wed 4/10/23 NA NA 0 0 RM 0.00 RM 0.00
2517 1.3.7.1.3 Wiring Works ‐0.14 days 3 days RM 17,000.00 Thu 5/10/23 Mon 9/10/23 NA NA 0 0 RM 0.00 RM 0.00
2518 1.3.7.1.3 Socket Fitting Installation ‐0.14 days 3 days RM 55,284.00 Tue 10/10/23 Thu 12/10/23 NA NA 0 0 RM 0.00 RM 0.00
2519 1.3.7.1.3 Submains Cabling & Ducting ‐0.14 days 4 days RM 60,590.00 Sun 15/10/23 Wed 18/10/23 NA NA 0 0 RM 0.00 RM 0.00
2520 1.3.7.1.3 Light Fitting Installation ‐0.14 days 3 days RM 38,400.00 Thu 19/10/23 Mon 23/10/23 NA NA 0 0 RM 0.00 RM 0.00
2521 1.3.7.1.3 SSB Installation ‐0.14 days 2 days RM 58,796.00 Tue 24/10/23 Wed 25/10/23 NA NA 0 0 RM 0.00 RM 0.00
2522 1.3.7.1.3 DB Installation ‐0.14 days 2 days RM 39,600.00 Thu 26/10/23 Sun 29/10/23 NA NA 0 0 RM 0.00 RM 0.00
2523 1.3.7.1.3 First Floor Floor ‐0.14 days 28 days RM 398,343.00 Mon 30/10/23 Thu 7/12/23 NA NA 0 0 RM 0.00 RM 0.00
2524 1.3.7.1.3 Conduit & Trunking Installation ‐0.14 days 5 days RM 16,000.00 Mon 30/10/23 Sun 5/11/23 NA NA 0 0 RM 0.00 RM 0.00
2525 1.3.7.1.3 Wiring Works ‐0.14 days 3 days RM 20,000.00 Mon 6/11/23 Wed 8/11/23 NA NA 0 0 RM 0.00 RM 0.00
2526 1.3.7.1.3 Socket Fitting Installation ‐0.14 days 3 days RM 55,777.00 Thu 9/11/23 Tue 14/11/23 NA NA 0 0 RM 0.00 RM 0.00
2527 1.3.7.1.3 Submains Cabling & Ducting ‐0.14 days 4 days RM 60,316.00 Wed 15/11/23 Mon 20/11/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
2528 1.3.7.1.3 Light Fitting Installation ‐0.14 days 3 days RM 57,579.00 Tue 21/11/23 Thu 23/11/23 NA NA 0 0 RM 0.00 RM 0.00
2529 1.3.7.1.3 Underfloor Trunking ‐0.14 days 2 days RM 30,094.00 Sun 26/11/23 Mon 27/11/23 NA NA 0 0 RM 0.00 RM 0.00
2530 1.3.7.1.3 SSB Installation ‐0.14 days 2 days RM 24,012.00 Tue 28/11/23 Wed 29/11/23 NA NA 0 0 RM 0.00 RM 0.00
2531 1.3.7.1.3 DB Installation ‐0.14 days 2 days RM 32,565.00 Thu 30/11/23 Sun 3/12/23 NA NA 0 0 RM 0.00 RM 0.00
2532 1.3.7.1.3 HVLS Fan Installation ‐0.14 days 4 days RM 102,000.00 Mon 4/12/23 Thu 7/12/23 NA NA 0 0 RM 0.00 RM 0.00
2533 1.3.7.1.4 LV Market ‐0.07 days 66 days RM 935,348.00 Thu 13/7/23 Tue 17/10/23 NA NA 0 0 RM 0.00 RM 0.00
2534 1.3.7.1.4 Ground Floor ‐0.07 days 33 days RM 464,784.00 Thu 13/7/23 Tue 29/8/23 NA NA 0 0 RM 0.00 RM 0.00
2535 1.3.7.1.4 Conduit & Trunking Installation ‐0.07 days 5 days RM 20,000.00 Thu 13/7/23 Thu 20/7/23 NA NA 0 0 RM 0.00 RM 0.00
2536 1.3.7.1.4 Wiring Works ‐0.07 days 5 days RM 30,000.00 Sun 23/7/23 Thu 27/7/23 NA NA 0 0 RM 0.00 RM 0.00
2537 1.3.7.1.4 Socket Fitting Installation ‐0.07 days 5 days RM 112,298.00 Sun 30/7/23 Thu 3/8/23 NA NA 0 0 RM 0.00 RM 0.00
2538 1.3.7.1.4 Light Fitting Installation ‐0.07 days 5 days RM 35,363.00 Sun 6/8/23 Thu 10/8/23 NA NA 0 0 RM 0.00 RM 0.00
2539 1.3.7.1.4 Submains Cabling & Ducting ‐0.07 days 5 days RM 170,294.00 Sun 13/8/23 Thu 17/8/23 NA NA 0 0 RM 0.00 RM 0.00
2540 1.3.7.1.4 SSB Installation ‐0.07 days 4 days RM 47,768.00 Sun 20/8/23 Wed 23/8/23 NA NA 0 0 RM 0.00 RM 0.00
2541 1.3.7.1.4 DB Installation ‐0.07 days 4 days RM 49,061.00 Thu 24/8/23 Tue 29/8/23 NA NA 0 0 RM 0.00 RM 0.00
2542 1.3.7.1.4 First Floor Floor ‐0.07 days 33 days RM 470,564.00 Wed 30/8/23 Tue 17/10/23 NA NA 0 0 RM 0.00 RM 0.00
2543 1.3.7.1.4 Conduit & Trunking Installation ‐0.07 days 5 days RM 20,000.00 Wed 30/8/23 Tue 5/9/23 NA NA 0 0 RM 0.00 RM 0.00
2544 1.3.7.1.4 Wiring Works ‐0.07 days 5 days RM 29,000.00 Wed 6/9/23 Tue 12/9/23 NA NA 0 0 RM 0.00 RM 0.00
2545 1.3.7.1.4 Socket Fitting Installation ‐0.07 days 5 days RM 87,022.00 Wed 13/9/23 Wed 20/9/23 NA NA 0 0 RM 0.00 RM 0.00
2546 1.3.7.1.4 Light Fitting Installation ‐0.07 days 5 days RM 100,604.00 Thu 21/9/23 Thu 28/9/23 NA NA 0 0 RM 0.00 RM 0.00
2547 1.3.7.1.4 Submains Cabling & Ducting ‐0.07 days 5 days RM 151,000.00 Sun 1/10/23 Thu 5/10/23 NA NA 0 0 RM 0.00 RM 0.00
2548 1.3.7.1.4 SSB Installation ‐0.07 days 4 days RM 12,387.00 Sun 8/10/23 Wed 11/10/23 NA NA 0 0 RM 0.00 RM 0.00
2549 1.3.7.1.4 DB Installation ‐0.07 days 4 days RM 70,551.00 Thu 12/10/23 Tue 17/10/23 NA NA 0 0 RM 0.00 RM 0.00
2550 1.3.7.1.5 External Lighting ‐0.07 days 32 days RM 689,005.00 Wed 18/10/23 Sun 3/12/23 NA NA 0 0 RM 0.00 RM 0.00
2551 1.3.7.1.5 Feeder Pillar Installation ‐0.07 days 2 days RM 115,040.00 Wed 18/10/23 Thu 19/10/23 NA NA 0 0 RM 0.00 RM 0.00
2552 1.3.7.1.5 Pole Footing Installation ‐0.07 days 4 days RM 31,812.00 Sun 22/10/23 Wed 25/10/23 NA NA 0 0 RM 0.00 RM 0.00
2553 1.3.7.1.5 Cable laying works ‐0.07 days 4 days RM 181,696.00 Thu 26/10/23 Tue 31/10/23 NA NA 0 0 RM 0.00 RM 0.00
2554 1.3.7.1.5 Pole erection works ‐0.07 days 10 days RM 106,476.00 Wed 1/11/23 Wed 15/11/23 NA NA 0 0 RM 0.00 RM 0.00
2555 1.3.7.1.5 Lantern Installation ‐0.07 days 10 days RM 225,314.00 Thu 16/11/23 Wed 29/11/23 NA NA 0 0 RM 0.00 RM 0.00
2556 1.3.7.1.5 Meter Panel Installation ‐0.07 days 2 days RM 28,667.00 Thu 30/11/23 Sun 3/12/23 NA NA 0 0 RM 0.00 RM 0.00
2557 1.3.7.1.6 Lightning Protection ‐0.07 days 30 days RM 111,863.30 Mon 4/12/23 Mon 15/1/24 NA NA 0 0 RM 0.00 RM 0.00
2558 1.3.7.1.6 Terminal Bus ‐0.14 days 15 days RM 48,576.30 Sun 10/12/23 Sun 31/12/23 NA NA 0 0 RM 0.00 RM 0.00
2559 1.3.7.1.6 Down Conductor GF ‐0.14 days 5 days RM 16,591.30 Sun 10/12/23 Thu 14/12/23 NA NA 0 0 RM 0.00 RM 0.00
2560 1.3.7.1.6 Down Conductor F1 ‐0.14 days 5 days RM 20,000.00 Sun 17/12/23 Thu 21/12/23 NA NA 0 0 RM 0.00 RM 0.00
2561 1.3.7.1.6 Perimeter Earthing ‐0.14 days 5 days RM 11,985.00 Sun 24/12/23 Sun 31/12/23 NA NA 0 0 RM 0.00 RM 0.00
2562 1.3.7.1.6 Market ‐0.07 days 30 days RM 63,287.00 Mon 4/12/23 Mon 15/1/24 NA NA 0 0 RM 0.00 RM 0.00
2563 1.3.7.1.6 Down Conductor GF ‐0.07 days 10 days RM 20,000.00 Mon 4/12/23 Sun 17/12/23 NA NA 0 0 RM 0.00 RM 0.00
2564 1.3.7.1.6 Down Conductor F1 ‐0.07 days 10 days RM 25,662.00 Mon 18/12/23 Mon 1/1/24 NA NA 0 0 RM 0.00 RM 0.00
2565 1.3.7.1.6 Perimeter Earthing ‐0.07 days 10 days RM 17,625.00 Tue 2/1/24 Mon 15/1/24 NA NA 0 0 RM 0.00 RM 0.00
2566 1.3.7.1.7 Generator Set ‐0.14 days 10 days RM 150,103.00 Mon 1/1/24 Sun 14/1/24 NA NA 0 0 RM 0.00 RM 0.00
2567 1.3.7.1.7 Earthing Installation ‐0.14 days 5 days RM 3,438.00 Mon 1/1/24 Sun 7/1/24 NA NA 0 0 RM 0.00 RM 0.00
2568 1.3.7.1.7 Acoustic Layout Submission ‐0.14 days 1 day RM 15,563.00 Mon 8/1/24 Mon 8/1/24 NA NA 0 0 RM 0.00 RM 0.00
2569 1.3.7.1.7 Generator Installation ‐0.14 days 2 days RM 126,414.00 Tue 9/1/24 Wed 10/1/24 NA NA 0 0 RM 0.00 RM 0.00
2570 1.3.7.1.7 AMF Board Installation ‐0.14 days 2 days RM 4,688.00 Thu 11/1/24 Sun 14/1/24 NA NA 0 0 RM 0.00 RM 0.00
2571 1.3.7.1.8 SDF Room ‐0.14 days 15 days RM 11,505.00 Mon 15/1/24 Sun 4/2/24 NA NA 0 0 RM 0.00 RM 0.00
2572 1.3.7.1.8 Conduit & Trunking Installation ‐0.14 days 3 days RM 1,488.00 Mon 15/1/24 Wed 17/1/24 NA NA 0 0 RM 0.00 RM 0.00
2573 1.3.7.1.8 Wiring Works ‐0.14 days 3 days RM 2,044.00 Thu 18/1/24 Mon 22/1/24 NA NA 0 0 RM 0.00 RM 0.00
2574 1.3.7.1.8 Socket Fitting Installation ‐0.14 days 2 days RM 1,307.00 Tue 23/1/24 Wed 24/1/24 NA NA 0 0 RM 0.00 RM 0.00
2575 1.3.7.1.8 Light Fitting Installation ‐0.14 days 2 days RM 545.00 Thu 25/1/24 Sun 28/1/24 NA NA 0 0 RM 0.00 RM 0.00
2576 1.3.7.1.8 Submains Cabling & Ducting ‐0.14 days 2 days RM 1,230.00 Mon 29/1/24 Tue 30/1/24 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
2577 1.3.7.1.8 Earthing Installation ‐0.14 days 2 days RM 3,354.00 Wed 31/1/24 Thu 1/2/24 NA NA 0 0 RM 0.00 RM 0.00
2578 1.3.7.1.8 DB Installation ‐0.14 days 1 day RM 1,537.00 Sun 4/2/24 Sun 4/2/24 NA NA 0 0 RM 0.00 RM 0.00
2579 1.3.7.1.9 ICT Room ‐0.14 days 18 days RM 322,605.00 Mon 22/1/24 Wed 14/2/24 NA NA 0 0 RM 0.00 RM 0.00
2580 1.3.7.1.9 Fibre Optic cable installation ‐0.14 days 4 days RM 39,201.00 Mon 22/1/24 Thu 25/1/24 NA NA 0 0 RM 0.00 RM 0.00
2581 1.3.7.1.9 Cable Ladder and Trunking Works ‐0.14 days 4 days RM 28,900.00 Sun 28/1/24 Wed 31/1/24 NA NA 0 0 RM 0.00 RM 0.00
2582 1.3.7.1.9 ICT Structure Cabling works ‐0.14 days 2 days RM 9,249.00 Thu 1/2/24 Sun 4/2/24 NA NA 0 0 RM 0.00 RM 0.00
2583 1.3.7.1.9 Enclosure and accessories installatio‐0.14 days 2 days RM 9,923.00 Mon 5/2/24 Tue 6/2/24 NA NA 0 0 RM 0.00 RM 0.00
2584 1.3.7.1.9 Active Equipment Installation ‐0.14 days 6 days RM 235,332.00 Wed 7/2/24 Wed 14/2/24 NA NA 0 0 RM 0.00 RM 0.00
2585 1.3.7.1.1 Testing and Commissioning ‐0.14 days 1 day RM 6,251.00 Thu 15/2/24 Thu 15/2/24 NA NA 0 0 RM 0.00 RM 0.00
2586 1.3.7.2 Mechanical Services ‐2 days 258 days RM 2,743,000.00 Wed 1/2/23 Mon 19/2/24 Sun 3/7/22 NA 0 4.84 RM 0.00 RM 44,560.00
2587 1.3.7.2.1 Lift & Escalator 0 days 255.9 days RM 980,000.00 Wed 1/2/23 Thu 15/2/24 Sun 3/7/22 NA 0 9.13 RM 0.00 RM 19,560.00
2588 1.3.7.2.1 Preliminaries Item 0 days 255.9 days RM 69,560.00 Wed 1/2/23 Thu 15/2/24 Sun 3/7/22 NA 0 50.77 RM 0.00 RM 19,560.00
2589 1.3.7.2.1 Performance Bond ‐143.1 days 3 days RM 12,500.00 Wed 1/2/23 Mon 6/2/23 Sun 3/7/22 Thu 7/7/22 0 100 RM 0.00 RM 12,500.00
2590 1.3.7.2.1 Insurances ‐146.1 days 3 days RM 4,000.00 Mon 6/2/23 Thu 9/2/23 Sun 3/7/22 Fri 8/7/22 0 100 RM 0.00 RM 4,000.00
2591 1.3.7.2.1 Preparation of Contract ‐160.1 days 14 days RM 1,560.00 Thu 9/2/23 Thu 2/3/23 Sun 3/7/22 Mon 11/7/22 0 100 RM 0.00 RM 1,560.00
Documents
2592 1.3.7.2.1 Method Statement ‐132.1 days 14 days RM 0.00 Thu 2/3/23 Wed 22/3/23 Thu 1/9/22 Thu 8/9/22 0 100 RM 0.00 RM 0.00
2593 1.3.7.2.1 Catalogue ‐136.1 days 14 days RM 0.00 Wed 8/3/23 Tue 28/3/23 Thu 1/9/22 Thu 8/9/22 0 100 RM 0.00 RM 0.00
2594 1.3.7.2.1 Shop Drawing ‐140.1 days 14 days RM 1,500.00 Tue 14/3/23 Mon 3/4/23 Thu 1/9/22 Thu 8/9/22 0 100 RM 0.00 RM 1,500.00
2595 1.3.7.2.1 Sample Board ‐62.1 days 14 days RM 0.00 Mon 20/3/23 Mon 10/4/23 NA NA 0 0 RM 0.00 RM 0.00
2596 1.3.7.2.1 Contractor's Management Cost 0 days 82 days RM 15,000.00 Mon 23/10/23 Thu 15/2/24 NA NA 0 0 RM 0.00 RM 0.00

2597 1.3.7.2.1 Contractor's Management Cos0 days 1 day RM 3,000.00 Mon 23/10/23 Mon 23/10/23 NA NA 0 0 RM 0.00 RM 0.00
2598 1.3.7.2.1 Contractor's Management Cos0 days 1 day RM 3,000.00 Thu 23/11/23 Thu 23/11/23 NA NA 0 0 RM 0.00 RM 0.00
2599 1.3.7.2.1 Contractor's Management Cos0 days 1 day RM 3,000.00 Sun 24/12/23 Sun 24/12/23 NA NA 0 0 RM 0.00 RM 0.00
2600 1.3.7.2.1 Contractor's Management Cos0 days 1 day RM 3,000.00 Tue 23/1/24 Tue 23/1/24 NA NA 0 0 RM 0.00 RM 0.00
2601 1.3.7.2.1 Contractor's Management Cos0 days 1 day RM 3,000.00 Thu 15/2/24 Thu 15/2/24 NA NA 0 0 RM 0.00 RM 0.00
2602 1.3.7.2.1 Site Meeting & Reporting & 0 days 82 days RM 7,000.00 Mon 23/10/23 Thu 15/2/24 NA NA 0 0 RM 0.00 RM 0.00
Testing Fees
2603 1.3.7.2.1 Site Meeting & Reporting & Te0 days 1 day RM 1,400.00 Mon 23/10/23 Mon 23/10/23 NA NA 0 0 RM 0.00 RM 0.00
2604 1.3.7.2.1 Site Meeting & Reporting & Te0 days 1 day RM 1,400.00 Thu 23/11/23 Thu 23/11/23 NA NA 0 0 RM 0.00 RM 0.00
2605 1.3.7.2.1 Site Meeting & Reporting & Te0 days 1 day RM 1,400.00 Sun 24/12/23 Sun 24/12/23 NA NA 0 0 RM 0.00 RM 0.00
2606 1.3.7.2.1 Site Meeting & Reporting & Te0 days 1 day RM 1,400.00 Tue 23/1/24 Tue 23/1/24 NA NA 0 0 RM 0.00 RM 0.00
2607 1.3.7.2.1 Site Meeting & Reporting & Te0 days 1 day RM 1,400.00 Thu 15/2/24 Thu 15/2/24 NA NA 0 0 RM 0.00 RM 0.00
2608 1.3.7.2.1 Hand over Documents ‐90.1 days 7 days RM 3,000.00 Sun 14/1/24 Tue 23/1/24 NA NA 0 0 RM 0.00 RM 0.00
2609 1.3.7.2.1 Training, Service & Maintainance‐90.1 days 1 day RM 25,000.00 Tue 23/1/24 Wed 24/1/24 NA NA 0 0 RM 0.00 RM 0.00
2610 1.3.7.2.1 Structure Works By Main ‐90.1 days 199 days RM 910,440.00 Mon 10/4/23 Thu 1/2/24 Thu 1/9/22 NA 0 1.88 RM 0.00 RM 0.00
Contractor
2611 1.3.7.2.1 Passenger Lift, L1 & L2 ‐90.1 days 178 days RM 494,215.00 Mon 10/4/23 Wed 3/1/24 Thu 1/9/22 NA 0 0.61 RM 0.00 RM 0.00
2612 1.3.7.2.1 Documents Approval and ‐158.1 days 14 days RM 0.00 Mon 10/4/23 Sun 7/5/23 Thu 1/9/22 Thu 8/9/22 0 100 RM 0.00 RM 0.00
Ordering of Equipment
2613 1.3.7.2.1 Fabrication and Shipping of ‐90.1 days 100 days RM 0.00 Sun 7/5/23 Tue 3/10/23 NA NA 0 0 RM 0.00 RM 0.00
Equipment
2614 1.3.7.2.1 Stage 1 ‐90.1 days 20 days RM 0.00 Sun 7/5/23 Sun 4/6/23 NA NA 0 0 RM 0.00 RM 0.00
2615 1.3.7.2.1 Stage 2 ‐90.1 days 20 days RM 0.00 Sun 4/6/23 Thu 6/7/23 NA NA 0 0 RM 0.00 RM 0.00
2616 1.3.7.2.1 Stage 3 ‐90.1 days 20 days RM 0.00 Thu 6/7/23 Sun 6/8/23 NA NA 0 0 RM 0.00 RM 0.00
2617 1.3.7.2.1 Stage 4 ‐90.1 days 20 days RM 0.00 Sun 6/8/23 Sun 3/9/23 NA NA 0 0 RM 0.00 RM 0.00
2618 1.3.7.2.1 Stage 5 ‐90.1 days 20 days RM 0.00 Sun 3/9/23 Tue 3/10/23 NA NA 0 0 RM 0.00 RM 0.00
2619 1.3.7.2.1 Mobilisation & Delivery of new‐90.1 days 5 days RM 53,055.00 Tue 3/10/23 Tue 10/10/23 NA NA 0 0 RM 0.00 RM 0.00
2620 1.3.7.2.1 Installation of Lift System ‐90.1 days 45 days RM 435,160.00 Tue 10/10/23 Wed 13/12/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
2621 1.3.7.2.1 Erection of Scafolding & Plu ‐90.1 days 3 days RM 25,000.00 Tue 10/10/23 Sun 15/10/23 NA NA 0 0 RM 0.00 RM 0.00
2622 1.3.7.2.1 Guide Rail brackets & Guide‐90.1 days 4 days RM 27,000.00 Sun 15/10/23 Thu 19/10/23 NA NA 0 0 RM 0.00 RM 0.00
2623 1.3.7.2.1 Machine & Controller settin‐90.1 days 4 days RM 26,100.00 Thu 19/10/23 Wed 25/10/23 NA NA 0 0 RM 0.00 RM 0.00
2624 1.3.7.2.1 Landing Sill Equipment Insta‐90.1 days 4 days RM 67,500.00 Wed 25/10/23 Tue 31/10/23 NA NA 0 0 RM 0.00 RM 0.00
2625 1.3.7.2.1 Landing Door Jamb and Doo‐90.1 days 4 days RM 32,400.00 Tue 31/10/23 Mon 6/11/23 NA NA 0 0 RM 0.00 RM 0.00
2626 1.3.7.2.1 Landing Door Installation ‐90.1 days 4 days RM 18,900.00 Mon 6/11/23 Mon 13/11/23 NA NA 0 0 RM 0.00 RM 0.00
2627 1.3.7.2.1 Machine and Hoistway Wiri ‐90.1 days 4 days RM 36,540.00 Mon 13/11/23 Sun 19/11/23 NA NA 0 0 RM 0.00 RM 0.00
2628 1.3.7.2.1 Car Cage, Car Wiring & Trav ‐90.1 days 4 days RM 68,800.00 Sun 19/11/23 Thu 23/11/23 NA NA 0 0 RM 0.00 RM 0.00
2629 1.3.7.2.1 CWT Frame & Filler Weight ‐90.1 days 4 days RM 35,050.00 Thu 23/11/23 Wed 29/11/23 NA NA 0 0 RM 0.00 RM 0.00
2630 1.3.7.2.1 Main Rope, Compensating C‐90.1 days 4 days RM 70,195.00 Wed 29/11/23 Tue 5/12/23 NA NA 0 0 RM 0.00 RM 0.00
2631 1.3.7.2.1 Fascial Plate Installation & D‐90.1 days 3 days RM 27,675.00 Tue 5/12/23 Sun 10/12/23 NA NA 0 0 RM 0.00 RM 0.00
2632 1.3.7.2.1 Cleaning & Touching Up Wo‐90.1 days 3 days RM 0.00 Sun 10/12/23 Wed 13/12/23 NA NA 0 0 RM 0.00 RM 0.00
2633 1.3.7.2.1 Testing & Commissioning of ‐90.1 days 14 days RM 6,000.00 Wed 13/12/23 Wed 3/1/24 NA NA 0 0 RM 0.00 RM 0.00
Lift System
2634 1.3.7.2.1 Wiring & Mechanical Adjust‐90.1 days 14 days RM 6,000.00 Wed 13/12/23 Wed 3/1/24 NA NA 0 0 RM 0.00 RM 0.00
2635 1.3.7.2.1 Escalator Works ‐90.1 days 183 days RM 416,225.00 Mon 10/4/23 Wed 10/1/24 Thu 1/9/22 NA 0 3.43 RM 0.00 RM 0.00
2636 1.3.7.2.1 Documents Approval and Orde‐158.1 days 14 days RM 0.00 Mon 10/4/23 Sun 7/5/23 Thu 1/9/22 Thu 8/9/22 0 100 RM 0.00 RM 0.00
2637 1.3.7.2.1 Fabrication and Shipping of ‐90.1 days 100 days RM 0.00 Sun 7/5/23 Tue 3/10/23 NA NA 0 0 RM 0.00 RM 0.00
Equipment
2638 1.3.7.2.1 Stage 1 ‐90.1 days 20 days RM 0.00 Sun 7/5/23 Sun 4/6/23 NA NA 0 0 RM 0.00 RM 0.00
2639 1.3.7.2.1 Stage 2 ‐90.1 days 20 days RM 0.00 Sun 4/6/23 Thu 6/7/23 NA NA 0 0 RM 0.00 RM 0.00
2640 1.3.7.2.1 Stage 3 ‐90.1 days 20 days RM 0.00 Thu 6/7/23 Sun 6/8/23 NA NA 0 0 RM 0.00 RM 0.00
2641 1.3.7.2.1 Stage 4 ‐90.1 days 20 days RM 0.00 Sun 6/8/23 Sun 3/9/23 NA NA 0 0 RM 0.00 RM 0.00
2642 1.3.7.2.1 Stage 5 ‐90.1 days 20 days RM 0.00 Sun 3/9/23 Tue 3/10/23 NA NA 0 0 RM 0.00 RM 0.00
2643 1.3.7.2.1 Mobilisation & Delivery of new‐90.1 days 5 days RM 256,230.00 Tue 3/10/23 Tue 10/10/23 NA NA 0 0 RM 0.00 RM 0.00
2644 1.3.7.2.1 Installation of Escalator ‐90.1 days 50 days RM 72,090.00 Tue 10/10/23 Wed 20/12/23 NA NA 0 0 RM 0.00 RM 0.00
System
2645 1.3.7.2.1 Template Setting and Check‐90.1 days 10 days RM 11,340.00 Tue 10/10/23 Tue 24/10/23 NA NA 0 0 RM 0.00 RM 0.00
2646 1.3.7.2.1 Track Installation ‐90.1 days 8 days RM 15,187.50 Tue 24/10/23 Sun 5/11/23 NA NA 0 0 RM 0.00 RM 0.00
2647 1.3.7.2.1 Glass Installation ‐90.1 days 8 days RM 15,187.50 Sun 5/11/23 Thu 16/11/23 NA NA 0 0 RM 0.00 RM 0.00
2648 1.3.7.2.1 Hanrail Installation ‐90.1 days 8 days RM 15,187.50 Thu 16/11/23 Tue 28/11/23 NA NA 0 0 RM 0.00 RM 0.00
2649 1.3.7.2.1 Step Installation ‐90.1 days 6 days RM 15,187.50 Tue 28/11/23 Wed 6/12/23 NA NA 0 0 RM 0.00 RM 0.00
2650 1.3.7.2.1 External Cladding & Others ‐90.1 days 10 days RM 0.00 Wed 6/12/23 Wed 20/12/23 NA NA 0 0 RM 0.00 RM 0.00
2651 1.3.7.2.1 Testing & Commissioning of ‐90.1 days 14 days RM 87,905.00 Wed 20/12/23 Wed 10/1/24 NA NA 0 0 RM 0.00 RM 0.00
Lift System
2652 1.3.7.2.1 Wiring & Mechanical Adjust‐90.1 days 14 days RM 87,905.00 Wed 20/12/23 Wed 10/1/24 NA NA 0 0 RM 0.00 RM 0.00
2653 1.3.7.2.1 JKKP Inspection of Lifts System ‐90.1 days 30 days RM 0.00 Wed 20/12/23 Thu 1/2/24 NA NA 0 0 RM 0.00 RM 0.00

2654 1.3.7.2.1 Liason with JKKP ‐90.1 days 14 days RM 0.00 Wed 20/12/23 Wed 10/1/24 NA NA 0 0 RM 0.00 RM 0.00
2655 1.3.7.2.1 JKKP Inspection (Lift & Escalato‐90.1 days 16 days RM 0.00 Wed 10/1/24 Thu 1/2/24 NA NA 0 0 RM 0.00 RM 0.00
2656 1.3.7.2.1 Finishing Works ‐90.1 days 2 days RM 0.00 Wed 20/12/23 Sun 24/12/23 NA NA 0 0 RM 0.00 RM 0.00
2657 1.3.7.2.1 Cladding & Finishing Works ‐90.1 days 2 days RM 0.00 Wed 20/12/23 Sun 24/12/23 NA NA 0 0 RM 0.00 RM 0.00
2658 1.3.7.2.1 Testing ‐90.1 days 1 day RM 0.00 Thu 1/2/24 Sun 4/2/24 NA NA 0 0 RM 0.00 RM 0.00
2659 1.3.7.2.2 Fire Fighting & Air‐Conditioning ‐39 days 258 days RM 1,763,000.00 Wed 1/2/23 Mon 19/2/24 Thu 1/9/22 NA 0 1.57 RM 0.00 RM 25,000.00
2660 1.3.7.2.2 Preliminaries ‐39 days 54 days RM 34,500.00 Wed 1/2/23 Wed 19/4/23 Thu 1/9/22 NA 0 16.67 RM 0.00 RM 25,000.00
2661 1.3.7.2.2 Public Liability ‐104 days 3 days RM 10,000.00 Wed 1/2/23 Sun 5/2/23 Thu 1/9/22 Mon 5/9/22 0 100 RM 0.00 RM 10,000.00
2662 1.3.7.2.2 Insurance of Works ‐107 days 3 days RM 10,000.00 Mon 6/2/23 Wed 8/2/23 Thu 1/9/22 Mon 5/9/22 0 100 RM 0.00 RM 10,000.00
2663 1.3.7.2.2 Perfomance Bond ‐110 days 3 days RM 5,000.00 Thu 9/2/23 Mon 13/2/23 Thu 1/9/22 Mon 5/9/22 0 100 RM 0.00 RM 5,000.00
2664 1.3.7.2.2 Shop Drawing ‐39 days 15 days RM 5,000.00 Tue 14/2/23 Tue 7/3/23 NA NA 0 0 RM 0.00 RM 0.00
2665 1.3.7.2.2 Material Approval ‐39 days 15 days RM 2,000.00 Wed 8/3/23 Tue 28/3/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
2666 1.3.7.2.2 Document Contract ‐39 days 15 days RM 2,500.00 Wed 29/3/23 Wed 19/4/23 NA NA 0 0 RM 0.00 RM 0.00
2667 1.3.7.2.2 Terminal Bas dan Teksi ‐39 days 192 days RM 1,416,500.00 Thu 20/4/23 Thu 1/2/24 NA NA 0 0 RM 0.00 RM 0.00
2668 1.3.7.2.2 Aras Tanah ‐39 days 192 days RM 1,090,000.00 Thu 20/4/23 Thu 1/2/24 NA NA 0 0 RM 0.00 RM 0.00
2669 1.3.7.2.2 Fire Fighting System ‐39 days 79 days RM 730,000.00 Thu 20/4/23 Tue 22/8/23 NA NA 0 0 RM 0.00 RM 0.00
2670 1.3.7.2.2 Delivery Hot Dipped Galvan ‐39 days 11 days RM 80,000.00 Thu 20/4/23 Thu 11/5/23 NA NA 0 0 RM 0.00 RM 0.00
2671 1.3.7.2.2 Install Hot Dipped Galvanise‐39 days 11 days RM 10,000.00 Sun 14/5/23 Sun 28/5/23 NA NA 0 0 RM 0.00 RM 0.00
2672 1.3.7.2.2 Delivery and install electric ‐39 days 4 days RM 80,000.00 Mon 29/5/23 Thu 1/6/23 NA NA 0 0 RM 0.00 RM 0.00
2673 1.3.7.2.2 Delivery and install Hose Re ‐39 days 3 days RM 160,000.00 Sun 4/6/23 Wed 7/6/23 NA NA 0 0 RM 0.00 RM 0.00
2674 1.3.7.2.2 Delivery and install portable‐39 days 7 days RM 20,000.00 Thu 8/6/23 Sun 18/6/23 NA NA 0 0 RM 0.00 RM 0.00
2675 1.3.7.2.2 Delivery and install smoke d‐39 days 7 days RM 60,000.00 Mon 19/6/23 Sun 2/7/23 NA NA 0 0 RM 0.00 RM 0.00
2676 1.3.7.2.2 Delivery and install connect ‐39 days 20 days RM 200,000.00 Mon 3/7/23 Mon 31/7/23 NA NA 0 0 RM 0.00 RM 0.00
2677 1.3.7.2.2 Delivery and install hydrauli ‐39 days 16 days RM 120,000.00 Tue 1/8/23 Tue 22/8/23 NA NA 0 0 RM 0.00 RM 0.00
2678 1.3.7.2.2 Air Conditoning System ‐39 days 73 days RM 180,000.00 Wed 23/8/23 Wed 6/12/23 NA NA 0 0 RM 0.00 RM 0.00
2679 1.3.7.2.2 Delivery Air Cooled Split Un ‐39 days 19 days RM 50,000.00 Wed 23/8/23 Tue 19/9/23 NA NA 0 0 RM 0.00 RM 0.00
2680 1.3.7.2.2 Install Air Cooled Split Unit c‐39 days 19 days RM 20,000.00 Wed 20/9/23 Tue 17/10/23 NA NA 0 0 RM 0.00 RM 0.00
2681 1.3.7.2.2 Supply fans c/w ductwork co‐39 days 11 days RM 30,000.00 Wed 18/10/23 Wed 1/11/23 NA NA 0 0 RM 0.00 RM 0.00
2682 1.3.7.2.2 Install fans c/w ductwork co‐39 days 10 days RM 40,000.00 Thu 2/11/23 Thu 16/11/23 NA NA 0 0 RM 0.00 RM 0.00
2683 1.3.7.2.2 Supply and install electrical ‐39 days 14 days RM 40,000.00 Sun 19/11/23 Wed 6/12/23 NA NA 0 0 RM 0.00 RM 0.00
2684 1.3.7.2.2 Cold Room System ‐39 days 20 days RM 150,000.00 Thu 7/12/23 Thu 4/1/24 NA NA 0 0 RM 0.00 RM 0.00
2685 1.3.7.2.2 Supply and install Cold Room‐39 days 20 days RM 150,000.00 Thu 7/12/23 Thu 4/1/24 NA NA 0 0 RM 0.00 RM 0.00
2686 1.3.7.2.2 Bosster Pump System ‐39 days 20 days RM 30,000.00 Sun 7/1/24 Thu 1/2/24 NA NA 0 0 RM 0.00 RM 0.00
2687 1.3.7.2.2 Supply and Install transfer p‐39 days 20 days RM 30,000.00 Sun 7/1/24 Thu 1/2/24 NA NA 0 0 RM 0.00 RM 0.00
2688 1.3.7.2.2 Substation ‐39 days 13 days RM 85,000.00 Sun 14/5/23 Tue 30/5/23 NA NA 0 0 RM 0.00 RM 0.00
2689 1.3.7.2.2 Delivery and install clean agen‐39 days 3 days RM 20,000.00 Sun 14/5/23 Tue 16/5/23 NA NA 0 0 RM 0.00 RM 0.00
2690 1.3.7.2.2 Delivery and install clean agen‐39 days 4 days RM 10,000.00 Wed 17/5/23 Mon 22/5/23 NA NA 0 0 RM 0.00 RM 0.00
2691 1.3.7.2.2 Delivery and install smoke det ‐39 days 2 days RM 15,000.00 Tue 23/5/23 Wed 24/5/23 NA NA 0 0 RM 0.00 RM 0.00
2692 1.3.7.2.2 Delivery and install portable fi ‐39 days 2 days RM 10,000.00 Thu 25/5/23 Sun 28/5/23 NA NA 0 0 RM 0.00 RM 0.00
2693 1.3.7.2.2 Delivery and install piping, fitti‐39 days 2 days RM 30,000.00 Mon 29/5/23 Tue 30/5/23 NA NA 0 0 RM 0.00 RM 0.00
2694 1.3.7.2.2 Aras Satu ‐39 days 80 days RM 201,500.00 Wed 31/5/23 Thu 28/9/23 NA NA 0 0 RM 0.00 RM 0.00
2695 1.3.7.2.2 Fire Fighting System ‐39 days 30 days RM 95,000.00 Wed 31/5/23 Mon 17/7/23 NA NA 0 0 RM 0.00 RM 0.00
2696 1.3.7.2.2 Delivery and install smoke d‐39 days 4 days RM 20,000.00 Wed 31/5/23 Tue 6/6/23 NA NA 0 0 RM 0.00 RM 0.00
2697 1.3.7.2.2 Delivery and install portable‐39 days 2 days RM 20,000.00 Wed 7/6/23 Thu 8/6/23 NA NA 0 0 RM 0.00 RM 0.00
2698 1.3.7.2.2 Delivery and install connect ‐39 days 20 days RM 40,000.00 Sun 11/6/23 Tue 11/7/23 NA NA 0 0 RM 0.00 RM 0.00
2699 1.3.7.2.2 Delivery and install hydrauli ‐39 days 4 days RM 15,000.00 Wed 12/7/23 Mon 17/7/23 NA NA 0 0 RM 0.00 RM 0.00
2700 1.3.7.2.2 Air Conditoning System ‐39 days 50 days RM 106,500.00 Tue 18/7/23 Thu 28/9/23 NA NA 0 0 RM 0.00 RM 0.00
2701 1.3.7.2.2 Delivery Air Cooled Split Un ‐39 days 4 days RM 20,000.00 Tue 18/7/23 Mon 24/7/23 NA NA 0 0 RM 0.00 RM 0.00
2702 1.3.7.2.2 Install Air Cooled Split Unit c‐39 days 2 days RM 15,000.00 Tue 25/7/23 Wed 26/7/23 NA NA 0 0 RM 0.00 RM 0.00
2703 1.3.7.2.2 Supply fans c/w ductwork co‐39 days 20 days RM 10,000.00 Thu 27/7/23 Wed 23/8/23 NA NA 0 0 RM 0.00 RM 0.00
2704 1.3.7.2.2 Install fans c/w ductwork co‐39 days 4 days RM 12,000.00 Thu 24/8/23 Tue 29/8/23 NA NA 0 0 RM 0.00 RM 0.00
2705 1.3.7.2.2 Supply and install electrical ‐39 days 20 days RM 49,500.00 Wed 30/8/23 Thu 28/9/23 NA NA 0 0 RM 0.00 RM 0.00
2706 1.3.7.2.2 Aras Bumbung ‐39 days 45 days RM 40,000.00 Sun 1/10/23 Sun 3/12/23 NA NA 0 0 RM 0.00 RM 0.00
2707 1.3.7.2.2 Delivery and install variable sp‐39 days 15 days RM 20,000.00 Sun 1/10/23 Thu 19/10/23 NA NA 0 0 RM 0.00 RM 0.00
2708 1.3.7.2.2 Delivery and install smoke det ‐39 days 15 days RM 10,000.00 Sun 22/10/23 Thu 9/11/23 NA NA 0 0 RM 0.00 RM 0.00
2709 1.3.7.2.2 Supply fans c/w ductwork con ‐39 days 15 days RM 10,000.00 Mon 13/11/23 Sun 3/12/23 NA NA 0 0 RM 0.00 RM 0.00
2710 1.3.7.2.2 Pasar ‐39 days 171 days RM 308,000.00 Wed 17/5/23 Tue 23/1/24 NA NA 0 0 RM 0.00 RM 0.00
2711 1.3.7.2.2 Aras Tanah ‐39 days 68 days RM 174,500.00 Wed 17/5/23 Sun 27/8/23 NA NA 0 0 RM 0.00 RM 0.00
2712 1.3.7.2.2 Fire Fighting System ‐39 days 26 days RM 65,000.00 Wed 17/5/23 Thu 22/6/23 NA NA 0 0 RM 0.00 RM 0.00
2713 1.3.7.2.2 Delivery and install smoke d‐39 days 4 days RM 20,000.00 Wed 17/5/23 Mon 22/5/23 NA NA 0 0 RM 0.00 RM 0.00
2714 1.3.7.2.2 Delivery and install portable‐39 days 2 days RM 5,000.00 Tue 23/5/23 Wed 24/5/23 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
2715 1.3.7.2.2 Delivery and install connect ‐39 days 10 days RM 20,000.00 Thu 25/5/23 Thu 8/6/23 NA NA 0 0 RM 0.00 RM 0.00
2716 1.3.7.2.2 Delivery and install hydrauli ‐39 days 10 days RM 20,000.00 Sun 11/6/23 Thu 22/6/23 NA NA 0 0 RM 0.00 RM 0.00
2717 1.3.7.2.2 Air Conditoning System ‐39 days 42 days RM 109,500.00 Sun 25/6/23 Sun 27/8/23 NA NA 0 0 RM 0.00 RM 0.00
2718 1.3.7.2.2 Supply fans c/w ductwork co‐39 days 14 days RM 49,500.00 Sun 25/6/23 Mon 17/7/23 NA NA 0 0 RM 0.00 RM 0.00
2719 1.3.7.2.2 Install fans c/w ductwork co‐39 days 14 days RM 10,000.00 Tue 18/7/23 Mon 7/8/23 NA NA 0 0 RM 0.00 RM 0.00
2720 1.3.7.2.2 Supply and install electrical ‐39 days 14 days RM 50,000.00 Tue 8/8/23 Sun 27/8/23 NA NA 0 0 RM 0.00 RM 0.00
2721 1.3.7.2.2 Aras Satu ‐39 days 94 days RM 126,500.00 Mon 28/8/23 Wed 10/1/24 NA NA 0 0 RM 0.00 RM 0.00
2722 1.3.7.2.2 Fire Fighting System ‐39 days 49 days RM 45,000.00 Mon 28/8/23 Mon 6/11/23 NA NA 0 0 RM 0.00 RM 0.00
2723 1.3.7.2.2 Delivery and install smoke d‐39 days 20 days RM 15,000.00 Mon 28/8/23 Mon 25/9/23 NA NA 0 0 RM 0.00 RM 0.00
2724 1.3.7.2.2 Delivery and install portable‐39 days 2 days RM 5,000.00 Tue 26/9/23 Thu 28/9/23 NA NA 0 0 RM 0.00 RM 0.00
2725 1.3.7.2.2 Delivery and install connect ‐39 days 20 days RM 20,000.00 Sun 1/10/23 Thu 26/10/23 NA NA 0 0 RM 0.00 RM 0.00
2726 1.3.7.2.2 Delivery and install hydrauli ‐39 days 7 days RM 5,000.00 Sun 29/10/23 Mon 6/11/23 NA NA 0 0 RM 0.00 RM 0.00
2727 1.3.7.2.2 Air Conditoning System ‐39 days 45 days RM 81,500.00 Tue 7/11/23 Wed 10/1/24 NA NA 0 0 RM 0.00 RM 0.00
2728 1.3.7.2.2 Delivery Air Cooled Split Un ‐39 days 15 days RM 15,000.00 Tue 7/11/23 Tue 28/11/23 NA NA 0 0 RM 0.00 RM 0.00
2729 1.3.7.2.2 Install Air Cooled Split Unit c‐39 days 10 days RM 10,000.00 Wed 29/11/23 Tue 12/12/23 NA NA 0 0 RM 0.00 RM 0.00
2730 1.3.7.2.2 Supply fans c/w ductwork co‐39 days 7 days RM 17,000.00 Wed 13/12/23 Thu 21/12/23 NA NA 0 0 RM 0.00 RM 0.00
2731 1.3.7.2.2 Install fans c/w ductwork co‐39 days 10 days RM 34,500.00 Sun 24/12/23 Sun 7/1/24 NA NA 0 0 RM 0.00 RM 0.00
2732 1.3.7.2.2 Supply and install electrical ‐39 days 3 days RM 5,000.00 Mon 8/1/24 Wed 10/1/24 NA NA 0 0 RM 0.00 RM 0.00
2733 1.3.7.2.2 Aras Bumbung ‐39 days 9 days RM 7,000.00 Thu 11/1/24 Tue 23/1/24 NA NA 0 0 RM 0.00 RM 0.00
2734 1.3.7.2.2 Delivery and install smoke det ‐39 days 7 days RM 5,000.00 Thu 11/1/24 Sun 21/1/24 NA NA 0 0 RM 0.00 RM 0.00
2735 1.3.7.2.2 Supply fans c/w ductwork con ‐39 days 2 days RM 2,000.00 Mon 22/1/24 Tue 23/1/24 NA NA 0 0 RM 0.00 RM 0.00
2736 1.3.7.2.2 Testing and Commissioning ‐39 days 19 days RM 4,000.00 Wed 24/1/24 Mon 19/2/24 NA NA 0 0 RM 0.00 RM 0.00
2737 1.3.7.2.2 TNC for Fire Fighting System ‐39 days 5 days RM 1,000.00 Wed 24/1/24 Tue 30/1/24 NA NA 0 0 RM 0.00 RM 0.00
2738 1.3.7.2.2 TNC for ACMV System ‐39 days 5 days RM 1,000.00 Wed 31/1/24 Tue 6/2/24 NA NA 0 0 RM 0.00 RM 0.00
2739 1.3.7.2.2 TNC for Cold Room System ‐39 days 5 days RM 1,000.00 Wed 7/2/24 Tue 13/2/24 NA NA 0 0 RM 0.00 RM 0.00
2740 1.3.7.2.2 TNC for Booster Pump System ‐39 days 4 days RM 1,000.00 Wed 14/2/24 Mon 19/2/24 NA NA 0 0 RM 0.00 RM 0.00
2741 1.3.7.3 Baki M & E ‐39 days 0 days RM 1,985,833.46 Mon 19/2/24 Mon 19/2/24 NA NA 0 0 RM 0.00 RM 0.00
2742 1.3.8 G ‐ PROVISIONAL SUM ‐0.18 days 177 days RM 1,581,000.00 Sun 4/6/23 Mon 19/2/24 NA NA 0 0 RM 0.00 RM 0.00
2743 1.3.8.1 Signages ‐0.18 days 84 days RM 510,000.00 Sun 22/10/23 Mon 19/2/24 NA NA 0 0 RM 0.00 RM 0.00
2744 1.3.8.1.1 Papan Tanda Pasar ‐0.18 days 28 days RM 170,000.00 Sun 22/10/23 Thu 30/11/23 NA NA 0 0 RM 0.00 RM 0.00
2745 1.3.8.1.1 Level 1 ‐0.18 days 14 days RM 85,000.00 Sun 22/10/23 Thu 9/11/23 NA NA 0 0 RM 0.00 RM 0.00
2746 1.3.8.1.1 Level 2 ‐0.18 days 14 days RM 85,000.00 Thu 9/11/23 Thu 30/11/23 NA NA 0 0 RM 0.00 RM 0.00
2747 1.3.8.1.2 Papan Tanda Terminal ‐0.18 days 28 days RM 170,000.00 Thu 30/11/23 Wed 10/1/24 NA NA 0 0 RM 0.00 RM 0.00
2748 1.3.8.1.2 Level 1 ‐0.18 days 14 days RM 85,000.00 Thu 30/11/23 Wed 20/12/23 NA NA 0 0 RM 0.00 RM 0.00
2749 1.3.8.1.2 Level 2 ‐0.18 days 14 days RM 85,000.00 Wed 20/12/23 Wed 10/1/24 NA NA 0 0 RM 0.00 RM 0.00
2750 1.3.8.1.3 Papan Tanda Bilik ‐0.18 days 28 days RM 170,000.00 Wed 10/1/24 Mon 19/2/24 NA NA 0 0 RM 0.00 RM 0.00
2751 1.3.8.1.3 Level 1 ‐0.18 days 14 days RM 85,000.00 Wed 10/1/24 Tue 30/1/24 NA NA 0 0 RM 0.00 RM 0.00
2752 1.3.8.1.3 Level 2 ‐0.18 days 14 days RM 85,000.00 Tue 30/1/24 Mon 19/2/24 NA NA 0 0 RM 0.00 RM 0.00
2753 1.3.8.2 Soft & Hard Landscaping Works ‐43.1 days 120 days RM 1,020,000.00 Sun 4/6/23 Wed 29/11/23 NA NA 0 0 RM 0.00 RM 0.00
2754 1.3.8.2.1 Turfing ‐43.1 days 60 days RM 510,000.00 Sun 4/6/23 Sun 3/9/23 NA NA 0 0 RM 0.00 RM 0.00
2755 1.3.8.2.1 Section 1 ‐43.1 days 20 days RM 170,000.00 Sun 4/6/23 Thu 6/7/23 NA NA 0 0 RM 0.00 RM 0.00
2756 1.3.8.2.1 Section 2 ‐43.1 days 20 days RM 170,000.00 Thu 6/7/23 Sun 6/8/23 NA NA 0 0 RM 0.00 RM 0.00
2757 1.3.8.2.1 Section 3 ‐43.1 days 20 days RM 170,000.00 Sun 6/8/23 Sun 3/9/23 NA NA 0 0 RM 0.00 RM 0.00
2758 1.3.8.2.2 Planting ‐43.1 days 60 days RM 510,000.00 Sun 3/9/23 Wed 29/11/23 NA NA 0 0 RM 0.00 RM 0.00
2759 1.3.8.2.2 Section 1 ‐43.1 days 20 days RM 170,000.00 Sun 3/9/23 Tue 3/10/23 NA NA 0 0 RM 0.00 RM 0.00
2760 1.3.8.2.2 Section 2 ‐43.1 days 20 days RM 170,000.00 Tue 3/10/23 Tue 31/10/23 NA NA 0 0 RM 0.00 RM 0.00
2761 1.3.8.2.2 Section 3 ‐43.1 days 20 days RM 170,000.00 Tue 31/10/23 Wed 29/11/23 NA NA 0 0 RM 0.00 RM 0.00
2762 1.3.8.3 Asset Registration & Labelling ‐0.18 days 7 days RM 51,000.00 Thu 8/2/24 Mon 19/2/24 NA NA 0 0 RM 0.00 RM 0.00
2763 1.4 TESTING & COMMISSIONING ‐0.14 days 60 days RM 0.00 Wed 29/11/23 Wed 21/2/24 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024
PROJEK PEMBANGUNAN CUKAI SENTRAL, KEMAMAN, TERENGGANU Tracking Date:15 DISEMBER 2022
ID WBS Task Name Finish Baseline Baseline Cost Baseline Start Baseline Finish Actual Start Actual Finish % Schedule % Actual Schedule Cost Actual Cost
Variance Duration (Decimal)
2764 1.4.1 CCC ‐0.14 days 60 days RM 0.00 Wed 29/11/23 Wed 21/2/24 NA NA 0 0 RM 0.00 RM 0.00
2765 1.4.1.1 Form G1 ‐ Kerja Tanah ‐0.14 days 5 days RM 0.00 Wed 29/11/23 Tue 5/12/23 NA NA 0 0 RM 0.00 RM 0.00
2766 1.4.1.2 Form G2 ‐ Pemancangan Tanda ‐0.14 days 5 days RM 0.00 Wed 29/11/23 Tue 5/12/23 NA NA 0 0 RM 0.00 RM 0.00
2767 1.4.1.3 Form G3 ‐ Asas Tapak ‐0.14 days 5 days RM 0.00 Mon 11/12/23 Sun 17/12/23 NA NA 0 0 RM 0.00 RM 0.00
2768 1.4.1.4 Form G4 ‐ Struktur ‐0.14 days 5 days RM 0.00 Mon 11/12/23 Sun 17/12/23 NA NA 0 0 RM 0.00 RM 0.00
2769 1.4.1.5 Form G5 ‐ Paip Air Dalaman ‐0.14 days 5 days RM 0.00 Thu 21/12/23 Thu 28/12/23 NA NA 0 0 RM 0.00 RM 0.00
2770 1.4.1.6 Form G6 ‐ Perpaipan sanitari Dalaman ‐0.14 days 5 days RM 0.00 Thu 21/12/23 Thu 28/12/23 NA NA 0 0 RM 0.00 RM 0.00
2771 1.4.1.7 Form G7 ‐ Elektrikal Dalaman ‐0.14 days 5 days RM 0.00 Wed 3/1/24 Tue 9/1/24 NA NA 0 0 RM 0.00 RM 0.00
2772 1.4.1.8 Form G8 ‐ Menetang Kebakaran (Pasir) ‐0.14 days 5 days RM 0.00 Wed 3/1/24 Tue 9/1/24 NA NA 0 0 RM 0.00 RM 0.00
2773 1.4.1.9 Form G9 ‐ Menetang Kebakaran (Aktif) ‐0.14 days 5 days RM 0.00 Wed 3/1/24 Tue 9/1/24 NA NA 0 0 RM 0.00 RM 0.00
2774 1.4.1.10 Form G10 ‐ Pengudaraan Mekanikal ‐0.14 days 5 days RM 0.00 Mon 15/1/24 Sun 21/1/24 NA NA 0 0 RM 0.00 RM 0.00
2775 1.4.1.11 Form G11 ‐ Pemasangan Lift/Eskalator ‐0.14 days 5 days RM 0.00 Mon 15/1/24 Sun 21/1/24 NA NA 0 0 RM 0.00 RM 0.00
2776 1.4.1.12 Form G12 ‐ Bangunan ‐0.14 days 5 days RM 0.00 Mon 15/1/24 Sun 21/1/24 NA NA 0 0 RM 0.00 RM 0.00
2777 1.4.1.13 Form G13 ‐ Sistem Bekalan Air Luaran ‐0.14 days 5 days RM 0.00 Thu 25/1/24 Wed 31/1/24 NA NA 0 0 RM 0.00 RM 0.00
2778 1.4.1.14 Form G14 ‐ Retikulasi Pembetungan ‐0.14 days 5 days RM 0.00 Thu 25/1/24 Wed 31/1/24 NA NA 0 0 RM 0.00 RM 0.00
2779 1.4.1.15 Form G15 ‐ Loji Rawatan Pembetungan ‐0.14 days 5 days RM 0.00 Thu 25/1/24 Wed 31/1/24 NA NA 0 0 RM 0.00 RM 0.00
2780 1.4.1.16 Form G16 ‐ Sistem Bekalan Elektrik Luara‐0.14 days 5 days RM 0.00 Thu 25/1/24 Wed 31/1/24 NA NA 0 0 RM 0.00 RM 0.00
2781 1.4.1.17 Form G17 ‐ Jalan & Parit ‐0.14 days 5 days RM 0.00 Tue 6/2/24 Mon 12/2/24 NA NA 0 0 RM 0.00 RM 0.00
2782 1.4.1.18 Form G18 ‐ Lampu Jalan ‐0.14 days 5 days RM 0.00 Tue 6/2/24 Mon 12/2/24 NA NA 0 0 RM 0.00 RM 0.00
2783 1.4.1.19 Form G19 ‐ Paip Luaran Utama ‐0.14 days 5 days RM 0.00 Thu 15/2/24 Wed 21/2/24 NA NA 0 0 RM 0.00 RM 0.00
2784 1.4.1.20 Form G20 ‐ Telekomunikasi ‐0.14 days 5 days RM 0.00 Thu 15/2/24 Wed 21/2/24 NA NA 0 0 RM 0.00 RM 0.00
2785 1.4.1.21 Form G21 ‐ Pandangan Darat ‐0.14 days 5 days RM 0.00 Thu 15/2/24 Wed 21/2/24 NA NA 0 0 RM 0.00 RM 0.00
2786 1.4.2 Testing & Commissioning ‐0.18 days 14 days RM 0.00 Wed 24/1/24 Mon 12/2/24 NA NA 0 0 RM 0.00 RM 0.00
2787 1.5 FINISH ‐0.14 days 0 days RM 0.00 Wed 21/2/24 Wed 21/2/24 NA NA 0 0 RM 0.00 RM 0.00

WRA SERVICES SDN. BHD TARIKH MULA PROJEK: 23 NOV 2020 JKR TRG_KEMAMAN_BGN_Pembangunan Cukai Sentral_Tracking EOT No.2_01_2022‐12‐15 PROJECT
NO.51A, TINGKAT 1, JALAN TOK LAM TARIKH SIAP ASAL: 23 JULAI 2023
20100 KUALA TERENGGANU NO.TEL: 09‐626 7800 FAX: 09‐624 0564 TARIKH SIAP SEMASA: 21 FEBRUARI 2024