You are on page 1of 2

Combined Group Contracting Co.

AL HAMAD COMMERCIAL CENTER ‫شــــــركـة‬


‫المـجــــمـوعة المشـــتـركـة للمـقــاوالت‬
HSE TOOL BOX MEETING

Project Name: Date:


Sheet No. ___ ___
‫اسم المشروع‬ ‫التاريخ‬

Start Time Finish Time


Location: ‫وقت البدء‬ ‫وقت االنتهاء‬
‫الموقع‬

Topic: ‫الموضوع‬
Presented by: Name: ‫االسم‬
‫المقدم‬ ID No: Signature: ‫التوقيع‬

Attendees Sign in:‫الحضور‬

Sr. No. ID No. Name ‫االسم‬ Designation‫الوظيفة‬ Signature‫التوقيع‬

NOTE: My signature acknowledges receipt of the required personal protective equipment for the day’s task. I understand that I am
CGC-HSE-F-001-Rev.0
Combined Group Contracting Co. AL HAMAD COMMERCIAL CENTER ‫شــــــركـة‬
‫المـجــــمـوعة المشـــتـركـة للمـقــاوالت‬
HSE TOOL BOX MEETING
expected to wear this at all times and if not I will receive a disciplinary action or shall be removed from site.

CGC-HSE-F-001-Rev.0

You might also like