Checklist Sample Appendix A
Checklist Sample Appendix A
Client : Contractor :
EXCAVATION YES NO NA
1 Check for any underground utilities like sewers, water pipelines, cables.
9 Use only work concrete of ratio 1:4:8 to correct over excavated depth.
concrete work.
Others
Checked By:
Approved By:
Checklist for Earthwork & Filling
Project : Doc No. : QA/CL-CON/
Client : Contractor :
1 Check that the earthwork material is appropriate for the project at hand.
of the site.
7 Check the fill materials such as: sand, laterite is level and well compacted.
Others
Checked By:
Approved By:
Checklist for Concreting
Project : Doc No. : QA/CL-CON/
Client : Contractor :
PRE-CONCRETING YES NO NA
concrete work & test e.g. concrete mixer, vibrator, cube test, admixture.
11 Check the reinforcement is free from oil, dirt, paints and soap.
Others
Remarks of Quality Assurance Engineer:
Checked By:
Approved By:
Checklist for Blockwork
Project : Doc No. : QA/CL-CON/
Client : Contractor :
BLOCKWORK YES NO NA
1 Check for the minimum crossing of the hollow block to be used Eg:
2N/mm2.
3 Check for the surface for block laying is free from dirt and anything that
6 Check level, alignment, spacing until the wall reach the required height.
7 Check and be sure the courses of the block are not more than four
courses at a go.
8 Check and be sure the two edges are well plum and square before
9 Check and make sure you don’t have more than 12 courses of block
10 Make sure the parapet wall is not more than one meter.
dimensions.
Others
Remarks of Quality Assurance Engineer:
Checked By:
Approved By:
Client : Contractor :
1 Check that the reinforcement to be used pass the required strength test
structural drawing
7 Check for main bar and distribution bar to be in appropriate position (B-B,
B-T)
9 Check and inspect the reinforcement for any kind of loose and
10 Check the reinforcement is clean of all kind of dirt, such as: oil, paint and
soapy water.
11 Check for any kind of damage of partially breaking that can occur in any
reinforcement placement
Others
Remarks of Quality Assurance Engineer:
Checked By:
Approved By:
Checklist for Formwork
Project : Doc No. : QA/CL-CON/
Client : Contractor :
FORMWORK YES NO NA
hazards.
Others
Checked By:
Approved By:
Checklist for Roofing
Project : Doc No. : QA/CL-CON/
Client : Contractor :
ROOFING YES NO NA
structural details.
4 Check that the roof material is well treated accordingly Eg: painting for
steel roofing , treatment against termite and insect for wooden roofing.
5 Check that the roof elements are frame adequately and brace as one.
Others
Checked By:
Approved By:
Checklist for Plastering
Project : Doc No. : QA/CL-CON/
Client : Contractor :
PLASTERING YES NO NA
1 Check the materials to be used for plastering is free from debris, and mild.
5 Check for maximum plastering thickness of 12mm and use chicken net
6 Check and be sure that the plaster sand is sieve before use.
7 Check and inspect the plaster, looking for any sign of sagging, bugging,
Others
Remarks of Quality Assurance Engineer:
Checked By:
Approved By:
Checklist for Finishing
Project : Doc No. : QA/CL-CON/
Client : Contractor :
FINISHING YES NO NA
3 Always check the vertical and horizontal level of any finishing installation.
4 Check and deploy necessary tool and equipment to get your alignment
Others
Checked By:
Approved By:
Checklist for Tiles & POP Work
Project : Doc No. : QA/CL-CON/
Client : Contractor :
2 Check a perfect reference level for both POP and tiling work.
4 Check for tiling screeding mix ratio and be sure it measured accordingly.
5 Check and deploy necessary tool and equipment to get your alignment
9 Inspect the tiles and look for any sign of damage for replacement.
10 Wait for the POP to dry up before you apply the final coat.
Others