You are on page 1of 5

OFFLINE PURIFICATION REPORT

Judul Pekerjaan Offline Purification TX3 8D Substation

Kode Pekerjaan

No. RO

Area

Lokasi

Nama Peralatan

Mulai :
TanggalPelaksanaan
Selesai :

PT. RADIANT UTAMA INTERINSCO. TBK PT. PERTAMINA HULU ROKAN


Disiapkan Oleh : Diperiksa Oleh : Diketahui Oleh: Disetujui oleh:

Andika Permana Joni Erwan


Electrical Analyst TAR Supervisor TAR
Tanggal: Tanggal: Tanggal: Tanggal:
OFFLINE PURIFICATION REPORT

SUMBER DAYA

No Nama Pelaksana Jabatan Sertifikasi


1
2
3
4
5
7
8
9
10

DATA TRANSFORMER

Name Plate

Manufacture

Serial Number

Standard

Type

Cooling type

Rating Voltage

Rated Power

Frequency

Operation voltage

Capacity oil

Year
OFFLINE PURIFICATION REPORT

PURIFICATION PREPARATION

Tanggal
Jam
Temperature Ambient
KondisiCuaca
Description Condition Remark
Filter Outlet Machine Purifier
Filter Inlet Machine Purifier
Oil Flushing Machine Purifier
Check Gasoline Filter
Generator
Test Run Generator
Test Run Machine Purification

OIL CAPACITY

Name Plate Data Qty (Ton) Qty (Liters)

Main Tank 12T

LTC - -

Total
Convertion :
 1 US Liquid Gals = 3.785
 1 kg/dm3(200C) = 0.876 liter (Nynas nytro 10X)
OFFLINE PURIFICATION REPORT

PURIFICATION MONITORING

 Data Instrument Oil Dielectric Strength (ODS)

Manufacture HUAZHENG

Type

Metoda Pengujian ASTM D1816

 Data Mesin Purifikasi

Manufacture INERSIA DAYA KAVITASI

MANF. Date 2022

Type

Capacity 5000 L/H

 Data Awal Pada Matering Mesin

Description Start Finish

Water Intensity -

Temperature (°C) 25°C

Water Content (ppm) n/a

Flow meter 0000


OFFLINE PURIFICATION REPORT

 Pengujian ODS Main Tank Saat oil purification

Pengujian ODS Saat oil purification


Tanggal
Waktu
Ambient Temp
Oil Temp
OT Gauge TX
Flow Meter
Cycle Cycle 1 Cycle 2 Cycle 3 Cycle 4 Cycle 5 Cycle 6 Cycle 7
Test 1
Test 2
Test 3
Test 4
Test 5
Average (KV)
PPM

Pengujian ODS Saat oil purification


Tanggal
Waktu
Ambient Temp
Oil Temp
OT Gauge TX
Flow Meter
Cycle Cycle 8 Cycle 9 Cycle 10 Cycle 11 Cycle 12 Cycle 13 Cycle 14
Test 1
Test 2
Test 3
Test 4
Test 5
Average (KV)
PPM

Persons:
DAY SHIFT NIGHT SHIFT
1. 1.
2. 2.
3. 3.

You might also like