You are on page 1of 1

TIME SCHEDULE

BOBOT
NO URAIAN PEKERJAAN VOL SAT 31 OKT 2023 1 NOV 2023 2 NOV 2023 3 NOV 2023 4 NOV 2023 5 NOV2023 6 NOV 2023 7 NOV 2023 8 NOV 2023 9 NOV 2023 10 NOV 2023 11 NOV 2023 12 NOV 2023 13 NOV 2023 KETERANGAN
%

PEKERJAAN PENGGANTIAN MAIN TRAFO UNIT 1 PLTA BATANG AGAM 100%

A MATERIAL
1 Unit 2,00% 78,31%
1 Main Transformer 80,31%

Spesifikasi :

Transformer Type : Conservator

Rated Power : 3055/4700 kVA

Rated Voltage : LV - 6,3 kV ; HV - 20 kV

Frequency : 50 Hz

Winding Conductor Material : Copper

Tap Changer Type : Off Load Tap Changer (OLTC)

Tapping Regulation Range : +2 x 2,5% s.d -2 x 2,5% 50%

Cooling ONAN / ONAF

Vector Group Ynd5

Max Temp Rise Top Oil 60° C

Average Winding 65° C

B JASA
1 lot 0,71% 1,07% 1,42% 1,78% 2,13% 2,13% 2,13% 1,42% 1,42%
1 Pekerjaan Bongkar Transformer Eksisting dan Pasang Transformer Baru 14,22%
1 lot 0,55% 3,01% 1,91%
2 Commisioning Test dan RLB 5,47%

0%

HARI INI
100,00% 2,00% 78,31% 0,71% 1,07% 1,42% 1,78% 2,13% 2,13% 2,13% 1,42% 1,97% 3,01% 1,91% 0,00%
RENCANA
KOMULATIF
0,00% 2,00% 80,31% 81,02% 82,08% 83,51% 85,28% 87,42% 89,55% 91,68% 93,11% 95,08% 98,09% 100,00% 100,00%
HARI INI
4,02% 76,29% 0,71% 1,42% 1,78% 2,13% 2,84% 2,84%
REALISASI
KOMULATIF
0,00% 4,02% 80,31% 81,02% 82,44% 84,22% 86,35% 89,20% 92,04%

KETERANGAN :
: RENCANA

: REALISASI

You might also like