You are on page 1of 10

TAKE OFF SHEET 6m

Length 600 m
Project COBBLESTONE
location BARODA TOWN

No dimension timising Description


A. SUB STRUCTURE

1. EXCAVATION & EARTH WORKS


1. Laying of Fine Crushed Aggregate
1.1 /Site Clearance
1 600
7
4200.00 M2
1 60
1
1 60.00m3
1,2. Excavation trench of side work
masonary for cobble stone project

1 600.00
0.6
1 360m3 1.3. Cartaway excass soil material

1 100.00
6.00
600.00m2 1.4. Road surface compact by hand compactor

2/ Supply and spread red ash or dire dawa sand to level


100.00 of 5 to 7 cm base
1 6.00
0.07
42.00m3
3/Supply Cobbelstone and Stone made of basaltic black hard.
1 100.00)
6.00 600.00m2

4/ Cobblestone Paving of aggregate size for o1.


100.00
1 6.00
0.04 24.00m3

5/ Filling Voids by Crushed


100.00 Fine Aggregate and Finishing
1 6.00
0.04
24.00m3
6/ Curb stone
100.00
1 2 240.00
240.00M
6.00
1 30 180
180.00M

420.00M Total length of curbstone


tic black hard.
SPECIFICATION & BILL OF

QUANTITIES

COBBLE STONE

FOR

BARODA TOWN

AT

Regin-Oromia

Zone-East Hararge

Wereda-Goro-Gutu

JULLY ,2023
SUMMARY COST OF STATEMENT
PROJECT:- COBBLESTONE
LOCATION:- BARODA TOWN
No Description Total (Eth. Birr)
Contract
1 Earth Work & Campacting
218,670.60
2 Red Ash/Dire dawa sand
71,400.00
3 Cobble stone
243,666.00

4 cobble stone paving aggregate 01 size


30,000.00

5 Filling void by fine aggregate foe 00 size


26,400.00

6 curb stone
341,166.00
7 Masonry work

8 Concrete C-20 Works

Sub TOTAL
931,302.60
VAT ( 15% )
139,695.39 27939078
GRAND TOTAL
1,070,997.99

O
Item No
PROJECT :COBBLESTONE
LOCATION :BARODA TOWN

Description Unit QTY


1 EARTH WORK
1.1 Clear the Site to remove all un wanted gravel and soil material from
both side of road. M2 4200.00
1.2 Cartaway
Trench excavation depth not material
surplus excavated exceedingas 1.5m
pertheininstruction
ordinary soil
of the M 3
60.00
1.3 engineer m3 360.00
1.4 Road surface shall be compacted by hand campactor m2 600.00
Total Carried to Summary
2 Red ash or dire dawa sand
Supply and spread red ash or dire dawa sand to level of 5 to 7 cm base
and surface shall be well compactecd,then base course of fine crashed
aggregate size from stone crusher site , keeping the design slope so as
to enable cobblestone paving following the slope. m2 42.00
Total Carried to Summary
3 Cobble stone

Spread aggregate size 01 used to the required level of keeping design


10x10x10 cm shaped cobble stone made of basaltic black hard rock
thickness as per the layout, design & slope for the main body of the road
and 15x10x10 cm shaped stones road pavement and price include
loading cost m2 600.00
Total Carried to Summary
Cobblestone Paving

Spread aggregate size 01 used to the required level of keeping design


10x10x10 cm shaped cobble stone made of basaltic black hard rock
thickness as per the layout, design & slope for the main body of the road
and 15x10x10 cm shaped stones road pavement and price include
loading cos m3 24.00
Total Carried to Summary
4 Filling Voids by Crushed Fine Aggregate and Finishing
Supply,fill and compact fine crushed aggregate of size 00 to the 2cm
spaces or voids between the cobblestones to prevent the movement of
the stones due to traffic and make fixed M3 24.00
Total Carried to Summary
5 Curb stone
transport and fix 15x25 cm shaped curb stones, 30 to 70 cm long,at
every 15m interval across the walkway pavement and sidewalk, along
both sides of the road with a cement mortar base of 1:4 mix and backed
with C-15 concrete on the external sides of the road and crushed
aggregate)bucket, plasterer knife, and price include loading cost, ml 420.00
Total Carried to Summary
SubTotal
15% VAT
Grand Total With Vat 15%
Rate Total

33.69 141,498.00
317.83 19,069.80
44.73 16,102.80
70.00 42,000.00
218,670.60

1,700.00 71,400.00
71,400.00

406.11 243,666.00
243,666.00

1,250.00 30,000.00
30,000.00

1,100.00 26,400.00
26,400.00
812.30 341,166.00
341,166.00
931,302.60
0.15 139,695.39
1,070,997.99

1157953.08