Length 600 m
Project COBBLESTONE
location BARODA TOWN
1 600.00
0.6
1 360m3 1.3. Cartaway excass soil material
1 100.00
6.00
600.00m2 1.4. Road surface compact by hand compactor
QUANTITIES
COBBLE STONE
FOR
BARODA TOWN
AT
Regin-Oromia
Zone-East Hararge
Wereda-Goro-Gutu
JULLY ,2023
SUMMARY COST OF STATEMENT
PROJECT:- COBBLESTONE
LOCATION:- BARODA TOWN
No Description Total (Eth. Birr)
Contract
1 Earth Work & Campacting
218,670.60
2 Red Ash/Dire dawa sand
71,400.00
3 Cobble stone
243,666.00
6 curb stone
341,166.00
7 Masonry work
Sub TOTAL
931,302.60
VAT ( 15% )
139,695.39 27939078
GRAND TOTAL
1,070,997.99
O
Item No
PROJECT :COBBLESTONE
LOCATION :BARODA TOWN
33.69 141,498.00
317.83 19,069.80
44.73 16,102.80
70.00 42,000.00
218,670.60
1,700.00 71,400.00
71,400.00
406.11 243,666.00
243,666.00
1,250.00 30,000.00
30,000.00
1,100.00 26,400.00
26,400.00
812.30 341,166.00
341,166.00
931,302.60
0.15 139,695.39
1,070,997.99
1157953.08