SR.

PARTICULARS UNIT RATE QTY AMOUNT


NO
,
1 Earthwork Cu.M 114.25 22.75 2599.18
01 X 14.00 X 0.250 =22.75 Cu.M

2 Sand filling Cu.M 2,340.75 6.82 15,963.92


01 X 14.00 X 6.50 X 0.075 = 6.82 Cu.M

3 Brickwork Sqmt 1011.25 12.30 12,438.37


01 X 02 X 14.00 + 13.00 X 0.300 =12.30 Sqmt

4 Cement concrete(1:3:6) Cu.M 6,658.00 13.65 90,881.70


01 X 14.00 X 6.50 0.150 = 13.65 Cu.M

5 Cement Concrete (1:2:4) with 12mm thick Sqmt 489.75 91.00 44,564.25
aggregate with glass strip finished
01 X 14.00 X 6.50 = 91.00 Sqmt.

6 Badminton post (TATA make) as per direction 4,930.00 4,930.00

7 Badminton court painting as per direction 19,200.0 19,200.00


(complete job) 0

Total : 1,90,576.00
In words:
Rupees one lakh ninety thousand five hundred and seventy six only

ESTIMATE FOR THE BADMINTON COURT – DEPTH 9’’


9 – 10 inch badminton court
SR.
NO,
PARTICULARS
1 Earthwork cutting
9-10 inch

2 Sand filling
3 inch

3 Brickwork flate soling outside the badminton court

4 Cement concrete(1:3:6)
6 inch

5 Cement Concrete (1:2:4) with 25 mm thick

6 Synthetic flooring 5-8 layer


Min 3mm thickness
7 Badminton pole(TATA make) with a net
and marking as per directions
Size = 22 X 46 feet