ERC

AWASH – KOMBOLCHA – HARA GEBAYA


RAILWAY PROJECT

Employer’s Representative:

STATIONS AND AUXILIARY BUILDINGS


LANDSCAPE DESIGN MANUAL
(PHASE 1)
Report No
AKH - YM I - DD - GL 0 0 X - G - L A - RE P - 0 0 0 1 - 1
Project Organization Stage Location Category Discipline Type of Number Vers.
Document

06.07.2017

28.05.2018
ERC AKH Railway Project

Project:

AWASH – KOMBOLCHA – HARA GEBAYA


RAILWAY PROJECT, ETHIOPIA

Employer:

ETHIOPIAN RAILWAYS CORPORATION (ERC)

Employer’s Representative:

Contractor:

www.ym.com.tr

Designer:

Report Name:

STATIONS AND AUXILIARY BUILDINGS


LANDSCAPE DESIGN MANUAL (PHASE 1)

Report No:
AKH - YM I - DD - GL 0 0 X - G - L A - RE P - 0 0 0 1 - 1
Project Organization Stage Location Category Discipline Type of Number Vers.
Document

Date:28.05.2018
STATIONS AND AUXILIARY
BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 2 / 43
ERC AKH Railway Project
VERSION HISTORY

Version Details Date Amended By

0 First issue 06.07.2017 YM Design Group

1 Second issue 28.05.2018 YM Design Group

PREPARED BY

Edited by Mr. Gürkan Oruç HP Forest Engineer

HP Landscape
Checked by Ms. Demet Şinel
Architect

YM Architecture Design
Checked by İ.Ünsal
Manager
YM General
Approved by L. Horozoğlu Architecture Design
Coordinator

Approved by Z. Uygun YM Deputy GM, Design

Approved by A. Kılıç YM Project Manager

APPROVAL

APPROVED APPROVED AS NOTED REJECTED

APPROVED BY

Name Title Signature & Stamp

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 3 / 43
ERC AKH Railway Project
TABLE OF CONTENT

1 PURPOSE OF REPORT 6

2 REFERENCES 6

2.1 Abbreviations 6

2.2 References 6

3 INTRODUCTION 6

4 CRITERIA OF SOFTSCAPE PLANNING 8

5 STATIONS 8

PHASE 1 9

5.1 Awash Station 9

5.2 Amibara Station 9

5.3 Robit Station 9

5.4 Senbete Station 9

5.5 Karakore Station 9

5.6 Mekoy Station 9

5.7 Kombolcha Station 9

5.8 Kombolcha Depot 9

PHASE 2 9

5.9 Hayk Station 9

5.10 Mersa Station 10

5.11 Hara Gebeya Station 10

6 PLANTATION 10

6.1 Tree species 11

6.2 Shrub species 13


STATIONS AND AUXILIARY
BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 4 / 43
ERC AKH Railway Project
6.3 Groundcover species 14

7 DRAINAGE SYSTEM 15

8 IRRIGATION SYSTEM 15

9 ANNEX 17

9.1 TERMINAL STATIONS LANDSCAPE PRINCIPLE PLANS 17


9.1.1 AWASH STATION 17
9.1.2 ROBİT STATION 19
9.1.3 KOMBOLCHA STATION 23

9.2 INTERMEDIATE STATIONS LANDSCAPE PRINCIPLE PLANS 25


9.2.1 AMIBARA STATION 25
9.2.2 SENBETE STATION 27
9.2.3 KARAKORE STATION 29
9.2.4 MEKOY STATION 31
9.2.5 MERSA STATION 33
9.2.6 HARAGEBEYA STATION 34

9.3 DEPOT ZONE&WORKSHOP LANDSCAPE PRINCIPLE PLANS 36

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 5 / 43
ERC AKH Railway Project
1 PURPOSE OF REPORT
The goal of this document is to explain landscape softscape planning method and
content of the landscape project of AKH Railway. Criteria for the planning of the green
areas to come to an esthetical and a functional resolution will be explained later in
details.

2 REFERENCES

2.1 Abbreviations

AKH Awash-Kombolcha-Haragebeya Railway Project


ER Employer's requirements (Request for Proposals Document on the
EPC/Turnkey Contract for Awash-Weldia Railway Project;
ET/ERC/EPC-Awash Haragebeya/11001; December 13,2011)
ERC Ethiopian Railways Corporation
YM Yapı Merkezi (The Design/Build Contactor)

2.2 References

 ER- Employer's Requirements


 Stations and Facilities Design Manual (AKH-YMI-DD-GL00X-D-AR-REP-
0001-0)
 Endemic plants of Ethiopia Preliminary working list to contribute to National
plant conservation target, Tesfaye Awas(Phd), Institute of Biodiversity
Conservation, 2009
 Red list of endemic trees&shrubs of Ethiopia and Eritrea, Jose Luis Vivero,
Ensermu Kelbessa and Sebsebe Demissev, 2005
 Golf Course Irrigation: Environmental Design and Management Practices;
James Barrett, Brian Vinchesi, Robert Dobson, Paul Roche, David
Zoldoske,2004

3 INTRODUCTION
Awash-Kombolcha-Hara Gebeya railway is to start from northeast end of the region,
continuing towards the north of the region, as it will finally reach out to Weldia town to
complete its route. Besides public and freight transportation, this railway line would
serve to import and export activities from Djibouti. Hence, it would be a part of the
connection between the northern and the central parts of the region.

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 6 / 43
ERC AKH Railway Project

Figure 3-1 Stations of AKH Railway

There are 11 main zones on the line. 4 of them are terminal stations, 6 of them are
intermediate stations, 4 freightyard facilities and 1 depot zone.

4 Terminal stations listed below:

1. Awash Station + Freightyard


2. Robit Station + Freightyard
3. Kombolcha Station
4. Hayk Station

6 İntermediate stations listed below:

1. Amibara Station
2. Senbete Station
3. Karakore Station
4. Mekoy Station
5. Mersa Station
6. Hara Gebaya Station + Freightyard

4 Freightyard facilities listed below:

1. Awash Freightyard
2. Robit Freightyard
3. Kombolcha Depot Freightyard
4. Hara Freightyard

1 Depot zone listed below:

1. Kombolcha

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 7 / 43
ERC AKH Railway Project
4 CRITERIA OF SOFTSCAPE PLANNING

 Indigenous plants and local row materials will be used to reduce cost of the
implementation. Simple planting measures are going to be employed so as to
increase the self-sustaining, refresh and development capacities which eventually
reduce the implementation, management and maintenance cost. (ref ER, clause
15.1)

 Green areas of stations and yards will be design with a protective approach.

 Existing conditions such as Topographic structure, climate (temperature,


precipitation, wind direction,…etc.), soil and water quality and environmental effects
of the project area will be determined by territorial analysis as well as obtaining the
necessary documentation from relevant authorities. Additionally, by use of
architectural plans, good and bad vision along with focus points are going to be
investigated in the project.

5 STATIONS

4 Terminal stations and 6 intermediate stations and 1 depot zone describe below;

Figure 5-1 General view to AKH Railway

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 8 / 43
ERC AKH Railway Project
PHASE 1

5.1 Awash Station

Awash station is the first and terminal station of the railway. It is located at KM 2+369
of the railway. Location of this station is close to the Awash National Park and Awash
River.

5.2 Amibara Station

Amibara station is located at KM 35+893. This station is an intermediate and second


station on the line. It is close to Aledeghi Wildlife Reserve.

5.3 Robit Station

The third station is Robit. This station is located at KM 120+792 and the terminal
station. This station is close to the Robit- city.

5.4 Senbete Station

Senbete is the fourth and intermediate station of the line. It is located at KM


158+900. It is close to the Yangudi Rassa National Park.

5.5 Karakore Station

Karakore station is located at KM 181+526. It is the fifth and an intermediate station.


It is situated 1 km away from No1 Motorway and 3 km from Karakore town.

5.6 Mekoy Station

Mekoy Station is an intermadiate and the sixth station. It is located at KM 216+996. It


is close to Mekoy town.

5.7 Kombolcha Station

Kombolcha station is a terminal type and seventh station. It is located at KM


265+047

5.8 Kombolcha Depot

Kombolcha depot zone is the one depot zone of this line. It is located at KM
268+453. It has depot, workshops and freight yard facilities. It is close to the
Kombolcha Airport and Kombolcha City.

PHASE 2

5.9 Hayk Station

Hayk station is a terminal type station. It is located at KM 306+503. Hayk station is


the eight station and close to the Hayk Lake and nature reserves.

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 9 / 43
ERC AKH Railway Project
5.10 Mersa Station

Mersa Station is the ninth station of the line. It is an intermediate station and
located at KM 359+606

5.11 Hara Gebeya Station

Hara Gebeya is the last station of the line. It is located at 389+005. It is close to
the city Hara Gebeya.

6 PLANTATION
In this section, plant species that are chosen for plantation of the stations will be
presented with their illustrations. Species shown on the plantation projects will be
explained with their sizes while these projects are planned in 3 different zones,
particularly named "Terminal Stations", "Intermediate Stations" and "Depot Zone".

Kombolcha Depot (1890)


Hara Gebaya (1515)
Shewarobit (1200)

Kombolcha (1890)

Workshop (1910)
Plant Name / Station Name

Karakore (1675)
Senbete (1447)
Amibara (762)

Mekoy (1465)

(Altitude) Mersa (1503)


Awash (910)

Hayk (1928)
ARAUCARIA HETEROPHYLLA X
DELONIX REGIA
GRAVILLEA ROBUSTA
SPATHODEA CAMPANULATA
SHRUBS
CALLISTEMON CITRIUS
DURANTA ERECTA
EUPHORBIA PULCHERRIMA
LANTANA CAMARA
GROUNDCOVERS
Carpobrotus edulis or
Mesembryanthemmum

Proper for this station altitude


X Not proper for this station altitude

FIGURE 6-1 Plant species for stations

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 10 / 43
ERC AKH Railway Project

Altitude
Plant Name Local Name
(m)
TREES
ARAUCARIA HETEROPHYLLA Norfolk Island pine 900-2000
DELONIX REGIA Yedredawa Zaf 0-2000
GRAVILLEA ROBUSTA Silky Oak 500-2000
SPATHODEA CAMPANULATA Tulip tree 0-2000
SHRUBS
CALLISTEMON CITRIUS Bottle brush 0-2300
DURANTA ERECTA Geisha Girl 500-2600
EUPHORBIA PULCHERRIMA Ataturk Poinsettia 0-3000
LANTANA CAMARA Red Sage 0-2000
GROUNDCOVERS
Carpobrotus edulis or 100 m and
Mesembryanthemmum Ice plant /Fig marigold above

FIGURE 6-2 Plant species

6.1 Tree species

 Araucaria heterophylla (Norfolk Island Pine)

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 11 / 43
ERC AKH Railway Project

 Delonix regia (Yedredawa zaf)

 Gravillea robusta (Silky Oak)

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 12 / 43
ERC AKH Railway Project

 Spathodea campanulata (Tulip tree)

6.2 Shrub species

 Callistemon citrinus (Bottle brush)

 Durantha eracta (Geisha Girl)

 Euphorbia pulcherrima (Ataturk Poinsetti)


STATIONS AND AUXILIARY
BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 13 / 43
ERC AKH Railway Project

 Lantana camara (Red Sage)

6.3 Groundcover species

 Carpobrotus edulis (Ice plant)

 Mesembryanthemmum (Fig marigold)

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 14 / 43
ERC AKH Railway Project

7 DRAINAGE SYSTEM

Drainage systems and calculations have been shown in site storm water projects and
reports.

8 IRRIGATION SYSTEM
Manual irrigation systems have been planned for irrigation of green areas at this project.
Garden taps and hoses will be used for irrigation of the green areas.

Irrigation installation design criterias:

1. Tap flow rate will be 2-4 m3/h,


2. Flow pressure will be 15 mWG,
3. Booster pumps will be provided as 1 main and 1 spare.
4. Half of the green areas will be irrigated in a day in 12 hours. Therefore Total green
area will be irrigated in 2 days.
5. Water tank will be sized based on 10 l per green area m2
6. Hose length will be 50 m.

Quick coupling valve box;

Concrete menhole to be pour 60*60*40 (h:40 cm) centimeters of sizes.


For menhole cover shall be used diamond embossed locked sheet 60*60cm of sizes.

FIGURE 3-1 Irrigation tap and hose illüstration

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 15 / 43
ERC AKH Railway Project

FIGURE 3-2 Diamond embossed sheet menhole cover illustration

FIGURE 3-3 Quick coupling valve detail illustration

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 16 / 43
ERC AKH Railway Project
9 ANNEX

9.1 TERMINAL STATIONS LANDSCAPE PRINCIPLE PLANS

9.1.1 AWASH STATION

9.1 FIGURE: AWASH STATION LANDSCAPE PROJECT

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 17 / 43
ERC AKH Railway Project

9.2 FIGURE: AWASH FREIGHTYARD LANDSCAPE PROJECT

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 18 / 43
ERC AKH Railway Project
9.1.2 ROBİT STATION

9.3 FIGURE: ROBIT STATION LANDSCAPE PROJECT

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 19 / 43
ERC AKH Railway Project

9.4 FIGURE: ROBIT STATION IRRIGATION PROJECT

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 20 / 43
ERC AKH Railway Project

9.5 FIGURE: ROBIT FREIGHTYARD LANDSCAPE PROJECT


STATIONS AND AUXILIARY
BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 21 / 43
ERC AKH Railway Project

9.6 FIGUREFIGURE: ROBIT FREIGHTYARD IRRIGATION PROJECT

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 22 / 43
ERC AKH Railway Project
9.1.3 KOMBOLCHA STATION

9.7 FIGUREFIGURE: KOMBOLCHA STATION LANDSCAPE PROJECT

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 23 / 43
ERC AKH Railway Project

9.8 FIGURE: KOMBOLCHA STATION IRRIGATION PROJECT

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 24 / 43
ERC AKH Railway Project
9.2 INTERMEDIATE STATIONS LANDSCAPE PRINCIPLE PLANS

9.2.1 AMIBARA STATION

9.10 FIGURE: AMIBARA STATION LANDSCAPE PROJECT

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 25 / 43
ERC AKH Railway Project

9.11 FIGURE: AMIBARA STATION IRRIGATION PROJECT


STATIONS AND AUXILIARY
BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 26 / 43
ERC AKH Railway Project
9.2.2 SENBETE STATION

9.12 FIGURE: SENBETE STATION LANDSCAPE PROJECT

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 27 / 43
ERC AKH Railway Project

9.13 FIGURE: SENBETE STATION IRRIGATION PROJECT

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 28 / 43
ERC AKH Railway Project
9.2.3 KARAKORE STATION

9.14 FIGURE: KARAKORE STATION LANDSCAPE PROJECT


STATIONS AND AUXILIARY
BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 29 / 43
ERC AKH Railway Project

9.15 FIGURE: KARAKORE STATION IRRIGATION PROJECT


STATIONS AND AUXILIARY
BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 30 / 43
ERC AKH Railway Project
9.2.4 MEKOY STATION

9.16 FIGURE: MEKOY STATION LANDSCAPE PROJECT

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 31 / 43
ERC AKH Railway Project

9.17 FIGURE: MEKOY STATION IRRIGATION PROJECT


STATIONS AND AUXILIARY
BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 32 / 43
ERC AKH Railway Project
9.2.5 MERSA STATION

9.18 FIGURE: MERSA STATION LANDSCAPE PROJECT

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 33 / 43
ERC AKH Railway Project
9.2.6 HARAGEBEYA STATION

9.19 FIGURE: HARAGEBEYA STATION LANDSCAPE PROJECT


STATIONS AND AUXILIARY
BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 34 / 43
ERC AKH Railway Project

9.20 FIGURE: HARAGEBEYA FREIGHTYARD LANDSCAPE PROJECT

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 35 / 43
ERC AKH Railway Project
9.3 DEPOT ZONE&WORKSHOP LANDSCAPE PRINCIPLE PLANS

9.21 FIGURE: DEPOT ZONE&WORKSHOP LANDSCAPE PROJECT


STATIONS AND AUXILIARY
BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 36 / 43
ERC AKH Railway Project

9.22 FIGURE: DEPOT ZONE&WORKSHOP LANDSCAPE PROJECT

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 37 / 43
ERC AKH Railway Project

9.23 FIGURE: DEPOT ZONE&WORKSHOP LANDSCAPE PROJECT


STATIONS AND AUXILIARY
BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 38 / 43
ERC AKH Railway Project

9.24 FIGURE: KOMBOLCHA FREUGHTYARD LANDSCAPE PROJECT

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 39 / 43
ERC AKH Railway Project

9.25 FIGURE: DEPOT ZONE&WORKSHOP IRRIGATION PROJECT

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 40 / 43
ERC AKH Railway Project

9.26 FIGURE: DEPOT ZONE&WORKSHOP IRRIGATION PROJECT

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 41 / 43
ERC AKH Railway Project

9.27 FIGURE: DEPOT ZONE&WORKSHOP IRRIGATION PROJECT

STATIONS AND AUXILIARY


BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 42 / 43
ERC AKH Railway Project

9.28 FIGURE: KOMBOLCHA FREIGHTYARD IRRIGATION PROJECT


STATIONS AND AUXILIARY
BUILDINGS LANDSCAPE DESIGN AKH – YMI – DD – GL00X – G – LA – REP – 0001 – 1 28.05.2017
MANUEL (PHASE 1)
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpos without the prior written permission of Yapı Merkezi. © Yapi Merke zi Insaat ve Sanayi A.Ş.,2015 Page: 43 / 43