AKH - YM I - DD - S S 0 0 X - S - P S - RE P - 0 4 0 1 - 2
Project Organization Stage Location Category Discipline Type of Number Vers.
Document

22.06.2018
ERC AKH Railway Project

Project:

AWASH – KOMBOLCHA – HARA GEBAYA RAILWAY PROJECT,


ETHIOPIA

Employer:

ETHIOPIAN RAILWAYS CORPORATION (ERC)

Employer’s Representative:

Contractor:

www.ym.com.tr

Designer:

Report Name:
TRACTION POWER SUBSTATION CONTROL BUILDING MECHANICAL DESIGN
REPORT

Report No:
AKH - YM I - DD - S S 0 0 X - S - P S - RE P - 0 4 0 1 - 2
Project Organization Stage Location Category Discipline Type of Number Vers.
Document

Date: 22.06.2018

TRACTION POWER SUBSTATION CONTROL


BUILDING MECHANICAL DESIGN REPORT AKH – YMI – DD – SS00X – S – PS – REP – 0401 – 2 22.06.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpose without the prior written permission of Yapı Merkezi. © Yapi Merkezi Insaat ve Sanayi A.Ş.,201 6 Page 2 / 13
ERC AKH Railway Project
VERSION HISTORY

Version Details Date Amended By

0 First Issue 02.10.2017 4A MECH. DESIGN TEAM

1 Revised 30.10.2017 4A MECH. DESIGN TEAM

2 Guard House Addition 22.06.2018 4A MECH. DESIGN TEAM

PREPARED BY

Edited by O.TUĞA M.Sc. Mechanical Engineer

Checked by O.TUĞA M.Sc. Mechanical Engineer

YM Senior Electrical
Approved by E. Akdoğan
Engineer

YM General Railway
Approved by M. Çelen
Design Coordinator

Approved by Z. Uygun YM Deputy GM, Design

Approved by E. Cengiz YM Project Manager

APPROVAL

APPROVED APPROVED AS NOTED REJECTED

APPROVED BY

Name Title Signature & Stamp

TRACTION POWER SUBSTATION CONTROL


BUILDING MECHANICAL DESIGN REPORT AKH – YMI – DD – SS00X – S – PS – REP – 0401 – 2 22.06.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpose without the prior written permission of Yapı Merkezi. © Yapi Merkezi Insaat ve Sanayi A.Ş.,201 6 Page 3 / 13
ERC AKH Railway Project

Table of Contents

Traction Substation Building Structural Design Report …………………..... 1

Table of Contents ………………………………………………………………….. 4

1. GENERAL INFORMATION...........……………………………………………........ 5

2. STANDARDS, REFERENES and SOFTWARES ……………………………….. 5

3. DESIGN CRITERIA ……………………………………………………………….... 6

4. HVAC SYSTEM …………………………………………………………………...… 7

5. PLUMBING SYSTEM ………………………………………………………………. 13

TRACTION POWER SUBSTATION CONTROL


BUILDING MECHANICAL DESIGN REPORT AKH – YMI – DD – SS00X – S – PS – REP – 0401 – 2 22.06.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpose without the prior written permission of Yapı Merkezi. © Yapi Merkezi Insaat ve Sanayi A.Ş.,201 6 Page 4 / 13
ERC AKH Railway Project
1 GENERAL INFORMATION
This design document covers the mechanical installation systems’ designs of AKH Railway Project’s CONTROL BUILDING
& GUARD HOUSE in Ethopia. The design report is composed of the following sections,

i. Heating, ventilating and air-conditioning (HVAC) system concept description and calculations,
ii. Plumbing system description and calculations

2 STANDARDS, REFERENCES and SOFTWARES


Mechanical systems are to be developed on the basis of architectural drawings and client requirements by taking the
following international codes into consideration;

ASHRAE Standards (American Society of Heating Refrigerating and Air Conditioning Engineers)
 ASHRAE Handbook, 2007 Applications Volume
 ASHRAE Handbook, 2009 Fundamentals Volume
 ASHRAE Handbook, 2008 Systems & Equipment Volume
 ASHRAE Standard 62.1-2017

ASPE Standards
 American Society of Plumbing Engineers Plumbing System Data Book 1
 American Society of Plumbing Engineers Plumbing System Data Book 2

International Code Council


International Plumbing Code 2009

The following softwares will mainly be used for the structural design of Buildings:

 AutoCAD

 Carrier E20-II Hourly Analysis Heat Load Program

 Other engineering and drawing software

TRACTION POWER SUBSTATION CONTROL


BUILDING MECHANICAL DESIGN REPORT AKH – YMI – DD – SS00X – S – PS – REP – 0401 – 2 22.06.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpose without the prior written permission of Yapı Merkezi. © Yapi Merkezi Insaat ve Sanayi A.Ş.,201 6 Page 5 / 13
ERC AKH Railway Project
3 DESIGN CRITERIA

3.1 Outdoor Design Criteria

General outdoor design temperatures of Ethiopia is given above. The route is generally around Amhara region and through
Addis Abada. In order to be on the safer side, the outdoor design temperature is selected as below;

 Latitude : 10 deg North


 Longitude : 38 deg. East
 Elevation : 2000 meters
 Summer : 32,8oC DB & %68 RH (27oC WB)
 Winter : 6oC DB
 Daily Range : 10oC DB

3.2 Indoor Design Criteria


Indoor comfort conditions are selected according to equipment specifications & ASHRAE standards as follows;

Room Name Summer (DB & RH) Winter (DB)


Battery Room, Control Room, PFC Room max.30 oC & %50 (Design 30 oC & %50) min. 0 oC (Design 5 oC)
PFC TR Room max.40 oC min. 0 oC
WC - 10 oC
Guard/Security Room ~26 oC ~20 oC

TRACTION POWER SUBSTATION CONTROL


BUILDING MECHANICAL DESIGN REPORT AKH – YMI – DD – SS00X – S – PS – REP – 0401 – 2 22.06.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpose without the prior written permission of Yapı Merkezi. © Yapi Merkezi Insaat ve Sanayi A.Ş.,201 6 Page 6 / 13
ERC AKH Railway Project
3.3 Internal Heat Loads
Internal heat loads are selected according to equipment specifications as follows;

Room Name Internal Load


Lightning 10 W/m2
PFC Room Equipment Full Load 24 kW with %70 diversity 16,8kW selected
Control Room Equipment 20# x 10 W/unit = 200 W (for safety, 3 kW selected)
Battery Room 150~300 W/m2 (for safety, 280 W/m2 selected)
Guard/Security Room 15 W/m2 lights & 100 W computer etc

3.4 Ventilation Requirement


Outdoor air requirements for occupants are to be determined in accordance with equipment specifications and
ANSI/ASHRAE Standard 62.1-2017 Table-6.1.
Room Name Flow Rate
WC/urinal 23,6 L/s.closet.urinal or 10ach
Battery Room 25 ach
Control Room NA (natural vent.)
PFC Room Each cabin fresh air need is 1.400m3/h For 10# cabin & %70 diversity 10.000m3/h selected
TR Room for dT 5oC cooling

4 HVAC SYSTEM
Due to outdoor design temperature (32,8oC), equipment room design 30oC can not be maintained by fan/ventilation in critical
seasons. Therefore, for rooms indoor design temperature 30oC shall be maintained by Split Type AC Units.

PFC-TR room cooling and ventilation is provided by door louvers & wall type exhaust fans.

PFC room ventilation is provided by means of fresh air – air handling unit according to cabinet ventilation requirements. In
order to maintain (+) pressure, exhaust fans total air flow is lower than the fresh air ventilation unit.

TRACTION POWER SUBSTATION CONTROL


BUILDING MECHANICAL DESIGN REPORT AKH – YMI – DD – SS00X – S – PS – REP – 0401 – 2 22.06.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpose without the prior written permission of Yapı Merkezi. © Yapi Merkezi Insaat ve Sanayi A.Ş.,201 6 Page 7 / 13
ERC AKH Railway Project
4.1 HVAC Equipment List

TRACTION POWER SUBSTATION CONTROL


BUILDING MECHANICAL DESIGN REPORT AKH – YMI – DD – SS00X – S – PS – REP – 0401 – 2 22.06.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpose without the prior written permission of Yapı Merkezi. © Yapi Merkezi Insaat ve Sanayi A.Ş.,201 6 Page 8 / 13
ERC AKH Railway Project

4.2 Heat Loss/Gain Calculations

TRACTION POWER SUBSTATION CONTROL


BUILDING MECHANICAL DESIGN REPORT AKH – YMI – DD – SS00X – S – PS – REP – 0401 – 2 22.06.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpose without the prior written permission of Yapı Merkezi. © Yapi Merkezi Insaat ve Sanayi A.Ş.,201 6 Page 9 / 13
ERC AKH Railway Project

TRACTION POWER SUBSTATION CONTROL


BUILDING MECHANICAL DESIGN REPORT AKH – YMI – DD – SS00X – S – PS – REP – 0401 – 2 22.06.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpose without the prior written permission of Yapı Merkezi. © Yapi Merkezi Insaat ve Sanayi A.Ş.,201 6 Page 10 / 13
ERC AKH Railway Project

TRACTION POWER SUBSTATION CONTROL


BUILDING MECHANICAL DESIGN REPORT AKH – YMI – DD – SS00X – S – PS – REP – 0401 – 2 22.06.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpose without the prior written permission of Yapı Merkezi. © Yapi Merkezi Insaat ve Sanayi A.Ş.,201 6 Page 11 / 13
ERC AKH Railway Project

TRACTION POWER SUBSTATION CONTROL


BUILDING MECHANICAL DESIGN REPORT AKH – YMI – DD – SS00X – S – PS – REP – 0401 – 2 22.06.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpose without the prior written permission of Yapı Merkezi. © Yapi Merkezi Insaat ve Sanayi A.Ş.,201 6 Page 12 / 13
ERC AKH Railway Project

5 PLUMBING SYSTEM

5.1 Domestic Water


Since, water can not be provided from city main, PE (poly ethylene) circular water tank & booster pump is used to provide
domestic water in WC-Shower & kitchenette area. 0,5 m3 PE water storage tank is selected. Insulation shall be provided
for the storage tank.
Cold water fixture units (FU) will be in compliance with 2009 International Plumbing Code.

WATER DISTRIBUTION SYSTEM DESIGN CRITERIA


REQUIRED CAPACITY AT FIXTURE SUPPLY PIPE OUTLETS
FLOW RATE FLOW PRESSURE
FIXTURE SUPPLY OUTLET SERVING
GPM (L/min) PSI (bar)
Lavatory 2 (7,5) 8 (0,55)
Water Closet 3 (11,3) 8 (0,55)
Shower 3 (11,3) 8 (0,55)
Sink 3 (11,3) 8 (0,55)

LOAD VALUES ASSIGNED TO FIXTURES (DOMESTIC WATER)


TYPE OF LOAD VALUES
FIXTURE OCCUPANCY SUPPLY IN SUPPLY FIXTURE UNITS (wsfu)
CONTROL Cold Hot Total Quantiy Total
Lavatory Public Faucet 1,5 1,5 3 3,0
WC Public, Private Flush Tank 2,0 2,0 2 4,0
Shower Private 4,0 4,0 1 4,0
Sink Private 3,0 3,0 1 3,0
TOTAL 14

For, 14 WSFU (water supply fixture unit) according to international plumbing code Table E103.3;
Water Demand can be calculated as 6,7 GPM (1,5 m3/h)
Since min. flow pressure is 0,55bar, with safety 4 bar pump head is selected.

5.2 Waste Water


Drainage shall be provided from water closets, urinals, lavatories and showers. All waste water piping will be PVC type.
Waste water is to be drained through manhole. Manhole detail shall be provided by civil design group.

TRACTION POWER SUBSTATION CONTROL


BUILDING MECHANICAL DESIGN REPORT AKH – YMI – DD – SS00X – S – PS – REP – 0401 – 2 22.06.2018
This report must not be either loaned, copied or otherwise reproduced in whole or in part or used for any
purpose without the prior written permission of Yapı Merkezi. © Yapi Merkezi Insaat ve Sanayi A.Ş.,201 6 Page 13 / 13

You might also like