You are on page 1of 6

■ System Comparision

1. Repert of Design Company

PT SLAB ( TYPICAL FLOOR ) / SÀN DỰ ỨNG LỰC ( SÀN ĐIỂN HÌ


QUANLITY / KHỐI
MATERIAL / VẬT LIỆU UNIT / ĐƠN VỊ
LƯỢNG

CONCRETE / BÊ TÔNG m3/m2 0.27


REINFORCEMENT / CỐT THÉP kg/m2 18
COFFA / VÁN KHUÔN m2/m2 1.2
TENDON / CÁP kg/m2 4.6
SUM / TỔNG

RC SLAB ( TYPICAL FLOOR ) / SÀN BTCT THƯỜNG ( SÀN ĐIỂN H


QUANLITY / KHỐI
MATERIAL / VẬT LIỆU UNIT / ĐƠN VỊ
LƯỢNG

CONCRETE / BÊ TÔNG m3/m2 0.25


REINFORCEMENT / CỐT THÉP kg/m2 43
COFFA / VÁN KHUÔN m2/m2 1.3
TENDON / CÁP kg/m2 0
SUM / TỔNG
■ Data of Handong
1) Block 1Dragon Castle, Ha Long: 2021
NG LỰC ( SÀN ĐIỂN HÌNH ) PT SLAB ( TYPICAL
UNIT PRICE / ĐƠN GIÁ COST / CHI PHÍ
MATERIAL / VẬT LIỆU
VNĐ/m2 VNĐ/m2
1,800,000 486,000 CONCRETE / BÊ TÔNG
20,000 360,000 REINFORCEMENT / CỐT THÉP
250,000 300,000 COFFA / VÁN KHUÔN (ALU FORM)
55,000 253,000 TENDON / CÁP
1,399,000 SU

2) Block 3 - An Lac, Ho Chi Minh (2018)


THƯỜNG ( SÀN ĐIỂN HÌNH ) RC SLAB ( TYPICAL F
UNIT PRICE / ĐƠN GIÁ COST / CHI PHÍ
MATERIAL / VẬT LIỆU
VNĐ/m2 VNĐ/m2
1,800,000 450,000 CONCRETE / BÊ TÔNG
20,000 860,000 REINFORCEMENT / CỐT THÉP
250,000 325,000 COFFA / VÁN KHUÔN
55,000 0 TENDON / CÁP
1,635,000 SU

2) Block 1 Gempark, Hai Phong


RC SLAB ( TYPICAL F

MATERIAL / VẬT LIỆU

CONCRETE / BÊ TÔNG
REINFORCEMENT / CỐT THÉP
COFFA / VÁN KHUÔN (ALU FORM)
TENDON / CÁP
SU
CFA = 1567 m2 20 unit / floors EB unit price with-out indrect cost)
PT SLAB ( TYPICAL FLOOR ) / SÀN DỰ ỨNG LỰC ( SÀN ĐIỂN HÌNH )
QUANLITY / KHỐI UNIT PRICE / ĐƠN GIÁ
UNIT / ĐƠN VỊ
LƯỢNG
VNĐ/m2
m3/m2 0.22 1,314,300
kg/m2 21.75 20,999
m2/m2 1.15 163,300
kg/m2 1.85 53,000
SUM / TỔNG

CFA = 1602 m2 20 unit / floors


RC SLAB ( TYPICAL FLOOR ) / SÀN BTCT THƯỜNG ( SÀN ĐIỂN HÌNH )
QUANLITY / KHỐI UNIT PRICE / ĐƠN GIÁ
UNIT / ĐƠN VỊ
LƯỢNG
VNĐ/m2
m3/m2 0.17 1,445,183
kg/m2 24.80 16,136
m2/m2 1.31 150,270
kg/m2 - 0
SUM / TỔNG

CFA = 992 m2 12 units / floors


RC SLAB ( TYPICAL FLOOR ) / SÀN BTCT THƯỜNG ( SÀN ĐIỂN HÌNH )
QUANLITY / KHỐI UNIT PRICE / ĐƠN GIÁ
UNIT / ĐƠN VỊ
LƯỢNG
VNĐ/m2
m3/m2 0.19 1,475,300
kg/m2 25.94 18,200
m2/m2 1.19 225,000
kg/m2 - 0
SUM / TỔNG
-out indrect cost)
ÌNH )
COST / CHI PHÍ

VNĐ/m2
286,407 B30 / M400
456,833
188,059
97,960
1,029,260 1,216,911

HÌNH )
COST / CHI PHÍ

VNĐ/m2
241,055 M350
400,154
196,369
0
837,578 1,122,895

HÌNH )
COST / CHI PHÍ

VNĐ/m2
281,032 B30 / M400
472,144
267,935
-
1,021,111
Typical Floor of
Tower 1 - Dragon Castle

20 units /
floor

Using - Factor (0/1) Item DESCRIPTION Unit Qty Remark

1.00 Slab m3 305


1.00 Beam m3 37
- Wall / Column m3 160
Concrete
- Corewall m3 53
- Stair m3 5
Total m3 342

1.00 Slab m2 1,562


1.00 Beam m2 243
- Wall / Column m2 1,233
Formwork
- Core wall m2 368
- Stair m2 51
Total m2 1,806

1.00 Slab kg 25,192


1.00 Beam kg 8,918
- Wall / Column kg 32,682
Rebar
- Core wall kg 12,806
- Stair kg 944
Total kg 34,110 99.83

Slab kg 2,898
Rebar
Total kg 2,898

CFA m2 1,567.90
Concrete / CFA m3/m2 0.22
Summary Rebar / CFA kg/m2 21.75
Formwork / CFA m2/m2 1.15
Post-Tension/CFA kg/m2 1.85
Typical Floor of Typical Floor of
Tower 3 - Imperial Place Tower 1 - Gempark

21 units / 12 units /
floor floor

Qty Remark Qty Remark

171 H=130mm 153 H=160-350


96 36
130 75
33 41
4 6
267 189

1,393 922
701 260
766 471
195 270
37 51
2,093 1,182

19,092 18,641
20,635 7,104
21,310 13,453
4,719 10,844
420 918
39,727 148.67 25,745 136.18

- -
- -

1,602.01 992.42
0.17 0.19
24.80 25.94
1.31 1.19
- -