i.Dimesion
H(m)
6
ii.Masonry Qty
Cpt.
W1
W2
W3
iii.Concrete qty
W4
iv.Rebar Quantity
Desig.
Summary qty Unit F1(Main)
ii.Masonry Qty 12524.4 m3 F2(Dist.)
iii.Concrete qty 1252.44 m3 F3(Temp.)
iv.Rebar Quantity 65673.94 kg
V.Excavation 22862 m3 V.Excavation
VI.Backfill
1. Using Excavated Matrial 4137.525 m3 1st Station
2.Granular material 8946 m3 2nd Station
vii.Sheating Waterial 1927.03 m3
ix..Weaphole 500 no. VI.Backfill
Lean concrete(Class-C) 4174.8 m2 1. Using Excavated Matrial
Work.spac.
Fore slope
2.Granular material
vii.Sheating Waterial
ix..Weaphole
Spacingv(m)
3
x .Lean Concrete
Masonry Retaining Wall Quantity
S1 S2 B2(m) B1(m) T(m) a(m) b(m) B(m) D(m)
2.5 10 0.6 2.4 0.6 0.3 0.3 4.2 0.3
bar Quantity
Dia(mm) S(mm) Wt(kg/m) L(m) B(m) n Lt(m) Bt (m) Wt(kg)
14 200 1.209877 994 4.2 4971 994.4 4.6 27665.76
12 200 0.888889 994 4.2 43 994.4 4.6 38008.18
0 200 0 994 4.2 4971 994.4 4.6 0
Total= 65673.94
ng Excavated Matrial
W(m) L(m) a(m2) D(m) V(m3)
2 994 3.6 1.8 3578.4
- 994 0.5625 559.125
Total 4137.525 m3
nular material
w(m) H(m) a(m2) L(m) V(m3)
2.4 6 9 994.00 8946
eating Waterial
t(m) Linc(m) L(m) V(m3)
0.3 6.46 994.00 1927.03
(Dia=110mm)
Spacing H(m) H(m) L(m) Nv nh Total
2 6 994.00 3 497 500
W(m) l(m) a(m2)
4.2 994.00 4174.8
m3
Retaining Wall Sche
Station Location Haverage(m) S1 S2 L(m)
University)
Concrete Reinforcement bar Weep hole
Lean concrete (m2) C-30(m3) (Kg) (No.)
1428.2 235 22973.9135802469 196
4174.8 1252.44 65673.9407407407 500
0 0 0 0