You are on page 1of 10

g One GE India Facility Quality Management System

PWI04 Packaging Work Instruction for Master Rod

PWI04 Master Rod

Arranging base pallet for packaging of Master Rod &


Put Foam sheet on it

Place the VCI Bubble Sheet over the Foam sheet.

1
th
Rev01 Date of revision 09 March 2015
g One GE India Facility Quality Management System
PWI04 Packaging Work Instruction for Master Rod

PWI04 Master Rod

Rest the Master Rod on Bubble bag.

Put the PP Spacer In between Joint of Master Rod

2
th
Rev01 Date of revision 09 March 2015
g One GE India Facility Quality Management System
PWI04 Packaging Work Instruction for Master Rod

PWI04 Master Rod

Rest the 4 Master Rods on Base Pallet.

Wrap the Master Rods with Bubble Bag and put


Separator in between both. Put the Additional Foam
sheets in between Separator & master rod.

3
th
Rev01 Date of revision 09 March 2015
g One GE India Facility Quality Management System
PWI04 Packaging Work Instruction for Master Rod

PWI04 Master Rod

Put a Foam Sheet on the parts

Put a corrugator sheet on the foam sheet


4
th
Rev01 Date of revision 09 March 2015
g One GE India Facility Quality Management System
PWI04 Packaging Work Instruction for Master Rod

PWI04 Master Rod

Put Foam Sheet on the corrugator sheet

Arrange 4 more parts onto the separator

5
th
Rev01 Date of revision 09 March 2015
g One GE India Facility Quality Management System
PWI04 Packaging Work Instruction for Master Rod

PWI04 Master Rod

Repeat steps to ensure parts are properly wrapped into


bubble sheets

1+1 layers

6
th
Rev01 Date of revision 09 March 2015
g One GE India Facility Quality Management System
PWI04 Packaging Work Instruction for Master Rod

PWI04 Master Rod

Put The Aluminum Bag over the master rod.

Seal the Aluminum Bag of Master rod.

7
th
Rev01 Date of revision 09 March 2015
g One GE India Facility Quality Management System
PWI04 Packaging Work Instruction for Master Rod

PWI04 Master Rod

Vacuum the Bag of Master Rod

Put the lashing belt over the master rods

8
th
Rev01 Date of revision 09 March 2015
g One GE India Facility Quality Management System
PWI04 Packaging Work Instruction for Master Rod

PWI04 Master Rod

Put the side wall of Box.

Put the Top of Box.


9
th
Rev01 Date of revision 09 March 2015
g One GE India Facility Quality Management System
PWI04 Packaging Work Instruction for Master Rod

PWI04 Master Rod

Complete the Lashing of Box with lashing Belt same is


wrap with stretch film.

10
th
Rev01 Date of revision 09 March 2015